HomeMy WebLinkAboutLA199445 - Approved Vuthy Phan Solar Drawings wStamp 02 03 2022EXISTINGSNAPNRACKSITE MAP & PV LAYOUTELECTRICAL 1-LINE DIAGRAM ATTACHMENT LAYOUTSYSTEM LABELING DETAILINVERTER DATA SHEETSHEET INDEXPROPERTY PLANMODULE DATA SHEETRACKING DATA SHEETATTACHMENT DATA SHEETPV 1.0PV 2.0PV 4.0PV 5.0PV 6.0D 8.0D 9.0D 10.0SYSTEM RATINGEQUIPMENT SUMMARYELECTRICAL INFORMATIONMAIN SERVICE PANEL BUS SIZE:MAIN SERVICE BREAKER SIZE:MOUNTING SYSTEM:BUILDING INFORMATIONCONSTRUCTION TYPE: V-BOCCUPANCY: R3ROOF:Truss 2 x 4 @ 24" O.C.Comp ShingleVICINITY MAP (SCALE: NTS)SATELLITE VIEW (SCALE: NTS)GENERAL NOTES1.All electrical materials shall be new and listed by recognizedelectrical testing laboratory Custom made equipment shall have complete test data submittedby the manufacturer attesting to its safety2.Outdoor equipment shall be NEMA 3R rated or equivalent3.All metallic equipment shall be grounded4.Contractor shall obtain electrical permits prior to installation andshall coordinate all inspections, testing commissioning andacceptance with the client, utility co. and city inspectors as needed.5.The electrical contractor shall verify the exact locations of servicepoints and service sizes with the serving utility company andcomply with all utility companies requirements.6.Drawings are diagrammatic only, routing of raceways shall beoption of the contractor unless otherwise noted and shall becoordinated with other trades.7.If the roof material or the roof structure not adequate for PVinstallation, call the engineer of record print to installation. Thecontractor is responsible to verify that the roof is capable ofwithstanding the extra weight.8.If the distances for cable runs are different than shown, thecontractor shall notify the electrical engineer to validate the wiresize. Final drawings will be red-lined and updated as appropriate.9.Whenever a discrepancy in quality of equipment arises on thedrawing or specifications, the contractor shall be responsible forproviding and installing all materials and services required by thestrictest conditions noted on the drawings or in the specificationsto ensure complete compliance and longevity of the operablesystem required by the engineer of record.PHOTOVOLTAIC NOTES:1.Rooftop mounted photovoltaic panels and modules shall be tested,listed and identified by recognized testing laboratory2.Solar system shall not cover any plumbing or mechanical vents3.Modules and support structures shall be grounded unless racking has integrated ground.4.Removal of an interactive inverter or other equipment shall notdisconnect the bonding connection between the groundingelectrode conductor and the photovoltaic source and/or outputcircuit grounded conductors.5.All PV modules and associated equipment and wiring shall beprotected from physical damage.6.Live parts of PV source circuits and PV output circuits over 150v toground shall not be accessible to other than qualified persons while energized.7.Inverter is equipped with integrated DC disconnect, thus providingground fault protection8.All conductors shall be copper and 75 deg rated9.A single conductor shall be permitted to be used to perform themultiple functions of dc grounding, AC grounding and bondingbetween AC and DC systems.10.Non-current carrying metal parts of equipment shall be effectivelybonded together. Bond both ends of raceways.150A150A01/20/2022Property