Loading...
HomeMy WebLinkAboutLA198710 - 5899 Upper 179th St W Permit PackRESIDENTIAL BUILDING PERMIT APPLICATION CITY OF LAKEVILLE BUILDING INSPECTIONS DEPARTMENT 20195 HOLYOKE AVENUE LAKEVILLE, MN 55044 952-985-4440 Office Use Only __________________ Permit Number ___________________ Received By ___________________ Date Received _______ _______ Fee Total SITE ADDRESS: MAILING ADDRESS: CITY: STATE: ZIP: JOB DESCRIPTION:__________________________________ MASTER PLAN: (Number or Address)____________________ LIST OTHER STRUCTURES ON PROPERTY:_______________________________________________________________ ESTIMATED VALUATION: PROPOSED START DATE: END DATE: (New Residential Only): LEGAL DESCRIPTION: LOT: _____ BLOCK: _____ SUBDIVISION: APPLICANT IS: RESIDENT OWNER CONTRACTOR EMAIL NEW MODEL HOME: YES NO (IF YES – ADMINISTRATIVE PERMIT REQUIRED) PLEASE FILL OUT THE FOLLOWING COMPLETELY (All Contractor information must be as listed on State License) RESIDENT OWNER NAME:_______________________________________________________________________________ HOME PHONE #:_____________________________ CELL PHONE:___________________________ GENERAL CONTRACTOR Homeowner Contractor CONTRACTOR:_______________________________________________________________________ LICENSE #:BC______________ LEAD CERTIFICATE#_______________ (PRE 1978 STRUCTURE) OFFICE PHONE #:_____________________________ CELL PHONE:___________________________ ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________ PLUMBING WORK Homeowner Contractor CONTRACTOR:__________________________________________LICENSE #: PM______________ OFFICE PHONE #:_____________________________ CELL PHONE:___________________________ ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________ MECHANICAL WORK Homeowner Contractor CONTRACTOR:________________________________________ _______________________________ OFFICE PHONE #:_____________________________ CELL PHONE:___________________________ ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________ BOND #:_______________________________________ EXPIRATION DATE____________________ SEWER/WATER CONTRACTOR New Construction Only NAME:________________________________________________ ______________________________ HOME PHONE _____________________________ CELL PHONE:______________________________ BOND #:_______________________________________ EXPIRATION DATE____________________ INTEREST EARNINGS ON THE ESCROW ACCOUNTS, IF ANY, ARE RETAINED BY THE CITY TO OFFSET THE ADMINISTRATIVE COSTS ASSOCIATED WITH PROCESSING THE ESCROW APPLICATION AND REFUND. I HEREBY APPLY FOR A BUILDING PERMIT AND I ACKNOWLEDGE THAT THE INFORMATION ABOVE IS COMPLETE AND ACCURATE; THAT THE WORK WILL BE IN CONFORMANCE WITH THE ORDINANCES AND CODES OF THE CITY AND WITH THE STATE BUILDING CODE, THAT I UNDERSTAND THIS IS NOT A PERMIT AND WORK IS NOT TO START WITHOUT A PERMIT AND THAT THE WORK WILL BE IN ACCORDANCE WITH THE APPROVED PLAN. NAME OF APPLICANT (Please Print)DATE APPLICANT’S SIGNATURE: www.lakevillemn.gov 12/17/21 DM RESIDENTIAL BUILDING PERMIT APPLICATION PAGE 2 OFFICE USE ONLY BUILDING PERMIT TYPE REQUIRED INSPECTIONS SINGLE FAMILY DWELLING BUILDING DUPLEX AS BUILT TOWNHOUSE UNITS BUILDING FINAL DETACHED TOWN HOUSE UNIT DECK FOOTING CONDO FIREPLACE ACESSORY BUILDING FOOTING REROOF FOUNDATION RESIDE FRAMING PORCH FRAMING GARAGES INSULATION RES ADDN/REPAIR/RMDL DECK PORCH GARAGES LATH LOWER LEVEL FINISH LOWER LEVEL FINAL ADDITION OTHER FOUNDATION ONLY PORCH FOOTING MISCELLANEOUS POURED WALL DEMO SEPTIC TANK REMOVAL MOVED SITE MECHANICAL CITY BUILDING VALUATION: $AIR TEST FINAL BUILDING PERMIT FEES ROUGH-IN $PERMIT FEE PLUMBING $PLAN CHECK FINAL $SURCHARGE ROUGH-IN $METRO SAC METER SIZE $CITY WATER HOOKUP UNIT PRESSURE REDUCING VALVE $CITY SEWER HOOKUP UNIT SEWER/WATER $LANDSCAPE ESCROW SEWER/WATER $TREE ESCROW FINAL $MISC ESCROW STREET DRAINTILE $PLUMBING BUILDING INFORMATION $MECHANICAL TYPE OF CONSTRUCTION $SEWER WATER ZONING $OTHER CODE EDITION $TOTAL FIRE SUPPRESSION SYSTEM OCCUPANCY GROUP APPROVED BY: BUILDING INSPECTOR: Date: PLUMBING/MECHANICAL INSPECTOR: Date: COMMENTS: 20195 Holyoke Avenue, Lakeville, MN 55044 952-985-4400  952-985-4499 fax www.lakevillemn.gov Sewer & Water Tie Card Address:________________________________________ Contractor:______________________________________ Permit Number:__________________________________ Final Date:________________ Street Drain-Tile:______ Size of Water Service: 1” Comments: AIRTEST SANITARY OVER 20’/2 FITTINGS THIS CARD MUST BE COMPLETED AND ON-SITE AT TIME OF SEWER & WATER INSPECTION !!!" !!"#$"#$"#$"#$""""####"#$"#$"#$"#$%&’%%&’%%&’%%&’%%&’%%&’%%&’%%&’%Concept Approval ONLYSubject to Field InspectionInspectorDate2020MN BldgCode12/30/2021dmathews #"#"$"!"%&’ $ $&# ()!"*)! )! )! $+""#"$’’"%#(),#(),"’- "#!"$$"’’ !*"!"%$ $$’ "$""##""%$ $$’ "%’## .’ .$# )!$ %#’## .’ .$%$#"#$$$#%’#"###$$"$’#%’(!#"#$+"%##/ #$##$&$$#0%$$# -12## ###"$(!#"- "#$#$)!&$$#’#%!"3!$4!"3%4$+"$"$$’556789:;<=2<9=<:,1>?<!&)6@5=<:6?!$>71:9A1>:,1>B<:@CD955=@8<7,@>7,E,1:6A16:95=<19@5,E97=955?6@5=@7FA>=<,G:@>:1>A>7,1:6A1@>7",<>75D8976C9A16:<:9GG:>B<=297F<:,97=29:=/9:</@12955598@791<=?<98,97=1:6,,<,7,19559,G<:C9A1>:D,G<A@C@A91@>7,12<<&1<:@>:/9555@7<,2955?<9GG5@<=C:>812<<9B<,1>95@7<@7A2<,@7,@=<7<59D<:@A</91<:,2@<5=&?>9:=,2<912@7F/2<76,<=>7:>>C,EA5@G,86,1?<6,<=<8?<==<=@789,>7:D@7@868) $ 97A2>:?>51,:<H6@:<=8@7@868:<91<=G591<,9:<:<H6@:<=/2<7?<9:@7F>7A>7A:<1<6?8@11:6,,=<,@F7,1>A@1D?<C>:<C:98@7F@7,G<A1@>769:=:9@5,@7@8682<@F21-G9A@7F,5<,,12978@7@8681:<9=@7@8682<9=:>>8C<<1@7A2<,-69:=:9@5>G<7,@=<,1<G,- 89&@868:@,<:E>7>7<,@=<E-!-9?>B<1:<9=7>,@7FE8@7@868/@=12<,@=<71@95,19@:,!>:8>:<:@,<:,:<H6@:<,9297=:9@5,2<<1:>A;<=/2<7<7A5>,<=2<67=<:,@=<>C,19@:,597=@7F,,2955?<A>8G5<1<5D@7@868911@A9AA<,,&-568?@7F9AA<,,:<H6@:<=>795516?,#6555<7F12EA>71@76>6,297=:9@5,:<H6@:<=E/@12<7=,9:9F<C@:<=>>:E,>5@=A>:<!,<5CA5>,@7F#@:<,<G9:91@>7@7F9:9F<@7@868 DG<%/955.55?<9:@7F5>A91@>7,3@<?<98,EF@:=<:,4:>B@=<C655/@=12E,>5@=?