Loading...
HomeMy WebLinkAboutLA198718 - 19808 Henning Ave Permit PackRESIDENTIAL BUILDING PERMIT APPLICATION CITY OF LAKEVILLE BUILDING INSPECTIONS DEPARTMENT 20195 HOLYOKE AVENUE LAKEVILLE, MN 55044 952-985-4440 Office Use Only __________________ Permit Number ___________________ Received By ___________________ Date Received ___________________ Fee Total SITE ADDRESS: MAILING ADDRESS: CITY: STATE: ZIP: JOB DESCRIPTION:__________________________________ MASTER PLAN: (Number or Address)____________________ LIST OTHER STRUCTURES ON PROPERTY:_______________________________________________________________ ESTIMATED VALUATION: PROPOSED START DATE: END DATE: (New Residential Only): LEGAL DESCRIPTION: LOT: _____ BLOCK: _____ SUBDIVISION: APPLICANT IS: RESIDENT OWNER CONTRACTOR EMAIL NEW MODEL HOME: YES NO (IF YES – ADMINISTRATIVE PERMIT REQUIRED) PLEASE FILL OUT THE FOLLOWING COMPLETELY (All Contractor information must be as listed on State License) RESIDENT OWNER NAME:_______________________________________________________________________________ HOME PHONE #:_____________________________ CELL PHONE:___________________________ GENERAL CONTRACTOR Homeowner Contractor CONTRACTOR:_______________________________________________________________________ LICENSE #:BC______________ LEAD CERTIFICATE#_______________ (PRE 1978 STRUCTURE) OFFICE PHONE #:_____________________________ CELL PHONE:___________________________ ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________ PLUMBING WORK Homeowner Contractor CONTRACTOR:__________________________________________LICENSE #: PM______________ OFFICE PHONE #:_____________________________ CELL PHONE:___________________________ ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________ MECHANICAL WORK Homeowner Contractor CONTRACTOR:________________________________________ _______________________________ OFFICE PHONE #:_____________________________ CELL PHONE:___________________________ ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________ BOND #:_______________________________________ EXPIRATION DATE____________________ SEWER/WATER CONTRACTOR New Construction Only NAME:________________________________________________ ______________________________ HOME PHONE _____________________________ CELL PHONE:______________________________ BOND #:_______________________________________ EXPIRATION DATE____________________ INTEREST EARNINGS ON THE ESCROW ACCOUNTS, IF ANY, ARE RETAINED BY THE CITY TO OFFSET THE ADMINISTRATIVE COSTS ASSOCIATED WITH PROCESSING THE ESCROW APPLICATION AND REFUND. I HEREBY APPLY FOR A BUILDING PERMIT AND I ACKNOWLEDGE THAT THE INFORMATION ABOVE IS COMPLETE AND ACCURATE; THAT THE WORK WILL BE IN CONFORMANCE WITH THE ORDINANCES AND CODES OF THE CITY AND WITH THE STATE BUILDING CODE, THAT I UNDERSTAND THIS IS NOT A PERMIT AND WORK IS NOT TO START WITHOUT A PERMIT AND THAT THE WORK WILL BE IN ACCORDANCE WITH THE APPROVED PLAN. NAME OF APPLICANT (Please Print)DATE APPLICANT’S SIGNATURE: www.lakevillemn.gov RESIDENTIAL BUILDING PERMIT APPLICATION PAGE 2 OFFICE USE ONLY BUILDING PERMIT TYPE REQUIRED INSPECTIONS SINGLE FAMILY DWELLING BUILDING DUPLEX AS BUILT TOWNHOUSE UNITS BUILDING FINAL DETACHED TOWN HOUSE UNIT DECK FOOTING CONDO FIREPLACE ACESSORY BUILDING FOOTING REROOF FOUNDATION RESIDE FRAMING PORCH FRAMING GARAGES INSULATION RES ADDN/REPAIR/RMDL DECK PORCH GARAGES LATH LOWER LEVEL FINISH LOWER LEVEL FINAL ADDITION OTHER FOUNDATION ONLY PORCH FOOTING MISCELLANEOUS POURED WALL DEMO SEPTIC TANK REMOVAL MOVED SITE MECHANICAL CITY BUILDING VALUATION: $AIR TEST FINAL BUILDING PERMIT FEES ROUGH-IN $PERMIT FEE PLUMBING $PLAN CHECK FINAL $SURCHARGE ROUGH-IN $METRO SAC METER SIZE $CITY WATER HOOKUP UNIT PRESSURE REDUCING VALVE $CITY SEWER HOOKUP UNIT SEWER/WATER $LANDSCAPE ESCROW SEWER/WATER $TREE ESCROW FINAL $MISC ESCROW STREET DRAINTILE $PLUMBING BUILDING INFORMATION $MECHANICAL TYPE OF CONSTRUCTION $SEWER WATER ZONING $OTHER CODE EDITION $TOTAL FIRE SUPPRESSION SYSTEM OCCUPANCY GROUP APPROVED BY: BUILDING INSPECTOR: Date: PLUMBING/MECHANICAL INSPECTOR: Date: COMMENTS: 20195 Holyoke Avenue, Lakeville, MN 55044 952-985-4400  952-985-4499 fax www.lakevillemn.gov Sewer & Water Tie Card Address:________________________________________ Contractor:______________________________________ Permit Number:__________________________________ Final Date:________________ Street Drain-Tile:______ Size of Water Service: 1” Comments: AIRTEST SANITARY OVER 20’/2 FITTINGS THIS CARD MUST BE COMPLETED AND ON-SITE AT TIME OF SEWER & WATER INSPECTION GRADE LINESVERIFY ALLTO BE S.P.F. #2 OR BETTER*ALL DOOR & WINDOW HEADERSRESIDENCE FOR:cPlanco MN, Inc.modified or used in any redesign without the priormay not be assigned or copied, and may not bemay not be re-used for any additional structures,structure. Planco MN reserves all rights. These planslicense is granted to use these plans to build oneCopyright for these drawings is owned by Planco MN,written consent of Planco MN, Inc. VLADIMIR & NICOLE ILIC STONE COTTAGE CONSTRUCTION, INC.