Loading...
HomeMy WebLinkAboutLA198619 - 19810 Henning Ave Permit PackRESIDENTIAL BUILDING PERMIT APPLICATION CITY OF LAKEVILLE BUILDING INSPECTIONS DEPARTMENT 20195 HOLYOKE AVENUE LAKEVILLE, MN 55044 952-985-4440 Office Use Only __________________ Permit Number ___________________ Received By ___________________ Date Received ___________________ Fee Total SITE ADDRESS: MAILING ADDRESS: CITY: STATE: ZIP: JOB DESCRIPTION:__________________________________ MASTER PLAN: (Number or Address)____________________ LIST OTHER STRUCTURES ON PROPERTY:_______________________________________________________________ ESTIMATED VALUATION: PROPOSED START DATE: END DATE: (New Residential Only): LEGAL DESCRIPTION: LOT: _____ BLOCK: _____ SUBDIVISION: APPLICANT IS: RESIDENT OWNER CONTRACTOR EMAIL NEW MODEL HOME: YES NO (IF YES – ADMINISTRATIVE PERMIT REQUIRED) PLEASE FILL OUT THE FOLLOWING COMPLETELY (All Contractor information must be as listed on State License) RESIDENT OWNER NAME:_______________________________________________________________________________ HOME PHONE #:_____________________________ CELL PHONE:___________________________ GENERAL CONTRACTOR Homeowner Contractor CONTRACTOR:_______________________________________________________________________ LICENSE #:BC______________ LEAD CERTIFICATE#_______________ (PRE 1978 STRUCTURE) OFFICE PHONE #:_____________________________ CELL PHONE:___________________________ ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________ PLUMBING WORK Homeowner Contractor CONTRACTOR:__________________________________________LICENSE #: PM______________ OFFICE PHONE #:_____________________________ CELL PHONE:___________________________ ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________ MECHANICAL WORK Homeowner Contractor CONTRACTOR:________________________________________ _______________________________ OFFICE PHONE #:_____________________________ CELL PHONE:___________________________ ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________ BOND #:_______________________________________ EXPIRATION DATE____________________ SEWER/WATER CONTRACTOR New Construction Only NAME:________________________________________________ ______________________________ HOME PHONE _____________________________ CELL PHONE:______________________________ BOND #:_______________________________________ EXPIRATION DATE____________________ INTEREST EARNINGS ON THE ESCROW ACCOUNTS, IF ANY, ARE RETAINED BY THE CITY TO OFFSET THE ADMINISTRATIVE COSTS ASSOCIATED WITH PROCESSING THE ESCROW APPLICATION AND REFUND. I HEREBY APPLY FOR A BUILDING PERMIT AND I ACKNOWLEDGE THAT THE INFORMATION ABOVE IS COMPLETE AND ACCURATE; THAT THE WORK WILL BE IN CONFORMANCE WITH THE ORDINANCES AND CODES OF THE CITY AND WITH THE STATE BUILDING CODE, THAT I UNDERSTAND THIS IS NOT A PERMIT AND WORK IS NOT TO START WITHOUT A PERMIT AND THAT THE WORK WILL BE IN ACCORDANCE WITH THE APPROVED PLAN. NAME OF APPLICANT (Please Print)DATE APPLICANT’S SIGNATURE: www.lakevillemn.gov RESIDENTIAL BUILDING PERMIT APPLICATION PAGE 2 OFFICE USE ONLY BUILDING PERMIT TYPE REQUIRED INSPECTIONS SINGLE FAMILY DWELLING BUILDING DUPLEX AS BUILT TOWNHOUSE UNITS BUILDING FINAL DETACHED TOWN HOUSE UNIT DECK FOOTING CONDO FIREPLACE ACESSORY BUILDING FOOTING REROOF FOUNDATION RESIDE FRAMING PORCH FRAMING GARAGES INSULATION RES ADDN/REPAIR/RMDL DECK PORCH GARAGES LATH LOWER LEVEL FINISH LOWER LEVEL FINAL ADDITION OTHER FOUNDATION ONLY PORCH FOOTING MISCELLANEOUS POURED WALL DEMO SEPTIC TANK REMOVAL MOVED SITE MECHANICAL CITY BUILDING VALUATION: $AIR TEST FINAL BUILDING PERMIT FEES ROUGH-IN $PERMIT FEE PLUMBING $PLAN CHECK FINAL $SURCHARGE ROUGH-IN $METRO SAC METER SIZE $CITY WATER HOOKUP UNIT PRESSURE REDUCING VALVE $CITY SEWER HOOKUP UNIT SEWER/WATER $LANDSCAPE ESCROW SEWER/WATER $TREE ESCROW FINAL $MISC ESCROW STREET DRAINTILE $PLUMBING BUILDING INFORMATION $MECHANICAL TYPE OF CONSTRUCTION $SEWER WATER ZONING $OTHER CODE EDITION $TOTAL FIRE SUPPRESSION SYSTEM OCCUPANCY GROUP APPROVED BY: BUILDING INSPECTOR: Date: PLUMBING/MECHANICAL INSPECTOR: Date: COMMENTS: 20195 Holyoke Avenue, Lakeville, MN 55044 952-985-4400  952-985-4499 fax www.lakevillemn.gov Sewer & Water Tie Card Address:________________________________________ Contractor:______________________________________ Permit Number:__________________________________ Final Date:________________ Street Drain-Tile:______ Size of Water Service: 1” Comments: AIRTEST SANITARY OVER 20’/2 FITTINGS THIS CARD MUST BE COMPLETED AND ON-SITE AT TIME OF SEWER & WATER INSPECTION 19810 HENNING AVE, LAKEVILLE*ALL DOOR & WINDOW HEADERSTO BE S.P.F. #2 OR BETTERRESIDENCE FOR:written consent of Planco MN, Inc. modified or used in any redesign without the priormay not be assigned or copied, and may not bemay not be re-used for any additional structures,structure. Planco MN reserves all rights. These planslicense is granted to use these plans to build oneCopyright for these drawings is owned by Planco MN,Planco MN, Inc.c#21-093SMA182021STONE COTTAGE CONSTRUCTION, INC. LOT 2, BLOCK 3, BERRES RIDGES 7TH ADDITIION JOE HONSEY & STEPHANIE LUANGSAYSANA FRONT ELEVATION 1/4" = 1'-0" & SOFFITALUM. FASCIAVINYLSIDINGSTONECAPTOTAL2nd FLR.1st FLR.1,152 SQ. FT.1,152 SQ. FT.2,304 SQ. FT.16x8 OVH. DR.9x8 OVH. DR.SSSS8'-4" POURED FOUNDATION1'-6"128128125VINYLB & BVINYLB & B4" TRIM128WOOD PORCHVINYL SIDINGSIMONTON WDWS.STONE AS SHOWNFRONT ONLYGRIDS IN WDWS.FRONT ONLYALL SIDESSTONE 