<9:@7F=>/71>12<C>67=91@>7E&296,1C97B<71<==@:<A15D>61,@=<=<1<A1>:96=@?5<@7,5<<G@7F9:<9,6,1?</@:<=8>;<=<1<A1>:A>77<A1<=1>9,>67=@7F=<B@A<>:>12<:>:,G9A@7F:<H6@:<=@:A261<,<B<:D,G9A<:<16:7<=?>9:=$#’+"@7/>>=1><9:12,<G9:91@>7$E$%55,1:6A16:958<8?<:,86,1?<9GG:>B<=/>>=>:7916:95:<,@,197A<1>=<A9D>:1:<91<=/>>=6:@7FA>7,1:6A1@>79GG:>B<=9==:<,,<,,2955?<=@,G59D<=G59@75DB@,@?5<97=5<F@?5<C:>812<,1:<<1C:>71@7F12<:@>:1>>AA6G97ADG<:8@1A@1D9GG:>B<5>A91@>7>C2>6,<$965;@7F97=C59,2@7F91955<&1<:@>:>G<7@7F,$5<97,1:<<1=9@5D>C97D891<:@951:9A;<=>71>@1C:>8:>B@=<>61,@=<A>8?6,1@>79@:=6A11>>CCC5>>:<71=:D<:=@:<A15D>61,@=<>:=:9@7<==@:<A15D1>12<<&1<:@>:12:>6F2:@F@=G59,1@A55/91<:C:>8C>67=91@>7=:9@7,>:,68G,86,1?<G68G<=,HC18@7>G<7@7F89&,@552<@F21>:,1<<5G@G@7F<A6:<,68GA>B<:768?<:,8@7@86812@,,@1<’’#@:<<&@1:<H6@:<=8@7A5<9:/@=128@7A5<9:2<@F21G:>G<:1D)!-$#"#E"""$$$$$"#3)!’4"#")!’#’’)!’##")!’#’’(($""##$$"#"$$#$"$%#/ -)!$$$"#’$#’#’##"$"###’$#$$$’$$$$+"$####-%##$$"##""#I’$$$$""- !!""""####"#$"#$"#$"#$("("("("%&’%%&’%%&’%%&’%%&’%%&’%%&’%%&’%%&’%%&’%%&’%%&’%%&’%%&’%%&’%%&’%%&’%%&’%%&’%%&’%%&’%%&’%%&’%%&’%Secure door closed until deck isconstructed with a separate permit. "WH)!-)!)!)!)!)!)!-)!-)!)!--)!-)!*)!*)!)!)!--)!*-)!*-)!)! * )!)!-)!)!)!)!*)!-)!)!)!)!)!)!)!-)!-)!)!)!)!-)!-)!*)!)!)!)!)!)!)! )! "%$#"#" & &),#"&-)!38@74"’&3@714&#$#""#*)!)!#"#"#"#"$#"&##$#$$#!0#"- #"#"$$#"&’ $"&#&)!"$$/ &&#$ & ! &’ $"&# $# !(),&#" !(),! I"#’"#"I&)!"$$&#$&’"’&-)!38@74"$$/ &&#$#!* !* "-!&),34$(),$&)!"$$&#$(! 34#"(’+#+"$$ !!""""####"#$"#$"#$"#$####%&’%%&’%%&’%%&’%UFER Ground-Provide 20' Rebar in footing and stubup near electrical service panel.SmokeBWPsAbove REF.D/W"$"$")!)!)!)!-)!-)!)!)!)!)!)!)!)!)!)!)!*)!-)!)!)!)!)!)!-)!-)!-)!*-)!)!-)!)!)!--)!*)!)!)!**)!)!-)!)!)!*)!)!)!)!)!)!)!-)!--)!)!)!-)!-)!)!-)!)!)!)!)!-)!)!)!)!)!-)!*)!)!)!)!-)!)!)!)!)!)!)!)!)!$##$$" ’&$ $$ ’*)! $$ $),"! $ ’ ’- #- & & * & - &- & ##%- & .)!#%- & .)!! #"$# !(),$# !(),!* ’ &’$""$$’#!* !&),$! ’$"# / #$.#/ "&&#’#$" !!""""####"#$"#$"#$"#$$$$$%&’%%&’%%&’%%&’%))))BWPsAboveBWPsAbove8888CS-WSPCS-WSPSmoke $"$"SDSDSDSDSD)!-)!)!)!-)!-)!-)!-)!-)!)!)!)!)!)!-)!)!)!)!)!)!)!-)!)!)!)!)!)!)!)!)!-)!)!)!)!)!--)!-)!-)!)! -)! )!)!-)!*)!-)!)!)!)!)!)!)!)!)!-)!)!-)!*-)!)!-)!-)!)!)!)!’$" & $ &- &- ’ # & & # # & #" $- & #% & .)!###% & - #""!* ’!$’$"&’ ’/ ’$##)! $$$$$"#/ ’’=-$34#/ J%--$#3"E$E4($ !’$3$$#4 $/ &&- ’- 389&4"38@74--$389&4)!38@74 !!""""####"#$"#$"#$"#$*+*+*+*+%&’%%&’%%&’%%&’%))))(((((((()#$)#$)#$)#$CO-Min. 15" clearance to anyobstruction from center ofW.C., 24" in front(typ).FAN? BASEMENT WALL BRACING PLAN METHOD WSP 4' r---------------- 1 I I ------------------�-------------------- METHOD WSP 4' ---7-1 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I �------___ I METHOD WSP L ________________ _ LJ 1-------------------------� ATTACH WSP TO ALL EXTERIOR SURFACES ABOVE AND BELOW OPENINGS INCLUDING GABLE WALLS ALONG ENTIRE WALL, FULL HEIGHT OF WALL UNO. THIS INCLUDES AREAS COVERED BY LOW ROOFS. * ---- LEGEND SHEAR WALL HOLD-DOWN DRAG STRUT I hereby certify that this plain, speci:fica,ti,on or report wasp epared bv e or 1.m er my direct supervision and that I am a duly k.ense Professional Engineer under the laws of the Sta e of Ml nne!.ota. /L;_cfidlA� Sigriecl: ______________ _ Pr"i'rit Nla:me: Tim 11,,t Lipa,selk ---------------- Date:10/29/2020 1icer1Sce N11mbesr: �46;10 LOCATION WALL BRACING GENERAL NOTES: 1. SEE SHEETS FR-01, FR-02, FR-OJ, FR-04, TJ-1 & TJ-2 (IF APPLICABLE) FOR NOTES AND DETAILS. 