#21-075SMA152021 FRONT ELEVATION 1/4" = 1'-0" (2) CEDAR BRACKETS12/126" CEDAR BOXED BM.6x6 CEDAR812121212125122'-0"1'-6"VINYLB & BVINYLB & BVINYLB & BVINYLB & BVINYLB & B18x8 OVH. DR.9x8 OVH. DR.4" TRIM4" TRIMTOTAL2nd FLR.1st FLR.1,811 SQ. FT.1,175 SQ. FT.2,986 SQ. FT.9' POURED FOUNDATION10' CEILING @ FIRST FLOORWOOD PORCH12x12 CEDARCOLUMNVINYL B & BFRONT ONLYVINYL SIDINGSIDES & REARMARVIN ESSENTIALWINDOWSWDW. GRIDS AS SHOWNFRONT ONLYALUM SOFFIT & FASCIAALL SIDES2/6x4/0 FXBLACKED OUT RIGHT ELEVATION 1/8" = 1'-0" 12581212/121'-6"VINYLCORNERSSIDINGVINYL SIDINGVINYL WDW. WELLEGRESS REAR ELEVATION 1/8" = 1'-0" 812812125SIDINGVINYL SIDINGVINYL VINYLCORNERS8x7 OVH. DR. LEFT ELEVATION 1/8" = 1'-0" VINYLB & B8128121212SIDINGVINYL VINYLCORNERSConcept Approval ONLYSubject to Field InspectionInspectorDate2020MN BldgCode01/07/2022dmathews cPlanco MN, Inc.#21-07525SMA2021 BASEMENT PLAN 1/4" = 1'-0" ”),1,6+('64)7 (;&/8'(667$,56 UNEXCAVATED UP17 R603424682468266826685/0x4/0 SL 2-2x10 5/0x4/0 SL 2-2x10 LIN.4068 C.O. 48"*L.V.T.1 PIECE FIB.3068 FAMILY/REC ROOM *CARPET BEDROOM #3 BEDROOM #4 *CARPET*CARPETSD/COSDSD W.I.C. *CARPET MECH/STORAGE *UNFINISHEDWHFURNF.D.92%2- 2 x 1 0 49'-0"15'-0"14'-0"20'-0"49'-0"45'-0"4'-0"19'-6"7'-6"18'-0"WALLEDGEWALLEDGE68'-0"9'-0"35'-6"32'-6"12'-0"20'-6"23'-6"12'-0"9'-0" 52'-0" 25'-6"26'-6" 2'-0"23'-6" 16'-0" 12'-6"2'-6"12'-0"F2x613'-0"19'-0"2" LEDGE6'-8"14'-0"5'-10" 3'-9"3'-9"4'-0"3'-9"3'-9"4'-0"TREATED 4x4 CURB2x4 - 16" O.C.FTG. SIZE BY OTHERSTREATED 4x4 CURB2x4 - 16" O.C.FTG. SIZE BY OTHERS6'-2"5'-0"6'-8"3'-9"3'-9"10"11'-4"6'-4"14'-6"1'-9"10'-4"24'-0" 8'-10"11'-2"6'-3"14'-7"9'-2"6'-0" 2'-6"TREATED 4x4 CURB2x4 - 16" O.C.FTG. SIZE BY OTHERSSUMP9' POURED FOUNDATIONTRT. 2-2x10 FLUSHTRT. 3-2x10 FLUSHTREATED 2x10 16" O.C.6"6'-6"7'-0"TRT. 6x6 POSTON 24"x42" CONC.TUBE FTG.14'-0"TRENCH DRAIN11 7/8" I JOIST16" O.C. 11 7/8" I JOIST 16" O.C. 11 7/8" I JOIST 16" O.C. 11 7/8" I JOIST 19.2" O.C. 11 7/8" LSL16" O.C. 11 7/8" LSL 16" O.C.BM. PKT.SERIES 560 26682-2x122-11 7/8" LVL DROPPEDSOFFIT FUT. WET BAR *R.I. SINK1'-8"6'-2"6'-4" 12'-6" TREATED 2x10 16" O.C.TRT. 3-2x10 FLUSH1'-6"9'-0"1'-0"8'-6"6"6"2-11 7/8" LVL DROPPEDRAILRADONVENTFUT. GAS F.P.R.I. GAS 2668266826683 1/2"x5 1/4"PSL COL.30"x30"x12"CONC. PAD FTG.30"x30"x12"CONC. PAD FTG.TREATED2x816" O.C.TREATED 2x8 16" O.C. TREATED 2x8 16" O.C.TRT. 2-2x8 FLUSHTRT. 2-2x8 FLUSHTRT. 3-2x10 FLUSH 1'-6"3'-0"TRT. 5 1/4"x9 5/8" GLULAM DROPPED SIMPSON TITEN 2 CONC SCREWS1/4"x1 3/4" (TTNS-25134H) FORCONNECTION TO CONC.SIMPSON SDS STRUC. WOOD SCREWS(SUPPLIED W/ HANGER) FORCONNECTION TO WOODBWPsAboveUFER Ground-Provide 20' Rebar in footing and stubup near electrical service panel. cPlanco MN, Inc.#21-07535SMA2021TRUSSES 24" O.C. FIRST FLOOR PLAN 1/4" = 1'-0" 18x8 OVH. DR.9x8 OVH. DR.BUILT-INS GASF.P.BUILT-INS5'-0" TUB& SHOWER1 PIECE FIB.246824682868266818x24 LIN.48"724849'-0"30802468 C.O.2468PKT.1668LIN.2468PKT.246884"8x7 OVH. DR.3068FULLVIEW2868PKT.5068 BI-PASSSH'S2880 C.O.LTSTACKW & D66" BENCH45" CUBBIES45" CUBBIES3068FIREDOOR28682480PKT.MICROOVEN/REF'G12" CAB. 92"x48" C. TOP 30" RANGE W/ HOODVENT RAIL 15'-0"14'-0"20'-0"6"13'-6"14'-0"3'-0"7'-0"7'-0"6'-3"8'-9"3"3"2-2x102-2x104/0x5/6 SHTOP @ 7'-6"49'-0"45'-0"4'-0"11'-4"2'-6"5'-8"7'-6"18'-0"5'-11"6'-4"5'-9"3'-9"3'-9"WALLEDGEWALLEDGE1'-8"1'-10"DN17 R2-2x105/0x6/0 FX TEMPSET 3" OFF FDN.3'-9"3'-9"4'-6"5'-10"10"2'-0"7'-8"1'-8"2-2x102/0x2/0 FX 2-2x102/0x2/0 FX3/0x5/0-2 SH2-2x1068'-0"2/6x4/6-2 SH2-2x109'-0"35'-6"32'-6"12'-0"20'-6"23'-6"12'-0"6'-0"6'-0"6'-6"2-2x1013'-3"13'-8"2'-6"7'-10"6'-9"7'-9"11'-10"5'-4"4'-4" FOYER *WOOD*WOOD DINING KITCHEN *WOOD*WOOD GREAT ROOM *CARPET W.I.C. PANTRY*WOOD MASTER BEDROOM *CARPET OFFICE/BEDROOM #2 *CARPETFFF4'-8"9'-0"6'-2"*C.T.*C.T.FIB. BASEC.T. WALLSNICHE4'-0"7'-6" 15'-6"11'-0" 2'-8"10'-6"2'-4"4'-0"7'-0" 3/0x5/6 SH TOP @ 7'-6" 2-2x0 3/0x5/6 SH TOP @ 7'-6" 2-2x0 2/6x4/0 SH 2-2x0 2'-6"2'-6"2x62x62-2x10 9'-0"16'-0"10'-3"10'-3"5'-8"6'-4"52'-0" 25'-6"26'-6" 2'-0"23'-6"5'-10" WOOD PORCH 1'-0"8'-6"12'-0"5'-6"2'-6"4'-0"10'-4"3'-6"2x6 MUD RM *VINYL*VINYL*VINYL6"F.P.GAS1'-6"5'-9" (FRAMING) 5'-10" (FINISHED)3068SCREENDOOR SCREEN PORCH *4x4 POSTSTRUSSES24" O.C.TRUSSES24" O.C.TRUSSES24" O.C.4'-0"8'-8"1'-4"1,811 SQ. FT.10' CEILING @ FIRST FLOOR7'-0"13'-4"TRUSSES24" O.C.GIRDERTRUSSES24" O.C.ACCESS ATTIC 12'-8"14'-8" 8'-6" CAB.SDSDSDSD/CO13'-0"19'-0"6" BOXED BM.3"3"1/6x5/0 FX1/6x5/0 FXTOP @ 8'TOP @ 8'TRENCH DRAIN GARAGE *4" CONC. FLOOR*2x6 WALLS*INSUL. WALLS & CLG.SOFFIT @ 9'*BOX VAULT1'-6"8'-0"4'-10"3'-6"4'-0"GIRDERRADONVENT3/0x5/6 SH 3" SPACE 2'-3" TOP @ 9'3"3"3/0x1/6-3 FX3/0x5/6-3 SHTOP @ 9'2x62x2REF'GRECESS2880 C.O.8'x4' CONC. APRON3-11 7/8" LVL*VAULTRIDGE OFVAULT3-2x103" SPACE3/0x1/6 FX 2-2x10 3/0x5/6 SH 3" SPACE 3/0x1/6 FX 2-2x10 2'-3"3/0x1/6-3 FX3/0x5/6-3 SHTOP @ 9'2-2x103" SPACE3080 C.O.3-2x63-2x62-2x10 2-9 1/2" LSL 2-2x122-2x122-11 7/8" LVL 2-11 7/8" LSL 2-11 7/8" LSLTemperTemper333333366PFHPFHCS-PF33StrapStrapStrapCO-Min. 15" clearance to anyobstruction from center ofW.C., 24" in front(typ). cPlanco MN, Inc.