Loading...
HomeMy WebLinkAbout17943 Exeter Cir SurveyZoning = RS-4The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.*Draintile connection required.ENGINEERING REVIEWEDDate:__________________01/11/2022corlowskyEROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION*Maintain 6" between bottom of siding and sod.*No structures in easements.