Address:Owner:Vuthy PhanProperty Type:Single Family ResidenceDrawn by:New@engineerinc.ioDate:DC 9.775 KW STCAC 7.6 KW STC21381 Hytrail Cir Lakeville, MN 55044CONTRACTORAddress:101 Isanti ParkwayNE, Isanti, MN 55040Phone number: (763) 229-6662E-mail: contact@wolfriverelectric.comTHE INSTALLATION OF SOLAR ARRAYS ANDPHOTOVOLTAIC POWER SYSTEMS SHALL COMPLY WITHTHE FOLLOWING CODES:·2020 National Electrical Code·2018 International Building Code·2018 International Residential Code·2020 Minnesota Residential Code·2020 Minnesota Building Code·2020 Minnesota Energy Code·2020 Minnesota Accessibility Code·2020 Minnesota State Fire Code·2018 International Fire Code·2018 International Energy Conservation Code·2018 Mechanical CodeAS ADOPTED BY THE STATE OF MINNESOTAALL OTHER ORDINANCE ADOPTED BY THELOCAL GOVERNING AGENCIESGOVERNING CODESPV 3.123 LG 425 WATT MODULES WITH P505 POWEROPTIMIZERS, SOLAREDGE HD WAVE 7.6 KW INVERTEROPTIMIZER DATA SHEETPV 7.0D 11.0SURGE PROTECTIOND 12.0D 13.0INVERTER CERTIFICATIOND 14.0PV INSPECTION CHECKLISTINVERTER CERTIFICATIONPLACARDPV 3.2D 15.0MILBANK DATA SHEETDate Certified andSigned: 02/03/2022 SOLAR MODULES___ LG 425 WattModel #LG425QAK-A6 425WEMT type ConduitSolar Module(N) Junction BoxJB.........................................................23INDEX(N) Production MeterPM...........AC...................(N) 60A Utility AC(N) OptimizerNOTE: Conduit in attic shallbe minimum 18 inches from roof sheatingSITE MAP & PVLAYOUTPV 1.0PV SYSTEMAS INDICATEDScale:Project:Drawn by:New@engineerinc.ioProject Name:Property Adress:01/20/2022Vuthy Phan21381 Hytrail CirLakeville, MN 55044DATE:CONTRACTORIN(N) Inverter.........................Wolf RIver ElectircAddress:101 Isanti ParkwayNE, Isanti, MN 55040Phone number: (763) 229-6662E-mail: contact@wolfriverelectric.comNOTE: No clearance issue Distance between all equipments is maximum 10"(E) Main MeterMM........................FMT type Conduit..............SECONDARY INTERCONNECTIONDakota Electric#:TBDNote: 24/ 7 Unescorted keyless access is to beprovided for ALL UTILITY EQUIPMENT..........................INVERTERINVERTER TYPE: Central:Solar Edge Single Phase 7.6 kWHD Wave Technology InverterModel #SE7600H-US(240V)EQUIPMENT ELEVATIONMainServicePanelUtility ACDisconnectPerformanceMeterFrom roofSolarEdgeStorEdgeMainMeter4'MSP(E) Main Service Panel150AInsideOutsideInsideOutside10"10"Fire Setback Line..............18 ' ' f i r e s e t b a c kJB ACINPMMMMSPbSolar PV Array 18 - LG 425W Modules8 - P505 Power OptimizerPitch: 27 DegOrientation: 224 Deg18'' fire setbackHytrail CirbbbbbbbbbbSolar PV Array 211 - LG 425W Modules11 - P505 Power OptimizerPitch: 27 DegOrientation: 134 DegGASRoof Access36 " f i r e p a t h w a y 18'' fire setback36 " f i r e s e t b a c k 36 " f i r e s e t b a c kaaaaaaaa aaaaSolar PV Array 34 - LG 425W Modules4 - P505 Power OptimizerPitch: 27 DegOrientation: 44 DegSCALE:3/32" = 1'-0" 180° 90° 270°0°SWNE 6000(4) #10 AWG THWN/THWN-2(1) #8 AWG GND3/4" FMT, 15 FEET1J BOXNEMA3RSolarEdge Power OptimizerRated DC Input Power -Maximum Input Voltage - 87 VdcMPPT Range - 12.5 to 87 VdcMaximum Input Current - 12.5 AdcMaximum Output Current - 15 AdcString Limitations - 6 to 25Optimizers, watts STC per string maximum.Solaredge optimizers have integratedrapid shut downP505505 watts12STRING - A2 PV 2.1PV SYSTEMAS INDICATEDScale:Project:Project Name:Property Adress:Vuthy