#21-07545SMA2021 CROSS SECTION 3/8" = 1'-0" 1-2x6 TREATED3 1/2" CONC. FLOOR9'-0" POURED “WALL W/ REBARPER CODESILL PLATEWATER PROOFINGGRADESHEATHINGSIDINGR-21 INSUL.10'-11 8"R-20 SPRAY FOAM1/2" GYP. BD.VB11 7/8" I JTS. @ 16" O.C.3/4" T & G FLOOR2x6- 16" O.C.36'-0"5/8" GYP. BD.W/ V.B.2x6- 16" O.C.VB1/2" GYP. BD.R-21 INSUL.SIDINGSHEATHING5/8" GYP. BD.(DESIGNED BY MFR)TRUSSES @ 24" O.C.R-49 INSUL.5/4 DECKINGTRT. 2x10 JTS. @ 16" O.C.TRT. 3-2x1012'-0"12'-6"TRT. 6x6 POST GREAT ROOM FAMILY ROOM 8'-0"1'-0"R-10 W/ <2.6 ACHINSUL.DRAIN TILE 9'-0" POUREDWALL W/ REBARPER CODEWATER PROOFINGR-10 W/ <2.6 ACHINSUL.DRAIN TILE GRADE1-2x6 TREATEDSILL PLATEFOUNDATION & FTG.SIZES & DETAILSPER ENGINEER SPECSFOUNDATION & FTG.SIZES & DETAILSPER ENGINEER SPECS9 1/2" I JTS. @ 16" O.C.5/8" GYP. BD.17 RISERS CROSS SECTION 3/8" = 1'-0" 9'-0" POUREDWALL W/ REBARPER CODEWATER PROOFINGR-10 W/ <2.6 ACHINSUL.GRADE1-2x6 TREATEDSILL PLATEFOUNDATION & FTG.SIZES & DETAILSPER ENGINEER SPECS6'-8" MIN. HDRM1x8 RISERS5/4x11 TREADS3- 2x12 STRINGERSTAIR NOTES:10" ROUGH CUT TREADS10"7 7 16"FASCIAALUM. SOFFITVENTEDALUM.1/2" SHTG.15# FELTSHINGLES1'-6"812ROOF VENTS @ 1/300 ATTIC50% ROOF 50% SOFFITENERGY HEEL1'-6" FOYER 24x24 PADFOOTING12x16 PIERFOOTING11 7/8" LSL JTS. @ 16" O.C. MECH/STORAGE R-20 SPRAY FOAM2-9 1/2" LSL6" CEDAR BOXED BM.TRT. 6x6 POST12x12 BOXEDCEDAR COL.71116"2-11 7/8" LVL ROOF PLAN 1/8" = 1'-0" 81281281281212121212125121281212/121'-6"1'-6"2'-0"1'-0"1'-6"1'-0"1'-0"1'-0" cPlanco MN, Inc.#21-07555SMA2021 CROSS SECTION 3/8" = 1'-0" BEDROOM #3 3 1/2" CONC. FLOOR “SHEATHINGSIDINGR-20 SPRAY FOAMR-21 INSUL.10'-118"R-20 SPRAY FOAM1/2" GYP. BD.VB3/4" T & G FLOOR2x6- 16" O.C.25'-0"5/8" GYP. BD.W/ V.B.2x6- 16" O.C.VB1/2" GYP. BD.R-21 INSUL.5/8" GYP. BD.1-2x6 TREATED9'-0" POUREDWALL W/ REBARSILL PLATEPER CODEWATER PROOFING4" CONC. FLOOR GARAGE GRADEPOURED WALLSLOPE TO DOORSFASCIAALUM. ALUM.SOFFITVENTED1'-6"ENERGY HEEL(DESIGNED BY MFR)TRUSSES @ 24" O.C.R-49 INSUL.22'-0" MASTER BEDROOM R-10 W/ <2.6 ACHINSUL.DRAIN TILE 1/2" GYP. BD.1/2" SHTG.15# FELTSHINGLES812ROOF VENTS @ 1/300 ATTIC50% ROOF 50% SOFFIT71116"9'-0" POUREDWALL W/ REBARPER CODEWATER PROOFINGR-10 W/ <2.6 ACHINSUL.DRAIN TILE GRADE1-2x6 TREATEDSILL PLATEFOUNDATION & FTG.SIZES & DETAILSPER ENGINEER SPECSFOUNDATION & FTG.SIZES & DETAILSPER ENGINEER SPECSFOUNDATION & FTG.SIZES & DETAILSPER ENGINEER SPECS11'-31 4"11 7/8" I JTS. @ 16" O.C. BEDROOM #4 FLOOR SYSTEMROOFTRUSSPVC T-FITTINGTO SUPPORTVENT PIPEMIN. 4" OF GASPERMEABLE MATERIAL3 1/2" CONC. SLAB4" PVC VENT PIPESUPPORTSTRAPPINGFLASHINGEXHAUST 10' FROM OPNGS.INTO CONDITIONED SPACESOF BUILDING12" MIN. ABOVE ROOFSEAL6 MIL POLYUNDER SLAB10' OF DRAIN TILEEACH WAY FROMT-FITTING(ROCK) RADON GAS VENT SYSTEM 3/8" = 1'-0" 36" MIN. HT. CLEAR SPACE24" DIA. AROUND VENTPROVIDE ELECTRICALBOX POWER SOURCER-4 MIN. INSUL. VENT PIPE@ UNCONDITIONED SPACE4" MIN. CLEARANCEFOR FUT. FANSIDINGSHEATHINGR-49 INSUL.2x6- 16" O.C.VBR-21 INSUL. TRUSSES 24" O.C. FIRST FLOOR PLAN 1/4" = 1'-0" 18x8 OVH. DR.9x8 OVH. DR.BUILT-INS GASF.P.BUILT-INS5'-0" TUB& SHOWER1 PIECE FIB.246824682868266818x24LIN.48"724849'-0"30802468 C.O.2468PKT.1668LIN.2468PKT.246884"8x7 OVH. DR.3068FULLVIEW2868PKT.5068 BI-PASSSH'S2880 C.O.LTSTACKW & D66" BENCH45" CUBBIES45" CUBBIES3068FIREDOOR28682480PKT.MICROOVEN/REF'G12" CAB. 92"x48" C. TOP 30" RANGE W/ HOODVENT RAIL 15'-0"14'-0"20'-0"6"13'-6"14'-0"3'-0"7'-0"7'-0"6'-3"8'-9"3"3"2-2x102-2x104/0x5/6 SHTOP @ 7'-6"49'-0"45'-0"4'-0"11'-4"2'-6"5'-8"7'-6"18'-0"5'-11"6'-4"5'-9"3'-9"3'-9"WALLEDGEWALLEDGE1'-8"1'-10"DN17 R2-2x105/0x6/0 FX TEMPSET 3" OFF FDN.3'-9"3'-9"4'-6"5'-10"10"2'-0"7'-8"1'-8"2-2x102/0x2/0 FX 2-2x102/0x2/0 FX3/0x5/0-2 SH2-2x1068'-0"2/6x4/6-2 SH2-2x109'-0"35'-6"32'-6"12'-0"20'-6"23'-6"12'-0"6'-0"6'-0"6'-6"2-2x1013'-3"13'-8"2'-6"7'-10"6'-9"7'-9"11'-10"5'-4"4'-4" FOYER *WOOD*WOOD DINING KITCHEN *WOOD*WOOD GREAT ROOM *CARPET W.I.C. PANTRY*WOOD MASTER BEDROOM *CARPET OFFICE/BEDROOM #2 *CARPETFFF4'-8"9'-0"6'-2"*C.T.*C.T.FIB. BASEC.T. WALLSNICHE4'-0"7'-6" 15'-6"11'-0" 2'-8"10'-6"2'-4"4'-0"7'-0" 3/0x5/6 SH TOP @ 7'-6" 2-2x0 3/0x5/6 SH TOP @ 7'-6" 2-2x0 2/6x4/0 SH 2-2x0 2'-6"2'-6"2x62x62-2x10 9'-0"16'-0"10'-3"10'-3"5'-8"6'-4"52'-0" 25'-6"26'-6" 2'-0"23'-6"5'-10" WOOD PORCH 1'-0"8'-6"12'-0"5'-6"2'-6"4'-0"10'-4"3'-6"2x6 MUD RM *VINYL*VINYL*VINYL6"F.P.GAS1'-6"5'-9" (FRAMING) 5'-10" (FINISHED)3068SCREENDOOR SCREEN PORCH *4x4 POSTSTRUSSES24" O.C.TRUSSES24" O.C.TRUSSES24" O.C.4'-0"8'-8"1'-4"1,811 SQ. FT.10' CEILING @ FIRST FLOOR7'-0"13'-4"TRUSSES24" O.C.GIRDERTRUSSES24" O.C.ACCESS ATTIC 12'-8"14'-8" 8'-6" CAB.SDSDSDSD/CO13'-0"19'-0"6" BOXED BM.3"3"1/6x5/0 FX1/6x5/0 FXTOP @ 8'TOP @ 8'TRENCH DRAIN GARAGE *4" CONC. FLOOR*2x6 WALLS*INSUL. WALLS & CLG.SOFFIT @ 9'*BOX VAULT1'-6"8'-0"4'-10"3'-6"4'-0"GIRDERRADONVENT3/0x5/6 SH 3" SPACE 2'-3" TOP @ 9'3"3"3/0x1/6-3 FX3/0x5/6-3 SHTOP @ 9'2x62x2REF'GRECESS2880 C.O.8'x4' CONC. APRON2-11 7/8" LSL*VAULTRIDGE OFVAULT2-2x103" SPACE3/0x1/6 FX 2-2x10 3/0x5/6 SH 3" SPACE 3/0x1/6 