Loading...
HomeMy WebLinkAboutLA197621 - 21160 Idaho Ave Permit PackRESIDENTIAL BUILDING PERMIT APPLICATION PAGE 2 OFFICE USE ONLY BUILDING PERMIT TYPE REQUIRED INSPECTIONS SINGLE FAMILY DWELLING BUILDING DUPLEX AS BUILT TOWNHOUSE UNITS BUILDING FINAL DETACHED TOWN HOUSE UNIT DECK FOOTING CONDO FIREPLACE ACESSORY BUILDING FOOTING REROOF FOUNDATION RESIDE FRAMING PORCH FRAMING GARAGES INSULATION RES ADDN/REPAIR/RMDL DECK PORCH GARAGES LATH LOWER LEVEL FINISH LOWER LEVEL FINAL ADDITION OTHER FOUNDATION ONLY PORCH FOOTING MISCELLANEOUS POURED WALL DEMO SEPTIC TANK REMOVAL MOVED SITE MECHANICAL CITY BUILDING VALUATION: $AIR TEST FINAL BUILDING PERMIT FEES ROUGH-IN $PERMIT FEE PLUMBING $PLAN CHECK FINAL $SURCHARGE ROUGH-IN $METRO SAC METER SIZE $CITY WATER HOOKUP UNIT PRESSURE REDUCING VALVE $CITY SEWER HOOKUP UNIT SEWER/WATER $LANDSCAPE ESCROW SEWER/WATER $TREE ESCROW FINAL $MISC ESCROW STREET DRAINTILE $PLUMBING BUILDING INFORMATION $MECHANICAL TYPE OF CONSTRUCTION $SEWER WATER ZONING $OTHER CODE EDITION $TOTAL FIRE SUPPRESSION SYSTEM OCCUPANCY GROUP APPROVED BY: BUILDING INSPECTOR: Date: PLUMBING/MECHANICAL INSPECTOR: Date: COMMENTS: 20195 Holyoke Avenue, Lakeville, MN 55044 952-985-4400  952-985-4499 fax www.lakevillemn.gov Sewer & Water Tie Card Address:________________________________________ Contractor:______________________________________ Permit Number:__________________________________ Final Date:________________ Street Drain-Tile:______ Size of Water Service: 1” Comments: AIRTEST SANITARY OVER 20’/2 FITTINGS THIS CARD MUST BE COMPLETED AND ON-SITE AT TIME OF SEWER & WATER INSPECTION 21160 IDAHO AVE, LAKEVILLE*ALL DOOR & WINDOW HEADERSTO BE S.P.F. #2 OR BETTERRESIDENCE FOR:written consent of Planco MN, Inc. modified or used in any redesign without the priormay not be assigned or copied, and may not bemay not be re-used for any additional structures,structure. Planco MN reserves all rights. These planslicense is granted to use these plans to build oneCopyright for these drawings is owned by Planco MN,Planco MN, Inc.cHEBERT HOMES#21-073SMA182021LOT 2, BLOCK 1 FRONT ELEVATION 1/4" = 1'-0" 16x8 OVH. DR.9x8 OVH. DR.812812512TOTAL2nd FLR.1st FLR.1,294 SQ. FT.1,316 SQ. FT.2,610 SQ. FT.9' CEILING @ FIRST FLOOR9' POURED FOUNDATION1'-6"1'-0"VINYL B & BVINYL B & B12x12 BOXED COL.CONC. PORCHSTONEON JOG3'-0"STONECAPSTONE612VINYL B & BWDW. TRIMALL SIDESU VALUE = .29FRONT ONLYVINYL CORNERSANDERSEN 100 SERIES WINDOWSVINYL SIDINGFRONT ONLYFRONT ONLYVINYL B & BSTONE AS SHOWNALL SIDES7/16" OSB SHEATHING3 1/4" CASING TRIMINTERIORSSSS4" TRIMGLASS @ TOP PANELGLASS @ TOP PANELConcept Approval ONLYSubject to Field InspectionInspectorDate2020MN BldgCode11/12/2021dmathews VERIFY ALLGRADE LINESPlanco MN, Inc.C#21-073SMA282021 LEFT ELEVATION 1/8" = 1'-0" 8128121261252'-6"2'-0"1'-6"SIDINGVINYL SIDINGVINYL VINYLCORNERS RIGHT ELEVATION 1/8" = 1'-0" 8121251251'-9"1'-0"SIDINGVINYL 6"6/12VINYLCORNERS REAR ELEVATION 1/8" = 1'-0" 8121266"1'-6"SIDINGVINYL 1'-0"5/12VINYLCORNERSSIDINGVINYL ROOF PLAN 1/8" = 1'-0" 1261268128121251'-9"1'-6"2'-0"1'-6"5/122'-6"6"812812Secure door closed until deck isconstructed with a separate permit. Planco MN, Inc.C#21-073SMA382021 BASEMENT PLAN 1/4" = 1'-0" UP17 R2-2x105/0x4/0 SL2-2x105/0x4/0 SL206820682668 UNEXCAVATED UNEXCAVATED 246836"WHFURNF.D.92%2-9 1/2" LSLDROPPED BEDROOM #5 *CARPET MECH/STORAGE *UNFINISHED FAMILY/REC RM *CARPET38'-0" 15'-6"7'-6"WALLEDGE15'-0" 6'-0"WALLEDGE2'-10"34'-0"16'-0"18'-0"4'-0" 60'-0"28'-0"32'-0"2'-0"26'-0" 36'-0" 4'-0"12'-0"56'-0"34'-0"22'-0"13'-0"21'-0"22'-0"6'-0"18'-0"4" LEDGE4" LEDGE2" LEDGE20x8 FTG.1/2C. - 6" BLK.2x6 - 16" O.C.9'-2"6'-2"3'-4"4'-2"10"26683'-9"3'-9"20x8 FTG.1/2C. - 6" BLK.2x6 - 16" O.C.20x8 FTG.1/2C. - 6" BLK.2x6 - 16" O.C.20x8 FTG.1/2C. - 6" BLK.2x6 - 16" O.C.20x8 FTG.1/2C. - 4" BLK.2x4 - 16" O.C.5'-10"4'-6"8'-0"9'-3"12'-2" 6'-1"9'-5"30"x30"x12"CONC. PAD FTG.13'-2"32'-0"2" LEDGE9' POURED FOUNDATION WET BAR *L.V.T.5'-6"2'-6" 24'-6"11'-6" 9'-3" 2'-3" 18" FLR.TRUSS 24" O.C. 18" FLR.TRUSS 24" O.C. 18" FLR.TRUSS 24" O.C.SD/CO48 34 F28682868 EXERCISE RM *CARPET3'-8"11'-10"10'-4"5'-0"*VINYL2'-0"REF'GU.C.”),1,6+('64)7 (;&/8'(667$,56 2x61 PIECE FIB.8'-2516"12'-4"SDUFER Ground-Provide 20' Rebar in footing and stubup near electrical service panel. Planco MN, Inc.C#21-073SMA482021 FIRST FLOOR PLAN 1/4" = 1'-0" 1,294 SQ. FT.9' CEILING @ FIRST FLOOR38'-0"4'-6"UP17 RDN17 R6'-8"3'-9"3'-9" 9'-5" CONC. PORCH 2468 OFFICE/FLEX RM *CARPET6'-1"7'-6"12x12 BOXED COL.3/0x5/0-2 SH3-2x10WALLEDGE*WOOD6'-2"10'-9"6"10'-9"10'-9"2x6TRUSSES 24" O.C.2-7 1/4" LSL2-2x10 FLUSH3'-11"2'-2" 2/4x4/0 SH TEMPF RADONVENT2x624682'-6"30"4'-7"28682-2x10 5068 C.O.CHASE246824682868PKT.16" SH'SPANTRY*WOOD66" BENCH2868PKT.206820683068SLREF'G KITCHEN *WOOD30" RANGE W/ HOODVENT 12" CAB. S.B.MICRO3-9 1/2" LVL 6068 P.D. 15'-0"GASF.P.6'-0" 5'-6"6"WALLEDGE FOYER *WOOD MUD ROOM *VINYL2868FIREDOOR2-2x10 W.I.C. *VINYL*WOOD GREAT ROOM *WOOD DINING 16x8 OVH. DR.9x8 OVH. DR.