24"WRAPSTONEON JOGSTONE 24"WRAPTOTALBSM'T887 SQ. FT.3,191 SQ. FT.9' CEILING @ FIRST FLOOR4" TRIM4" WDW. TRIMFRONT ONLYVINYLB & BSTONE 24"WRAPVINYLSIDINGConcept Approval ONLYSubject to Field InspectionInspectorDate2020MN BldgCode12/29/2021dmathews VERIFY ALLGRADE LINESPlanco MN, Inc.C#21-093SMA282021 LEFT ELEVATION 1/8" = 1'-0" SIDINGVINYL1'-0"2'-0"STONE 24"WRAP1258/12CORNERSVINYL RIGHT ELEVATION 1/8" = 1'-0" VINYL1'-6"ON JOGSTONE6"1'-0"SIDINGVINYLCORNERSVINYLSIDING8/12STONE 24"WRAP8/12812 REAR ELEVATION 1/8" = 1'-0" SIDINGVINYLSIDINGVINYL8128/121'-6"1'-0"CORNERSVINYL14' DECKLEDGERSecure door closed until deck isconstructed with a separate permit. Planco MN, Inc.C#21-093SMA382021 BASEMENT PLAN 1/4" = 1'-0" UP15 R UNEXCAVATED WHFURNF.D.92% MECH/STORAGE *UNFINISHED30'-0"39'-0"60'-0"30'-0"30'-0"17'-0"13'-0"19'-0"11'-0"3'-0" 3'-9"3'-9"5'-0"5'-0"10"13'-0" 47'-0" 2'-0"22'-0" 23'-0"24'-0" 8'-0"15'-0"2'-6"”),1,6+('64)7 (;&/8'(667$,56 SUMP2" LEDGE11'-0"11"7'-7"5'-5"(2) 6x6 POSTON 12x16 PIER FTG.24x24 FROST FTG.TREATED 2x8 16" O.C. 6'-0"9"TRD. 2-2x8 FLUSHTRD. 2-2x8 FLUSH3'-0"TREATED 4x6 CURB2x6 - 16" O.C.FTG. SIZE BY OTHERS5'-10"48"18"x24" LIN.2'-4"2'-6"5'-0"11 7/8" I JTS. 16" O.C. 11 7/8" I JTS. 16" O.C.2-2x102-11 7/8" LSL DROPPEDTREATED 4x6 CURB2x6 - 16" O.C.FTG. SIZE BY OTHERS14'-3"5'-5"19'-4"TREATED 4x4 CURB2x4 - 16" O.C.FTG. SIZE BY OTHERS BEDROOM #4 *CARPET FAMILY/REC ROOM *CARPET7'-6"6'-9"2-9 1/2" LSL6/0x3/6 SL 13'-8"3'-4"10'-3"4'-0"12'-8"8'-10"1'-0"60341 PIECE FIB.8'-4" POURED FOUNDATIONLOOKOUT LOOKOUT 2'-6"27'-6"2'-8"3-9 1/2" LSL9/0x3/6 SL 10'-0"9'-4"30"x30"x12"CONC. PAD FTG.5'-9"15'-9"6x6 POST30"x30"x12"CONC. PAD FTG.6x6 POSTTREATED 4x6 CURB2x6 - 16" O.C.FTG. SIZE BY OTHERSTREATED 4x4 CURB2x4 - 16" O.C.FTG. SIZE BY OTHERS*VINYLFNO FTG.@ TOILET11 7/8" LSL JOISTS 1-11 7/8" LSL 1-11 7/8" LSL UFER Ground-Provide 20' Rebar in footing and stubup near electrical service panel.333 Planco MN, Inc.C#21-093SMA482021 FIRST FLOOR PLAN 1/4" = 1'-0" 1,152 SQ. FT.9' CEILING @ FIRST FLOOR3'-0"GASF.P.39'-0"11'-10"11'-8"15'-6" 3'-9"UP16 RDN15 R16x8 OVH DOOR9x8 OVH DOOR GARAGE *4" CONC. FLOOR*WOOD FOYER REF'G 30" RANGEVENTED HOOD 12" S.B.4'-0"3'-9"4'-3"6'-4"3'-6" KITCHEN *WOOD*WOOD DINING GREAT ROOM *CARPET*CARPET OFFICE ARCHED SOFFIT ARCHED SOFFIT 2'-4"2'-4"2'-8"FIREDR.1'-3"14'-5"10"1'-3"14'-0"9'-8"10'-0"10"30'-0"16'-2"9'-2"5/0x5/0 SL2-2x10TOP @ 7'-6"6/0x4/0 SL2-2x102/4x4/0 SH60'-0"30'-0"30'-0"17'-0"13'-0"19'-0"11'-0"5'-8"5'-4"9'-6"9'-6"2'-6"27'-6"47'-0" 2'-0"22'-0" 23'-0"24'-0" 8'-0"15'-0"2'-6"9'-10"5'-2" 3'-9"5'-10"5'-0"10"4'-10"6'-3"4'-5"1'-8"(FRAMING) W.I.C. *VINYL*VINYLRAIL4'-8"7'-6" 5'-6"12x12 BOXED COL.2-7 1/4" LSL2-7 1/4" LSL2-2x10CHASE3'-0"24"PANT.20" FLR.TRUSS 19.2" O.C.8'-6"ARCHED SOFFITSOFFIT1'-3"13'-9"10"2'-8"FULLVIEWGIRDER9'-2"3'-10"F8'-3"7'-11"10"WALL EDGE 4'-8"2'-8"4'-9"11'-0" 5'-6"1'-2"7'-7"5'-5" WOOD PORCH WALLEDGEWALLEDGETRUSSES 24" O.C. 10"6'-1"7'-2"2x62x6TURNSTUDS2-11 7/8" LSL DROPPED 2-2x103'-2"6'-5"2-2x103'-5"*VINYL1'-3"*SHTRK. WALLS & CLG.2-2x10SLSL 2-11 7/8" LSL2-11 7/8" LSL30"ON 18x18x42STONE BASEARCHED2'-8" C.O. 2-2x102/6x2/0 FX 2-2x102/6x2/0 FX5'-10"5'-10"3-2x106/0x2/0 FX 2'-8"2'-2"2'-3"2'-2"SD/CO4'-9" 2-2x10 OVEN/ MICRO *2x6 WALLS4'-3" 5/0x4/0 FX TEMP 2-2x10 1'-11"3'-3" 2/6x4/0 SH 2-2x10 2'-0"2'-0"2-9 1/2" LSL9/0x5/0 SL3-16" LVL DROPPED20" FLR.TRUSS 19.2" O.C. 20" FLR.TRUSS 19.2" O.C. 20" FLR.TRUSS 19.2" O.C.2x62-9 1/2" LSLFLUSH2-2x103'-0"6'-2"14' DECK LEDGERRAIL632.252.2510555PFHPFH11563 Planco MN, Inc.C#21-093SMA582021 SECOND FLOOR PLAN 1/4" = 1'-0" 1,152 SQ. FT.39'-0"8'-1"11'-11"11'-0"DN16 R2'-6"2'-6"2'-4"5'-0"*CARPET W.I.C. 8'-0" BEDROOM #2 *CARPET*CARPET BEDROOM #3 30'-0"15'-8"14'-4"30'-0"17'-0"13'-0"8'-6"8'-6"6'-2"6'-10"3'-0" 36'-0" 12'-6"8'-6"15'-0"14'-2"3'-9"3'-9"5'-0"5'-10"10"6'-0"5/0x3/0 FX TEMP 2-2x10 2'-4"2'-4"7'-4"7'-0"4'-3"FFF2x6TRUSSES24" O.C.*L.V.T.*VINYL*VINYLTOP @ 9'-6" OFF LANDING5'-0" TUB& SHOWER1 PIECE FIB.2'-6" 2-9 1/2" LSL SLOPED CLG.6/0x5/0 SL2-2x102'-6"2'-8"6'-11"6'-6"9'-2"W D 2'-6"5'-0"2'-4"78"26"LIN.2x66'-7" MASTER BEDROOM *CARPET5'-7"6/0x4/6 SL2-2x10SDSDSDSD/COACCESSATTIC6"2'-4"TRUSSES24" O.C.TRUSSES24" O.C.2'-6"2'-2"1'-10"BENCH1'-8"9'-4"2'-2"10'-10" 1/2 WALL W/ WD. CAP 2-2x107/6x5/0 SL32x60FREESTANDINGTUB 48342'-4" C.O.3'-9"3'-738"2x62'-4"PKT.4'-4"5'-9"2'-4"42"7'-0"3'-4"5'-2"5'-9"*L.V.T.WALLHUNG LT3'-9"2-2x105/0x4/0 FX48" TALL WALLW/ GLASS PANEL42"24"42" TALL CAB.W/ WD. TOPTemper-Min. 15" clearance to anyobstruction from center ofW.C., 24" in front(typ).223222222222223Strap Planco MN, Inc.C#21-093SMA682021GRADEWATERPROOFINGPOURED WALLSHEATHINGSIDINGR-21 INSUL.9'-11 8"VB “2x6- 16" O.C.30'-0"2x6- 16" O.C.VB1/2" GYP. BD.R-21 INSUL.8'-11 8"SHEATHINGSIDINGR-21 INSUL.1/2" GYP. BD.VB2x6- 16" O.C.2x6- 16" O.C.VB1/2" GYP. BD.R-21 INSUL.11 7/8" I JTS. @ 19.2" O.C.20" FLOOR TRUSSES @ 19.2" O.C.3/4" T & G FLOOR3/4" T & G FLOOR1-2x6 TREATED8'-4" POUREDWALL W/ REBARPER CODESILL PLATEWATERPROOFING9 1/2" I JTS.9 1/2" I JTS.16 RISERS15 RISERS GRADE2-9 1/2" LSL6'-8" MIN. HDRM1x8 RISERS5/4x11 TREADS4- 2x12 STRINGERSTAIR NOTES:10" ROUGH CUT TREADS2'-0" CROSS SECTION 3/8" = 1'-0" ENERGY HEEL10129'-6" TOP OF WDW.2" FURRING WALL1/2" GYP. BD.21'-8"VENTEDSOFFITFASCIAALUM. ALUM.1'-6"ENERGY HEELFASCIAALUM. SOFFITVENTEDALUM.1/2" SHTG.15# FELTSHINGLES1'-6"812ROOF VENTS @ 1/300 ATTIC50% ROOF 50% SOFFIT(DESIGNED BY MFR)TRUSSES @ 24" O.C.R-49 INSUL.10"73 8"R-21 SPRAY FOAMR-21 SPRAY FOAMR-21 SPRAY FOAMW/ V.B.5/8" GYP. BD.5/8" GYP. BD.FOUNDATION & FTG.SIZES & DETAILSPER ENGINEER SPECS2" R-10RIGID INSUL.R-21 INSUL.1/2" GYP. BD.VB2x6- 16" O.C.10"75 8"FOUNDATION & FTG.SIZES & DETAILSPER ENGINEER SPECSDRAIN TILE DRAIN TILE R-10 W/ <2.6 ACHINSUL.5/8" GYP. BD. Planco MN, Inc.C#21-093SMA7820216'-0"GRADEMINIMAL HEELVENTEDSOFFITFASCIAALUM. ALUM.2-7 1/4" LSL1256x6 POST9'-11 8" CROSS SECTION 3/8" = 1'-0"  “PER CODEWALL W/ REBAR8'-4" POUREDSILL PLATE1-2x6 TREATED3 1/2" CONC. FLOORPROOFINGWATERTRUSSES @ 24" O.C.