FX 2-2x10 2'-3"3/0x1/6-3 FX3/0x5/6-3 SHTOP @ 9'2-2x103" SPACE3080 C.O.25'25'34'34'BWL 1BWL 2BWL 3BWL 4BWL 5BWL 63'3'3'4'4'4'4'3'3'SEE DETAIL 1/PF-1SEE DETAIL 2/PF-14'4'4'3'3'3'3'4'4'6'6' Voigt & Associates, Inc.C-1Structural Engineering Services 4635 Nicols Road, Suite 204Eagan, MN 55122MethodCS-WSPWind speed 115Exposure CGB GB BWL 1 2 3 4 5 6Spacing - ft 25 25 25 34 34 34Level 1 1 1 1 1 1Length req'd- ft 4 8 4 5.1 10.7 5.1per Table R602.10.3(1)Adjustments:Exposure 1.2 1.2 1.2 1.2 1.2 1.2Eave to ridge Height 1.18 1.18 1.18 1.18 1.18 1.18Wall Height 1 1 1 1 1 1# of BWL 1.3 1.3 1.3 1.3 1.3 1.34" Gyp WB w.block joints1 1 1 1 1 1Adjusted Length 7.4 14.7 7.4 9.4 19.7 9.4Vladimir & Nicole Ilic Residence19808 Henning Ave, Lakeville, MN Sheet Stone Cottage HVAC Load Calculations for Ilic 19808 Henning Ave Lakeville,mn Prepared By: Randy Andrews Lofgren Heating 5708 Upper 147th Street West Apple Vallley, MN 55124 Monday, November 22, 2021 Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 2 Project Report General Project Information Project Title:Stone Cottage Project Date:Monday, November 22, 2021 Client Name:Ilic Client Address:19808 Henning Ave Client City:Lakeville,mn Company Name:Lofgren Heating Company Representative:Randy Andrews Company Address:5708 Upper 147th Street West Company City:Apple Vallley, MN 55124 Company E-Mail Address:rrandrews@lofgrenheating-ac.com Design Data Reference City:Minneapolis, Minnesota Building Orientation:Front door faces West Daily Temperature Range:Medium Latitude:44 Degrees Elevation:834 ft. Altitude Factor:0.970 Elevation Sensible Adj. Factor:1.000 Elevation Total Adj. Factor:1.000 Elevation Heating Adj. Factor:1.000 Elevation Heating Adj. Factor:1.000 Outdoor Outdoor Outdoor Indoor Indoor Grains Dry Bulb Wet Bulb Rel.Hum Rel.Hum Dry Bulb Difference Winter:-15 -15.33 80%n/a 72 n/a Summer:88 72 47%50%75 29 Check Figures Total Building Supply CFM:1,005 CFM Per Square ft.:0.277 Square ft. of Room Area:3,622 Square ft. Per Ton:1,615 Volume (ft³) of Cond. Space:32,598 Building Loads Total Heating Required Including Ventilation Air:46,913 Btuh 46.913 MBH Total Sensible Gain:21,986 Btuh 82 % Total Latent Gain:4,934 Btuh 18 % Total Cooling Required Including Ventilation Air:26,920 Btuh 2.24 Tons (Based On Sensible + Latent) Notes Calculations are based on 8th edition of ACCA Manual J. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads. C:\ ...\19808 HENNING LAKEVILLE 11222021.rhv Monday, November 22, 2021, 9:38 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 3 Miscellaneous Report System 1 Whole House Input Data Outdoor Dry Bulb Outdoor Wet Bulb Outdoor Rel.Hum Indoor Rel.Hum Indoor Dry Bulb Grains Difference Winter:-15 -15.33 80%n/a 72 n/a Summer:88 72 47%50%75 29.27 Duct Sizing Inputs Main Trunk Runouts Calculate:Yes Yes Use Schedule:No No Roughness Factor:0.00300 0.01000 Pressure Drop:0.1000 in.wg./100 ft.0.1000 in.wg./100 ft. Minimum Velocity:650 ft./min 450 ft./min Maximum Velocity:900 ft./min 750 ft./min Minimum Height:8 in.6 in. Maximum Height:10 in.6 in. Outside Air Data Winter Summer Infiltration Specified:0.250 AC/hr 0.130 AC/hr 68 CFM 35 CFM Infiltration Actual:0.250 AC/hr 0.130 AC/hr Above Grade Volume:Cu.ft.Cu.ft.X 16,299 X 16,299 4,075 Cu.ft./hr 2,119 Cu.ft./hr X 0.0167 X 0.0167 Total Building Infiltration:68 CFM 35 CFM Total Building Ventilation:140 CFM 70 CFM ---System 1--- Infiltration & Ventilation Sensible Gain Multiplier: 13.87 = (1.10 X 0.970 X 13.00 Summer Temp. Difference) Infiltration & Ventilation Latent Gain Multiplier: 19.31 = (0.68 X 0.970 X 29.27 Grains Difference) Infiltration & Ventilation Sensible Loss Multiplier: 92.85 = (1.10 X 0.970 X 87.00 Winter Temp. Difference) Winter Infiltration Specified:0.250 AC/hr (68 CFM), Construction: Unknown Summer Infiltration Specified:0.130 AC/hr (35 CFM), Construction: Unknown C:\ ...\19808 HENNING LAKEVILLE 11222021.rhv Monday, November 22, 2021, 9:38 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 4 Load Preview Report Scope Has AED Net Ton ft.² /Ton Area Sen Gain Lat Gain Net Gain Sen Loss Sys Htg CFM Sys Clg CFM Sys Act CFM Duct Size Building 2.24 1,615 3,622 21,986 4,934 26,920 46,913 828 1,005 1,005 System 1 Yes 2.24 1,615 3,622 21,986 4,934 26,920 46,913 828 1,005 1,005 18x10 Ventilation 534 1,352 1,886 7,150 Zone 1 3,622 21,452 3,582 25,034 39,763 828 1,005 1,005 18x10 1-Upper Level 1,811 19,992 2,682 22,674 28,304 589 937 937 11--6 2-Lower Level 1,811 1,460 900 2,360 11,459 239 68 68 1--6 C:\ ...\19808 HENNING LAKEVILLE 11222021.rhv Monday, November 22, 2021, 9:38 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 5 Duct Size Preview Room or Duct Name Minimum Velocity Maximum Velocity Rough. Factor Design L/100 Actual L/100 SP Loss Duct Velocity Duct Length Htg Flow Clg Flow Act. Flow Duct Size System 1 Supply Runouts Zone 1 1-Upper Level 450 750 0 0.1 0.1 433.7 589 937 937 11--6 2-Lower Level 450 750 0 0.1 0.1 348.4 239 68 68 1--6 Other Ducts Supply Main Trunk 650 900 0 0.1 0.1 804 828 1,005 1,005 18x10 SummarySummarySummarySummarySummarySummarySummarySummary System 1 Heating Flow:828 Cooling Flow:1005 C:\ ...