*4" CONC. FLOOR GARAGE *2x6 WALLSTRUSSES24" O.C. 5'-2"4'-8"5'-2"1'-6"6"18" FLR.TRUSS 24" O.C.2-11 7/8" LSL FLUSHGIRDER TRUSSES24" O.C.GIRDER2-11 7/8" LSL3-9 1/2" LSL6/0x5/0 FX3/0x5/0 SH3/0x5/0 SH3-2x105/0x5/0 FX3/0x5/0 SH3/0x5/0 SH34'-0"16'-0"18'-0"8'-0"8'-0"8'-9"9'-3"4'-0" 58'-0"26'-0"32'-0"2'-0"24'-0" 36'-0"6'-0" 11'-6"13'-0"5'-6"2'-0"4'-0"4'-0"4'-0"7'-6"4'-3"5'-6"6'-0"12'-0"56'-0"34'-0"22'-0"13'-0"21'-0"6'-10"10'-6"2-11 7/8" LSL6'-0"5'-10"18" FLR.TRUSS 24" O.C.18" FLR.TRUSS 24" O.C.2-9 1/2" LSL FLUSHFLUSH2x62x62x62x6SD/CO6'-6"2'-5"26'-9"3'-8"2-9 1/2" LSL6'-2"7'-6"4'-6"10"3'-8"7'-11"22'-0"24" CANT.SL5'-6"5'-0"6"2'-6" 2'-0"5'-0"3-2x106'-0"3"3"3"3"(3)14" LVLCS-PFCS-PFCS-PFCS-PFCS-PF48" GB4' WSP4' WSP4' WSP4' WSPCS-PFCS-PFCS-PFCS-PFCS-PFCS-PFBWPsAboveBWPsAbove Planco MN, Inc.C#21-073SMA582021 SECOND FLOOR PLAN 1/4" = 1'-0" 1,316 SQ. FT.TRUSSES24" O.C.DN17 R20682068RADONVENT5'-0" TUB & SHOWER 1 PIECE FIB.F*VINYL66"26682668206820682068266860342468PKT.24681668LIN.LIN.20682868LTW D 2868PKT.84"5/0x4/0 SL3-2x106/0x4/0 SL2-2x10PKT.24682-9 1/2" LSL4/0x5/0-2 SH3-2x103/0x5/0-2 SH*CARPET MASTER BEDROOM *VAULTRIDGE OFVAULT*CARPET W.I.C. *CARPET BEDROOM #2 BEDROOM #3 *CARPET BEDROOM #4 *CARPETSD/CO2468SDSDSDSD2-2x10 3/0x4/0 SH *VINYLFF4/0x5/0 FX TEMP 2-2x10 34'-0"14'-0"6'-10"13'-2"7'-2"6'-10"6'-9"6'-5"40'-0" 11'-9"5'-9"7'-6"2'-8"12'-4"WALLEDGEWALLEDGE3'-9"3'-9" 38'-0" 12'-6"3'-4"7'-2"15'-0" 5'-0"2'-2"*VINYL34'-0"12'-0"22'-0"10'-4"2'-8"6'-0"6'-0"2'-0" 6'-213 16"14'-0"2'-6"2'-6"15'-0"TRUSSES24" O.C.5'-8"5'-5"6'-5"2x62'-6"4'-0"6'-2"RAIL 10"5'-10"4'-6"3'-9"3'-9"11'-6"3'-6"5'-11 7 16"2'-6"4'-0"8'-2"2x6*VINYLFIB. BASEC.T. WALLS20685'-10"2/6x4/0 SH2-2x109'-0"-Min. 15" clearance to anyobstruction from center ofW.C., 24" in front(typ).CS-PFCS-PFCS-PFCS-PFCS-PFCS-PF Planco MN, Inc.C#21-073SMA682021 “3 1/2" CONC. FLOOR20X88'-11 8"3/4" T & G FLOOR3/4" T & G FLOOR9'-11 8"2x6- 16" O.C.VB1/2" GYP. BD.R-21 INSUL.SIDING2x6- 16" O.C.VB1/2" GYP. BD.R-21 INSUL.18" FLOOR TRUSSES @ 24" O.C.5/8" GYP. BD.5/8" GYP. BD.W/ V.B.2x6- 16" O.C.2X6- 16" O.C.R-21 INSUL.1/2" GYP. BD.VBSIDINGR-21 INSUL.1/2" GYP. BD.VB2x6- 16" O.C.20X82X6- 16" O.C.20X82X4- 16" O.C.17 RISERS 17 RISERS 2x440'-0"18" FLOOR TRUSSES @ 24" O.C.(DESIGNED BY MFR)TRUSSES @ 24" O.C.R-49 INSUL.SHEATHING7/16" OSBSHEATHING7/16" OSBW/ CLIPSSHINGLESPROTECT 120 UNDERLAYMENT15/32" OSB SHTG.R-21 SPRAY FOAMR-21 SPRAY FOAMR-21 SPRAY FOAMR-21 SPRAY FOAMTRT. 4x6 CURBTRT. 4x4 CURBTRT. 4x6 CURB CROSS SECTION 3/8" = 1'-0" GRADE5'-6"6'-0"TRT. 6x6 POST5122-9 1/2" LVLALUM.ALUM. FASCIASOFFITVENTED1'-9"MINIMAL HEELPOLY UNDERSLABPER CODE5/8" GYP. BD.1-2x6 TREATED9'-0" POUREDWALL W/ REBARSILL PLATEWATER PROOFINGAS REQUIREDDRAIN TILE 20X8R-10 RIGID INSUL.MIN. R-38@ CANT.71 2"75 16"2'-0"6'-8" MIN. HDRM1x8 RISERS5/4x11 TREADS3- 2x12 STRINGERSTAIR NOTES:10" ROUGH CUT TREADSCONC. PORCHCONTINUOUSRIDGE VENT1 1/2" RIGID2X6- 16" O.C.2X6- 16" O.C.WATER DRAIN TILE AS REQUIREDPROOFINGPOURED WALL20x8GRADE2x6- 16" O.C.R-21 INSUL.VBR-10 RIGID INSUL. Planco MN, Inc.C#21-073SMA7820213 1/2" CONC. FLOOR9'-11 8" “SIDING8'-11 8"2x6- 16" O.C.1/2" GYP. BD.R-21 INSUL.VB5/8" GYP. BD.R-21 INSUL.1/2" GYP. BD.2x6- 16" O.C.VB3/4" T & G FLOOR3/4" T & G FLOORR-21 INSUL.1/2" GYP. BD.VB2x6- 16" O.C.2x6- 16" O.C.VB1/2" GYP. BD.R-21 INSUL.4" CONC. FLOOR1/2" GYP. BD. GARAGE 20X8POURED WALL2X6- 16" O.C. CROSS SECTION 3/8" = 1'-0" R-49 INSUL.(DESIGNED BY MFR)TRUSSES @ 24" O.C.GIRDER38'-0"16'-0" N.T.S.6'-0"R-387/16" OSBSHEATHINGSLOPE TO DOORS5/8" GYP. BD.5/8" GYP. BD.W/ V.B.10'-107 8"22'-0" N.T.S.36'-0"20X82X6- 16" O.C.5/8" GYP. BD.W/ V.B.TRT. 4x6 CURB1-2x6 TREATED9'-0" POUREDWALL W/ REBARSILL PLATEPER CODE20X8AS REQUIREDDRAIN TILE WATER PROOFINGR-10 RIGID INSUL.18" FLOOR TRUSSES @ 24" O.C.18" FLOOR TRUSSES @ 24" O.C.R-21 SPRAY FOAMR-21 SPRAY FOAMR-21 SPRAY FOAM1 1/2" RIGIDWATER DRAIN TILE AS REQUIREDPROOFINGPOURED WALL20x8GRADE2x6- 16" O.C.R-21 INSUL.VBR-10 RIGID INSUL.VENTEDSOFFITALUM.ALUM. FASCIA1/2" SHTG.15# FELTSHINGLES2'-6"512ENERGY HEEL4'-0"2X6- 16" O.C.(DESIGNED BY MFR)TRUSSES @ 24" O.C.W/ CLIPSSHINGLESPROTECT 120 UNDERLAYMENT15/32" OSB SHTG.CONTINUOUSRIDGE VENT4"6" Planco MN, Inc.C#21-073SMA882021FLOOR SYSTEMROOFTRUSSPVC T-FITTINGTO SUPPORTVENT PIPEMIN. 4" OF GASPERMEABLE MATERIAL3 1/2" CONC. SLAB4" PVC VENT PIPESUPPORTSTRAPPINGFLASHINGEXHAUST 10' FROM OPNGS.INTO CONDITIONED SPACESOF BUILDING12" MIN. ABOVE ROOFSEAL6 MIL POLYUNDER SLAB10' OF DRAIN TILEEACH WAY FROMT-FITTING(ROCK) RADON GAS VENT SYSTEM 3/8" = 1'-0" 36" MIN. HT. CLEAR SPACE24" DIA. AROUND VENTPROVIDE ELECTRICALBOX POWER SOURCER-4 MIN. INSUL. VENT PIPE@ UNCONDITIONED SPACE4" MIN. CLEARANCEFOR FUT. FANHEADER & BEARING/KING STUDS PER PLANPROVIDE SPACER TO FLUSH OUT HEADER TOWALL STUD THICKNESS AS REQD. EACH SIDEFASTEN TOP PLATE TO HEADER W/ 2 ROWS16d SINKER NAILS @ 3" O.C.NAIL SHEATHING TO HEADER W/ 10dNAILS @ 3" O.C. EACH WAY TYP.