(DESIGNED BY MFR)SHEATHINGSIDING8'-11 8"R-21 INSUL.1/2" GYP. BD.VB2x6- 16" O.C.R-21 INSUL.1/2" GYP. BD.VB2x6- 16" O.C.R-49 INSUL.2x6- 16" O.C.1/2" GYP. BD.R-21 INSUL.1/2" GYP. BD.2x6- 16" O.C.3/4" T & G FLOORVBR-21 INSUL.W/ V.B.5/8" GYP. BD.VBSIDINGSHEATHING5/8" GYP. BD.3/4" T & G FLOOR2'-0"5'-6"36'-0"17 RISERS15 RISERS 18x18 BOXEDBASETRD. 2x8 JTS. @ 16" O.C.TREATED2-2x812x16 PIERFOOTING12x12 PADFOOTING73 8"R-10 W/ <2.6 ACHINSUL.R-21 SPRAY FOAMR-21 SPRAY FOAM2x6- 16" O.C.4x6 TRT. CURB4x6 TRT. CURB4x4 TRT. CURB2x4- 16" O.C.2x6- 16" O.C.11 7/8" I JTS. @ 19.2" O.C.11 7/8" LSL JOISTSFOUNDATION & FTG.SIZES & DETAILSPER ENGINEER SPECSDRAIN TILE PER CODEWALL W/ REBAR8'-4" POUREDSILL PLATE1-2x6 TREATEDPROOFINGWATERR-10 W/ <2.6 ACHINSUL.FOUNDATION & FTG.SIZES & DETAILSPER ENGINEER SPECSDRAIN TILE GRADE5/8" GYP. BD.75 8"R-21 SPRAY FOAMR-21 SPRAY FOAM20" FLOOR TRUSSES @ 19.2" O.C.6'-8" MIN. HDRM1x8 RISERS5/4x11 TREADS4- 2x12 STRINGERSTAIR NOTES:10" ROUGH CUT TREADS Planco MN, Inc.C#21-093SMA8820211/2" GYP. BD. GARAGE 9'-118"3/4" T & G FLOOR CROSS SECTION 3/8" = 1'-0"  “3 1/2" CONC. FLOOR5/8" GYP. BD.R-21 INSUL.1/2" GYP. BD.VB2x6- 16" O.C.PER CODEWALL W/ REBAR8'-4" POUREDSILL PLATE1-2x6 TREATED20" FLOOR TRUSSES @ 19.2" O.C.PROOFINGWATER3/4" T & G FLOOR4" CONC. FLOORGRADEPOURED WALL2X4- 16" O.C.SLOPE TO DOORS10'-31 4"FOUNDATION & FTG.SIZES & DETAILSPER ENGINEER SPECSR-10 W/ <2.6 ACHINSUL.FOUNDATION & FTG.SIZES & DETAILSPER ENGINEER SPECSDRAIN TILE 11 7/8" LSL JOISTSR-21 SPRAY FOAMR-21 SPRAY FOAM1'-0"10"14'-5"1'-3"R=24'-3 5/8"7'-0" 9'-11 8" DINING/GREAT ROOM ARCH DETAIL 3/8" = 1'-0" FLOOR SYSTEMROOFTRUSSPVC T-FITTINGTO SUPPORTVENT PIPEMIN. 4" OF GASPERMEABLE MATERIAL3 1/2" CONC. SLAB4" PVC VENT PIPESUPPORTSTRAPPINGFLASHINGEXHAUST 10' FROM OPNGS.INTO CONDITIONED SPACESOF BUILDING12" MIN. ABOVE ROOFSEAL6 MIL POLYUNDER SLAB10' OF DRAIN TILEEACH WAY FROMT-FITTING(ROCK) RADON GAS VENT SYSTEM 3/8" = 1'-0" 36" MIN. HT. CLEAR SPACE24" DIA. AROUND VENTPROVIDE ELECTRICALBOX POWER SOURCER-4 MIN. INSUL. VENT PIPE@ UNCONDITIONED SPACE4" MIN. CLEARANCEFOR FUT. FAN BASEMENT PLAN UP15 R UNEXCAVATED WHFURNF.D.92% MECH/STORAGE *UNFINISHED30'-0"39'-0"60'-0"30'-0"30'-0"17'-0"13'-0"19'-0"11'-0"3'-0" 3'-9"3'-9"5'-0"5'-0"10"13'-0" 47'-0" 2'-0"22'-0" 23'-0"24'-0" 8'-0"15'-0"2'-6"SUMP2" LEDGE11'-0"11"7'-7"5'-5"(2) 6x6 POSTON 12x16 PIER FTG.24x24 FROST FTG.TREATED 2x8 16" O.C. 6'-0"9"TRD. 2-2x8 FLUSHTRD. 2-2x8 FLUSH3'-0"TREATED 4x6 CURB2x6 - 16" O.C.FTG. SIZE BY OTHERS5'-10"48"18"x24" LIN.2'-4"2'-6"5'-0"11 7/8" I JTS.16" O.C. 11 7/8" I JTS. 16" O.C.2-2x10DROPPED LVLTREATED 4x6 CURB2x6 - 16" O.C.FTG. SIZE BY OTHERS14'-3"5'-5"19'-4"TREATED 4x4 CURB2x4 - 16" O.C.FTG. SIZE BY OTHERS BEDROOM #4 *CARPET FAMILY/REC ROOM *CARPET7'-6"6'-9"2-2x106/0x3/6 SL13'-8"3'-4"10'-3"4'-0"12'-8"8'-10"1'-0"60341 PIECE FIB.LOOKOUT LOOKOUT 2'-6"27'-6"2'-8"2-9 1/2" LVL9/0x3/6 SL 10'-0"9'-4"30"x30"x12"CONC. PAD FTG.5'-9"15'-9"6x6 POST30"x30"x12"CONC. PAD FTG.6x6 POSTTREATED 4x6 CURB2x6 - 16" O.C.FTG. SIZE BY OTHERSTREATED 4x4 CURB2x4 - 16" O.C.FTG. SIZE BY OTHERS*VINYLFNO FTG.@ TOILET11 7/8" LSL JOISTS 10'BWL 13'3'3' FIRST FLOOR PLAN 3'-0"GASF.P.39'-0"11'-10"11'-8"15'-6" 3'-9"UP16 RDN15 R16x8 OVH DOOR9x8 OVH DOOR GARAGE *4" CONC. FLOOR*WOOD FOYER REF'G 30" RANGEVENTED HOOD12" S.B.4'-0"3'-9"4'-3"6'-4"3'-6" KITCHEN *WOOD*WOOD DINING GREAT ROOM *CARPET*CARPET OFFICE ARCHED SOFFIT ARCHED SOFFIT 2'-4"2'-4"2'-8"FIREDR.1'-3"14'-5"10"1'-3"14'-0"9'-8"10'-0"10"30'-0"16'-2"9'-2"5/0x5/0 SL2-2x10TOP @ 7'-6"6/0x4/0 SL2-2x102/4x4/0 SH60'-0"30'-0"30'-0"17'-0"13'-0"19'-0"11'-0"5'-8"5'-4"9'-6"9'-6"2'-6"27'-6"47'-0" 2'-0"22'-0" 23'-0"24'-0" 8'-0"15'-0"2'-6"9'-10"5'-2" 3'-9"5'-10"5'-0"10"4'-10"6'-3"4'-5"1'-8"(FRAMING) W.I.C. *VINYL*VINYLRAIL4'-8"7'-6" 5'-6"12x12 BOXED COL.2-7 1/4" LSL2-7 1/4" LSL3-2x10CHASE3'-0"24"PANT.20" FLR.TRUSS 19.2" O.C.8'-6"ARCHED SOFFITSOFFIT1'-3"13'-9"10"2'-8"FULLVIEWGIRDER9'-2"3'-10"F8'-3"7'-11"10"WALL EDGE 4'-8"2'-8"4'-9"11'-0" 5'-6"1'-2"7'-7"5'-5" WOOD PORCH WALLEDGEWALLEDGETRUSSES 24" O.C. 10"6'-1"7'-2"2x62x6TURNSTUDS2-11 7/8" LSL DROPPED 3-2x103'-2"6'-5"2-2x103'-5"*VINYL1'-3"*SHTRK. WALLS & CLG.3-2x10SLSL 2-11 7/8" LSL2-11 7/8" LSL30"ON 18x18x42STONE BASEARCHED2'-8" C.O. 3-2x102/6x2/0 FX 3-2x102/6x2/0 FX5'-10"5'-10"3-2x106/0x2/0 FX 2'-8"2'-2"2'-3"2'-2"SD/CO4'-9" 2-2x10 OVEN/ MICRO *2x6 WALLS4'-3" 5/0x4/0 FX TEMP 2-2x10 1'-11"3'-3" 2/6x4/0 SH 2-2x10 2'-0"2'-0"2-9 1/2" LVL9/0x5/0 SL3-11 7/8" LSL DROPPED20" FLR.TRUSS 19.2" O.C. 20" FLR.TRUSS 19.2" O.C. 20" FLR.TRUSS19.2" O.C.2x62-9 1/2" LSLFLUSHRAIL3'-0"6'-2"14' DECK LEDGER30'30'42'BWL 2BWL 3BWL 4BWL 5BWL 62'-3"2'-3"3'4'SEE DETAIL 1/PF-14'4'5'5'5'3'6'6'10'5'11'4' SECOND FLOOR PLAN 39'-0"8'-1"11'-11"11'-0"DN16 R2'-6"2'-6"2'-4"5'-0"*CARPET W.I.C. 8'-0" BEDROOM #2 *CARPET*CARPET BEDROOM #3 30'-0"15'-8"14'-4"30'-0"17'-0"13'-0"8'-6"8'-6"6'-2"6'-10"3'-0" 36'-0" 12'-6"8'-6"15'-0"14'-2"3'-9"3'-9"5'-0"5'-10"10"6'-0"5/0x3/0 FX TEMP 2-2x10 2'-4"2'-4"7'-4"7'-0"4'-3"FFF2x6TRUSSES24" O.C.*L.V.T.