\19808 HENNING LAKEVILLE 11222021.rhv Monday, November 22, 2021, 9:38 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 6 System 1 - Whole House - Adequate Exposure Diversity Test Test For Adequate Exposure Diversity Average Glass Sensible Gain Over 12 Hours 1.3 x Average Glass Gain Hourly Glass Gain Hourly Total Net GainHeat Gain, Btuh15.9% Diff. from Avg. 0 5,000 10,000 15,000 20,000 25,000 30,000 8 am 9 am 10 am 11 am 12 pm 1 pm 2 pm 3 pm 4 pm 5 pm 6 pm 7 pm AED Calculation Summary --- SYSTEM HAS ADEQUATE EXPOSURE DIVERSITY. --- System is on N, E, S, W rosette. Peak load exceeds 12-hour average load by 15.9%. AED Excursion (amount by which peak exceeds 1.3 x average): 0 Btuh Definition: A system has adequate exposure diversity if the peak-hour glass load for the entire conditioned space does not exceed the average glass load for the entire conditioned space by more than 30 percent. C:\ ...\19808 HENNING LAKEVILLE 11222021.rhv Monday, November 22, 2021, 9:38 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 7 System 1 - Whole House - Psychrometric Chart ZC Zone (Room) Condition OC Outdoor Condition LC Leaving Coil Condition EC Entering Coil Condition SD Supply Duct Temperature Rise DTF Draw Through Fan Sensible Gain HRV Heat Recovery Ventilator C:\ ...\19808 HENNING LAKEVILLE 11222021.rhv Monday, November 22, 2021, 9:38 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 8 Total Building Summary Loads Component Description Area Quan Sen Loss Lat Gain Sen Gain Total Gain 4A-1a-o: Glazing-Double pane low-e (e = 0.20 or less), operable window, e=0.20 on surface 2, wood with metal clad frame, u-value 0.32, SHGC 0.33 353 9,827 0 10,078 10,078 11N: Door-Metal - Polystyrene Core 42 1,278 0 352 352 12F-0sw: Wall-Frame, R-21 insulation in 2 x 6 stud cavity, no board insulation, siding finish, wood studs 1369 7,742 0 1,183 1,183 15B0-10sf-10: Wall-Basement, , R-10 board insulation to floor, no interior finish, 10' floor depth 1764 7,520 0 0 0 16B-50: Roof/Ceiling-Under Attic with Insulation on Attic Floor (also use for Knee Walls and Partition Ceilings), Vented Attic, No Radiant Barrier, Dark Asphalt Shingles or Dark Metal, Tar and Gravel or Membrane, R-50 insulation 1811 3,151 0 1,739 1,739 21A-24-c: Floor-Basement, Concrete slab, any thickness, 2 or more feet below grade, no insulation below floor, carpet covering, shortest side of floor slab is 24' wide 1811 3,939 0 0 0 Subtotals for structure:33,457 0 13,352 13,352 People:7 1,400 1,610 3,010 Equipment:1,500 6,000 7,500 Lighting:0 0 0 Ductwork:0 0 0 0 Infiltration: Winter CFM: 68, Summer CFM: 35 6,306 682 490 1,172 Ventilation: Winter CFM: 140, Summer CFM: 70 7,150 1,352 534 1,886 Total Building Load Totals:46,913 4,934 21,986 26,920 Check Figures Total Building Supply CFM:1,005 CFM Per Square ft.:0.277 Square ft. of Room Area:3,622 Square ft. Per Ton:1,615 Volume (ft³) of Cond. Space:32,598 Building Loads Total Heating Required Including Ventilation Air:46,913 Btuh 46.913 MBH Total Sensible Gain:21,986 Btuh 82 % Total Latent Gain:4,934 Btuh 18 % Total Cooling Required Including Ventilation Air:26,920 Btuh 2.24 Tons (Based On Sensible + Latent) Notes Calculations are based on 8th edition of ACCA Manual J. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads. C:\ ...\19808 HENNING LAKEVILLE 11222021.rhv Monday, November 22, 2021, 9:38 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 9 Building Pie Chart Building Loss 46,913 Btuh Floor 8% Roof 7% Wall 33% Glass 21% Door 3% Infiltration 13% Ventilation 15% Building Gain 26,920 Btuh Roof 6% Wall 4% Glass 37% Door 1%People 11% Equipment 28% Infiltration 4% Ventilation 7% C:\ ...\19808 HENNING LAKEVILLE 11222021.rhv Monday, November 22, 2021, 9:38 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 10 Building Bar Graph Building Loss 46,913 Btuh 0 5,000 10,000 15,000 20,000 Floor 8%Wall 33%Door 3%Ventilation 15% Roof 7%Glass 21%Infiltration 13% Building Gain 26,920 Btuh 0 5,000 10,000 15,000 Roof 6%Glass 37%People 11%Infiltration 4% Wall 4%Door 1%Equipment 28%Ventilation 7% C:\ ...\19808 HENNING LAKEVILLE 11222021.rhv Monday, November 22, 2021, 9:38 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 11 System 1 Whole House Summary Loads Component Description Area Quan Sen Loss Lat Gain Sen Gain Total Gain 4A-1a-o: Glazing-Double pane low-e (e = 0.20 or less), operable window, e=0.20 on surface 2, wood with metal clad frame, u-value 0.32, SHGC 0.33 353 9,827 0 10,078 10,078 11N: Door-Metal - Polystyrene Core 42 1,278 0 352 352 12F-0sw: Wall-Frame, R-21 insulation in 2 x 6 stud cavity, no board insulation, siding finish, wood studs 1369 7,742 0 1,183 1,183 15B0-10sf-10: Wall-Basement, , R-10 board insulation to floor, no interior finish, 10' floor depth 1764 7,520 0 0 0 16B-50: Roof/Ceiling-Under Attic with Insulation on Attic Floor (also use for Knee Walls and Partition