(1) 2x6 BEARING STUD & (1) 2x6 FULLHEIGHT STUD EACH END OF HEADER7/16" MIN. PLYWD OR OSB SHEATHING APPLIED TOEXTERIOR SIDE OF STUDS (NAIL SHEATHING TO ALLBACKING STUDS W/ 10d NAILS @ 3" O.C. TYP.)LOCATE PANEL JOINT WITHIN 2'-0"FROM CENTER OPENINGS AS REQD.2x SOLID BLKG. RQD. AT SHEATHINGJOINTS (ORIENT FACE TO SHEATHING, FASTENSIMPSON STHD14 EMBEDDED HOLD DOWNANCHORS AT LOCATIONS SHOWN (REFERTO POST-INSTALLED OPTIONS)SIMPSON LSTA36 STRAPON INTERIOR STUD FACECENTERED ON HEADERNAIL FULL HEIGHT STUDTO EACH HEADER PLY W/16d NAILS @ 3" O.C.PROVIDE 2x6 INFILLWALL ABOVE AS REQD.PROVIDE 7/16" MIN.PLYWD. OR OSB SHEATHINGABOVE GARAGE DOOR OPNG.W/ STANDARD FASTENINGPROVIDE INTERMEDIATEFRAMING AS REQD. TOMAINTAIN 16" MAX. STUDSPACING(2) 1/2" DIA. ANCHOR BOLTSMIN. (7" MIN. EMBED)C.I.P. CONCRETE FOUNDATION PER CODETOGETHER W/ (3) 16 d SINKERSBEARING STUDS PER PLAN(2-2x6 BEARING STUDS MIN.) “ “ “11'-8" MAX.LENGTH OF CONTINUOUS HEADERNOTE: INFO APPLIES EQUALLYBOTH SIDES OF OPENING GARAGE FRONT PORTAL FRAMING 1/2" = 1'-0" FASCIAALUM. SOFFITVENTEDALUM.1'-6"812(DESIGNED BY MFR)TRUSSES @ 24" O.C.W/ CLIPSSHINGLESPROTECT 120 UNDERLAYMENT15/32" OSB SHTG.41214'-0" CROSS SECTION 3/8" = 1'-0" B.W. LINE B1 4'-0" WSP 4'-0" WSP 4'-0" WSP 4'-0" WSP BRACED PANEL TYPE WSP = 7/16 OSB GWB = 1/2" GYP BOTH SIDES CS-PF = CONTINUOSLY SHEATHED PORTAL FRAME - IRC FIGURE R602.10.4.6 (SEE SHT. 3 & 4) BASEMENT BRACED WALL LINES 1 Scale: 1/16" = 1'-0" BASEMENT1 _____________________________________ 21160 IDAHO AVE. LAKEVILLE, MN BLANCHARD ENGINEERING 6936 WASHBURN AVE. S. RICHFIELD, MN 55423 612-861-6361CCOPYRIGHT BLANCHARD ENGINEERING 1'-6"1'-6" CS-PF 1'-6" CS-PF 2'-0" CS-PF 2'-0" B.W. LINE 1A B.W. LINE 1B 42'-0"2'-0" CS-PF 2'-0" 4'-0" WSP 4'-0" WSP 2'-0"2'-0" CS-PF B.W. LINE GA 18'-0"B.W.LINE G1B.W.LINE G2B.W.LINE 1234'-0"B.W.LINE 11WSP4'-0"WSP4'-0"WSP4'-0"WSP4'-0"4'-0"WSP4'-0"WSP2'-0"CS-PF2'-0"4'-0"GWBWSP4'-0"4'-0"GWB4'-0"WSP4'-0"WSP34'-0" 1ST FLOOR BRACED WALL LINES 2 Scale: 1/16" = 1'-0" FIRST FLOOR1 _____________________________________ 21160 IDAHO AVE. LAKEVILLE, MN BLANCHARD ENGINEERING 6936 WASHBURN AVE. S. RICHFIELD, MN 55423 612-861-6361CCOPYRIGHT BLANCHARD ENGINEERING B.W.LINE 211'-6"1'-6" CS-PF 1'-6" CS-PF WSP4'-0"WSP4'-0"WSP4'-0"4'-0"WSP4'-0"WSP4'-0"WSP4'-0" WSP 1'-6"1'-6" CS-PF 1'-6"B.W.LINE 22B.W. LINE 2A B.W. LINE 2B 40'-0"34'-0" 2ND FLOOR BRACED WALL LINES 3 Scale: 1/16" = 1'-0" SECOND FLOOR1 _____________________________________ 21160 IDAHO AVE. LAKEVILLE, MN BLANCHARD ENGINEERING 6936 WASHBURN AVE. S. RICHFIELD, MN 55423 612-861-6361CCOPYRIGHT BLANCHARD ENGINEERING EXTENT OF HEADER WITH DOUBLE PORTAL FRAMES (TWO BRACED WALL PANELS) EXTENT OF HEADER WITH SINGLE PORTAL FRAME (ONE BRACED WALL PANEL) 2′-18′ FINISHED WIDTH OF OPENINGFOR SINGLE OR DOUBLE PORTAL PONY WALL HEIGHT MIN. 3″x11¼″ NET HEADER STEEL HEADER PROHIBITED IF ½″ SPACER IS USED, PLACE ON BACK-SIDE OF HEADER FASTEN SHEATHING TO HEADER WITH 8D COMMON OR GALVANIZED BOX NAILS IN 3″ GRID PATTERN AS SHOWN HEADER TO JACK-STUD STRAP PER TABLE R602.10.6.4 ON BOTH SIDES OF OPENINGOPPOSITE SIDE OF SHEATHING MIN. DOUBLE 2″x4″ FRAMING COVERED WITH MIN.7/16″ THICK WOOD STRUCTURAL PANEL SHEATHINGWITH 8D COMMON OR GALVANIZED BOX NAILS AT 3″ O.C. IN ALL FRAMING (STUDS, BLOCKING, AND SILLS) TYP. MIN. LENGTH OF PANEL PER TABLE R602.10.5 MIN. (2) ½″ DIAMETER ANCHOR BOLTSINSTALLED PER SECTION R403.1.6 WITH 2″x2″x3/16″ PLATE WASHER TENSION STRAP PERTABLE 602.10.6.4 (ON OPPOSITE SIDE OF SHEATHING) BRACED WALL LINECONTINUOUSLY SHEATHEDWITH WOOD STRUCTURALPANELS IF NEEDED, PANELSPLICE EDGES SHALL OCCUR OVER AND BE NAILED TO COMMON BLOCKING WITHIN THEMIDDLE 24″ OF THEPORTAL- LEG HEIGHT.ONE ROW OF 3″ O.C. NAILING IS REQUIRED IN EACH PANEL EDGE. TYPICAL PORTAL FRAME CONSTRUCTION MIN. DOUBLE 2x4 POST(KING AND JACK STUD) NUMBER OF JACK STUDS PER TABLES R602.7(1) & (2) FASTEN TOP PLATE TOHEADER WITHTWO ROWS OF 16D SINKER NAILS AT 3″ O.C. TYP. MIN. 7 /16″ WOOD STRUCTURAL PANELSHEATHING FASTEN KING STUDTO HEADER WITH 6 16D SINKERS OVER CONCRETE OR MASONRY BLOCK FOUNDATION ANCHOR BOLTS PER SECTION R403.1.612″ MAX. TOTAL WALL HEIGHT10″ MAX. HEIGHTFIGURE R602.10.6.4 ALTERNATE BRACED WALL PANEL 4 Scale: Not to Scale CONTINUOUSLY SHEATHED PORTAL FRAME1 _____________________________________ 21160 IDAHO AVE. LAKEVILLE, MN BLANCHARD ENGINEERING 6936 WASHBURN AVE. S. RICHFIELD, MN 55423 612-861-6361CCOPYRIGHT BLANCHARD ENGINEERING WOOD STRUCTURAL PANELSHEATHING TO TOP OF BAND OR RIM JOIST NAIL SOLE PLATE TO JOIST PERTABLE R602.3(1) (2) FRAMING ANCHORS APPLIED ACROSS SHEATHING JOINT WITH A CAPACITY OF 670 LBS INTHE HORIZONTAL ANDVERTICAL DIRECTIONS NAIL SOLE PLATE TO JOISTPER TABLER602.3(1) WOOD STRUCTURAL PANEL SHEATHING OVER APPROVED BAND OR RIM JOIST OVER RAISED WOOD FLOOR - FRAMING ANCHOR OPTION (WHERE PORTAL SHEATHING DOES NOT LAP OVER BAND OR RIM JOIST) APPROVED BANDOR RIM JOIST WOOD STRUCTURAL PANEL SHEATHING TO TOP OF BAND OR RIM JOIST NAIL SOLE PLATETO JOIST PERTABLE R602.3(1) ATTACH SHEATHING TO BAND OR RIM JOIST WITH 8D COMMON NAILS AT 3″ O.C. TOP AND BOTTOM WOOD STRUCTURAL PANEL SHEATHING OVER APPROVED BAND OR RIM JOIST OVER RAISED WOOD FLOOR - OVERLAP OPTION (WHERE PORTAL SHEATHING LAPS OVER BAND OR RIM BOARD) FRONT ELEVATION FIGURE R602.10.6.4 SECTION NAIL SOLEPLATE TO JOISTPER TABLER602.3(1) APPROVED BANDOR RIM JOISTMIN.OVERLAP9¼″ALTERNATE BRACED WALL PANEL 5 Scale: Not to Scale CONTINUOUSLY SHEATHED PORTAL FRAME1 _____________________________________ 21160 IDAHO AVE. LAKEVILLE, MN