2. UNLESS OTHERWISE NOTED, METHOD WSP SHALL BE USED FOR WALL BRACING SEGMENTS IND/CA TED ON THE PLANS. REFER TO SHEET FR-OJ FOR MATERIAL REQUIREMENTS AND ATTACHMENT. J. STRAPS AND HOLD DOWNS SHALL MEET THE STRENGTH REQUIREMENTS IND/CA TED IN THE FRAMING NOTES. SEE SHEET FR-04 FOR STRAPPING REQUIREMENTS. 4. RED OR BLUE THERMO-PLY AND ZIP SYSTEM WALL SHEA THING PANELS INSTALLED PER MANUFACTURER'S SPECIF/CA T/ONS ARE AN ACCEPTABLE 1 TO 1 REPLACEMENT FOR WSP EXCEPT IN PORTAL FRAME W/ HOLDOOWN (PFH) APPL/CATIONS. ALL OTHER FIBERBOARD SHEA THING SHALL BE APPROVED BY DPIS ENGINEERING. 5. STUD WALLS AT SHEAR WALL SEGMENTS SHALL BE CONSTRUCTED WITH 16" O.C. MAX SPACING. REFERENCE SHEET FR-02 & SECTION R602.J.1 OF THE !RC. 6. THIS PLAN IS DESIGNED FOR THIS ADDRESS ONLY. ANY AL TERA TIONS TO THIS PLAN OR CHANGES IN LOCA T!OJf/DDRESS MUST BE APPROVED IN WRITING BY THE NG/NEER OF RECORD. DPIS ENGINEERING,LLC. 1600 EAST HUFSMITH ROAD TOMBALL, TEXAS 77375 PH: 281.351.0048 FAX: 281.351.0148 -st -st LO LO z � ...J ...J w z <( w· Cl) ....J ::::, 0:::a. z w (9 w 0z � ....Juw ::J � Cl) CDa..I ...J CD u u .. ....J w Cl) �_J � co J-�<( � (') �w � a, �s I r--�c.. DRAWN: DESIGNED: CHECKED: AR MMM TML DRAWING SCl'J...E: ISSUE DATE: 1/8" = 1'-0" 10/27/2020 DRAWING NUMBER: WB-1 New build at 5899 Upper 179th. St. W. ,Thomco Heating & Air Conditioning Inc '15185 Carrousel Way Suite 106 •Rosemount, MN 55068 \ ' 612-386-5373 -thomcoheating@gmail.com Sales Consultant: Job#: 20-44 Date: 10/08/2020 System I _ ( Average Load Procedure). �------------------------------------------l Design Conditions Location: Minneapolis/St Paul AP, Minnesota Elevation: 834 ft Daily Range: Medium Input Data: Outdoor Dry Bulb Indoor Dry Bulb Latitude: 44° N Design Grains: 24 Summer: 88 75 Heated Area 2665 Sq.Ft. Winter: -15 70 Cooled Area 2665 Sq.Ft. Heat/Loss Summary (July Heat Load Calculations) Gross Sensible Latent Area Loss Gain Gain Walls 3780 18317 2923 0 Windows 335 8542 5709 0 Doers 42 1250 382 0 Ceilings 1271 2377 1118 0 Skylights 0 0 0 0 Floors i100 1870 0 0 Room Internal Loads 0 9784 1973 Blower Load 1707 0 ... Hot Water Piping Load 0 0 0 { . ✓.-:-•·. Winter Humidification Load 6381 0 0 ·�te::::!, lnfiitration 8822 584 666 A1mroved ACCA Ventilation 4330 2066 1149 MJ8 Calculations Duct Loss/Gain EHLF:::0 ESGF=O 0 () 0 AEO Excursion n/a 1105 nla Suhtotal 51889 25378 3788 Total Heating 51889 Btuh 16 k\v of electric heat Total Cooling 29166 Btuh 98 linear ft. of Hydronic Baseboard •catculat,ons are based on the ACCA Manual J 8th Edition and are approved by ACCA. All computed calculations areestimates