*VINYL*VINYLTOP @ 9'-6" OFF LANDING5'-0" TUB& SHOWER1 PIECE FIB.2'-6" 2-9 1/2" LSL SLOPED CLG.6/0x5/0 SL2-2x102'-6"2'-8"6'-11"6'-6"9'-2"W D 2'-6"5'-0"2'-4"78"26"LIN.2x66'-7" MASTER BEDROOM *CARPET5'-7"6/0x4/6 SL2-2x10SDSDSDSD/COACCESSATTIC6"2'-4"TRUSSES24" O.C.TRUSSES24" O.C.2'-6"2'-2"1'-10"BENCH1'-8"9'-4"2'-2"10'-10" 1/2 WALL W/ WD. CAP 2-2x107/6x5/0 SL32x60FREESTANDINGTUB 48342'-4" C.O.3'-9"3'-738"2x62'-4"PKT.4'-4"5'-9"2'-4"42"7'-0"3'-4"5'-2"5'-9"*L.V.T.WALLHUNG LT3'-9"2-2x105/0x4/0 FX48" TALL WALLW/ GLASS PANEL42"24"42" TALL CAB.W/ WD. TOPBWL 7BWL 8BWL 9BWL 1036'30'2'2'2'2'2'3'3'2'2'2'2'2'2'2'2' Voigt & Associates, Inc.C-1Structural Engineering Services 4635 Nicols Road, Suite 204Eagan, MN 55122MethodCS-WSPWind speed 115Exposure C GB BWL 1 2 3 4 5 6 7 8 9 10Spacing - ft 10 42 42 30 30 30 36 36 30 30Level 3 2 2 2 2 2 1 1 1 1Length req'd- ft 5 12 12 9 18 9 5.4 5.4 4.5 4.5per Table R602.10.3(1)Adjustments:Exposure 1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.3Eave to ridge Height 1 1 1 1 1 1 1 1 1 1Wall Height 0.9 0.95 0.95 0.95 0.95 0.95 0.9 0.9 0.9 0.9# of BWL 1 1 1 1.3 1.3 1.3 1 1 1 14" Gyp WB w.block joints1 0.7 1 1 1 1 1 1 1 1Adjusted Length 5.9 10.4 14.8 14.4 28.9 14.4 6.3 6.3 5.3 5.3Joe Honsey & Stephanie Luangsaysana Res19810 Henning Avenue, Lakeville, MNSheet Stone Cottage HVAC Load Calculations for Honsey Luangsaysana 19810 Henning Ave Lakeville,mn Prepared By: Randy Andrews Lofgren Heating 5708 Upper 147th Street West Apple Vallley, MN 55124 Thursday, December 2, 2021 Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 2 Project Report General Project Information Project Title:Stone Cottage Project Date:Thursday, December 2, 2021 Client Name:Honsey Luangsaysana Client Address:19810 Henning Ave Client City:Lakeville,mn Company Name:Lofgren Heating Company Representative:Randy Andrews Company Address:5708 Upper 147th Street West Company City:Apple Vallley, MN 55124 Company E-Mail Address:rrandrews@lofgrenheating-ac.com Design Data Reference City:Minneapolis, Minnesota Building Orientation:Front door faces West Daily Temperature Range:Medium Latitude:44 Degrees Elevation:834 ft. Altitude Factor:0.970 Elevation Sensible Adj. Factor:1.000 Elevation Total Adj. Factor:1.000 Elevation Heating Adj. Factor:1.000 Elevation Heating Adj. Factor:1.000 Outdoor Outdoor Outdoor Indoor Indoor Grains Dry Bulb Wet Bulb Rel.Hum Rel.Hum Dry Bulb Difference Winter:-15 -15.33 80%n/a 72 n/a Summer:88 72 47%50%75 29 Check Figures Total Building Supply CFM:1,294 CFM Per Square ft.:0.374 Square ft. of Room Area:3,456 Square ft. Per Ton:1,203 Volume (ft³) of Cond. Space:31,104 Building Loads Total Heating Required Including Ventilation Air:50,003 Btuh 50.003 MBH Total Sensible Gain:27,962 Btuh 81 % Total Latent Gain:6,520 Btuh 19 % Total Cooling Required Including Ventilation Air:34,482 Btuh 2.87 Tons (Based On Sensible + Latent) Notes Calculations are based on 8th edition of ACCA Manual J. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads. C:\ ...\19810 HENNING LAKEVILLE 12022021.rhv Thursday, December 2, 2021, 10:33 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 3 Miscellaneous Report System 1 Whole House Input Data Outdoor Dry Bulb Outdoor Wet Bulb Outdoor Rel.Hum Indoor Rel.Hum Indoor Dry Bulb Grains Difference Winter:-15 -15.33 80%n/a 72 n/a Summer:88 72 47%50%75 29.27 Duct Sizing Inputs Main Trunk Runouts Calculate:Yes Yes Use Schedule:No No Roughness Factor:0.00300 0.01000 Pressure Drop:0.1000 in.wg./100 ft.0.1000 in.wg./100 ft. Minimum Velocity:650 ft./min 450 ft./min Maximum Velocity:900 ft./min 750 ft./min Minimum Height:8 in.6 in. Maximum Height:10 in.6 in. Outside Air Data Winter Summer Infiltration Specified:0.250 AC/hr 0.130 AC/hr 86 CFM 45 CFM Infiltration Actual:0.250 AC/hr 0.130 AC/hr Above Grade Volume:Cu.ft.Cu.ft.X 20,736 X 20,736 5,184 Cu.ft./hr 2,696 Cu.ft./hr X 0.0167 X 0.0167 Total Building Infiltration:86 CFM 45 CFM Total Building Ventilation:140 CFM 70 CFM ---System 1--- Infiltration & Ventilation Sensible Gain Multiplier: 13.87 = (1.10 X 0.970 X 13.00 Summer Temp. Difference) Infiltration & Ventilation Latent Gain Multiplier: 19.31 = (0.68 X 0.970 X 29.27 Grains Difference) Infiltration & Ventilation Sensible Loss Multiplier: 92.85 = (1.10 X 0.970 X 87.00 Winter Temp. Difference) Winter Infiltration Specified:0.250 AC/hr (86 CFM), Construction: Unknown Summer Infiltration Specified:0.130 AC/hr (45 CFM), Construction: Unknown C:\ ...\19810 HENNING LAKEVILLE 12022021.rhv Thursday, December 2, 2021, 10:33 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 4 Load Preview Report Scope Has AED Net Ton ft.² /Ton Area Sen Gain Lat Gain Net Gain Sen Loss Sys Htg CFM Sys Clg CFM Sys Act CFM Duct Size Building 2.87 1,203 3,456 27,962 6,520 34,482 50,003 946 1,294 1,294 System 1 Yes 2.87 1,203 3,456 27,962 6,520 34,482 50,003 946 1,294 1,294 22x10 Ventilation 340 1,352 1,692 4,550 Zone 1 3,456 27,622 5,168 32,790 45,453 946 1,294 1,294 22x10 1-Main Level 1,152 12,285 1,834 14,119 18,377 383 576 576 7--6 2-Upper Level 1,152 13,877 2,434 16,311 19,122 398 650 650 8--6 3-Lower Level 1,152 1,460 900 2,360 7,954 166 68 68 1--6 C:\ ...