BLANCHARD ENGINEERING 6936 WASHBURN AVE. S. RICHFIELD, MN 55423 612-861-6361CCOPYRIGHT BLANCHARD ENGINEERING SOLID BLOCKING BETWEEN RAFTERS ATTACHED TO TOP PLATES WITH 8d @ 6″ O.C. ALONG LENGTH OF BRACED WALL PANEL FIGURE R602.10.8.2(1) BRACED WALL PANEL CONNECTION TO PERPENDICULAR RAFTERS15.25″ MAX2″ MAXOPENBRACED WALL PANEL CONNECTION TO RAFTERS 6 Scale: Not to Scale BRACED WALL PANEL CONNECTION TO RAFTERS1 _____________________________________ 21160 IDAHO AVE. LAKEVILLE, MN BLANCHARD ENGINEERING 6936 WASHBURN AVE. S. RICHFIELD, MN 55423 612-861-6361CCOPYRIGHT BLANCHARD ENGINEERING CONTINUOUS RIM OR BAND JOIST FULL-HEIGHT BLOCKING CONTINUOUS ALONG LENGTH OF BRACED WALL PANEL PERPENDICULAR FRAMING 8d @ 6″ O.C. ALONG BRACED WALL PANEL 8d @ 6″ O.C. ALONG BRACED WALL PANEL BRACED WALL PANEL BRACED WALL PANEL 3-16d @ 16″ O.C. ALONG BRACED WALL PANEL 3-16d @ 16″ O.C. ALONG BRACED WALL PANEL PERPENDICULAR FRAMING CONTINUOUS RIM OR BAND JOIST FIGURE R602.10.8(1) BRACED WALL PANEL CONNECTION WHEN PERPENDICULAR TO FLOOR/CEILING FRAMING FULL-HEIGHT BLOCKING CONTINUOUS ALONG LENGTH OF BRACED WALL PANEL BRACED WALL PANEL CONNECTIONS TO FLOOR /CLG 7 Scale: Not to Scale BRACED PANEL CONNECTIONS1 _____________________________________ 21160 IDAHO AVE. LAKEVILLE, MN BLANCHARD ENGINEERING 6936 WASHBURN AVE. S. RICHFIELD, MN 55423 612-861-6361CCOPYRIGHT BLANCHARD ENGINEERING CONTINUOUS RIM OR END JOIST ADDITIONAL FRAMING MEMBER DIRECTLY ABOVE BRACED WALL PANEL FULL-HEIGHT BLOCKING @ 16″ O.C. ALONG BRACED WALL PANEL 8d @ 6″ O.C. ALONG BRACED WALL PANEL 8d @ 6″ O.C. ALONG BRACED WALL PANEL TOE NAIL 3-8d NAILS AT EACH BLOCKING MEMBER BRACED WALL PANEL BRACED WALL PANEL 3-16d @ 16″ O.C. ALONG BRACED WALL PANEL 3-16d @ 16″ O.C. ALONG BRACED WALL PANEL BRACED WALL PANEL 3-16d AT EACH BLOCKING MEMBER 2-16d NAILS EACH SIDE CONTINUOUS RIM OR END JOIST FIGURE R602.10.8(2) BRACED WALL PANEL CONNECTION WHEN PARALLEL TO FLOOR/CEILING FRAMING ADDITIONAL FRAMING MEMBER DIRECTLY BELOW BRACED WALL PANEL FULL-HEIGHT BLOCKING @ 16″ O.C. ALONG BRACED WALL PANEL BRACED WALL PANEL CONNECTIONS TO FLOOR /CLG 8 Scale: Not to Scale BRACED PANEL CONNECTIONS1 _____________________________________ 21160 IDAHO AVE. LAKEVILLE, MN BLANCHARD ENGINEERING 6936 WASHBURN AVE. S. RICHFIELD, MN 55423 612-861-6361CCOPYRIGHT BLANCHARD ENGINEERING FL 2-9 1/2" LVLFLUSH 2-2X10FLUSH 3-14" LVLFLUSH 2-11 7/8" LVLFL 2-9 1/2" LVLTHA422ODD SPACING<- PAINTED ENDS -><- PAINTED ENDS ->18" TRUSSES @ 24" O. C. ->TO FAR FACE OF LVL'STO FAR FACE OF LVL'STHGQH3.62->18" DEEP TRUSSES24" O.C. BASE SPACING.DIMENSIONS ARE FROM THE OUTSIDE OFSHEATHING. TRUSSES HAVE BEEN HELD IN1/2" AT EXTERIOR WALLS FOR SHEATHING.THE PAINTED END DENOTES THE LEFT ENDOF THE FLOOR TRUSS. THIS END OF THEFLOOR TRUSS IS TO BE PLACED WHERE YOUSEE THE TRIANGLE AND THE PAINTED ENDNOTE ON THE PLACEMENT PLAN. THEPAINTED END ALSO CORRESPONDS TO THELEFT SIDE OF THE SEALED TRUSS DRAWING.PLUMBING LOCATIONS ARE ESTIMATED.CONTRACTOR TO VERIFY PLUMBINGLOCATIONS.DO NOT CUT TRUSSES.IF YOU HAVE ANY QUESTIONS OR CONCERNS,PLEASE CALLBOB @ 651-688-3615OREMAIL: BKIEMEN@VILLAUME.COMDIMENSIONS ARE FROM THE OUTSIDE OFSHEATHING.THE TRUSS ID DOES NOT DENOTE THE LEFTEND OF THE ROOF TRUSS ON THEPLACEMENT PLAN. USE THE LEFT END OFTHE SEALED TRUSS DRAWING AND THETRIANGLE ON THE PLACEMENT PLAN TOLOCATE THE PROPER END OF EACH ROOFTRUSS.DO NOT CUT TRUSSES.IF YOU HAVE ANY QUESTIONS OR CONCERNS,PLEASE CALLBOB @ 651-688-3615OREMAIL: BKIEMEN@VILLAUME.COMFRAMING NOTE:RUN POST UP TO BOTTOM CHORD ATLEFT END OF "A1" REQUIREDFF2FF6FF6FF3FF4FF5FF7FF8FF8FF8FF10FF10FF10FF11FF11FF12FF14FF14FF14FF14FF16FF16FF16FF16FF16FF17FF13FF13FF9FF15FF18FF1FF1H2H1H1H2G2G1G1G1G1G1G1G1G2C2A4A3A3A3A3A3A3A2A2A2A2A1E2E1E1C3C3C3C3C3C4C4C1D3D3D3D3D3D3D2D2D2D2D1W1W2W3W4W511-06-009-03-0015-05-123-09-02 3-09-0215-00-004-00-082-00-0026-00-0032-00-0018-00-004-00-0013-00-0021-00-0022-00-0022-00-0016-00-0018-00-005-02-004-08-0028-02-0012-06-00 7-06-0011-02-001-10-041-10-041-06-005-06-0027-06-001-11-042-05-04Customer: Dakota Cty Lumber - JFJob Number: 318504-BHome Owner: HEBERT-21160 IDAHO AVENUEJob Name: 2nd FloorSite Address: 21160 IDAHO AVENUE Sales Rep: John FrankCity, ST, ZIP: LAKEVILLE MN 55044 Designer: Bob Kiemen2926 Lone Oak Circle, St. Paul, MN 55121Ph: 651-454-3610 Fax: 651-454-4765Date: 11/2/2021Version: 8.5.1.199 Hebert Homes HVAC Load Calculations for Hebert 21160 Idaho Ave Lakeville,mn Prepared By: Randy Andrews Lofgren Heating 5708 Upper 147th Street West Apple Vallley, MN 55124 Monday, October 18, 2021 Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Hebert Homes Farmington, MN 55024 Page 2 Project Report General Project Information Project Title:Hebert Homes Project Date:Monday, October 18, 2021 Client Name:Hebert Client Address:21160 Idaho Ave Client City:Lakeville,mn Company Name:Lofgren Heating Company Representative:Randy Andrews Company Address:5708 Upper 147th Street West Company City:Apple Vallley, MN 55124 Company E-Mail Address:rrandrews@lofgrenheating-ac.com Design Data Reference City:Minneapolis, Minnesota Building Orientation:Front door faces West