Phan21381 Hytrail CirLakeville, MN 55044ELECTRICAL 1-LINE DIAGRAMCONTRACTOR60A FUSED AC DISCONNECT,WITH 40A FUSESUTILITY AC DISCONNECT VISIBLE-OPENLOCKABLE, READILY ACCESSIBLENEMA3R120 / 240V32AWolf RIver ElectircAddress:101 Isanti ParkwayNE, Isanti, MN 55040Phone number: (763) 229-6662E-mail: contact@wolfriverelectric.comEXISTING______ MAINSERVICEPANEL120/240V,1P, 3WGEC(E) GROUNDINGELECTRODE SYSTEM150ANOTE: Service Panel does not contain center fed Main Breaker:SECONDARY INTERCONNECTIONATT:PLEASE REFER TO WH NETMEETERING GUIDE:APPENDIX GThe lockable visible disconnect must be located within 5 feet from the GeneralService Meter and must be located onthe exterior of the buildingMeter Socket must be 150A ratedand must have lever BypassFor smaller DERs, using the PoC as the Reference Point of Applicability allows the DERequipment type testing certification to be utilized as the main method by whichcompliance with the Standard is verified. The PoC might be the terminals of an inverter,for example, and utilizing a UL 1741 certified and listed inverter would be sufficient todemonstrate Standard compliance. In locations where there is no local Public Authority, the customer is exempt frominspection, and/or the service has been shut off or disconnected for more than 365 days (1 year),the licensed electrician or wireman shall submit a signed and dated Dakota Electric ElectricalInspection Certificate to the Company’s Builders Call Line attesting that the electrical installationhas been completed and installed according to the current National Electrical Code®, the DakotaElectric Standard for Electric Installation and Use, and any other applicable codes that apply beforeelectric service is energized.AtticWall MAIN METER120/240V,1P, 3W(4) #10 AWG THWN/THWN-2(1) #8 AWG GND3/4" EMT, 25 FEET111STRING - B2NOTE:UTILITY HAS 24 HOURUNRESTRICTED ACCESS TO ALL PVSYSTEM COMPONENTS LOCATED ATSERVICE ENTRANCE.If there is cold water bonding and UFER , noadditional supplementary rod is requiredIf there is no UFER new ground rod shall beinstalledIf existing ground rod is more than 25-OHMthan a new ground rod shall be installedEXISTINGNON CENTER _____MAIN C/B150A(2) #10 AWG PV WIRE,(1) #10 AWG EGCFREE IN THE AIRSurge ProtectionREFERENCE POIN OF APPLICABILITY23 LG 425WATT MODULES23 P505 POWER OPTIMIZER(3) #6AWG THWN(1) #6 AWG GND 3/4" PVC, 2 FEETDakota Electric#:TBDNote: 24/ 7 Unescorted keyless access is to beprovided for ALL UTILITY EQUIPMENTSolar Edge single phaseHD Wave 7.6kW TechnologyInverter have IntegratedDC Disconnect safety switchand Arc Fault ProtectionINVERTERSOLAR EDGE HD WAVE 7.6 kWMODEL #SE7600H-US(240V)(3) #6AWG THWN/THWN-23/4" PVC,2 FEET32ADC 9.775 KW STCAC 7.6 KW STCDrawn by:New@engineerinc.io01/20/2022DATE:PV ARRAY RATINGWIRE SIZE CALCULATIONPV ARRAYFROM JUNCTION BOX TO INVERTERNumber Modules23TypeLG425QAK-A6LG425WattMaximum Current (A)12 *425 / 400 = 12.75Number Inverters1Solar Edge 7.6kW Inverter with OptimizersSE7600H-US (240V)Considers Continuous (A)12.75 * 1.25 = 15.937LocationWatts STC, (425Watts/Module) 23 * 425 = 9775Short Circuit Current (A)15.973 * 1.25 = 19.92Array CurrentsI-SC10.84AI-MP10.31ARaceway Height From Roof (Temp 39+22=61C)3 1/2"Module VoltageV-OC48.1VV-MP41.3VTemp. Derate Factor (A)19.92 / 0.71 = 28.05SYSTEM POWER#of wire(#of Strings*2)4Number Of Strings2Max Number of Modules Per String12More Than 3 CCC