Loading...
HomeMy WebLinkAboutLA199621 - 19977 Harrisburg Way Permit PackRESIDENTIAL BUILDING PERMIT APPLICATION CITY OF LAKEVILLE BUILDING INSPECTIONS DEPARTMENT 20195 HOLYOKE AVENUE LAKEVILLE, MN 55044 952-985-4440 Office Use Only __________________ Permit Number ___________________ Received By ___________________ Date Received ___________________ Fee Total SITE ADDRESS: MAILING ADDRESS: CITY: STATE: ZIP: JOB DESCRIPTION:__________________________________ MASTER PLAN: (Number or Address)____________________ LIST OTHER STRUCTURES ON PROPERTY:_______________________________________________________________ ESTIMATED VALUATION: PROPOSED START DATE: END DATE: (New Residential Only): LEGAL DESCRIPTION: LOT: _____ BLOCK: _____ SUBDIVISION: APPLICANT IS: RESIDENT OWNER CONTRACTOR EMAIL NEW MODEL HOME: YES NO (IF YES – ADMINISTRATIVE PERMIT REQUIRED) PLEASE FILL OUT THE FOLLOWING COMPLETELY (All Contractor information must be as listed on State License) RESIDENT OWNER NAME:_______________________________________________________________________________ HOME PHONE #:_____________________________ CELL PHONE:___________________________ GENERAL CONTRACTOR Homeowner Contractor CONTRACTOR:_______________________________________________________________________ LICENSE #:BC______________ LEAD CERTIFICATE#_______________ (PRE 1978 STRUCTURE) OFFICE PHONE #:_____________________________ CELL PHONE:___________________________ ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________ PLUMBING WORK Homeowner Contractor CONTRACTOR:__________________________________________LICENSE #: PM______________ OFFICE PHONE #:_____________________________ CELL PHONE:___________________________ ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________ MECHANICAL WORK Homeowner Contractor CONTRACTOR:________________________________________ _______________________________ OFFICE PHONE #:_____________________________ CELL PHONE:___________________________ ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________ BOND #:_______________________________________ EXPIRATION DATE____________________ SEWER/WATER CONTRACTOR New Construction Only NAME:________________________________________________ ______________________________ HOME PHONE _____________________________ CELL PHONE:______________________________ BOND #:_______________________________________ EXPIRATION DATE____________________ INTEREST EARNINGS ON THE ESCROW ACCOUNTS, IF ANY, ARE RETAINED BY THE CITY TO OFFSET THE ADMINISTRATIVE COSTS ASSOCIATED WITH PROCESSING THE ESCROW APPLICATION AND REFUND. I HEREBY APPLY FOR A BUILDING PERMIT AND I ACKNOWLEDGE THAT THE INFORMATION ABOVE IS COMPLETE AND ACCURATE; THAT THE WORK WILL BE IN CONFORMANCE WITH THE ORDINANCES AND CODES OF THE CITY AND WITH THE STATE BUILDING CODE, THAT I UNDERSTAND THIS IS NOT A PERMIT AND WORK IS NOT TO START WITHOUT A PERMIT AND THAT THE WORK WILL BE IN ACCORDANCE WITH THE APPROVED PLAN. NAME OF APPLICANT (Please Print)DATE APPLICANT’S SIGNATURE: www.lakevillemn.gov RESIDENTIAL BUILDING PERMIT APPLICATION PAGE 2 OFFICE USE ONLY BUILDING PERMIT TYPE REQUIRED INSPECTIONS SINGLE FAMILY DWELLING BUILDING DUPLEX AS BUILT TOWNHOUSE UNITS BUILDING FINAL DETACHED TOWN HOUSE UNIT DECK FOOTING CONDO FIREPLACE ACESSORY BUILDING FOOTING REROOF FOUNDATION RESIDE FRAMING PORCH FRAMING GARAGES INSULATION RES ADDN/REPAIR/RMDL DECK PORCH GARAGES LATH LOWER LEVEL FINISH LOWER LEVEL FINAL ADDITION OTHER FOUNDATION ONLY PORCH FOOTING MISCELLANEOUS POURED WALL DEMO SEPTIC TANK REMOVAL MOVED SITE MECHANICAL CITY BUILDING VALUATION: $AIR TEST FINAL BUILDING PERMIT FEES ROUGH-IN $PERMIT FEE PLUMBING $PLAN CHECK FINAL $SURCHARGE ROUGH-IN $METRO SAC METER SIZE $CITY WATER HOOKUP UNIT PRESSURE REDUCING VALVE $CITY SEWER HOOKUP UNIT SEWER/WATER $LANDSCAPE ESCROW SEWER/WATER $TREE ESCROW FINAL $MISC ESCROW STREET DRAINTILE $PLUMBING BUILDING INFORMATION $MECHANICAL TYPE OF CONSTRUCTION $SEWER WATER ZONING $OTHER CODE EDITION $TOTAL FIRE SUPPRESSION SYSTEM OCCUPANCY GROUP APPROVED BY: BUILDING INSPECTOR: Date: PLUMBING/MECHANICAL INSPECTOR: Date: COMMENTS: 19977 HARRISBURG WAY, LAKEVILLE*ALL DOOR & WINDOW HEADERSTO BE S.P.F. #2 OR BETTERRESIDENCE FOR:written consent of Planco MN, Inc. modified or used in any redesign without the priormay not be assigned or copied, and may not bemay not be re-used for any additional structures,structure. Planco MN reserves all rights. These planslicense is granted to use these plans to build oneCopyright for these drawings is owned by Planco MN,Planco