Daily Temperature Range:Medium Latitude:44 Degrees Elevation:834 ft. Altitude Factor:0.970 Elevation Sensible Adj. Factor:1.000 Elevation Total Adj. Factor:1.000 Elevation Heating Adj. Factor:1.000 Elevation Heating Adj. Factor:1.000 Outdoor Outdoor Outdoor Indoor Indoor Grains Dry Bulb Wet Bulb Rel.Hum Rel.Hum Dry Bulb Difference Winter:-15 -15.33 80%n/a 72 n/a Summer:88 72 47%50%75 29 Check Figures Total Building Supply CFM:1,249 CFM Per Square ft.:0.325 Square ft. of Room Area:3,840 Square ft. Per Ton:1,366 Volume (ft³) of Cond. Space:34,560 Building Loads Total Heating Required Including Ventilation Air:51,611 Btuh 51.611 MBH Total Sensible Gain:26,992 Btuh 80 % Total Latent Gain:6,731 Btuh 20 % Total Cooling Required Including Ventilation Air:33,723 Btuh 2.81 Tons (Based On Sensible + Latent) Notes Calculations are based on 8th edition of ACCA Manual J. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads. C:\ ...\21160 IDAHO LAKEVILLE 10182021.rhv Monday, October 18, 2021, 11:55 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Hebert Homes Farmington, MN 55024 Page 3 Miscellaneous Report System 1 Whole House Input Data Outdoor Dry Bulb Outdoor Wet Bulb Outdoor Rel.Hum Indoor Rel.Hum Indoor Dry Bulb Grains Difference Winter:-15 -15.33 80%n/a 72 n/a Summer:88 72 47%50%75 29.27 Duct Sizing Inputs Main Trunk Runouts Calculate:Yes Yes Use Schedule:No No Roughness Factor:0.00300 0.01000 Pressure Drop:0.1000 in.wg./100 ft.0.1000 in.wg./100 ft. Minimum Velocity:650 ft./min 450 ft./min Maximum Velocity:900 ft./min 750 ft./min Minimum Height:8 in.6 in. Maximum Height:10 in.6 in. Outside Air Data Winter Summer Infiltration Specified:0.250 AC/hr 0.130 AC/hr 108 CFM 56 CFM Infiltration Actual:0.250 AC/hr 0.130 AC/hr Above Grade Volume:Cu.ft.Cu.ft.X 25,811 X 25,811 6,453 Cu.ft./hr 3,355 Cu.ft./hr X 0.0167 X 0.0167 Total Building Infiltration:108 CFM 56 CFM Total Building Ventilation:140 CFM 70 CFM ---System 1--- Infiltration & Ventilation Sensible Gain Multiplier: 13.87 = (1.10 X 0.970 X 13.00 Summer Temp. Difference) Infiltration & Ventilation Latent Gain Multiplier: 19.31 = (0.68 X 0.970 X 29.27 Grains Difference) Infiltration & Ventilation Sensible Loss Multiplier: 92.85 = (1.10 X 0.970 X 87.00 Winter Temp. Difference) Winter Infiltration Specified:0.250 AC/hr (108 CFM), Construction: Unknown Summer Infiltration Specified:0.130 AC/hr (56 CFM), Construction: Unknown C:\ ...\21160 IDAHO LAKEVILLE 10182021.rhv Monday, October 18, 2021, 11:55 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Hebert Homes Farmington, MN 55024 Page 4 Load Preview Report Scope Has AED Net Ton ft.² /Ton Area Sen Gain Lat Gain Net Gain Sen Loss Sys Htg CFM Sys Clg CFM Sys Act CFM Duct Size Building 2.81 1,366 3,840 26,992 6,731 33,723 51,611 980 1,249 1,249 System 1 Yes 2.81 1,366 3,840 26,992 6,731 33,723 51,611 980 1,249 1,249 21x10 Ventilation 340 1,352 1,692 4,550 Zone 1 3,840 26,652 5,379 32,031 47,061 980 1,249 1,249 21x10 1-Main Level 1,262 11,779 1,884 13,663 18,354 382 552 552 6--6 2-Upper Level 1,316 11,703 2,484 14,187 17,941 374 548 548 6--6 3-Lower Level 1,262 3,170 1,011 4,181 10,766 224 149 149 2--6 C:\ ...\21160 IDAHO LAKEVILLE 10182021.rhv Monday, October 18, 2021, 11:55 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Hebert Homes Farmington, MN 55024 Page 5 Duct Size Preview Room or Duct Name Minimum Velocity Maximum Velocity Rough. Factor Design L/100 Actual L/100 SP Loss Duct Velocity Duct Length Htg Flow Clg Flow Act. Flow Duct Size System 1 Supply Runouts Zone 1 1-Main Level 450 750 0 0.1 0.1 468.4 382 552 552 6--6 2-Upper Level 450 750 0 0.1 0.1 465.4 374 548 548 6--6 3-Lower Level 450 750 0 0.1 0.1 378.2 224 149 149 2--6 Other Ducts Supply Main Trunk 650 900 0 0.1 0.1 856.2 980 1,249 1,249 21x10 SummarySummarySummarySummarySummarySummarySummarySummary System 1 Heating Flow:980 Cooling Flow:1249 C:\ ...\21160 IDAHO LAKEVILLE 10182021.rhv Monday, October 18, 2021, 11:55 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Hebert Homes Farmington, MN 55024 Page 6 System 1 - Whole House - Adequate Exposure Diversity Test Test For Adequate Exposure Diversity Average Glass Sensible Gain Over 12 Hours 1.3 x Average Glass Gain Hourly Glass Gain Hourly Total Net GainHeat Gain, Btuh10.2% Diff. from Avg. 0 10,000 20,000 30,000 40,000 8 am 9 am 10 am 11 am 12 pm 1 pm 2 pm 3 pm 4 pm 5 pm 6 pm 7 pm AED Calculation Summary --- SYSTEM HAS ADEQUATE EXPOSURE DIVERSITY. --- System is on N, E, S, W rosette. Peak load exceeds 12-hour average load by 10.2%. AED Excursion (amount by which peak exceeds 1.3 x average): 0 Btuh Definition: A system has adequate exposure diversity if the peak-hour glass load for the entire conditioned space does not exceed the average glass load for the entire conditioned space by more than 30 percent. C:\ ...\21160 IDAHO LAKEVILLE 10182021.rhv Monday, October 18, 2021, 11:55 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Hebert Homes Farmington, MN 55024 Page 7 System 1 - Whole House - Psychrometric Chart ZC Zone (Room) Condition OC Outdoor Condition LC Leaving Coil Condition EC Entering Coil Condition SD Supply Duct Temperature Rise DTF Draw Through Fan Sensible Gain HRV Heat Recovery Ventilator C:\ ...