\19810 HENNING LAKEVILLE 12022021.rhv Thursday, December 2, 2021, 10:33 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 5 Duct Size Preview Room or Duct Name Minimum Velocity Maximum Velocity Rough. Factor Design L/100 Actual L/100 SP Loss Duct Velocity Duct Length Htg Flow Clg Flow Act. Flow Duct Size System 1 Supply Runouts Zone 1 1-Main Level 450 750 0 0.1 0.1 418.8 383 576 576 7--6 2-Upper Level 450 750 0 0.1 0.1 413.9 398 650 650 8--6 3-Lower Level 450 750 0 0.1 0.1 348.4 166 68 68 1--6 Other Ducts Supply Main Trunk 650 900 0 0.1 0.1 847 946 1,294 1,294 22x10 SummarySummarySummarySummarySummarySummarySummarySummary System 1 Heating Flow:946 Cooling Flow:1294 C:\ ...\19810 HENNING LAKEVILLE 12022021.rhv Thursday, December 2, 2021, 10:33 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 6 System 1 - Whole House - Adequate Exposure Diversity Test Test For Adequate Exposure Diversity Average Glass Sensible Gain Over 12 Hours 1.3 x Average Glass Gain Hourly Glass Gain Hourly Total Net GainHeat Gain, Btuh20.3% Diff. from Avg. 0 10,000 20,000 30,000 40,000 8 am 9 am 10 am 11 am 12 pm 1 pm 2 pm 3 pm 4 pm 5 pm 6 pm 7 pm AED Calculation Summary --- SYSTEM HAS ADEQUATE EXPOSURE DIVERSITY. --- System is on N, E, S, W rosette. Peak load exceeds 12-hour average load by 20.3%. AED Excursion (amount by which peak exceeds 1.3 x average): 0 Btuh Definition: A system has adequate exposure diversity if the peak-hour glass load for the entire conditioned space does not exceed the average glass load for the entire conditioned space by more than 30 percent. C:\ ...\19810 HENNING LAKEVILLE 12022021.rhv Thursday, December 2, 2021, 10:33 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 7 System 1 - Whole House - Psychrometric Chart ZC Zone (Room) Condition OC Outdoor Condition LC Leaving Coil Condition EC Entering Coil Condition SD Supply Duct Temperature Rise DTF Draw Through Fan Sensible Gain HRV Heat Recovery Ventilator C:\ ...\19810 HENNING LAKEVILLE 12022021.rhv Thursday, December 2, 2021, 10:33 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 8 Total Building Summary Loads Component Description Area Quan Sen Loss Lat Gain Sen Gain Total Gain 4A-1a-o: Glazing-Double pane low-e (e = 0.20 or less), operable window, e=0.20 on surface 2, wood with metal clad frame, u-value 0.32, SHGC 0.33 540 15,033 0 14,763 14,763 11N: Door-Metal - Polystyrene Core 42 1,278 0 352 352 12F-0sw: Wall-Frame, R-21 insulation in 2 x 6 stud cavity, no board insulation, siding finish, wood studs 1974 11,162 0 1,707 1,707 15B0-10sf-10: Wall-Basement, , R-10 board insulation to floor, no interior finish, 10' floor depth 1278 5,448 0 0 0 16B-50: Roof/Ceiling-Under Attic with Insulation on Attic Floor (also use for Knee Walls and Partition Ceilings), Vented Attic, No Radiant Barrier, Dark Asphalt Shingles or Dark Metal, Tar and Gravel or Membrane, R-50 insulation 1152 2,004 0 1,106 1,106 21A-24: Floor-Basement, Concrete slab, any thickness, 2 or more feet below grade, no insulation below floor, any floor cover, shortest side of floor slab is 24' wide 1152 2,506 0 0 0 Subtotals for structure:37,431 0 17,928 17,928 People:9 1,800 2,070 3,870 Equipment:2,500 7,000 9,500 Lighting:0 0 0 Ductwork:0 0 0 0 Infiltration: Winter CFM: 86, Summer CFM: 45 8,022 868 624 1,492 Ventilation: Winter CFM: 140, Summer CFM: 70 4,550 1,352 340 1,692 Total Building Load Totals:50,003 6,520 27,962 34,482 Check Figures Total Building Supply CFM:1,294 CFM Per Square ft.:0.374 Square ft. of Room Area:3,456 Square ft. Per Ton:1,203 Volume (ft³) of Cond. Space:31,104 Building Loads Total Heating Required Including Ventilation Air:50,003 Btuh 50.003 MBH Total Sensible Gain:27,962 Btuh 81 % Total Latent Gain:6,520 Btuh 19 % Total Cooling Required Including Ventilation Air:34,482 Btuh 2.87 Tons (Based On Sensible + Latent) Notes Calculations are based on 8th edition of ACCA Manual J. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads. C:\ ...\19810 HENNING LAKEVILLE 12022021.rhv Thursday, December 2, 2021, 10:33 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 9 Building Pie Chart Building Loss 50,003 Btuh Floor 5%Roof 4% Wall 33% Glass 30% Door 3% Infiltration 16% Ventilation 9% Building Gain 34,482 Btuh Roof 3%Wall 5% Glass 43% Door 1% People 11% Equipment 28% Infiltration 4%Ventilation 5% C:\ ...\19810 HENNING LAKEVILLE 12022021.rhv Thursday, December 2, 2021, 10:33 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 10 Building Bar Graph Building Loss 50,003 Btuh 0 5,000 10,000 15,000 20,000 Floor 5%Wall 33%Door 3%Ventilation 9% Roof 4%Glass 30%Infiltration 16% Building Gain 34,482 Btuh 0 5,000 10,000 15,000 Roof 3%Glass 43%People 11%Infiltration 4% Wall 5%Door 1%Equipment 28%Ventilation 5% C:\ ...\19810 HENNING LAKEVILLE 12022021.rhv Thursday, December 2, 2021, 10:33 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 11 System 1 Whole House Summary Loads Component Description Area Quan Sen Loss Lat Gain Sen Gain Total Gain 4A-1a-o: Glazing-Double pane low-e (e = 0.20 or less), operable window, e=0.20 on surface 2, wood with metal clad frame, u-value 0.32, SHGC 0.33 540 15,033 0 14,763 14,763 11N: Door-Metal - Polystyrene Core 42 1,278 0 352 352 12F-0sw: Wall-Frame, R-21 insulation in 2 x 6 stud cavity, no board insulation, siding finish, wood studs 1974 11,162 0 1,707 1,707 15B0-10sf-10: Wall-Basement, , R-10 board insulation to floor, no interior finish, 10' floor depth 1278 5,448 0 0 0 16B-50: Roof/Ceiling-Under Attic with Insulation on Attic Floor (also use for Knee Walls and Partition Ceilings), Vented Attic, No Radiant Barrier, Dark Asphalt Shingles or Dark Metal, Tar and Gravel or Membrane, R-50 insulation 1152 2,004 0 1,106 1,106 21A-24: Floor-Basement, Concrete slab, any thickness, 2 or more feet below