MN, Inc.c#21-097SMA172021STONE COTTAGE CONSTRUCTION, INC. DYMOUL CHHOUN & KAKNIKA SRORS LOT 10, BLOCK 2, BERRES RIDGE 5TH ADDITION FRONT ELEVATION 1/4" = 1'-0" 8128121012101210126124" TRIM4" TRIM12x12 BOXED COL.ON 18x18x42STONE BASEWOOD PORCHVINYLB & BVINYLB & BVINYLB & BVINYLB & BVINYLB & B16x8 OVH. DR.9x8 OVH. DR.VINYLSIDINGVINYLSIDINGSTONECAPSTONE1'-3"13'-0"8'-4" POURED FOUNDATION9' CEILING @ FIRST FLOORTOTAL2nd FLR.1st FLR.1,198 SQ. FT.1,228 SQ. FT.2,426 SQ. FT.TOTALBSM'T787 SQ. FT.3,213 SQ. FT.STONEON JOGTHERMO-TECHPATIO DOORMARVIN ESSENTIALSTONE AS SHOWNFRONT & SIDESWINDOWS4" TRIMFRONT ONLY4" VINYL SIDINGSIDES & REARVINYL B & BFRONT ONLYFRONT ONLYGRIDS IN WDWS.Concept Approval ONLYSubject to Field InspectionInspectorDate2020MN BldgCode02/04/2022dmathews VERIFY ALLGRADE LINESPlanco MN, Inc.C#21-097SMA272021 LEFT ELEVATION 1/8" = 1'-0" 8121012SIDINGVINYL VINYLCORNERS1'-6"1'-5" RIGHT ELEVATION 1/8" = 1'-0" 1012812SIDINGVINYL SIDINGVINYL VINYLCORNERS1'-0" REAR ELEVATION 1/8" = 1'-0" 8121012VINYLCORNERSSIDINGVINYL SIDINGVINYL 1'-0" ROOF PLAN 1/8" = 1'-0" 81281210121012101210121261'-5"10/1210/1213'-0"8121'-3"1'-3"1'-0"1'-6"1'-6"1'-0"Secure door closed until deck isconstructed with a separate permit. Planco MN, Inc.C#21-097SMA372021 BASEMENT PLAN 1/4" = 1'-0" (2) TRT. 6x6 POSTON 12x16 PIER FTG.24x24 FROST FTG. UNEXCAVATED 2-2x102868266854"24685'-0" TUB& SHOWER1 PIECE FIB.30"x30"x12"CONC. PAD FTG.30"x12"CONC. FTG.30"x30"x12"CONC. PAD FTG.246818"x24" LIN.F*VINYL4'-6"5'-0"8'-6"6'-0"3'-5"8'-7"UP15 RFUT. DRY BAR BM. PKT.2x64'-7"9'-5"7'-8"10'-4"TREATED 4x6 CURB2x6 - 16" O.C.FTG. SIZE BY OTHERSTREATED 4x6 CURB2x6 - 16" O.C.FTG. SIZE BY OTHERS36'-0"11'-6"7'-6"17'-0"6'-6"WALLEDGEWALLEDGE10'-0"2-9 1/2" LSL6068 P.D.2-9 1/2" LSL8/0x5/0 SL2-9 1/2" LSL6/0x4/0 SL63'-0"36'-0"27'-0"43'-0" 21'-0"22'-0" 2'-0"20'-0"63'-0"31'-6"31'-6"11'-0"20'-6"12'-0"19'-6"9"10'-6"9"8'-3"11'-3"9'-0"12'-6" 2'-0"24'-0"12'-0"7'-6"12'-0"4'-6"5'-7"6'-5" FAMILY/REC ROOM *CARPET BEDROOM #4 *CARPET W.I.C. *CARPET3'-8"WHFURNF.D.92% MECH/STORAGE *CARPET266816'-8"5'-0" 11 7/8" I JOIST 19.2" O.C. 11 7/8" LSL 19.2" O.C. 11 7/8" I JOIST 19.2" O.C.TREATED 4x4 CURB2x4 - 16" O.C.FTG. SIZE BY OTHERSTREATED 2x8 16" O.C.TRT. 2-2x10 FLUSHTRT. 2-2x10 FLUSHTRT. 2-2x10 FLUSH8'-4" POURED FOUNDATION”),1,6+('64)72" LEDGE4'-0"1/2 WALL10'-0" LOOKOUT LOOKOUT WALKOUTWALKOUT2-9 1/2" LSL DROPPED1-11 7/8" LSL FLUSH 3-9 1/2" LVLDROPPED4x12 PSL W/COL. CAP333UFER Ground-Provide 20' Rebar in footing and stubup near electrical service panel. Planco MN, Inc.C#21-097SMA472021 FIRST FLOOR PLAN 1/4" = 1'-0" FUP18 RDN15 R10"3'-9"3'-9"2068SH'SMICRO OVEN/REF'G30" COOKTOP W/ HOODVENT26682668SLSL30686/0x5/0 SL2-2x102868FIREDOOR50685068CHASEFUT. D.Z.FUT. BENCH PED24682868 C.O.FUT. CAB.2-2x10PANT.*WOODS.B.LS2-9 1/2" LSL6068 P.D.2-2x103/0x4/0 SHTOP @ 7'-6"2-9 1/2" LSL8/0x5/0 SL FOYER *WOOD*WOOD DINING KITCHEN *WOOD*WOOD GREAT ROOM OFFICE *CARPET16x8 OVH. DR.9x8 OVH. DR.*4" CONC. FLOOR GARAGE *2x6 WALLS2-2x105/0x4/0 FXTEMPSET 3" OFF T.O.F. 24" FLR.TRUSS 24" O.C. 24" FLR.TRUSS 24" O.C. 24" FLR.TRUSS 24" O.C.*VINYL*VINYL WOOD PORCH 2/6x4/6 DH2-2x102x62x62x663'-0"36'-0"27'-0"14'-6"10'-0"11'-6"7'-6"7'-0"5'-0"5'-0"4'-6"7'-0"4'-0"6'-6" CAB.3'-0"4'-0"90"x48" COUNTER TOP 2'-5"43'-0" 21'-0"22'-0" 2'-0"20'-0"63'-0"31'-6"31'-6"11'-0"20'-6"11'-3"8'-3"10'-6"9"5'-10"5'-2"10'-3"10'-3"36'-0"11'-6"7'-6"17'-0"5'-3"6'-6"5'-3"3'-9"3'-9"WALLEDGEWALLEDGE6'-6"6'-0"6" 9'-0"12'-0"9"6'-0"6'-0"3'-9"11'-0"4'-9"2'-10"6'-10"2'-6"7'-10"1'-10" 5'-5"1'-11"5'-10"3'-7"4'-7"4'-5"16'-7"4'-11"8'-6"4'-4" 12'-6"1,198 SQ. FT.9' CEILING @ FIRST FLOOR4"1'-0"4'-6"7'-6"2'-0"3-2x10SD/CO19'-6"12x12 BOXED COL.ON 18x18x42STONE BASETRUSSES24" O.C.2'-0"2'-0"*8" BOX VAULT10'-0"3-11 7/8" LVL FLUSH3-9 1/2" LSLFLUSH2-7 1/4" LSL2-7 1/4" LSL2-7 1/4" LSL2-11 7/8" LSL2-2x126'-0"GASF.P.1'-8"2'-1012"2'-412"2'-1012"2'-412"2-2x102/6x2/0 FXTOP @ 8'2-2x102/6x2/0 FXTOP @ 8'BWPsAbove355599CS-PFPFHPFH33575 Planco MN, Inc.C#21-097SMA572021 SECOND FLOOR PLAN 1/4" = 1'-0" DN18 R3'-9"3'-9"40682468PKT.2468PKT.74"5'-0" TUB & SHOWER 1 PIECE FIB.24682668WD286818"LIN.2468PKT.2'-4"724874401'-6"*C.T.2'-4"GLASSPANELFREESTANDING TUB 5/0x2/0 FX 2-2x10 96"246824683'-10"5'-8"3'-6"2668286872"x24" ISLAND 4068 C.O.2-2x103/0x5/0 SH2-2x103/0x5/0 SH2-2x102/6x4/6 SH*CARPET MASTER BEDROOM *CARPET W.I.C. *CARPET W.I.C. *CARPET BEDROOM #2 BEDROOM #3 *CARPET2'-0"6/0x5/0 SL2-2x105/0x4/6 SL2-2x102/6x2/0 FX2-2x102-2x105/0x6/0 FXTEMP 1'-0" 37'-0"12'-6"7'-6"17'-0"WALLEDGEWALLEDGE3'-9"3'-9"36'-0"11'-0"15'-10"9'-2"3'-8"1'-9"3'-9"2'-2"11'-6"2'-2"34'-0" 12'-6"21'-6" 7'-0"7'-6"7'-0"4'-0"32'-0"12'-0"9'-0"11'-0"6'-0"6'-0"4'-0"5'-0"5'-3"5'-9"1,228 SQ. FT.GIRDERACCESS ATTICSD/COSDSDSD10"2x66'-10"2'-6"6'-6"2'-6"3'-8"4'-6"5'-10"8"7'-9"4'-5"2'-2"FFF*C.T.