\21160 IDAHO LAKEVILLE 10182021.rhv Monday, October 18, 2021, 11:55 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Hebert Homes Farmington, MN 55024 Page 8 Total Building Summary Loads Component Description Area Quan Sen Loss Lat Gain Sen Gain Total Gain 4A-1a-o: Glazing-Double pane low-e (e = 0.20 or less), operable window, e=0.20 on surface 2, wood with metal clad frame, u-value 0.32, SHGC 0.33 443 12,334 0 13,043 13,043 11N: Door-Metal - Polystyrene Core 42 1,278 0 352 352 12F-0sw: Wall-Frame, R-21 insulation in 2 x 6 stud cavity, no board insulation, siding finish, wood studs 2485 14,053 0 2,148 2,148 15B0-10sf-10: Wall-Basement, , R-10 board insulation to floor, no interior finish, 10' floor depth 1026 4,374 0 0 0 16B-50: Roof/Ceiling-Under Attic with Insulation on Attic Floor (also use for Knee Walls and Partition Ceilings), Vented Attic, No Radiant Barrier, Dark Asphalt Shingles or Dark Metal, Tar and Gravel or Membrane, R-50 insulation 1316 2,290 0 1,263 1,263 21A-24: Floor-Basement, Concrete slab, any thickness, 2 or more feet below grade, no insulation below floor, any floor cover, shortest side of floor slab is 24' wide 1262 2,745 0 0 0 Subtotals for structure:37,074 0 16,806 16,806 People:9 1,800 2,070 3,870 Equipment:2,500 7,000 9,500 Lighting:0 0 0 Ductwork:0 0 0 0 Infiltration: Winter CFM: 108, Summer CFM: 56 9,987 1,079 776 1,855 Ventilation: Winter CFM: 140, Summer CFM: 70 4,550 1,352 340 1,692 Total Building Load Totals:51,611 6,731 26,992 33,723 Check Figures Total Building Supply CFM:1,249 CFM Per Square ft.:0.325 Square ft. of Room Area:3,840 Square ft. Per Ton:1,366 Volume (ft³) of Cond. Space:34,560 Building Loads Total Heating Required Including Ventilation Air:51,611 Btuh 51.611 MBH Total Sensible Gain:26,992 Btuh 80 % Total Latent Gain:6,731 Btuh 20 % Total Cooling Required Including Ventilation Air:33,723 Btuh 2.81 Tons (Based On Sensible + Latent) Notes Calculations are based on 8th edition of ACCA Manual J. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads. C:\ ...\21160 IDAHO LAKEVILLE 10182021.rhv Monday, October 18, 2021, 11:55 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Hebert Homes Farmington, MN 55024 Page 9 Building Pie Chart Building Loss 51,611 Btuh Floor 5%Roof 4% Wall 36% Glass 24% Door 2% Infiltration 19% Ventilation 9% Building Gain 33,723 Btuh Roof 4%Wall 6% Glass 39% Door 1%People 11% Equipment 28% Infiltration 6% Ventilation 5% C:\ ...\21160 IDAHO LAKEVILLE 10182021.rhv Monday, October 18, 2021, 11:55 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Hebert Homes Farmington, MN 55024 Page 10 Building Bar Graph Building Loss 51,611 Btuh 0 5,000 10,000 15,000 20,000 Floor 5%Wall 36%Door 2%Ventilation 9% Roof 4%Glass 24%Infiltration 19% Building Gain 33,723 Btuh 0 5,000 10,000 15,000 Roof 4%Glass 39%People 11%Infiltration 6% Wall 6%Door 1%Equipment 28%Ventilation 5% C:\ ...\21160 IDAHO LAKEVILLE 10182021.rhv Monday, October 18, 2021, 11:55 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Hebert Homes Farmington, MN 55024 Page 11 System 1 Whole House Summary Loads Component Description Area Quan Sen Loss Lat Gain Sen Gain Total Gain 4A-1a-o: Glazing-Double pane low-e (e = 0.20 or less), operable window, e=0.20 on surface 2, wood with metal clad frame, u-value 0.32, SHGC 0.33 443 12,334 0 13,043 13,043 11N: Door-Metal - Polystyrene Core 42 1,278 0 352 352 12F-0sw: Wall-Frame, R-21 insulation in 2 x 6 stud cavity, no board insulation, siding finish, wood studs 2485 14,053 0 2,148 2,148 15B0-10sf-10: Wall-Basement, , R-10 board insulation to floor, no interior finish, 10' floor depth 1026 4,374 0 0 0 16B-50: Roof/Ceiling-Under Attic with Insulation on Attic Floor (also use for Knee Walls and Partition Ceilings), Vented Attic, No Radiant Barrier, Dark Asphalt Shingles or Dark Metal, Tar and Gravel or Membrane, R-50 insulation 1316 2,290 0 1,263 1,263 21A-24: Floor-Basement, Concrete slab, any thickness, 2 or more feet below grade, no insulation below floor, any floor cover, shortest side of floor slab is 24' wide 1262 2,745 0 0 0 Subtotals for structure:37,074 0 16,806 16,806 People:9 1,800 2,070 3,870 Equipment:2,500 7,000 9,500 Lighting:0 0 0 Ductwork:0 0 0 0 Infiltration: Winter CFM: 108, Summer CFM: 56 9,987 1,079 776 1,855 Ventilation: Winter CFM: 140, Summer CFM: 70 4,550 1,352 340 1,692 System 1 Whole House Load Totals:51,611 6,731 26,992 33,723 Check Figures Supply CFM:1,249 CFM Per Square ft.:0.325 Square ft. of Room Area:3,840 Square ft. Per Ton:1,366 Volume (ft³) of Cond. Space:34,560 System Loads Total Heating Required Including Ventilation Air:51,611 Btuh 51.611 MBH Total Sensible Gain:26,992 Btuh 80 % Total Latent Gain:6,731 Btuh 20 % Total Cooling Required Including Ventilation Air:33,723 Btuh 2.81 Tons (Based On Sensible + Latent) Notes Calculations are based on 8th edition of ACCA Manual J. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads. C:\ ...