Adjist. Factor0.8Max DC Wattage In Strings12 * 425 = 5100 < 6000 (Watts)Max AC Voltage 120/240VAdjusted Conductor Ampacity(A)28.05 / 0.8 = 35.07FROM INVERTER TO MAIN PANELWire Size from NEC Table 310.15(b)1610 AWGTotal Current (A)32Ambiend Tem Factor Per NEC Table 310.15(b)(2)(a)0.71Total AC Wattage (Watts)7600Consider Continuous (A)32 * 1.25 = 40Temperature Adjustment40 / 0.91 = 36.4AConductor Size From NEC Table 310.166 AWGPV Production meter socket musthave lever bypass/bypassProduction meter is required based on the der sizeand program under which the application is submittedSQUARE-D-200A PVproduction meter socket withstamped brass aluminium orstainless steel tag labeled inaccordance with NEC andAHJ requirmentslocated within 5' of main.Inverter output wired to loadside terminal of meter1 phase 3-wire 120/240V32ANOTE: EMT only use from roof to combiner. Conduit between the boxeson the ground is PVC so we can avoid using ground bushings for metallic tube.(3) #6AWG THWN/THWN-23/4" PVC,2 FEETLINE SIDE TAPWITH K4977-INT LUG(NEW)GECAdd 2nd Ground rod andtie it to the existing ground rod.(1) #6 AWG GND PV 3.1PV SYSTEMAS INDICATEDScale:Project:Project Name:Property Adress:Vuthy Phan21381 Hytrail CirLakeville, MN 55044CONTRACTORWolf RIver ElectircAddress:101 Isanti ParkwayNE, Isanti, MN 55040Phone number: (763) 229-6662E-mail: contact@wolfriverelectric.comSYSTEM LABELING DETAILDrawn by:New@engineerinc.io01/20/2022DATE:PV ARRAYJ BOXPV SUB-PANELACDISCONNECTPVPRODUCTIONMETERMAIN SERVICEPANELMETER12333331617218135Note: LABELS SHALL COMPLY WITH NEC 690“Labels shall be weatherproof, durable and permanently mounted”32AProduction MeterLABEL 1Photovoltaic Power SourceLABEL 2CAUTION: SOLAR CIRCUITLABEL 3WARNINGELECTRIC SHOCK HAZARDTHE DC CONDUCTORS OF THISPHOTOVOLTAIC SYSTEM AREUNDERGROUND AND MAY BE ENERGIZEDLABEL 4WARNINGELECTRIC SHOCK HAZARDIF GROUND FAULT IS INDICATEDNORMALLY GROUNDED CONDUCTORSMAY BE UNDERGROUND AND ENERGIZEDLABEL 5WARNINGELECTRIC SHOCK HAZARDDO NOT TOUCH TERMINALSTERMINALS ON BOTH LINE AND LOADSIDES MAY BE ENERGIZED IN THE OPENPOSITIONLABEL 6WARNINGELECTRIC SHOCK HAZARDDO NOT TOUCH TERMINALSTERMINALS ON BOTH LINE AND LOADSIDES MAY BE ENERGIZED IN THE OPENPOSITIONDC VOLTAGE IS ALWAYS PRESENTWHEN SOLAR MODULESARE EXPOSED TO SUNLIGHTLABEL 7WARNINGLABEL 8TURN OF PHOTOVOLTAICAC DISCONNECT PRIOR TOWORKING INSIDE PANELDO NOT DISCONNECTUNDER LOADLABEL 9MAIN PV SYSTEMDISCONNECTLABEL 10MAIN PV SYSTEMAC DISCONNECTLABEL 11LABEL 12CAUTIONLABEL 13SOLAR ELECTRIC SYSTEMCONNECTEDWARNING-LABEL 14 DUAL POWER SOURCESECOND SOURCE IS PV SYSTEMCAUTIONLABEL 15PHOTOVOLTAIC SYSTEM CIRCUITIS BACKFEDLABEL 16PHOTOVOLTAIC AC DISCONNECTMAXIMUM AC OPERATING CURRENTMAXIMUM AC OPERATING CURRENTPHOTOVOLTAICLABEL 17UTILITY AC DISCONNECTPHOTOVOLTAICLABEL 18DC DISCONNECTNOMINAL OPERATING AC VOLTAGENOMINAL OPERATING AC FREQUANCYMAXIMUM AC POWERMAXIMUM AC CURRENTMAX OCERCURRENT DEVICE RATINGFOR AC MODULE PROTECTIONLABEL 19LABEL 20PV SYSTEM DC DISCONNECTOPERATING CURRENTOPERATING VOLTAGEMAXIMUM SYSTEM VOLTAGESHORT CIRCUIT CURRENTCAUTIONLABEL 21PHOTOVOLTAIC SOURCECONNECTED***ALL LABELS = RED THERMOPLASTIC/REFLECTIVE , Permanently mounted240VSOLAR DISCONNECT21 PLACARDPV 3.2PV SYSTEMAS INDICATEDScale:Project:Project Name:Property Adress:Vuthy Phan21381 Hytrail CirLakeville, MN 55044CONTRACTORWolf RIver ElectircAddress:101 Isanti ParkwayNE, Isanti, MN 55040Phone number: (763) 229-6662E-mail: contact@wolfriverelectric.comCAUTIONPOWER TO THIS BUILDING IS ALSO SUPPLIEDFROM THE FOLLOWING SOURCES WITHDISCONNECTS LOCATED AS SHOWN:CAUTIONPOWER TO THIS BUILDING IS ALSO SUPPLIEDFROM THE FOLLOWING SOURCES WITHDISCONNECTS LOCATED AS SHOWN:SERVICE 1 OF 2SERVICE 2 OF 221381 Hytrail Cir Lakeville, MN 5504421381 Hytrail Cir Lakeville, MN 55044Drawn by:New@engineerinc.io01/20/2022DATE:NWESNWESSERVICE POINT &UTILITY METERINGPV SYSTEM DISCONNECTFOR UTILITY OPERATIONINVERTERSOLAR PV ARRAYPERFORMANCE METERSERVICE POINT &UTILITY METERINGPV SYSTEM DISCONNECTFOR UTILITY OPERATIONINVERTERSOLAR PV ARRAYPERFORMANCE METER PROPERTY PLANLEGENDMSPMain Service Panel................ Production MeterPM.................. AC DisconnectAC.........................PV 4.0PV SYSTEMAS INDICATEDScale:Project:Project Name:Property Adress:Vuthy Phan21381 Hytrail CirLakeville, MN 55044CONTRACTORInverterIN........................................Wolf RIver ElectircAddress:101 Isanti ParkwayNE, Isanti, MN 55040Phone number: (763) 229-6662E-mail: contact@wolfriverelectric.comMMMain Meter............................ Dakota Electric#:TBDNote: 24/ 7 Unescorted keyless access is to beprovided for ALL UTILITY EQUIPMENTDrawn by:New@engineerinc.io01/20/2022DATE:PROPERTY LINED r i v e w a y H y t r a i l C i rACINPMMMMSP104'-8"55'-6"148'-1"160'-2"9'-11"30'42'-10"71'-3"AC UnitFENCEGASSCALE:1/16" = 1'-0" 180° 90° 270°0°SWNEDate Certified andSigned: 02/03/2022 ATTACHMENTLAYOUTPV 5.0PV SYSTEMAS INDICATEDScale:Project:Project Name:Property Adress:Vuthy Phan21381 Hytrail CirLakeville, MN 55044CONTRACTORWolf RIver ElectircAddress:101 Isanti ParkwayNE, Isanti, MN 55040Phone number: (763) 229-6662E-mail: contact@wolfriverelectric.comDESIGN CRITERIAModules:Max Distributed Load: 3 PSFPOINT LOAD CALCULATION PER ARRAYModule Weight (lbs)# Of Modules45.19Total Module Weight (lbs)Rack Weight (lbs)Optimizers Weight (lbs)Total System Weight (lbs)# Of StandoffsMax Span Between Standoffs (in)Loading Per Standoff (lbs)Total Area (sq.ft.)Loading (PSF)1039.37207.8739.11286.34664819.495062.54RAIL ATTACHMENTMODULES ON ROOFTruss 2 x 4 @ 24" O.C.2323Dakota Electric#:TBDNote: 24/ 7 Unescorted keyless access is to beprovided for ALL UTILITY EQUIPMENT1 Layer of .Plywood & Building FeltSolar Module6"AttachmentMODULES ON ROOFTruss 2 x 4 @ 24" O.C.Comp. ShinglePrior to the commencement of work, the contractor shall verify the existing roof and framingconditions. Notify New@engineerinc.io of any Discrepancies prior to starting construction.Prior to the commencement of work, the contractor shall inspect framing for any damagesuch as water damage, cracked framing, etc. and These Plans are stamped for structuralcode compliance of the roof framing supporting the proposed PV installation reference only.These plans are not stamped for water leakage. PV modules, racking, and attachmentcomponents must follow manufacturer guidelines and requirements. Attachments to beinstalled in a staggered orientation to properly distribute loads.2x4PurlinDrawn by:New@engineerinc.io01/20/2022DATE:SNAPNRACK , ULTRA RAIL ATTACHMENT DETAILS1.00.3004.20105°0.45.3508.753.256.7511.751.370.300.381.801.622.781.781.503.251.00SLOT1.50COMP FLASHING PROPERTIESDESCRIPTIONSKUCOMP FLASHING,9" X 12",BLACK ALUM232-01375232-01376COMP FLASHING,9" X 12",SILVER ALUMSnapNrack Solar Mounting SolutionsUMBRELLA L FOOT