*C.T.TRUSSES 24" O.C. TRUSSES 24" O.C.TRUSSES24" O.C.3'-9"3'-9" 3'-0"TOP @ 8'OFF LNDG. 2'-0"2'-0"*12" BOX VAULT1' - 6 "*VINYL*VINYL*VINYLWALLHUNG LT1/2 WALL W/ WD. CAP 20x14NICHESH'SCONTROLSTemper if within60" of tub floor.2222222222222222-Min. 15" clearance to anyobstruction from center ofW.C., 24" in front(typ). Planco MN, Inc.C#21-097SMA672021 CROSS SECTION 3/8" = 1'-0" SHEATHINGR-21 INSUL.9'-11 8"3 1/2" CONC. FLOOR1/2" GYP. BD.VB “TRT. 4x6 CURB2X6- 16" O.C.3/4" T & G FLOOR5/8" GYP. BD.2x6- 16" O.C.GRADE2x6- 16" O.C.VB1/2" GYP. BD.R-21 INSUL.5/8" GYP. BD.W/ V.B.3/4" T & G FLOORR-21 INSUL.1/2" GYP. BD.VB2x6- 16" O.C.2x6- 16" O.C.VB1/2" GYP. BD.R-21 INSUL.8'-11 8"24" FLOOR TRUSSES @ 24" O.C.SIDINGSHEATHING15 RISERSTRT. 4x6 CURB2X6- 16" O.C.18 RISERS R-49 INSUL.1'-0"SIDINGALUM.ALUM. FASCIASOFFITVENTED1'-5"2-7 1/4" LSL12x12 BOXEDCOLUMN6'-0"6'-6"73 8"PER CODEWALL W/ REBAR8'-4" POUREDSILL PLATE1-2x6 TREATEDDRAIN TILE R-20 SPRAY FOAMPROOFINGWATERR-10 W/ <2.6 ACHINSUL.R-20 SPRAY FOAMR-20 SPRAY FOAMR-20 SPRAY FOAMMIN. R-38@ CANT.11'-6"TRT. 4x4 CURB2X4- 16" O.C.GIRDERAPPLY STONE TO14x14x42 TREATEDPLYWOOD BOX11 7/8" I JTS. @ 19.2" O.C. OFFICE GREAT ROOM W.I.C. BEDROOM #2 FOUNDATION & FTG.SIZES & DETAILSPER ENGINEER SPECSFOUNDATION & FTG.SIZES & DETAILSPER ENGINEER SPECSFASCIAALUM. SOFFITVENTEDALUM.ENERGY HEEL1/2" SHTG.15# FELTSHINGLES1'-6"812ROOF VENTS @ 1/300 ATTIC50% ROOF 50% SOFFIT(DESIGNED BY MFR)TRUSSES @ 24" O.C.34'-0"3'-0" STORAGE 11 7/8" LSL @ 19.2" O.C.5/8" GYP. BD.612HOUSE WRAPHOUSE WRAP FAMILY/REC RM POURED WALLGRADE2" FOAM758"2" FOAM W/“%(9(/512"4'-0"R-21 INSUL.1/2" GYP. BD.VB2x6- 16" O.C.6'-8" MIN. HDRM1x8 RISERS5/4x11 TREADS4- 2x12 STRINGERSTAIR NOTES:10" ROUGH CUT TREADS24x24 PADFOOTING12x16 PIERFOOTING6x6 POSTTRT. 6x6 POSTTRT. 2-2x102x8 JTS. @ 16" O.C.DECKING2'-0"8"2'-0"BOX VAULT @ GREAT ROOM77 16"FLOOR SYSTEMROOFTRUSSPVC T-FITTINGTO SUPPORTVENT PIPEMIN. 4" OF GASPERMEABLE MATERIAL3 1/2" CONC. SLAB4" PVC VENT PIPESUPPORTSTRAPPINGFLASHINGEXHAUST 10' FROM OPNGS.INTO CONDITIONED SPACESOF BUILDING12" MIN. ABOVE ROOFSEAL6 MIL POLYUNDER SLAB10' OF DRAIN TILEEACH WAY FROMT-FITTING(ROCK) RADON GAS VENT SYSTEM 3/8" = 1'-0" 36" MIN. HT. CLEAR SPACE24" DIA. AROUND VENTPROVIDE ELECTRICALBOX POWER SOURCER-4 MIN. INSUL. VENT PIPE@ UNCONDITIONED SPACE4" MIN. CLEARANCEFOR FUT. FAN Planco MN, Inc.C#21-097SMA772021 CROSS SECTION 3/8" = 1'-0" SHEATHINGSIDING1-2x6 TREATEDR-21 INSUL.9'-11 8"3 1/2" CONC. FLOOR1/2" GYP. BD.VB8'-4" POURED “WALL W/ REBARPER CODE3/4" T & G FLOORSILL PLATE5/8" GYP. BD.2x6- 16" O.C.WATERPROOFING21'-6"2x6- 16" O.C.VB1/2" GYP. BD.R-21 INSUL.5/8" GYP. BD.W/ V.B.3/4" T & G FLOORR-21 INSUL.1/2" GYP. BD.VB2x6- 16" O.C.2x6- 16" O.C.VB1/2" GYP. BD.R-21 INSUL.8'-11 8"24" FLOOR TRUSSES @ 19.2"O.C.4" CONC. FLOOR GARAGE GRADEPOURED WALL2X6- 16" O.C.SLOPE TO DOORSR-49 INSUL.22'-0"10'-31 4"R-20 SPRAY FOAMR-20 SPRAY FOAMR-20 SPRAY FOAMR-20 SPRAY FOAMDRAIN TILE R-10 W/ <2.6 ACHINSUL.1/2" GYP. BD. MASTER BATHROOM KITCHEN FOUNDATION & FTG.SIZES & DETAILSPER ENGINEER SPECSFOUNDATION & FTG.SIZES & DETAILSPER ENGINEER SPECS11 7/8" I JTS. @ 19.2" O.C.5/8" GYP. BD. BEDROOM #4 FASCIAALUM. SOFFITVENTEDALUM.ENERGY HEEL1/2" SHTG.15# FELTSHINGLES1'-6"812ROOF VENTS @ 1/300 ATTIC50% ROOF 50% SOFFIT(DESIGNED BY MFR)TRUSSES @ 24" O.C.(DESIGNED BY MFR)TRUSSES @ 24" O.C.HOUSE WRAPFOUNDATION & FTG.SIZES & DETAILSPER ENGINEER SPECSPOURED WALLGRADE2" FOAM758"2" FOAM W/“%(9(/512"4'-0"R-21 INSUL.1/2" GYP. BD.VB2x6- 16" O.C.12'-1"2'-5" BASEMENT PLAN (2) TRT. 6x6 POSTON 12x16 PIER FTG.24x24 FROST FTG. UNEXCAVATED 2-2x102868266854"24685'-0" TUB& SHOWER1 PIECE FIB.30"x30"x12"CONC. PAD FTG.30"x48"x12"CONC. PAD FTG.30"x30"x12"CONC. PAD FTG.246818"x24" LIN.F*VINYL4'-6"5'-0"8'-6"6'-0"3'-5"8'-7"UP15 RFUT. DRY BAR BM. PKT.2x64'-7"9'-5"7'-8"10'-4"TREATED 4x6 CURB2x6 - 16" O.C.FTG. SIZE BY OTHERSTREATED 4x6 CURB2x6 - 16" O.C.FTG. SIZE BY OTHERS36'-0"11'-6"7'-6"17'-0"6'-6"WALLEDGEWALLEDGE10'-0"3-2x106068 P.D.3-2x108/0x5/0 SL3-2x106/0x4/0 SL63'-0"36'-0"27'-0"43'-0" 21'-0"22'-0" 2'-0"20'-0"63'-0"31'-6"31'-6"11'-0"20'-6"12'-0"19'-6"9"10'-6"9"8'-3"11'-3"9'-0"12'-6" 2'-0"24'-0"12'-0"7'-6"12'-0"4'-6"5'-7"6'-5" FAMILY/REC ROOM *CARPET BEDROOM #4 *CARPET W.I.C. *CARPET3'-8"WHFURNF.D.92% MECH/STORAGE *CARPET266817'-0"4'-8" 11 7/8" I JOIST 19.2" O.C. 11 7/8" LSL19.2" O.C. 11 7/8" I JOIST 19.2" O.C.TREATED 4x4 CURB2x4 - 16" O.C.FTG. SIZE BY OTHERSTREATED 2x8 16" O.C.TRT. 2-2x10 FLUSHTRT. 