HomeMy WebLinkAbout9958 189th St SurveyZoning = RS-3
FY - 30'
SY - 10' Interior, 20' Corner
RY - 30'
SY Buffer - 30'
RY Buffer - 50'
The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies will
be released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.
*Draintile connection required.
ENGINEERING REVIEWED
Date:__________________01/21/2022 corlowsky
EROSION CONTROL
MUST BE INSTALLEDBEFORE EXCAVATION
*Maintain 6" between bottom of siding and sod.
*No structures in easements.