Ceilings), Vented Attic, No Radiant Barrier, Dark Asphalt Shingles or Dark Metal, Tar and Gravel or Membrane, R-50 insulation 1811 3,151 0 1,739 1,739 21A-24-c: Floor-Basement, Concrete slab, any thickness, 2 or more feet below grade, no insulation below floor, carpet covering, shortest side of floor slab is 24' wide 1811 3,939 0 0 0 Subtotals for structure:33,457 0 13,352 13,352 People:7 1,400 1,610 3,010 Equipment:1,500 6,000 7,500 Lighting:0 0 0 Ductwork:0 0 0 0 Infiltration: Winter CFM: 68, Summer CFM: 35 6,306 682 490 1,172 Ventilation: Winter CFM: 140, Summer CFM: 70 7,150 1,352 534 1,886 System 1 Whole House Load Totals:46,913 4,934 21,986 26,920 Check Figures Supply CFM:1,005 CFM Per Square ft.:0.277 Square ft. of Room Area:3,622 Square ft. Per Ton:1,615 Volume (ft³) of Cond. Space:32,598 System Loads Total Heating Required Including Ventilation Air:46,913 Btuh 46.913 MBH Total Sensible Gain:21,986 Btuh 82 % Total Latent Gain:4,934 Btuh 18 % Total Cooling Required Including Ventilation Air:26,920 Btuh 2.24 Tons (Based On Sensible + Latent) Notes Calculations are based on 8th edition of ACCA Manual J. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads. C:\ ...\19808 HENNING LAKEVILLE 11222021.rhv Monday, November 22, 2021, 9:38 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 12 System 1 Whole House Pie Chart System 1 Whole House Loss 46,913 Btuh Floor 8% Roof 7% Wall 33% Glass 21% Door 3% Infiltration 13% Ventilation 15% System 1 Whole House Gain 26,920 Btuh Roof 6% Wall 4% Glass 37% Door 1%People 11% Equipment 28% Infiltration 4% Ventilation 7% C:\ ...\19808 HENNING LAKEVILLE 11222021.rhv Monday, November 22, 2021, 9:38 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 13 System 1 Whole House Bar Graph System 1 Whole House Loss 46,913 Btuh 0 5,000 10,000 15,000 20,000 Floor 8%Wall 33%Door 3%Ventilation 15% Roof 7%Glass 21%Infiltration 13% System 1 Whole House Gain 26,920 Btuh 0 5,000 10,000 15,000 Roof 6%Glass 37%People 11%Infiltration 4% Wall 4%Door 1%Equipment 28%Ventilation 7% C:\ ...\19808 HENNING LAKEVILLE 11222021.rhv Monday, November 22, 2021, 9:38 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 14 System 1, Zone 1 Summary Loads (Average Load Procedure for Rooms) Component Description Area Quan Sen Loss Lat Gain Sen Gain Total Gain 4A-1a-o: Glazing-Double pane low-e (e = 0.20 or less), operable window, e=0.20 on surface 2, wood with metal clad frame, u-value 0.32, SHGC 0.33 353 9,827 0 10,078 10,078 11N: Door-Metal - Polystyrene Core 42 1,278 0 352 352 12F-0sw: Wall-Frame, R-21 insulation in 2 x 6 stud cavity, no board insulation, siding finish, wood studs 1369 7,742 0 1,183 1,183 15B0-10sf-10: Wall-Basement, , R-10 board insulation to floor, no interior finish, 10' floor depth 1764 7,520 0 0 0 16B-50: Roof/Ceiling-Under Attic with Insulation on Attic Floor (also use for Knee Walls and Partition Ceilings), Vented Attic, No Radiant Barrier, Dark Asphalt Shingles or Dark Metal, Tar and Gravel or Membrane, R-50 insulation 1811 3,151 0 1,739 1,739 21A-24-c: Floor-Basement, Concrete slab, any thickness, 2 or more feet below grade, no insulation below floor, carpet covering, shortest side of floor slab is 24' wide 1811 3,939 0 0 0 Subtotals for structure:33,457 0 13,352 13,352 People:7 1,400 1,610 3,010 Equipment:1,500 6,000 7,500 Lighting:0 0 0 Ductwork:0 0 0 0 Infiltration: Winter CFM: 68, Summer CFM: 35 6,306 682 490 1,172 System 1, Zone 1 Load Totals:39,763 3,582 21,452 25,034 Check Figures Supply CFM:1,005 CFM Per Square ft.:0.277 Square ft. of Room Area:3,622 Square ft. Per Ton:1,736 Volume (ft³) of Cond. Space:32,598 Zone Loads Total Heating Required:39,763 Btuh 39.763 MBH Total Sensible Gain:21,452 Btuh 86 % Total Latent Gain:3,582 Btuh 14 % Total Cooling Required:25,034 Btuh 2.09 Tons (Based On Sensible + Latent) Notes Calculations are based on 8th edition of ACCA Manual J. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads. C:\ ...\19808 HENNING LAKEVILLE 11222021.rhv Monday, November 22, 2021, 9:38 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 15 System 1, Zone 1 Pie Chart System 1, Zone 1 Loss 39,763 Btuh Floor 10% Roof 8% Wall 38% Glass 25% Door 3% Infiltration 16% System 1, Zone 1 Gain 25,034 Btuh Roof 7% Wall 5% Glass 40% Door 1% People 12% Equipment 30% Infiltration 5% C:\ ...\19808 HENNING LAKEVILLE 11222021.rhv Monday, November 22, 2021, 9:38 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 16 System 1, Zone 1 Bar Graph System 1, Zone 1 Loss 39,763 Btuh 0 5,000 10,000 15,000 20,000 Floor 10%Wall 38%Door 3% Roof 8%Glass 25%Infiltration 16% System 1, Zone 1 Gain 25,034 Btuh 0 5,000 10,000 15,000 Roof 7%Glass 40%People 12%Infiltration 5% Wall 5%Door 1%Equipment 30% C:\ ...