Loading...
HomeMy WebLinkAbout12178 Upper 167th St SurveyLOT 3 BLOCK 1 LOT 4 BLOCK 1 UPPER 167TH STREET W. 10.0 10.0 30.0NEW DRIVE PROPOSED HOUSE WALK-OUT BASE=1006.1 GARAGE FF=1014.5 1014.5 1005.6 1014.1 4' RET. WALL TOW=1009.0 BOW=1005.0 4' RET. WALL TOW=1003.0 BOW=999.0 BENCH-TOP OF PIPE=993.51 TENNIS COURT AND FENCING TO BE REMOVED 16.530.516.0 Rongitsch Construction, Inc. 10561 165th Street West Lakeville, MN 55044 ARROWS SHOW DIRECTION OF SURFACE FLOW. BENCHMARK - TOP OF SW LOT CORNER, ELEVATION = 993.51 PROPOSED DRIVE SLOPE = 2.0% ALL ITEMS ARE PROPOSED: TOP OF FOUNDATION = 1014.8 GARAGE FLOOR = 1014.5 BASEMENT FLOOR = 1006.1 FINISHED GRADE AT FRONT OF HOUSE = 1014.1 FINISHED GRADE AT REAR OF HOUSE (WALKOUT) = 1005.6 AREA OF LOT = 19,834 SQ. FT. AREA OF HOUSE/GARAGE = 2,415 SQ. FT. AREA OF DRIVE/WALK = 1,211 SQ. FT. AREA OF IMPERVIOUS = 3,626 SQ. FT. % IMPERVIOUS = 18.3% CURBSTOP WAS DAMAGED DURING SITE CLEARING AND NEEDS TO BE REPLACED BEFORE CONNECTIONS ARE MADE ZONING=RS-1(PRE '94) FRONT YARD=30 FT. SIDE YARD=10 FT. REAR YARD=30 FT. 12178 Upper 167th Street The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies will be released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection. ENGINEERING REVIEWED Date:__________________12/15/2021 corlowsky EROSION CONTROLMUST BE INSTALLED BEFORE EXCAVATION *Maintain 6" between bottom of siding and sod.*No structures in easements.