grade, no insulation below floor, any floor cover, shortest side of floor slab is 24' wide 1152 2,506 0 0 0 Subtotals for structure:37,431 0 17,928 17,928 People:9 1,800 2,070 3,870 Equipment:2,500 7,000 9,500 Lighting:0 0 0 Ductwork:0 0 0 0 Infiltration: Winter CFM: 86, Summer CFM: 45 8,022 868 624 1,492 Ventilation: Winter CFM: 140, Summer CFM: 70 4,550 1,352 340 1,692 System 1 Whole House Load Totals:50,003 6,520 27,962 34,482 Check Figures Supply CFM:1,294 CFM Per Square ft.:0.374 Square ft. of Room Area:3,456 Square ft. Per Ton:1,203 Volume (ft³) of Cond. Space:31,104 System Loads Total Heating Required Including Ventilation Air:50,003 Btuh 50.003 MBH Total Sensible Gain:27,962 Btuh 81 % Total Latent Gain:6,520 Btuh 19 % Total Cooling Required Including Ventilation Air:34,482 Btuh 2.87 Tons (Based On Sensible + Latent) Notes Calculations are based on 8th edition of ACCA Manual J. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads. C:\ ...\19810 HENNING LAKEVILLE 12022021.rhv Thursday, December 2, 2021, 10:33 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 12 System 1 Whole House Pie Chart System 1 Whole House Loss 50,003 Btuh Floor 5%Roof 4% Wall 33% Glass 30% Door 3% Infiltration 16% Ventilation 9% System 1 Whole House Gain 34,482 Btuh Roof 3%Wall 5% Glass 43% Door 1% People 11% Equipment 28% Infiltration 4%Ventilation 5% C:\ ...\19810 HENNING LAKEVILLE 12022021.rhv Thursday, December 2, 2021, 10:33 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 13 System 1 Whole House Bar Graph System 1 Whole House Loss 50,003 Btuh 0 5,000 10,000 15,000 20,000 Floor 5%Wall 33%Door 3%Ventilation 9% Roof 4%Glass 30%Infiltration 16% System 1 Whole House Gain 34,482 Btuh 0 5,000 10,000 15,000 Roof 3%Glass 43%People 11%Infiltration 4% Wall 5%Door 1%Equipment 28%Ventilation 5% C:\ ...\19810 HENNING LAKEVILLE 12022021.rhv Thursday, December 2, 2021, 10:33 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 14 System 1, Zone 1 Summary Loads (Average Load Procedure for Rooms) Component Description Area Quan Sen Loss Lat Gain Sen Gain Total Gain 4A-1a-o: Glazing-Double pane low-e (e = 0.20 or less), operable window, e=0.20 on surface 2, wood with metal clad frame, u-value 0.32, SHGC 0.33 540 15,033 0 14,763 14,763 11N: Door-Metal - Polystyrene Core 42 1,278 0 352 352 12F-0sw: Wall-Frame, R-21 insulation in 2 x 6 stud cavity, no board insulation, siding finish, wood studs 1974 11,162 0 1,707 1,707 15B0-10sf-10: Wall-Basement, , R-10 board insulation to floor, no interior finish, 10' floor depth 1278 5,448 0 0 0 16B-50: Roof/Ceiling-Under Attic with Insulation on Attic Floor (also use for Knee Walls and Partition Ceilings), Vented Attic, No Radiant Barrier, Dark Asphalt Shingles or Dark Metal, Tar and Gravel or Membrane, R-50 insulation 1152 2,004 0 1,106 1,106 21A-24: Floor-Basement, Concrete slab, any thickness, 2 or more feet below grade, no insulation below floor, any floor cover, shortest side of floor slab is 24' wide 1152 2,506 0 0 0 Subtotals for structure:37,431 0 17,928 17,928 People:9 1,800 2,070 3,870 Equipment:2,500 7,000 9,500 Lighting:0 0 0 Ductwork:0 0 0 0 Infiltration: Winter CFM: 86, Summer CFM: 45 8,022 868 624 1,492 System 1, Zone 1 Load Totals:45,453 5,168 27,622 32,790 Check Figures Supply CFM:1,294 CFM Per Square ft.:0.374 Square ft. of Room Area:3,456 Square ft. Per Ton:1,265 Volume (ft³) of Cond. Space:31,104 Zone Loads Total Heating Required:45,453 Btuh 45.453 MBH Total Sensible Gain:27,622 Btuh 84 % Total Latent Gain:5,168 Btuh 16 % Total Cooling Required:32,790 Btuh 2.73 Tons (Based On Sensible + Latent) Notes Calculations are based on 8th edition of ACCA Manual J. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads. C:\ ...\19810 HENNING LAKEVILLE 12022021.rhv Thursday, December 2, 2021, 10:33 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 15 System 1, Zone 1 Pie Chart System 1, Zone 1 Loss 45,453 Btuh Floor 6%Roof 4% Wall 37% Glass 33% Door 3% Infiltration 18% System 1, Zone 1 Gain 32,790 Btuh Roof 3%Wall 5% Glass 45% Door 1% People 12% Equipment 29% Infiltration 5% C:\ ...\19810 HENNING LAKEVILLE 12022021.rhv Thursday, December 2, 2021, 10:33 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 16 System 1, Zone 1 Bar Graph System 1, Zone 1 Loss 45,453 Btuh 0 5,000 10,000 15,000 20,000 Floor 6%Wall 37%Door 3% Roof 4%Glass 33%Infiltration 18% System 1, Zone 1 Gain 32,790 Btuh 0 5,000 10,000 15,000 Roof 3%Glass 45%People 12%Infiltration 5% Wall 5%Door 1%Equipment 29% C:\ ...\19810 HENNING LAKEVILLE 12022021.rhv Thursday, December 2, 2021, 10:33 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 17 Detailed Room Loads - Room 1 - Main Level (Average Load Procedure) General Calculation Mode:Htg. & clg.Occurrences:1 Room Length:1,152.0 ft.System Number:1 Room Width:1.0 ft.Zone Number:1 Area:1,152.0 sq.ft.Supply Air:576 CFM Ceiling Height:9.0 ft.Supply Air Changes:3.3 AC/hr Volume:10,368.0 cu.ft.Req. Vent. Clg:0 CFM Number of Registers:7 Actual Winter Vent.:57 CFM Runout Air:82 CFM Percent of Supply.:10 % Runout Duct Size:6 in.Actual Summer Vent.:31 CFM Runout Air Velocity:419 ft./min.Percent of Supply:5 % Runout Air Velocity:419 ft./min.Actual Winter Infil.:43 CFM Actual Loss:0.110 in.wg./100 ft.Actual Summer Infil.:22 CFM Item Description Area Quantity -U- Value Htg HTM Sen Loss Clg HTM Lat Gain Sen Gain S -Wall-12F-0sw 39 X 9 300 0.065 5.7 1,696 0.9 0 259 N -Wall-12F-0sw 39 X 9 277 0.065 5.7 1,566 0.9 0 239 W -Wall-12F-0sw 32 X 9 187 0.065 5.7 1,057 0.9 0 162 E -Wall-12F-0sw 32 X 9 197 0.065 5.7 1,114 0.9 0 170 S -Door-11N 3 X 7 21 0.350 30.5 639 8.4 0 176 W -Door-11N 3 X 7 21 0.350 30.5 639 8.4 0 176 S -Gls-4A-1a-o shgc-0.33 0%S 30 0.320 27.8 835 19.2 0 575 N -Gls-4A-1a-o shgc-0.33 100%S 74 0.320 27.8 2,060 10.4 0 770 W -Gls-4A-1a-o shgc-0.33 0%S 80 0.320 27.8 2,227 35.0 0 2,800 E -Gls-4A-1a-o shgc-0.33 0%S 91 0.320 27.8 2,533 35.0 0 3,186 Subtotals for Structure:14,366 0 8,513 Infil.: Win.: 43.2, Sum.: 22.5 1,278 3.138 4,011 0.244 434 312 People: 200 lat/per, 230 sen/per:2 400 460 Equipment:1,000 3,000 Room Totals:18,377 1,834 12,285 C:\ ...