\19808 HENNING LAKEVILLE 11222021.rhv Monday, November 22, 2021, 9:38 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 17 Detailed Room Loads - Room 1 - Upper Level (Average Load Procedure) General Calculation Mode:Htg. & clg.Occurrences:1 Room Length:1,811.0 ft.System Number:1 Room Width:1.0 ft.Zone Number:1 Area:1,811.0 sq.ft.Supply Air:937 CFM Ceiling Height:9.0 ft.Supply Air Changes:3.4 AC/hr Volume:16,299.0 cu.ft.Req. Vent. Clg:0 CFM Number of Registers:11 Actual Winter Vent.:100 CFM Runout Air:85 CFM Percent of Supply.:11 % Runout Duct Size:6 in.Actual Summer Vent.:65 CFM Runout Air Velocity:434 ft./min.Percent of Supply:7 % Runout Air Velocity:434 ft./min.Actual Winter Infil.:68 CFM Actual Loss:0.118 in.wg./100 ft.Actual Summer Infil.:35 CFM Item Description Area Quantity -U- Value Htg HTM Sen Loss Clg HTM Lat Gain Sen Gain N -Wall-12F-0sw 49 X 9 403 0.065 5.7 2,279 0.9 0 348 S -Wall-12F-0sw 49 X 9 335 0.065 5.7 1,894 0.9 0 290 E -Wall-12F-0sw 49 X 9 308 0.065 5.7 1,742 0.9 0 266 W -Wall-12F-0sw 49 X 9 323 0.065 5.7 1,827 0.9 0 279 S -Door-11N 3 X 7 21 0.350 30.5 639 8.4 0 176 W -Door-11N 3 X 7 21 0.350 30.5 639 8.4 0 176 N -Gls-4A-1a-o shgc-0.33 100%S 38 0.320 27.8 1,058 10.4 0 396 S -Gls-4A-1a-o shgc-0.33 0%S 85 0.320 27.8 2,366 19.2 0 1,630 E -Gls-4A-1a-o shgc-0.33 0%S 133 0.320 27.8 3,703 35.0 0 4,656 W -Gls-4A-1a-o shgc-0.33 0%S 97 0.320 27.8 2,700 35.0 0 3,396 UP-Ceil-16B-50 1811 X 1 1811 0.020 1.7 3,151 1.0 0 1,739 Subtotals for Structure:21,998 0 13,352 Infil.: Win.: 67.9, Sum.: 35.3 1,764 3.575 6,306 0.278 682 490 People: 200 lat/per, 230 sen/per:5 1,000 1,150 Equipment:1,000 5,000 Room Totals:28,304 2,682 19,992 C:\ ...\19808 HENNING LAKEVILLE 11222021.rhv Monday, November 22, 2021, 9:38 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 18 Detailed Room Loads - Room 2 - Lower Level (Average Load Procedure) General Calculation Mode:Htg. & clg.Occurrences:1 Room Length:1,811.0 ft.System Number:1 Room Width:1.0 ft.Zone Number:1 Area:1,811.0 sq.ft.Supply Air:68 CFM Ceiling Height:9.0 ft.Supply Air Changes:0.3 AC/hr Volume:16,299.0 cu.ft.Req. Vent. Clg:0 CFM Number of Registers:1 Actual Winter Vent.:40 CFM Runout Air:68 CFM Percent of Supply.:59 % Runout Duct Size:6 in.Actual Summer Vent.:5 CFM Runout Air Velocity:348 ft./min.Percent of Supply:7 % Runout Air Velocity:348 ft./min.Actual Winter Infil.:0 CFM Actual Loss:0.077 in.wg./100 ft.Actual Summer Infil.:0 CFM Item Description Area Quantity -U- Value Htg HTM Sen Loss Clg HTM Lat Gain Sen Gain S -Wall-15B0-10sf-10 49 X 9 441 0.049 4.3 1,880 0.0 0 0 N -Wall-15B0-10sf-10 49 X 9 441 0.049 4.3 1,880 0.0 0 0 E -Wall-15B0-10sf-10 49 X 9 441 0.049 4.3 1,880 0.0 0 0 W -Wall-15B0-10sf-10 49 X 9 441 0.049 4.3 1,880 0.0 0 0 Floor-21A-24 1 X 1811 1811 0.025 2.2 3,939 0.0 0 0 Subtotals for Structure:11,459 0 0 Infil.: Win.: 0.0, Sum.: 0.0 0 0 0 0 0 0 People: 200 lat/per, 230 sen/per:2 400 460 Equipment:500 1,000 Room Totals:11,459 900 1,460 C:\ ...\19808 HENNING LAKEVILLE 11222021.rhv Monday, November 22, 2021, 9:38 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 19 Room Cooling and Heating Loads Bar Graphs Cooling Heating Btuh Lower Level Upper Level 0 5,000 10,000 15,000 20,000 25,000 30,000 C:\ ...\19808 HENNING LAKEVILLE 11222021.rhv Monday, November 22, 2021, 9:38 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 20 Room Cooling Loads Bar Graphs Sensible Latent Btuh Lower Level Upper Level 0 5,000 10,000 15,000 20,000 25,000 C:\ ...\19808 HENNING LAKEVILLE 11222021.rhv Monday, November 22, 2021, 9:38 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 21 System 1 Room Load Summary No Room Name Area SF Htg Sens Btuh Min Htg CFM Run Duct Size Run Duct Vel Clg Sens Btuh Clg Lat Btuh Min Clg CFM Act Sys CFM ---Zone 1--- 1 Upper Level 1,811 28,304 589 11-6 434 19,992 2,682 937 937 2 Lower Level 1,811 11,459 239 1-6 348 1,460 900 68 68 Ventilation 7,150 534 1,352 System 1 total 3,622 46,913 828 21,986 4,934 1,005 1,005 System 1 Main Trunk Size:18x10 in. Velocity:804 ft./min Loss per 100 ft.:0.102 in.wg Cooling System Summary Cooling Tons Sensible/Latent Split Sensible Btuh Latent Btuh Total Btuh Net Required:2.24 82% / 18%21,986 4,934 26,920 Actual:1.00 77% / 23%9,240 2,760 12,000 Equipment Data Heating System Cooling System Type:Natural Gas Furnace Standard Air Conditioner Model:QC-F38-E78-G QC-C12 Indoor Model:S12 Brand:Quikcool FE Series Quikcool AS Series Description:Hi Efficiency Furnace Standard Efficiency Air Condit Efficiency:78.3 AFUE 12.4 SEER Sound:8.1 bels Capacity:38,000 Btuh 12,000 Btuh Sensible Capacity:n/a 9,240 Btuh Latent Capacity:n/a 2,760 Btuh C:\ ...