Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
LA197585 - Porch/Deck Helical Pier Report
Installer's Name:Tyler, Craig E, Zayron and Ryan Installation Checklist Franchisee Location:Minnesota Installation Equipment: GoliathTech Calibrated Hydraulic Drill with PSI Gauge Torque Indicator Installation Date:1/21/22 Name of Customer or Contractor:Bellpar Description of customer project:Deck Porch Project Address:15800 Krafton Avenue Lakeville Pile Number Required Compression Capacity Required Torque Pile Used Helix Used Total Pile Length (if not 7')Cut-off Elevation (if not 8" +-2) Inclination of Pile (if not 90 Degrees +-2)Torque Achieved Achieved Compression Capacity Achieved Tension Capacity Pile 1:6500 1300 2 3/8”11”12’3100 15500 7750 Pile 2:6500 1300 2 3/8”11”24’1325 6625 3312 Pile 3:6500 1300 2 3/8”11”24’1580 7900 3950 Pile 4:6500 1300 2 3/8”11”1300 6500 3250 Pile 5: Pile 6: Pile 7: Pile 8: Pile 9: Pile 10: Pile 11: Pile 12: Pile 13: Pile 14: Draw your project here: The presence of this document in SharePoint certifies that the material contained within has been approved for release and supersedes all previous versions.Date Modified: October 20th 2016Document Name: Installation Checklist US Internal Document - Not for General Distribution. Copyright © 2013 GoliathTech Incorporated. All Rights Reserved.Page 1 of 2 Pile 15: Pile 16: Pile 17: 4 3 2 1 HOUSE 1 Pile 18: Pile 19: Pile 20: Pile 21: Pile 22: Pile 23: Pile 24: Pile 25: Pile 26: Pile 27: Pile 28: The presence of this document in SharePoint certifies that the material contained within has been approved for release and supersedes all previous versions.Date Modified: October 20th 2016Document Name: Installation Checklist US Internal Document - Not for General Distribution. Copyright © 2013 GoliathTech Incorporated. All Rights Reserved.Page 2 of 2 2