\19810 HENNING LAKEVILLE 12022021.rhv Thursday, December 2, 2021, 10:33 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 18 Detailed Room Loads - Room 2 - Upper Level (Average Load Procedure) General Calculation Mode:Htg. & clg.Occurrences:1 Room Length:1,152.0 ft.System Number:1 Room Width:1.0 ft.Zone Number:1 Area:1,152.0 sq.ft.Supply Air:650 CFM Ceiling Height:9.0 ft.Supply Air Changes:3.8 AC/hr Volume:10,368.0 cu.ft.Req. Vent. Clg:0 CFM Number of Registers:8 Actual Winter Vent.:59 CFM Runout Air:81 CFM Percent of Supply.:9 % Runout Duct Size:6 in.Actual Summer Vent.:35 CFM Runout Air Velocity:414 ft./min.Percent of Supply:5 % Runout Air Velocity:414 ft./min.Actual Winter Infil.:43 CFM Actual Loss:0.107 in.wg./100 ft.Actual Summer Infil.:22 CFM Item Description Area Quantity -U- Value Htg HTM Sen Loss Clg HTM Lat Gain Sen Gain N -Wall-12F-0sw 39 X 9 305 0.065 5.7 1,725 0.9 0 264 S -Wall-12F-0sw 39 X 9 306 0.065 5.7 1,730 0.9 0 265 E -Wall-12F-0sw 32 X 9 201 0.065 5.7 1,137 0.9 0 174 W -Wall-12F-0sw 32 X 9 201 0.065 5.7 1,137 0.9 0 174 N -Gls-4A-1a-o shgc-0.33 100%S 46 0.320 27.8 1,281 10.4 0 479 S -Gls-4A-1a-o shgc-0.33 0%S 45 0.320 27.8 1,253 19.2 0 863 E -Gls-4A-1a-o shgc-0.33 0%S 87 0.320 27.8 2,422 35.0 0 3,045 W -Gls-4A-1a-o shgc-0.33 0%S 87 0.320 27.8 2,422 35.0 0 3,045 UP-Ceil-16B-50 1152 X 1 1152 0.020 1.7 2,004 1.0 0 1,106 Subtotals for Structure:15,111 0 9,415 Infil.: Win.: 43.2, Sum.: 22.5 1,278 3.138 4,011 0.244 434 312 People: 200 lat/per, 230 sen/per:5 1,000 1,150 Equipment:1,000 3,000 Room Totals:19,122 2,434 13,877 C:\ ...\19810 HENNING LAKEVILLE 12022021.rhv Thursday, December 2, 2021, 10:33 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 19 Detailed Room Loads - Room 3 - Lower Level (Average Load Procedure) General Calculation Mode:Htg. & clg.Occurrences:1 Room Length:1,152.0 ft.System Number:1 Room Width:1.0 ft.Zone Number:1 Area:1,152.0 sq.ft.Supply Air:68 CFM Ceiling Height:9.0 ft.Supply Air Changes:0.4 AC/hr Volume:10,368.0 cu.ft.Req. Vent. Clg:0 CFM Number of Registers:1 Actual Winter Vent.:24 CFM Runout Air:68 CFM Percent of Supply.:36 % Runout Duct Size:6 in.Actual Summer Vent.:4 CFM Runout Air Velocity:348 ft./min.Percent of Supply:5 % Runout Air Velocity:348 ft./min.Actual Winter Infil.:0 CFM Actual Loss:0.077 in.wg./100 ft.Actual Summer Infil.:0 CFM Item Description Area Quantity -U- Value Htg HTM Sen Loss Clg HTM Lat Gain Sen Gain S -Wall-15B0-10sf-10 39 X 9 351 0.049 4.3 1,496 0.0 0 0 N -Wall-15B0-10sf-10 39 X 9 351 0.049 4.3 1,496 0.0 0 0 W -Wall-15B0-10sf-10 32 X 9 288 0.049 4.3 1,228 0.0 0 0 E -Wall-15B0-10sf-10 32 X 9 288 0.049 4.3 1,228 0.0 0 0 Floor-21A-24 1 X 1152 1152 0.025 2.2 2,506 0.0 0 0 Subtotals for Structure:7,954 0 0 Infil.: Win.: 0.0, Sum.: 0.0 0 0 0 0 0 0 People: 200 lat/per, 230 sen/per:2 400 460 Equipment:500 1,000 Room Totals:7,954 900 1,460 C:\ ...\19810 HENNING LAKEVILLE 12022021.rhv Thursday, December 2, 2021, 10:33 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 20 Room Cooling and Heating Loads Bar Graphs Cooling Heating Btuh Lower Level Upper Level Main Level 0 5,000 10,000 15,000 20,000 C:\ ...\19810 HENNING LAKEVILLE 12022021.rhv Thursday, December 2, 2021, 10:33 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 21 Room Cooling Loads Bar Graphs Sensible Latent Btuh Lower Level Upper Level Main Level 0 5,000 10,000 15,000 20,000 C:\ ...\19810 HENNING LAKEVILLE 12022021.rhv Thursday, December 2, 2021, 10:33 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 22 System 1 Room Load Summary No Room Name Area SF Htg Sens Btuh Min Htg CFM Run Duct Size Run Duct Vel Clg Sens Btuh Clg Lat Btuh Min Clg CFM Act Sys CFM ---Zone 1--- 1 Main Level 1,152 18,377 383 7-6 419 12,285 1,834 576 576 2 Upper Level 1,152 19,122 398 8-6 414 13,877 2,434 650 650 3 Lower Level 1,152 7,954 166 1-6 348 1,460 900 68 68 Ventilation 4,550 340 1,352 System 1 total 3,456 50,003 946 27,962 6,520 1,294 1,294 System 1 Main Trunk Size:22x10 in. Velocity:847 ft./min Loss per 100 ft.:0.104 in.wg Cooling System Summary Cooling Tons Sensible/Latent Split Sensible Btuh Latent Btuh Total Btuh Net Required:2.87 81% / 19%27,962 6,520 34,482 Actual:1.00 77% / 23%9,240 2,760 12,000 Equipment Data Heating System Cooling System Type:Natural Gas Furnace Standard Air Conditioner Model:QC-F38-E78-G QC-C12 Indoor Model:S12 Brand:Quikcool FE Series Quikcool AS Series Description:Hi Efficiency Furnace Standard Efficiency Air Condit Efficiency:78.3 AFUE 12.4 SEER Sound:8.1 bels Capacity:38,000 Btuh 12,000 Btuh Sensible Capacity:n/a 9,240 Btuh Latent Capacity:n/a 2,760 Btuh C:\ ...