\21160 IDAHO LAKEVILLE 10182021.rhv Monday, October 18, 2021, 11:55 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Hebert Homes Farmington, MN 55024 Page 12 System 1 Whole House Pie Chart System 1 Whole House Loss 51,611 Btuh Floor 5%Roof 4% Wall 36% Glass 24% Door 2% Infiltration 19% Ventilation 9% System 1 Whole House Gain 33,723 Btuh Roof 4%Wall 6% Glass 39% Door 1%People 11% Equipment 28% Infiltration 6% Ventilation 5% C:\ ...\21160 IDAHO LAKEVILLE 10182021.rhv Monday, October 18, 2021, 11:55 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Hebert Homes Farmington, MN 55024 Page 13 System 1 Whole House Bar Graph System 1 Whole House Loss 51,611 Btuh 0 5,000 10,000 15,000 20,000 Floor 5%Wall 36%Door 2%Ventilation 9% Roof 4%Glass 24%Infiltration 19% System 1 Whole House Gain 33,723 Btuh 0 5,000 10,000 15,000 Roof 4%Glass 39%People 11%Infiltration 6% Wall 6%Door 1%Equipment 28%Ventilation 5% C:\ ...\21160 IDAHO LAKEVILLE 10182021.rhv Monday, October 18, 2021, 11:55 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Hebert Homes Farmington, MN 55024 Page 14 System 1, Zone 1 Summary Loads (Average Load Procedure for Rooms) Component Description Area Quan Sen Loss Lat Gain Sen Gain Total Gain 4A-1a-o: Glazing-Double pane low-e (e = 0.20 or less), operable window, e=0.20 on surface 2, wood with metal clad frame, u-value 0.32, SHGC 0.33 443 12,334 0 13,043 13,043 11N: Door-Metal - Polystyrene Core 42 1,278 0 352 352 12F-0sw: Wall-Frame, R-21 insulation in 2 x 6 stud cavity, no board insulation, siding finish, wood studs 2485 14,053 0 2,148 2,148 15B0-10sf-10: Wall-Basement, , R-10 board insulation to floor, no interior finish, 10' floor depth 1026 4,374 0 0 0 16B-50: Roof/Ceiling-Under Attic with Insulation on Attic Floor (also use for Knee Walls and Partition Ceilings), Vented Attic, No Radiant Barrier, Dark Asphalt Shingles or Dark Metal, Tar and Gravel or Membrane, R-50 insulation 1316 2,290 0 1,263 1,263 21A-24: Floor-Basement, Concrete slab, any thickness, 2 or more feet below grade, no insulation below floor, any floor cover, shortest side of floor slab is 24' wide 1262 2,745 0 0 0 Subtotals for structure:37,074 0 16,806 16,806 People:9 1,800 2,070 3,870 Equipment:2,500 7,000 9,500 Lighting:0 0 0 Ductwork:0 0 0 0 Infiltration: Winter CFM: 108, Summer CFM: 56 9,987 1,079 776 1,855 System 1, Zone 1 Load Totals:47,061 5,379 26,652 32,031 Check Figures Supply CFM:1,249 CFM Per Square ft.:0.325 Square ft. of Room Area:3,840 Square ft. Per Ton:1,439 Volume (ft³) of Cond. Space:34,560 Zone Loads Total Heating Required:47,061 Btuh 47.061 MBH Total Sensible Gain:26,652 Btuh 83 % Total Latent Gain:5,379 Btuh 17 % Total Cooling Required:32,031 Btuh 2.67 Tons (Based On Sensible + Latent) Notes Calculations are based on 8th edition of ACCA Manual J. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads. C:\ ...\21160 IDAHO LAKEVILLE 10182021.rhv Monday, October 18, 2021, 11:55 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Hebert Homes Farmington, MN 55024 Page 15 System 1, Zone 1 Pie Chart System 1, Zone 1 Loss 47,061 Btuh Floor 6% Roof 5% Wall 39% Glass 26% Door 3% Infiltration 21% System 1, Zone 1 Gain 32,031 Btuh Roof 4%Wall 7% Glass 41% Door 1% People 12% Equipment 30% Infiltration 6% C:\ ...\21160 IDAHO LAKEVILLE 10182021.rhv Monday, October 18, 2021, 11:55 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Hebert Homes Farmington, MN 55024 Page 16 System 1, Zone 1 Bar Graph System 1, Zone 1 Loss 47,061 Btuh 0 5,000 10,000 15,000 20,000 Floor 6%Wall 39%Door 3% Roof 5%Glass 26%Infiltration 21% System 1, Zone 1 Gain 32,031 Btuh 0 5,000 10,000 15,000 Roof 4%Glass 41%People 12%Infiltration 6% Wall 7%Door 1%Equipment 30% C:\ ...\21160 IDAHO LAKEVILLE 10182021.rhv Monday, October 18, 2021, 11:55 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Hebert Homes Farmington, MN 55024 Page 17 Detailed Room Loads - Room 1 - Main Level (Average Load Procedure) General Calculation Mode:Htg. & clg.Occurrences:1 Room Length:1,262.0 ft.System Number:1 Room Width:1.0 ft.Zone Number:1 Area:1,262.0 sq.ft.Supply Air:552 CFM Ceiling Height:9.0 ft.Supply Air Changes:2.9 AC/hr Volume:11,358.0 cu.ft.Req. Vent. Clg:0 CFM Number of Registers:6 Actual Winter Vent.:55 CFM Runout Air:92 CFM Percent of Supply.:10 % Runout Duct Size:6 in.Actual Summer Vent.:31 CFM Runout Air Velocity:468 ft./min.Percent of Supply:6 % Runout Air Velocity:468 ft./min.Actual Winter Infil.:48 CFM Actual Loss:0.137 in.wg./100 ft.Actual Summer Infil.:25 CFM Item Description Area Quantity -U- Value Htg HTM Sen Loss Clg HTM Lat Gain Sen Gain S -Wall-12F-0sw 40 X 9 330 0.065 5.7 1,866 0.9 0 285 N -Wall-12F-0sw 40 X 9 312 0.065 5.7 1,764 0.9 0 270 W -Wall-12F-0sw 34 X 9 218 0.065 5.7 1,233 0.9 0 188 E -Wall-12F-0sw 34 X 9 191 0.065 5.7 1,080 0.9 0 165 W -Door-11N 3 X 7 21 0.350 30.5 639 8.4 0 176 W -Door-11N 3 X 7 21 0.350 30.5 639 8.4 0 176 S -Gls-4A-1a-o shgc-0.33 0%S 30 0.320 27.8 835 19.2 0 575 N -Gls-4A-1a-o shgc-0.33 100%S 48 0.320 27.8 1,336 10.4 0 500 W -Gls-4A-1a-o shgc-0.33 0%S 46 0.320 27.8 1,281 35.0 0 1,610 E -Gls-4A-1a-o shgc-0.33 0%S 115 0.320 27.8 3,202 35.0 0 4,026 Subtotals for Structure:13,875 0 7,971 Infil.: Win.: 48.2, Sum.: 25.1 1,332 3.363 4,479 0.261 484 348 People: 200 lat/per, 230 sen/per:2 400 460 Equipment:1,000 3,000 Room Totals:18,354 1,884 11,779 C:\ ...