HomeMy WebLinkAbout17924 Evershed Way SurveyZoning = RS-4
The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flush
with the sod. This will be scheduled with thelandscape inspection.
ENGINEERING REVIEWED
Date:__________________12/27/2021 corlowsky
*Maintain 6" between bottom of siding and sod.*No structures in easements.
EROSION CONTROLMUST BE INSTALLED
BEFORE EXCAVATION