PROPERTIESDESCRIPTIONSKUULTRA RALL UMBRELLA L FOOT,SILVER242-01219242-01220ULTRA RALL UMBRELLA L FOOT,BLACKDate Certified andSigned: 02/03/2022 INVERTERDATA SHEETINVERTERDATA SHEETD 6.0PV SYSTEMAS INDICATEDScale:Project:Project Name:Property Adress:Vuthy Phan21381 Hytrail CirLakeville, MN 55044CONTRACTORWolf RIver ElectircAddress:101 Isanti ParkwayNE, Isanti, MN 55040Phone number: (763) 229-6662E-mail: contact@wolfriverelectric.comDrawn by:New@engineerinc.io01/20/2022DATE: POWER OPTIMIZERDATA SHEETD 7.0PV SYSTEMAS INDICATEDScale:Project:Project Name:Property Adress:Vuthy Phan21381 Hytrail CirLakeville, MN 55044CONTRACTORWolf RIver ElectircAddress:101 Isanti ParkwayNE, Isanti, MN 55040Phone number: (763) 229-6662E-mail: contact@wolfriverelectric.comDrawn by:New@engineerinc.io01/20/2022DATE: MODULEDATA SHEETD 8.0PV SYSTEMAS INDICATEDScale:Project:Project Name:Property Adress:Vuthy Phan21381 Hytrail CirLakeville, MN 55044CONTRACTORWolf RIver ElectircAddress:101 Isanti ParkwayNE, Isanti, MN 55040Phone number: (763) 229-6662E-mail: contact@wolfriverelectric.comDrawn by:New@engineerinc.io01/20/2022DATE: RACKINGDATA SHEETD 9.0PV SYSTEMAS INDICATEDScale:Project:Project Name:Property Adress:Vuthy Phan21381 Hytrail CirLakeville, MN 55044CONTRACTORWolf RIver ElectircAddress:101 Isanti ParkwayNE, Isanti, MN 55040Phone number: (763) 229-6662E-mail: contact@wolfriverelectric.comDrawn by:New@engineerinc.io01/20/2022DATE: ATTACHMENTDATA SHEETD 10.0PV SYSTEMAS INDICATEDScale:Project:Project Name:Property Adress:Vuthy Phan21381 Hytrail CirLakeville, MN 55044CONTRACTORWolf RIver ElectircAddress:101 Isanti ParkwayNE, Isanti, MN 55040Phone number: (763) 229-6662E-mail: contact@wolfriverelectric.comDrawn by:New@engineerinc.io01/20/2022DATE: D 11.0PV SYSTEMAS INDICATEDScale:Project:Project Name:Property Adress:Vuthy Phan21381 Hytrail CirLakeville, MN 55044CONTRACTORSURGE PROTECTIONWolf RIver ElectircAddress:101 Isanti ParkwayNE, Isanti, MN 55040Phone number: (763) 229-6662E-mail: contact@wolfriverelectric.comDATE:Drawn by:New@engineerinc.io01/20/2022DATE: D 12.0PV SYSTEMAS INDICATEDScale:Project:Project Name:Property Adress:Vuthy Phan21381 Hytrail CirLakeville, MN 55044CONTRACTORINVERTERCERTIFICATIONWolf RIver ElectircAddress:101 Isanti ParkwayNE, Isanti, MN 55040Phone number: (763) 229-6662E-mail: contact@wolfriverelectric.comDrawn by:New@engineerinc.io01/20/2022DATE: D13.0PV SYSTEMAS INDICATEDScale:Project:Project Name:Property Adress:Vuthy Phan21381 Hytrail CirLakeville, MN 55044CONTRACTORWolf RIver ElectircAddress:101 Isanti ParkwayNE, Isanti, MN 55040Phone number: (763) 229-6662E-mail: contact@wolfriverelectric.comINVERTERCERTIFICATIONDrawn by:New@engineerinc.io01/20/2022DATE: D 14.0PV SYSTEMAS INDICATEDScale:Project:Project Name:Property Adress:Vuthy Phan21381 Hytrail CirLakeville, MN 55044PV INSPECTIONCHECKLISTCONTRACTORWolf RIver ElectircAddress:101 Isanti ParkwayNE, Isanti, MN 55040Phone number: (763) 229-6662E-mail: contact@wolfriverelectric.comWolf RIver ElectricLakeville, MN 5504421381 Hytrail CirDrawn by:New@engineerinc.io01/20/2022DATE: D 15.0PV SYSTEMAS INDICATEDScale:Project:Project Name:Property Adress:Vuthy Phan21381 Hytrail CirLakeville, MN 55044CONTRACTORWolf RIver ElectircAddress:101 Isanti ParkwayNE, Isanti, MN 55040Phone number: (763) 229-6662E-mail: contact@wolfriverelectric.comDrawn by:New@engineerinc.io01/20/2022DATE:MILBANKDATA SHEET