based on building use. weather data and inputted 'lalues such as R-Values. window types, duct loss, etc.Equipment selection should meet both the latent and sensible gain as well as building heat loss . .. """............. ·.,,. Adtek AccuLoad Report Version 7 .0.1 : ,C Page 1 5899 Upper 179th. St. Builders Associaton of Minnesota version 101014 New Construction Energy Code Compliance Certificate Place your logo here Per R401.3 Certificate. A building certificate shall be posted on or in the electrical distribution panel. Date Certificate Posted Mailing Address of the Dwelling or Dwelling Unit City5899 Upper 179th. St. W Lakeville, Mn. Name of Residential Contractor MN License NumberPietsch Builders Inc.2358THERMAL ENVELOPE RADON CONTROL SYSTEM Insulation Location Total R-Value of all Types ofInsulationType: Check All That Apply x Passive (No Fan)Non or Not ApplicableFiberglass, BlownFiberglass, BattsFoam, Closed CellFoam Open CellMineral FiberboardRigid, Extruded PolystyreneRigid, IsocynurateActive (With fan and monometeror other system monitoring device)Location (or future location) of Fan: Attic Other Please Describe Here Below Entire Slab Foundation Wall R-5 and R-10 x x Install on inside and outside of wall Perimeter of Slab on Grade Rim Joist (1st Floor)20 x Installed on the inside Rim Joist (2nd Floor+)20 x Installed on the inside Wall 21 x Ceiling, flat 50 x Ceiling, vaulted 50 x Bay Windows or cantilevered areas 30 x Installed on the inside Floors over unconditioned area 30 x Describe other insulated areas Building envelope air tightness:Duct system air tightness: Windows & Doors Heating or Cooling Ducts Outside Conditioned Spaces Average U-Factor (excludes skylights and one door) U: 0.30 Not applicable, all ducts located in conditioned space Solar Heat Gain Coefficient (SHGC):0.32 8 R-value MECHANICAL SYSTEMS Make-up Air Select a Type Appliances Heating System Domestic WaterHeater Cooling System Not required per mech. code Fuel Type gas gas electric x Passive Manufacturer American Standard A.O.Smith American Standard Powered Model AUH1B060A936BA AGPVH50 4A7A3030 Interlocked with exhaust device.Describe: Rating or Size Input inBTUS:60,000 Capacityin Gallons:50 Outputin Tons:2 1/2 Other, describe: Efficiency AFUE or HSPF%95%SEER/EER 13 Location of duct or system: Residential Load Calculation Heating Loss Heating Gain Cooling Load 51,889 29,166 29,166 Cfm's " round duct OR MECHANICAL VENTILATION SYSTEM " metal duct Describe any additional or combined heating or cooling systems if installed: (e.g. two furnaces or air source heat pump with gas back-up furnace): Combustion Air Select a Type Not required per mech. code Select Type x Passive Heat Recover Ventilator (HRV) Capacity in cfms:Low: High:Other, describe: x Energy Recover Ventilator (ERV) Capacity in cfms:Low: High: Location of duct or system: Balanced Ventilation capacity in cfms: Location of fan(s), describe: All bathrooms Cfm's Capacity continuous ventilation rate in cfms:80 CFM " round duct OR Total ventilation (intermittent + continuous) rate in cfms:160 CFM " metal duct NEW RESIDENTIAL CONSTRUCTION SWPPP VERIFICATION This form must be completed and submitted with all new residential permit applications. New residential building permits WILL NOT be issued without this completed form. Project Site Address: _____________________________________________________________________ Company Name: _________________________________________________________________________ Primary Contact: _________________________________________________________________________ Phone # (24 hr Contact): ______________________ Email: ______________________________________ Description of Land Disturbing Activity: _____________________________________________________ NPDES Construction Stormwater Permit # C000 ___ ___ ___ ___ ___ or # SUB00 ___ ___ ___ ___ ___ If you are not covered under a NPDES Construction Stormwater Permit administered by the MPCA, an erosion and sediment control plan MUST be submitted with the residential building permit application. “The permittee(s) shall ensure that the individuals are trained by local, state, federal agencies, professional organizations or other entities in erosion prevention, sediment control, permanent Stormwater management and the Minnesota NPDES/SDS Construction Stormwater Permit.” (NPDES Construction Stormwater Permit, MPCA) “The permittee(s) must ensure that a trained person (as identified in Part III.A.3.a) will routinely inspect the entire construction site at least once every seven (7) days during active construction and within 24 hours after a rainfall event greater than 0.5 inches in 24 hours.” (NPDES Construction Stormwater Permit, MPCA) Contact information of person CERTIFIED to provide weekly onsite erosion and sediment control inspections and corrective actions: Name of Person: ________________________________Company: _______________________________ Phone # (24 hr Contact): ______________________ Email: ______________________________________ Entity that Provided Training: ________________________ Certification Expiration Date: ____________ NOTE: Prior to any land-disturbing activity, all erosion and sediment controls must be installed on the project site and on individual lots. No land disturbing activity may begin until a residential building permit has been issued. I understand, the above information to be true and I will have read, understood, and accepted all terms and conditions of the National Pollutant Discharge Elimination System (NPDES) Permit (MN R 100001). The City of Lakeville may issue a STOP WORK ORDER; withhold building inspections; or, draw on securities/escrows to bring the site into compliance with the NPDES Construction Stormwater Permit (MN R 100001) or erosion and sediment control plan. Signature: ________________________________________________ Date:_________________________ Contact the City of Lakeville with questions at erosion@lakevillemn.gov or 952-985-4500 01/03/22 X KP