HomeMy WebLinkAbout9847 189th Street W SurveyZoning = RS-3
The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.
*Maintain 6" between bottom of siding and sod.*No structures in easements.
EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION
*Draintile connection required.
ENGINEERING REVIEWED
Date:__________________01/07/2022 JPesik
no trees for pres.
1/12/22
EA