2-2x10 FLUSHTRT. 2-2x10 FLUSH2" LEDGE4'-0"1/2 WALL10'-0" LOOKOUT LOOKOUT WALKOUTWALKOUTBWL 110'3'3'3'2-8-2022 FIRST FLOOR PLAN FUP18 RDN15 R10"3'-9"3'-9"2068SH'SMICRO OVEN/REF'G30" COOKTOP W/ HOODVENT26682668SLSL30686/0x5/0 SL2-2x102868FIREDOOR50685068CHASEFUT. D.Z.FUT. BENCH PED24682868 C.O.FUT. CAB.2-2x10PANT.*WOODS.B.LS2-9 1/2" LSL6068 P.D.2-2x103/0x4/0 SHTOP @ 7'-6"2-9 1/2" LSL8/0x5/0 SL FOYER *WOOD*WOOD DINING KITCHEN *WOOD*WOOD GREAT ROOM OFFICE *CARPET16x8 OVH. DR.9x8 OVH. DR.*4" CONC. FLOOR GARAGE *2x6 WALLS2-2x105/0x4/0 FXTEMPSET 3" OFF T.O.F. 24" FLR.TRUSS 24" O.C. 24" FLR.TRUSS 24" O.C. 24" FLR.TRUSS 24" O.C.*L.V.T.*L.V.T. WOOD PORCH 2/6x4/6 DH2-2x102x62x62x663'-0"36'-0"27'-0"14'-6"10'-0"11'-6"7'-6"7'-0"5'-0"5'-0"4'-6"7'-0"4'-0"6'-6" CAB.3'-0"4'-0"90"x48" COUNTER TOP 2'-5"43'-0" 21'-0"22'-0" 2'-0"20'-0"63'-0"31'-6"31'-6"11'-0"20'-6"11'-3"8'-3"10'-6"9"5'-10"5'-2"10'-3"10'-3"36'-0"11'-6"7'-6"17'-0"5'-3"6'-6"5'-3"3'-9"3'-9"WALLEDGEWALLEDGE6'-6"6'-0"6" 9'-0"12'-0"9"6'-0"6'-0"3'-9"11'-0"4'-9"2'-10"6'-10"2'-6"7'-10"1'-10" 5'-5"1'-11"5'-10"3'-7"4'-7"4'-5"16'-7"4'-11"8'-6"4'-4" 12'-6"4"1'-0"4'-6"7'-6"2'-0"3-2x10SD/CO19'-6"12x12 BOXED COL.ON 18x18x42STONE BASETRUSSES24" O.C.2'-0"2'-0"*8" BOX VAULT10'-0"3-11 7/8" LVL FLUSH3-9 1/2" LSLFLUSH2-7 1/4" LSL2-7 1/4" LSL2-7 1/4" LSL2-11 7/8" LSL2-2x126'-0"GASF.P.1'-8"2'-1012"2'-412"2'-1012"2'-412"2-2x102/6x2/0 FXTOP @ 8'2-2x102/6x2/0 FXTOP @ 8'BWL 2BWL 3BWL 4BWL 5BWL 640'32'32'5'4'4'3'3'3'5'9'9'9'5'5'SEE DETAIL 1/PF-1SEE DETAIL 2/PF-15'7'2-8-2022 SECOND FLOOR PLAN DN17 R3'-9"3'-9"40682468PKT.2468PKT.74"5'-0" TUB & SHOWER 1 PIECE FIB.24682668LTWD27"286818"LIN.2468PKT.2'-0"844874481'-6"*C.T.2'-8"GLASSPANEL36x66 FREESTANDING TUB 5/0x2/0 FX 2-2x10 96"246824683'-10"5'-8"3'-6"2668286872"x24" ISLAND 4068 C.O.2-2x103/0x5/0 SH2-2x103/0x5/0 SH2-2x102/6x4/6 SH*CARPET MASTER BEDROOM *CARPET W.I.C. *CARPET W.I.C. *CARPET BEDROOM #2 BEDROOM #3 *CARPET2'-0"6/0x5/0 SL2-2x105/0x4/6 SL2-2x102/6x2/0 FX2-2x102-2x105/0x6/0 FXTEMP 1'-0" 37'-0"12'-6"7'-6"17'-0"WALLEDGEWALLEDGE3'-9"3'-9"36'-0"11'-0"15'-10"9'-2"3'-8"1'-9"3'-9"2'-2"11'-6"2'-2"34'-0" 12'-6"21'-6" 7'-0"7'-6"7'-0"4'-0"32'-0"12'-0"9'-0"11'-0"6'-0"6'-0"4'-0"5'-0"5'-3"5'-9"GIRDERACCESS ATTICSD/COSDSDSD10"2x66'-10"2'-6"6'-6"2'-6"3'-8"4'-6"5'-10"8"7'-9"4'-5"1'-6"FFF*C.T.*C.T.TRUSSES 24" O.C. TRUSSES 24" O.C.TRUSSES24" O.C.3'-9"3'-9" 3'-0"TOP @ 8'OFF LNDG.BWL 7BWL 8BWL 9BWL 1035'35'2'2'2'2'2'2'2'2'2'2'2'2'2'2'2'2'2-8-2022 Voigt & Associates, Inc.C-1Structural Engineering Services 4635 Nicols Road, Suite 204Eagan, MN 55122MethodCS-WSPWind speed 115Exposure C BWL 1 2 3 4 5 6 7 8 9 10Spacing - ft 10 40 40 32 32 32 35 35 35 35Level 3 2 2 2 2 2 1 1 1 1Length req'd- ft 5 11.5 11.5 9.5 9.5 9.5 5.3 5.3 5.3 5.3per Table R602.10.3(1)Adjustments:Exposure 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4Eave to ridge Height 1 1 1 1 1 1 1 1 1 1Wall Height 0.9 0.95 0.95 0.95 0.95 0.95 0.9 0.9 0.9 0.9# of BWL 1 1 1 1.3 1.3 1.3 1 1 1 14" Gyp WB w.block joints1 1 1 1 1 1 1 1 1 1Adjusted Length 6.3 15.3 15.3 16.4 16.4 16.4 6.7 6.7 6.7 6.7Chhoun & Srors Residence19977 Harrisburg Way, Lakeville, MN Sheet Stone Cottage HVAC Load Calculations for Chhoun-srors 19977 Harrisburg Way Lakeville,mn Prepared By: Randy Andrews Lofgren Heating 5708 Upper 147th Street West Apple Vallley, MN 55124 Monday, January 3, 2022 Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 2 Project Report General Project Information Project Title:Stone Cottage Project Date:Monday, January 3, 2022 Client Name:Chhoun-srors Client Address:19977 Harrisburg Way Client City:Lakeville,mn Company Name:Lofgren Heating Company Representative:Randy Andrews Company Address:5708 Upper 147th Street West Company City:Apple Vallley, MN 55124 Company E-Mail Address:rrandrews@lofgrenheating-ac.com Design Data Reference City:Minneapolis, Minnesota Building Orientation:Front door faces North Daily Temperature Range:Medium Latitude:44 Degrees Elevation:834 ft. Altitude Factor:0.970 Elevation Sensible Adj. Factor:1.000 Elevation Total Adj. Factor:1.000 Elevation Heating Adj. Factor:1.000 Elevation Heating Adj. Factor:1.000 Outdoor Outdoor Outdoor Indoor Indoor Grains Dry Bulb Wet Bulb Rel.Hum Rel.Hum Dry Bulb Difference Winter:-15 -15.33 80%n/a 72 n/a Summer:88 72 47%50%75 29 Check Figures Total Building Supply CFM:1,336 CFM Per Square ft.:0.367 Square ft. of Room Area:3,638 Square ft. Per Ton:1,228 Volume (ft³) of Cond. Space:32,742 Building Loads Total Heating Required Including Ventilation Air:54,601 Btuh 54.601 MBH Total Sensible Gain:28,863 Btuh 81 % Total Latent Gain:6,682 Btuh 19 % Total Cooling Required Including Ventilation Air:35,545 Btuh 2.96 Tons (Based On Sensible + Latent) Notes Calculations are based on 8th edition of ACCA Manual J. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads. C:\ ...\19977 HARRISBURG LAKEVILLE 01032022.rhv Monday, January 3, 2022, 11:50 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 3 Miscellaneous Report System 1 Whole House Input Data Outdoor Dry Bulb Outdoor Wet Bulb Outdoor Rel.Hum Indoor Rel.Hum Indoor Dry Bulb Grains Difference Winter:-15 -15.33 80%n/a 72 n/a Summer:88 72 47%50%75 29.27 Duct Sizing Inputs Main Trunk Runouts Calculate:Yes Yes Use Schedule:No No Roughness Factor:0.00300 0.01000 Pressure Drop:0.1000 in.wg./100 ft.0.1000 in.wg./100 ft. Minimum Velocity:650 ft./min 450 ft./min Maximum Velocity:900 ft./min 750 ft./min Minimum Height:8 in.6 in. Maximum Height:10 in.6 in. Outside Air Data Winter Summer Infiltration Specified:0.250 AC/hr 0.130 AC/hr 103 CFM 53 CFM Infiltration Actual:0.250 AC/hr 0.130 AC/hr Above Grade Volume:Cu.ft.Cu.ft.X 24,608 X 24,608 6,152 Cu.ft./hr 3,199 Cu.ft./hr X 0.0167 X 0.0167 Total Building Infiltration:103 CFM 53 CFM Total Building Ventilation:140 CFM 70 CFM ---System 1--- Infiltration & Ventilation Sensible Gain Multiplier: 13.87 = (1.10 X 0.970 X 13.00 Summer Temp. Difference) Infiltration & Ventilation Latent Gain Multiplier: 19.31 = (0.68 X 0.970 X 29.27 Grains Difference) Infiltration & Ventilation Sensible Loss Multiplier: 92.85 = (1.10 X 0.970 X 87.00 Winter Temp. Difference) Winter Infiltration Specified:0.250 AC/hr (103 CFM), Construction: Unknown Summer Infiltration Specified:0.130 AC/hr (53 CFM), Construction: Unknown C:\ ...\19977 HARRISBURG LAKEVILLE 01032022.rhv Monday, January 3, 2022, 11:50 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 4 Load Preview Report Scope Has AED Net Ton ft.² /Ton Area Sen Gain Lat Gain Net Gain Sen Loss Sys Htg CFM Sys Clg CFM Sys Act CFM Duct Size Building 2.96 1,228 3,638 28,863 6,682 35,545 54,601 1,042 1,336 1,336 System 1 Yes 2.96 1,228 3,638 28,863 6,682 35,545 54,601 1,042 1,336 1,336 24x10 Ventilation 340 1,352 1,692 4,550 Zone 1 3,638 28,523 5,330 33,853 50,051 1,042 1,336 1,336 24x10 1-Main Level 1,205 11,094 1,855 12,949 18,297 381 520 520 6--6 2-Upper Level 1,228 13,610 2,461 16,071 19,688 410 638 638 8--6 3-Lower Level 1,205 3,819 1,014 4,833 12,066 251 179 179 2--6 C:\ ...\19977 HARRISBURG LAKEVILLE 01032022.rhv Monday, January 3, 2022, 11:50 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 5 Duct Size Preview Room or Duct Name Minimum Velocity Maximum Velocity Rough. Factor Design L/100 Actual L/100 SP Loss Duct Velocity Duct Length Htg Flow Clg Flow Act. Flow Duct Size System 1 Supply Runouts Zone 1 1-Main Level 450 750 0 0.1 0.1 441.2 381 520 520 6--6 2-Upper Level 450 750 0 0.1 0.1 405.9 410 638 638 8--6 3-Lower Level 450 750 0 0.1 0.1 455.6 251 179 179 2--6 Other Ducts Supply Main Trunk 650 900 0 0.1 0.1 801.8 1,042 1,336 1,336 24x10 SummarySummarySummarySummarySummarySummarySummarySummary System 1 Heating Flow:1042 Cooling Flow:1336 C:\ ...\19977 HARRISBURG LAKEVILLE 01032022.rhv Monday, January 3, 2022, 11:50 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 6 System 1 - Whole House - Adequate Exposure Diversity Test Test For Adequate Exposure Diversity Average Glass Sensible Gain Over 12 Hours 1.3 x Average Glass Gain Hourly Glass Gain Hourly Total Net GainHeat Gain, Btuh25.1% Diff. from Avg. 0 10,000 20,000 30,000 40,000 50,000 8 am 9 am 10 am 11 am 12 pm 1 pm 2 pm 3 pm 4 pm 5 pm 6 pm 7 pm AED Calculation Summary --- SYSTEM HAS ADEQUATE EXPOSURE DIVERSITY. --- System is on N, E, S, W rosette. Peak load exceeds 12-hour average load by 25.1%. AED Excursion (amount by which peak exceeds 1.3 x average): 0 Btuh Definition: A system has adequate exposure diversity if the peak-hour glass load for the entire conditioned space does not exceed the average glass load for the entire conditioned space by more than 30 percent. C:\ ...\19977 HARRISBURG LAKEVILLE 01032022.rhv Monday, January 3, 2022, 11:50 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 7 System 1 - Whole House - Psychrometric Chart ZC Zone (Room) Condition OC Outdoor Condition LC Leaving Coil Condition EC Entering Coil Condition SD Supply Duct Temperature Rise DTF Draw Through Fan Sensible Gain HRV Heat Recovery Ventilator C:\ ...