Loading...
HomeMy WebLinkAbout17924 Evershed Way SurveyZoning = RS-4 The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flush with the sod. This will be scheduled with thelandscape inspection. ENGINEERING REVIEWED Date:__________________12/27/2021 corlowsky *Maintain 6" between bottom of siding and sod.*No structures in easements. EROSION CONTROLMUST BE INSTALLED BEFORE EXCAVATION