HomeMy WebLinkAbout18535 Hidden Way SurveyZoning = RS-4ENGINEERING REVIEWEDDate:__________________10/22/2021corlowskyEROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATIONapprox draintileservice locationThe curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.*Maintain 6" between bottom of siding and sod.*No structures in easements.*Draintile connection required.