\19977 HARRISBURG LAKEVILLE 01032022.rhv Monday, January 3, 2022, 11:50 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 8 Total Building Summary Loads Component Description Area Quan Sen Loss Lat Gain Sen Gain Total Gain 4A-1a-o: Glazing-Double pane low-e (e = 0.20 or less), operable window, e=0.20 on surface 2, wood with metal clad frame, u-value 0.32, SHGC 0.33 631 17,567 0 15,227 15,227 11N: Door-Metal - Polystyrene Core 42 1,278 0 352 352 12F-0sw: Wall-Frame, R-21 insulation in 2 x 6 stud cavity, no board insulation, siding finish, wood studs 2261 12,785 0 1,955 1,955 15B0-10sf-10: Wall-Basement, , R-10 board insulation to floor, no interior finish, 10' floor depth 972 4,143 0 0 0 16B-50: Roof/Ceiling-Under Attic with Insulation on Attic Floor (also use for Knee Walls and Partition Ceilings), Vented Attic, No Radiant Barrier, Dark Asphalt Shingles or Dark Metal, Tar and Gravel or Membrane, R-50 insulation 1228 2,137 0 1,179 1,179 21A-24: Floor-Basement, Concrete slab, any thickness, 2 or more feet below grade, no insulation below floor, any floor cover, shortest side of floor slab is 24' wide 1205 2,621 0 0 0 Subtotals for structure:40,531 0 18,713 18,713 People:9 1,800 2,070 3,870 Equipment:2,500 7,000 9,500 Lighting:0 0 0 Ductwork:0 0 0 0 Infiltration: Winter CFM: 103, Summer CFM: 53 9,520 1,030 740 1,770 Ventilation: Winter CFM: 140, Summer CFM: 70 4,550 1,352 340 1,692 Total Building Load Totals:54,601 6,682 28,863 35,545 Check Figures Total Building Supply CFM:1,336 CFM Per Square ft.:0.367 Square ft. of Room Area:3,638 Square ft. Per Ton:1,228 Volume (ft³) of Cond. Space:32,742 Building Loads Total Heating Required Including Ventilation Air:54,601 Btuh 54.601 MBH Total Sensible Gain:28,863 Btuh 81 % Total Latent Gain:6,682 Btuh 19 % Total Cooling Required Including Ventilation Air:35,545 Btuh 2.96 Tons (Based On Sensible + Latent) Notes Calculations are based on 8th edition of ACCA Manual J. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads. C:\ ...\19977 HARRISBURG LAKEVILLE 01032022.rhv Monday, January 3, 2022, 11:50 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 9 Building Pie Chart Building Loss 54,601 Btuh Floor 5%Roof 4% Wall 31% Glass 32% Door 2% Infiltration 17% Ventilation 8% Building Gain 35,545 Btuh Roof 3%Wall 6% Glass 43% Door 1% People 11% Equipment 27% Infiltration 5%Ventilation 5% C:\ ...\19977 HARRISBURG LAKEVILLE 01032022.rhv Monday, January 3, 2022, 11:50 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 10 Building Bar Graph Building Loss 54,601 Btuh 0 5,000 10,000 15,000 20,000 Floor 5%Wall 31%Door 2%Ventilation 8% Roof 4%Glass 32%Infiltration 17% Building Gain 35,545 Btuh 0 5,000 10,000 15,000 20,000 Roof 3%Glass 43%People 11%Infiltration 5% Wall 6%Door 1%Equipment 27%Ventilation 5% C:\ ...\19977 HARRISBURG LAKEVILLE 01032022.rhv Monday, January 3, 2022, 11:50 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 11 System 1 Whole House Summary Loads Component Description Area Quan Sen Loss Lat Gain Sen Gain Total Gain 4A-1a-o: Glazing-Double pane low-e (e = 0.20 or less), operable window, e=0.20 on surface 2, wood with metal clad frame, u-value 0.32, SHGC 0.33 631 17,567 0 15,227 15,227 11N: Door-Metal - Polystyrene Core 42 1,278 0 352 352 12F-0sw: Wall-Frame, R-21 insulation in 2 x 6 stud cavity, no board insulation, siding finish, wood studs 2261 12,785 0 1,955 1,955 15B0-10sf-10: Wall-Basement, , R-10 board insulation to floor, no interior finish, 10' floor depth 972 4,143 0 0 0 16B-50: Roof/Ceiling-Under Attic with Insulation on Attic Floor (also use for Knee Walls and Partition Ceilings), Vented Attic, No Radiant Barrier, Dark Asphalt Shingles or Dark Metal, Tar and Gravel or Membrane, R-50 insulation 1228 2,137 0 1,179 1,179 21A-24: Floor-Basement, Concrete slab, any thickness, 2 or more feet below grade, no insulation below floor, any floor cover, shortest side of floor slab is 24' wide 1205 2,621 0 0 0 Subtotals for structure:40,531 0 18,713 18,713 People:9 1,800 2,070 3,870 Equipment:2,500 7,000 9,500 Lighting:0 0 0 Ductwork:0 0 0 0 Infiltration: Winter CFM: 103, Summer CFM: 53 9,520 1,030 740 1,770 Ventilation: Winter CFM: 140, Summer CFM: 70 4,550 1,352 340 1,692 System 1 Whole House Load Totals:54,601 6,682 28,863 35,545 Check Figures Supply CFM:1,336 CFM Per Square ft.:0.367 Square ft. of Room Area:3,638 Square ft. Per Ton:1,228 Volume (ft³) of Cond. Space:32,742 System Loads Total Heating Required Including Ventilation Air:54,601 Btuh 54.601 MBH Total Sensible Gain:28,863 Btuh 81 % Total Latent Gain:6,682 Btuh 19 % Total Cooling Required Including Ventilation Air:35,545 Btuh 2.96 Tons (Based On Sensible + Latent) Notes Calculations are based on 8th edition of ACCA Manual J. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads. C:\ ...\19977 HARRISBURG LAKEVILLE 01032022.rhv Monday, January 3, 2022, 11:50 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 12 System 1 Whole House Pie Chart System 1 Whole House Loss 54,601 Btuh Floor 5%Roof 4% Wall 31% Glass 32% Door 2% Infiltration 17% Ventilation 8% System 1 Whole House Gain 35,545 Btuh Roof 3%Wall 6% Glass 43% Door 1% People 11% Equipment 27% Infiltration 5%Ventilation 5% C:\ ...\19977 HARRISBURG LAKEVILLE 01032022.rhv Monday, January 3, 2022, 11:50 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 13 System 1 Whole House Bar Graph System 1 Whole House Loss 54,601 Btuh 0 5,000 10,000 15,000 20,000 Floor 5%Wall 31%Door 2%Ventilation 8% Roof 4%Glass 32%Infiltration 17% System 1 Whole House Gain 35,545 Btuh 0 5,000 10,000 15,000 20,000 Roof 3%Glass 43%People 11%Infiltration 5% Wall 6%Door 1%Equipment 27%Ventilation 5% C:\ ...\19977 HARRISBURG LAKEVILLE 01032022.rhv Monday, January 3, 2022, 11:50 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 14 System 1, Zone 1 Summary Loads (Average Load Procedure for Rooms) Component Description Area Quan Sen Loss Lat Gain Sen Gain Total Gain 4A-1a-o: Glazing-Double pane low-e (e = 0.20 or less), operable window, e=0.20 on surface 2, wood with metal clad frame, u-value 0.32, SHGC 0.33 631 17,567 0 15,227 15,227 11N: Door-Metal - Polystyrene Core 42 1,278 0 352 352 12F-0sw: Wall-Frame, R-21 insulation in 2 x 6 stud cavity, no board insulation, siding finish, wood studs 2261 12,785 0 1,955 1,955 15B0-10sf-10: Wall-Basement, , R-10 board insulation to floor, no interior finish, 10' floor depth 972 4,143 0 0 0 16B-50: Roof/Ceiling-Under Attic with Insulation on Attic Floor (also use for Knee Walls and Partition Ceilings), Vented Attic, No Radiant Barrier, Dark Asphalt Shingles or Dark Metal, Tar and Gravel or Membrane, R-50 insulation 1228 2,137 0 1,179 1,179 21A-24: Floor-Basement, Concrete slab, any thickness, 2 or more feet below grade, no insulation below floor, any floor cover, shortest side of floor slab is 24' wide 1205 2,621 0 0 0 Subtotals for structure:40,531 0 18,713 18,713 People:9 1,800 2,070 3,870 Equipment:2,500 7,000 9,500 Lighting:0 0 0 Ductwork:0 0 0 0 Infiltration: Winter CFM: 103, Summer CFM: 53 9,520 1,030 740 1,770 System 1, Zone 1 Load Totals:50,051 5,330 28,523 33,853 Check Figures Supply CFM:1,336 CFM Per Square ft.:0.367 Square ft. of Room Area:3,638 Square ft. Per Ton:1,290 Volume (ft³) of Cond. Space:32,742 Zone Loads Total Heating Required:50,051 Btuh 50.051 MBH Total Sensible Gain:28,523 Btuh 84 % Total Latent Gain:5,330 Btuh 16 % Total Cooling Required:33,853 Btuh 2.82 Tons (Based On Sensible + Latent) Notes Calculations are based on 8th edition of ACCA Manual J. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads. C:\ ...\19977 HARRISBURG LAKEVILLE 01032022.rhv Monday, January 3, 2022, 11:50 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 15 System 1, Zone 1 Pie Chart System 1, Zone 1 Loss 50,051 Btuh Floor 5%Roof 4% Wall 34% Glass 35% Door 3% Infiltration 19% System 1, Zone 1 Gain 33,853 Btuh Roof 3%Wall 6% Glass 45% Door 1% People 11% Equipment 28% Infiltration 5% C:\ ...\19977 HARRISBURG LAKEVILLE 01032022.rhv Monday, January 3, 2022, 11:50 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 16 System 1, Zone 1 Bar Graph System 1, Zone 1 Loss 50,051 Btuh 0 5,000 10,000 15,000 20,000 Floor 5%Wall 34%Door 3% Roof 4%Glass 35%Infiltration 19% System 1, Zone 1 Gain 33,853 Btuh 0 5,000 10,000 15,000 20,000 Roof 3%Glass 45%People 11%Infiltration 5% Wall 6%Door 1%Equipment 28% C:\ ...\19977 HARRISBURG LAKEVILLE 01032022.rhv Monday, January 3, 2022, 11:50 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 17 Detailed Room Loads - Room 1 - Main Level (Average Load Procedure) General Calculation Mode:Htg. & clg.Occurrences:1 Room Length:1,205.0 ft.System Number:1 Room Width:1.0 ft.Zone Number:1 Area:1,205.0 sq.ft.Supply Air:520 CFM Ceiling Height:9.0 ft.Supply Air Changes:2.9 AC/hr Volume:10,845.0 cu.ft.Req. Vent. Clg:0 CFM Number of Registers:6 Actual Winter Vent.:51 CFM Runout Air:87 CFM Percent of Supply.:10 % Runout Duct Size:6 in.Actual Summer Vent.:27 CFM Runout Air Velocity:441 ft./min.Percent of Supply:5 % Runout Air Velocity:441 ft./min.Actual Winter Infil.:45 CFM Actual Loss:0.122 in.wg./100 ft.Actual Summer Infil.:24 CFM Item Description Area Quantity -U- Value Htg HTM Sen Loss