\19808 HENNING LAKEVILLE 11222021.rhv Monday, November 22, 2021, 9:38 AM Builders Associaton of Minnesota version 101014 Date Certificate Posted x Passive (No Fan) Active (With fan and monometer or other system monitoring Location (or future location) of Fan: Other Please Describe Here x 10/15 x x x 20 x 20 x 21 x 49 x x x x x Not applicable, all ducts located in conditioned space x Not required per mech. code Passive Powered Interlocked with exhaust device. Describe:Input in BTUS: 70,000 Capacity in Gallons: Other, describe: AFUE or HSPF% 93% Cfm's " round duct OR " metal duct Not required per mech. code x Passive Low: Other, describe: x Low: Location of fan(s), describe: Cfm's 4" " round duct OR Flex " metal duct ML193UH070 Heating Loss Manufacturer Lennox Natural Gas Output in Tons: 3 Ton50 Total ventilation (intermittent + continuous) rate in cfms: Balanced Ventilation capacity in cfms: High: High: MECHANICAL VENTILATION SYSTEM Capacity continuous ventilation rate in cfms: 200CFM Select Type Describe any additional or combined heating or cooling systems if installed: (e.g. two furnaces or air source heat pump with gas back-up furnace): 21,986Residential Load Calculation SEER /EER Location of duct or system: Heating or Cooling Ducts Outside Conditioned Spaces Electric Make-up Air Select a Type AO Smith Domestic Water Heater MECHANICAL SYSTEMS Rating or Size Efficiency 13 Seer Building envelope air tightness: Rim Joist (1st Floor) GPVL-50 13ACXN042-230 Model Heating System Natrual Gas Lennox Fiberglass, Batts Foundation Wall R-value Average U-Factor (excludes skylights and one door) U: Duct system air tightness: Cooling SystemTotal R-Value of all Types of InsulationType: Check All That Apply Mineral Fiberboard Insulation Location Foam, Closed Cell0.22 Describe other insulated areas Fiberglass, BlownTHERMAL ENVELOPE Foam Open Cell Wall Rigid, Isocynurate Perimeter of Slab on Grade RADON CONTROL SYSTEM Non or Not ApplicableAttic Fuel Type Solar Heat Gain Coefficient (SHGC): Windows & Doors Ceiling, vaulted Bay Windows or cantilevered areas Floors over unconditioned area Rim Joist (2nd Floor+) 0.30 Appliances Mech Room Heat Recover Ventilator (HRV) Capacity in cfms: Energy Recover Ventilator (ERV) Capacity in cfms: 46,913 Heating Gain Cooling Load Per R401.3 Certificate. A building certificate shall be posted on or in the electrical distribution panel. Place your logo here New Construction Energy Code Compliance Certificate Name of Residential Contractor Stone Cottage Construction Inc. MN License Number Lakeville19808 Henning Ave BC636874 City Mailing Address of the Dwelling or Dwelling Unit Combustion Air Select a Type Location of duct or system: 26,920 Below Entire Slab Rigid, Extruded Polystyrene Ceiling, flat NEW RESIDENTIAL CONSTRUCTION SWPPP VERIFICATION This form must be completed and submitted with all new residential permit applications. New residential building permits WILL NOT be issued without this completed form. Project Site Address: _____________________________________________________________________ Company Name: _________________________________________________________________________ Primary Contact: _________________________________________________________________________ Phone # (24 hr Contact): ______________________ Email: ______________________________________ Description of Land Disturbing Activity: _____________________________________________________ NPDES Construction Stormwater Permit # C000 ___ ___ ___ ___ ___ or # SUB00 ___ ___ ___ ___ ___ If you are not covered under a NPDES Construction Stormwater Permit administered by the MPCA, an erosion and sediment control plan MUST be submitted with the residential building permit application. “The permittee(s) shall ensure that the individuals are trained by local, state, federal agencies, professional organizations or other entities in erosion prevention, sediment control, permanent Stormwater management and the Minnesota NPDES/SDS Construction Stormwater Permit.” (NPDES Construction Stormwater Permit, MPCA) “The permittee(s) must ensure that a trained person (as identified in Part III.A.3.a) will routinely inspect the entire construction site at least once every seven (7) days during active construction and within 24 hours after a rainfall event greater than 0.5 inches in 24 hours.” (NPDES Construction Stormwater Permit, MPCA) Contact information of person CERTIFIED to provide weekly onsite erosion and sediment control inspections and corrective actions: Name of Person: ________________________________Company: _______________________________ Phone # (24 hr Contact): ______________________ Email: ______________________________________ Entity that Provided Training: ________________________ Certification Expiration Date: ____________ NOTE: Prior to any land-disturbing activity, all erosion and sediment controls must be installed on the project site and on individual lots. No land disturbing activity may begin until a residential building permit has been issued. I understand, the above information to be true and I will have read, understood, and accepted all terms and conditions of the National Pollutant Discharge Elimination System (NPDES) Permit (MN R 100001). The City of Lakeville may issue a STOP WORK ORDER; withhold building inspections; or, draw on securities/escrows to bring the site into compliance with the NPDES Construction Stormwater Permit (MN R 100001) or erosion and sediment control plan. Signature: ________________________________________________ Date:_________________________ Contact the City of Lakeville with questions at erosion@lakevillemn.gov or 952-985-4500 KP X12/16/21