Loading...
HomeMy WebLinkAbout9958 189th St SurveyZoning = RS-3 FY - 30' SY - 10' Interior, 20' Corner RY - 30' SY Buffer - 30' RY Buffer - 50' The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies will be released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection. *Draintile connection required. ENGINEERING REVIEWED Date:__________________01/21/2022 corlowsky EROSION CONTROL MUST BE INSTALLEDBEFORE EXCAVATION *Maintain 6" between bottom of siding and sod. *No structures in easements.