Loading...
HomeMy WebLinkAboutSurvey 16439-63 Jaffna Place--SurveyTop nut of hydrant located at Lot 10, Block 1 = 1005.18SURVEYOR'S CERTIFICATEDenotes set spikeDenotes set iron monumentDenotes found iron monumentDenotes proposed drainageDenotes top of curbDenotes existing elevationDenotes proposed elevationJames R. Hill, Inc. PHONE: 952.890.6044 www.jrhinc.com PLANNERS / ENGINEERS / SURVEYORS CERTIFICATE OF SURVEY FOR D.R. HORTON - MINNNESOTADRAWN BYDATEREVISIONSPLM/TAMCAD FILEPRO-ECT NO.SHEET 1 OF 1Lots 6, 7, 8, 9, & 10, Block 1, CRYSTAL PARK, Dakota County, MinnesotaI hereby certify that this survey, plan or report wasprepared by me or under my direct supervision andthat I am a duly Licensed Land Surveyor under thelaws of the State of Minnesota. That this surveydoes not purport to show all improvements,easements or encroachments, to the propertyexcept as shown thereon.Signed this 2nd day of December, 2021Marcus F. Hampton, MN L.S. No. 4748111/8/2021411519-23.dwg411519-232999 WEST C.R. 42, SUITE 100, BURNSVILLE, MN 55306Lots 6, 7, 8, 9, & 10, Block 1, CRYSTAL PARK, DakotaCounty, MinnesotaPROPERTY DESCRIPTION16463, 16457, 16451, 16445, and 16439 Jaffna Place,Lakeville, MinnesotaPROPERTY ADDRESS1.Bearings are based on the recorded plat.2.Building dimensions shown are for horizontaland vertical placement of structure only. Seearchitectural plans for building andfoundation dimensions.3.No specific soils investigation has beencompleted on this lot by James R. Hill, Inc. thesuitability of soils to support the specifichouse proposed is not the responsibility ofJames R. Hill, Inc. or the surveyor.4.No specific title search for existence ornon-existence of recorded or un-recordedeasements has been conducted by thesurveyor as a part of this survey. Onlyeasements per the recorded plat are shown.5.Proposed grades shown were taken from thegrading &/or development plan prepared byJames R. Hill, Inc.6.Grading plan date/revision date: 9/14/2021.7.Plan No. 2620-L, 2625-M, 2625-N, 2625-M,2620-L.NOTESFLOOR ELEVATIONSBENCHMARKProposedGarage Floor @ Front= 1003.7Garage Top of Block= 1004.1House Top of Block= 1004.1Lowest Floor= 1004.1A. 12/2/21: Stake bldg.The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.ENGINEERING REVIEWEDDate:__________________12/27/2021corlowskyEROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION*Maintain 6" between bottom of siding and sod.*No structures in easements.Planning DepartmentApprovedDate:__________________12/30/2021kjenson