\21160 IDAHO LAKEVILLE 10182021.rhv Monday, October 18, 2021, 11:55 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Hebert Homes Farmington, MN 55024 Page 18 Detailed Room Loads - Room 2 - Upper Level (Average Load Procedure) General Calculation Mode:Htg. & clg.Occurrences:1 Room Length:1,316.0 ft.System Number:1 Room Width:1.0 ft.Zone Number:1 Area:1,316.0 sq.ft.Supply Air:548 CFM Ceiling Height:9.0 ft.Supply Air Changes:2.8 AC/hr Volume:11,844.0 cu.ft.Req. Vent. Clg:0 CFM Number of Registers:6 Actual Winter Vent.:53 CFM Runout Air:91 CFM Percent of Supply.:10 % Runout Duct Size:6 in.Actual Summer Vent.:31 CFM Runout Air Velocity:465 ft./min.Percent of Supply:6 % Runout Air Velocity:465 ft./min.Actual Winter Infil.:48 CFM Actual Loss:0.135 in.wg./100 ft.Actual Summer Infil.:25 CFM Item Description Area Quantity -U- Value Htg HTM Sen Loss Clg HTM Lat Gain Sen Gain N -Wall-12F-0sw 40 X 9 340 0.065 5.7 1,923 0.9 0 294 S -Wall-12F-0sw 40 X 9 340 0.065 5.7 1,923 0.9 0 294 E -Wall-12F-0sw 34 X 9 236 0.065 5.7 1,335 0.9 0 204 W -Wall-12F-0sw 34 X 9 252 0.065 5.7 1,425 0.9 0 218 N -Gls-4A-1a-o shgc-0.33 100%S 20 0.320 27.8 557 10.4 0 208 S -Gls-4A-1a-o shgc-0.33 0%S 20 0.320 27.8 557 19.2 0 384 E -Gls-4A-1a-o shgc-0.33 0%S 70 0.320 27.8 1,949 35.0 0 2,450 W -Gls-4A-1a-o shgc-0.33 0%S 54 0.320 27.8 1,503 35.0 0 1,890 UP-Ceil-16B-50 1316 X 1 1316 0.020 1.7 2,290 1.0 0 1,263 Subtotals for Structure:13,462 0 7,205 Infil.: Win.: 48.2, Sum.: 25.1 1,332 3.363 4,479 0.261 484 348 People: 200 lat/per, 230 sen/per:5 1,000 1,150 Equipment:1,000 3,000 Room Totals:17,941 2,484 11,703 C:\ ...\21160 IDAHO LAKEVILLE 10182021.rhv Monday, October 18, 2021, 11:55 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Hebert Homes Farmington, MN 55024 Page 19 Detailed Room Loads - Room 3 - Lower Level (Average Load Procedure) General Calculation Mode:Htg. & clg.Occurrences:1 Room Length:1,262.0 ft.System Number:1 Room Width:1.0 ft.Zone Number:1 Area:1,262.0 sq.ft.Supply Air:149 CFM Ceiling Height:9.0 ft.Supply Air Changes:0.8 AC/hr Volume:11,358.0 cu.ft.Req. Vent. Clg:0 CFM Number of Registers:2 Actual Winter Vent.:32 CFM Runout Air:74 CFM Percent of Supply.:22 % Runout Duct Size:6 in.Actual Summer Vent.:8 CFM Runout Air Velocity:378 ft./min.Percent of Supply:6 % Runout Air Velocity:378 ft./min.Actual Winter Infil.:11 CFM Actual Loss:0.090 in.wg./100 ft.Actual Summer Infil.:6 CFM Item Description Area Quantity -U- Value Htg HTM Sen Loss Clg HTM Lat Gain Sen Gain S -Wall-15B0-10sf-10 40 X 9 360 0.049 4.3 1,535 0.0 0 0 N -Wall-15B0-10sf-10 40 X 9 360 0.049 4.3 1,535 0.0 0 0 W -Wall-15B0-10sf-10 34 X 9 306 0.049 4.3 1,304 0.0 0 0 E -Wall-12F-0sw 34 X 9 266 0.065 5.7 1,504 0.9 0 230 E -Gls-4A-1a-o shgc-0.33 0%S 40 0.320 27.8 1,114 35.0 0 1,400 Floor-21A-24 1 X 1262 1262 0.025 2.2 2,745 0.0 0 0 Subtotals for Structure:9,737 0 1,630 Infil.: Win.: 11.1, Sum.: 5.8 306 3.363 1,029 0.261 111 80 People: 200 lat/per, 230 sen/per:2 400 460 Equipment:500 1,000 Room Totals:10,766 1,011 3,170 C:\ ...\21160 IDAHO LAKEVILLE 10182021.rhv Monday, October 18, 2021, 11:55 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Hebert Homes Farmington, MN 55024 Page 20 Room Cooling and Heating Loads Bar Graphs Cooling Heating Btuh Lower Level Upper Level Main Level 0 5,000 10,000 15,000 20,000 C:\ ...\21160 IDAHO LAKEVILLE 10182021.rhv Monday, October 18, 2021, 11:55 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Hebert Homes Farmington, MN 55024 Page 21 Room Cooling Loads Bar Graphs Sensible Latent Btuh Lower Level Upper Level Main Level 0 5,000 10,000 15,000 C:\ ...\21160 IDAHO LAKEVILLE 10182021.rhv Monday, October 18, 2021, 11:55 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Hebert Homes Farmington, MN 55024 Page 22 System 1 Room Load Summary No Room Name Area SF Htg Sens Btuh Min Htg CFM Run Duct Size Run Duct Vel Clg Sens Btuh Clg Lat Btuh Min Clg CFM Act Sys CFM ---Zone 1--- 1 Main Level 1,262 18,354 382 6-6 468 11,779 1,884 552 552 2 Upper Level 1,316 17,941 374 6-6 465 11,703 2,484 548 548 3 Lower Level 1,262 10,766 224 2-6 378 3,170 1,011 149 149 Ventilation 4,550 340 1,352 System 1 total 3,840 51,611 980 26,992 6,731 1,249 1,249 System 1 Main Trunk Size:21x10 in. Velocity:856 ft./min Loss per 100 ft.:0.108 in.wg Cooling System Summary Cooling Tons Sensible/Latent Split Sensible Btuh Latent Btuh Total Btuh Net Required:2.81 80% / 20%26,992 6,731 33,723 Actual:1.00 77% / 23%9,240 2,760 12,000 Equipment Data Heating System Cooling System Type:Natural Gas Furnace Standard Air Conditioner Model:QC-F38-E78-G QC-C12 Indoor Model:S12 Brand:Quikcool FE Series Quikcool AS Series Description:Hi Efficiency Furnace Standard Efficiency Air Condit Efficiency:78.3 AFUE 12.4 SEER Sound:8.1 bels Capacity:38,000 Btuh 12,000 Btuh Sensible Capacity:n/a 9,240 Btuh Latent Capacity:n/a 2,760 Btuh C:\ ...\21160 IDAHO LAKEVILLE 10182021.rhv Monday, October 18, 2021, 11:55 AM