\19810 HENNING LAKEVILLE 12022021.rhv Thursday, December 2, 2021, 10:33 AM Builders Associaton of Minnesota version 101014 Date Certificate Posted x Passive (No Fan) Active (With fan and monometer or other system monitoring Location (or future location) of Fan: Other Please Describe Here x 10/15 x x x 20 x 20 x 21 x 49 x x x x x Not applicable, all ducts located in conditioned space x Not required per mech. code Passive Powered Interlocked with exhaust device. Describe:Input in BTUS: 70,000 Capacity in Gallons: Other, describe: AFUE or HSPF% 93% Cfm's " round duct OR " metal duct Not required per mech. code x Passive Low: Other, describe: x Low: Location of fan(s), describe: Cfm's 4" " round duct OR Flex " metal duct ML193UH070 Heating Loss Manufacturer Lennox Natural Gas Output in Tons: 3 Ton50 Total ventilation (intermittent + continuous) rate in cfms: Balanced Ventilation capacity in cfms: High: High: MECHANICAL VENTILATION SYSTEM Capacity continuous ventilation rate in cfms: 200CFM Select Type Describe any additional or combined heating or cooling systems if installed: (e.g. two furnaces or air source heat pump with gas back-up furnace): 27,962Residential Load Calculation SEER /EER Location of duct or system: Heating or Cooling Ducts Outside Conditioned Spaces Electric Make-up Air Select a Type AO Smith Domestic Water Heater MECHANICAL SYSTEMS Rating or Size Efficiency 13 Seer Building envelope air tightness: Rim Joist (1st Floor) GPVL-50 13ACXN042-230 Model Heating System Natrual Gas Lennox Fiberglass, Batts Foundation Wall R-value Average U-Factor (excludes skylights and one door) U: Duct system air tightness: Cooling SystemTotal R-Value of all Types of InsulationType: Check All That Apply Mineral Fiberboard Insulation Location Foam, Closed Cell0.22 Describe other insulated areas Fiberglass, BlownTHERMAL ENVELOPE Foam Open Cell Wall Rigid, Isocynurate Perimeter of Slab on Grade RADON CONTROL SYSTEM Non or Not ApplicableAttic Fuel Type Solar Heat Gain Coefficient (SHGC): Windows & Doors Ceiling, vaulted Bay Windows or cantilevered areas Floors over unconditioned area Rim Joist (2nd Floor+) 0.30 Appliances Mech Room Heat Recover Ventilator (HRV) Capacity in cfms: Energy Recover Ventilator (ERV) Capacity in cfms: 50,003 Heating Gain Cooling Load Per R401.3 Certificate. A building certificate shall be posted on or in the electrical distribution panel. Place your logo here New Construction Energy Code Compliance Certificate Name of Residential Contractor Stone Cottage Construction Inc. MN License Number Lakeville19810 Henning Ave BC636874 City Mailing Address of the Dwelling or Dwelling Unit Combustion Air Select a Type Location of duct or system: 34,482 Below Entire Slab Rigid, Extruded Polystyrene Ceiling, flat NEW RESIDENTIAL CONSTRUCTION SWPPP VERIFICATION This form must be completed and submitted with all new residential permit applications. New residential building permits WILL NOT be issued without this completed form. Project Site Address: __________________________________________________________________ Company Name: _________________________________________________________________________ Primary Contact: _________________________________________________________________________ Phone # (24 hr Contact): ______________________ Email: ______________________________________ Description of Land Disturbing Activity: _____________________________________________________ NPDES Construction Stormwater Permit # C000 ___ ___ ___ ___ ___ or # SUB00 ___ ___ ___ ___ ___ If you are not covered under a NPDES Construction Stormwater Permit administered by the MPCA, an erosion and sediment control plan MUST be submitted with the residential building permit application. “The permittee(s) shall ensure that the individuals are trained by local, state, federal agencies, professional organizations or other entities in erosion prevention, sediment control, permanent Stormwater management and the Minnesota NPDES/SDS Construction Stormwater Permit.” (NPDES Construction Stormwater Permit, MPCA) “The permittee(s) must ensure that a trained person (as identified in Part III.A.3.a) will routinely inspect the entire construction site at least once every seven (7) days during active construction and within 24 hours after a rainfall event greater than 0.5 inches in 24 hours.” (NPDES Construction Stormwater Permit, MPCA) Contact information of person CERTIFIED to provide weekly onsite erosion and sediment control inspections and corrective actions: Name of Person: ________________________________Company: _______________________________ Phone # (24 hr Contact): ______________________ Email: ______________________________________ Entity that Provided Training: ________________________ Certification Expiration Date: ____________ NOTE: Prior to any land-disturbing activity, all erosion and sediment controls must be installed on the project site and on individual lots. No land disturbing activity may begin until a residential building permit has been issued. I understand, the above information to be true and I will have read, understood, and accepted all terms and conditions of the National Pollutant Discharge Elimination System (NPDES) Permit (MN R 100001). The City of Lakeville may issue a STOP WORK ORDER; withhold building inspections; or, draw on securities/escrows to bring the site into compliance with the NPDES Construction Stormwater Permit (MN R 100001) or erosion and sediment control plan. Signature: ________________________________________________ Date:_________________________ Contact the City of Lakeville with questions at erosion@lakevillemn.gov or 952-985-4500 12/28/21 KP X