Clg HTM Lat Gain Sen Gain S -Wall-12F-0sw 36 X 9 227 0.065 5.7 1,284 0.9 0 196 N -Wall-12F-0sw 36 X 9 246 0.065 5.7 1,391 0.9 0 213 W -Wall-12F-0sw 36 X 9 249 0.065 5.7 1,408 0.9 0 215 E -Wall-12F-0sw 36 X 9 274 0.065 5.7 1,549 0.9 0 237 N -Door-11N 3 X 7 21 0.350 30.5 639 8.4 0 176 W -Door-11N 3 X 7 21 0.350 30.5 639 8.4 0 176 S -Gls-4A-1a-o shgc-0.33 0%S 97 0.320 27.8 2,700 19.2 0 1,861 N -Gls-4A-1a-o shgc-0.33 100%S 57 0.320 27.8 1,587 10.4 0 593 W -Gls-4A-1a-o shgc-0.33 0%S 54 0.320 27.8 1,503 35.0 0 1,890 E -Gls-4A-1a-o shgc-0.33 0%S 50 0.320 27.8 1,392 35.0 0 1,750 Subtotals for Structure:14,092 0 7,307 Infil.: Win.: 45.3, Sum.: 23.6 1,296 3.245 4,205 0.252 455 327 People: 200 lat/per, 230 sen/per:2 400 460 Equipment:1,000 3,000 Room Totals:18,297 1,855 11,094 C:\ ...\19977 HARRISBURG LAKEVILLE 01032022.rhv Monday, January 3, 2022, 11:50 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 18 Detailed Room Loads - Room 2 - Upper Level (Average Load Procedure) General Calculation Mode:Htg. & clg.Occurrences:1 Room Length:1,228.0 ft.System Number:1 Room Width:1.0 ft.Zone Number:1 Area:1,228.0 sq.ft.Supply Air:638 CFM Ceiling Height:9.0 ft.Supply Air Changes:3.5 AC/hr Volume:11,052.0 cu.ft.Req. Vent. Clg:0 CFM Number of Registers:8 Actual Winter Vent.:55 CFM Runout Air:80 CFM Percent of Supply.:9 % Runout Duct Size:6 in.Actual Summer Vent.:33 CFM Runout Air Velocity:406 ft./min.Percent of Supply:5 % Runout Air Velocity:406 ft./min.Actual Winter Infil.:46 CFM Actual Loss:0.103 in.wg./100 ft.Actual Summer Infil.:24 CFM Item Description Area Quantity -U- Value Htg HTM Sen Loss Clg HTM Lat Gain Sen Gain N -Wall-12F-0sw 36 X 9 261 0.065 5.7 1,476 0.9 0 226 S -Wall-12F-0sw 36 X 9 283 0.065 5.7 1,600 0.9 0 245 E -Wall-12F-0sw 37 X 9 263 0.065 5.7 1,487 0.9 0 227 W -Wall-12F-0sw 37 X 9 243 0.065 5.7 1,374 0.9 0 210 N -Gls-4A-1a-o shgc-0.33 100%S 63 0.320 27.8 1,754 10.4 0 656 S -Gls-4A-1a-o shgc-0.33 0%S 41 0.320 27.8 1,141 19.2 0 786 E -Gls-4A-1a-o shgc-0.33 0%S 70 0.320 27.8 1,949 35.0 0 2,450 W -Gls-4A-1a-o shgc-0.33 0%S 90 0.320 27.8 2,506 35.0 0 3,150 UP-Ceil-16B-50 1228 X 1 1228 0.020 1.7 2,137 1.0 0 1,179 Subtotals for Structure:15,424 0 9,129 Infil.: Win.: 45.9, Sum.: 23.9 1,314 3.245 4,264 0.252 461 331 People: 200 lat/per, 230 sen/per:5 1,000 1,150 Equipment:1,000 3,000 Room Totals:19,688 2,461 13,610 C:\ ...\19977 HARRISBURG LAKEVILLE 01032022.rhv Monday, January 3, 2022, 11:50 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 19 Detailed Room Loads - Room 3 - Lower Level (Average Load Procedure) General Calculation Mode:Htg. & clg.Occurrences:1 Room Length:1,205.0 ft.System Number:1 Room Width:1.0 ft.Zone Number:1 Area:1,205.0 sq.ft.Supply Air:179 CFM Ceiling Height:9.0 ft.Supply Air Changes:1.0 AC/hr Volume:10,845.0 cu.ft.Req. Vent. Clg:0 CFM Number of Registers:2 Actual Winter Vent.:34 CFM Runout Air:89 CFM Percent of Supply.:19 % Runout Duct Size:6 in.Actual Summer Vent.:9 CFM Runout Air Velocity:456 ft./min.Percent of Supply:5 % Runout Air Velocity:456 ft./min.Actual Winter Infil.:11 CFM Actual Loss:0.130 in.wg./100 ft.Actual Summer Infil.:6 CFM Item Description Area Quantity -U- Value Htg HTM Sen Loss Clg HTM Lat Gain Sen Gain S -Wall-12F-0sw 36 X 9 215 0.065 5.7 1,216 0.9 0 186 N -Wall-15B0-10sf-10 36 X 9 324 0.049 4.3 1,381 0.0 0 0 W -Wall-15B0-10sf-10 36 X 9 324 0.049 4.3 1,381 0.0 0 0 E -Wall-15B0-10sf-10 36 X 9 324 0.049 4.3 1,381 0.0 0 0 S -Gls-4A-1a-o shgc-0.33 0%S 109 0.320 27.8 3,035 19.2 0 2,091 Floor-21A-24 1 X 1205 1205 0.025 2.2 2,621 0.0 0 0 Subtotals for Structure:11,015 0 2,277 Infil.: Win.: 11.3, Sum.: 5.9 324 3.244 1,051 0.253 114 82 People: 200 lat/per, 230 sen/per:2 400 460 Equipment:500 1,000 Room Totals:12,066 1,014 3,819 C:\ ...\19977 HARRISBURG LAKEVILLE 01032022.rhv Monday, January 3, 2022, 11:50 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 20 Room Cooling and Heating Loads Bar Graphs Cooling Heating Btuh Lower Level Upper Level Main Level 0 5,000 10,000 15,000 20,000 C:\ ...\19977 HARRISBURG LAKEVILLE 01032022.rhv Monday, January 3, 2022, 11:50 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 21 Room Cooling Loads Bar Graphs Sensible Latent Btuh Lower Level Upper Level Main Level 0 5,000 10,000 15,000 20,000 C:\ ...\19977 HARRISBURG LAKEVILLE 01032022.rhv Monday, January 3, 2022, 11:50 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 22 System 1 Room Load Summary No Room Name Area SF Htg Sens Btuh Min Htg CFM Run Duct Size Run Duct Vel Clg Sens Btuh Clg Lat Btuh Min Clg CFM Act Sys CFM ---Zone 1--- 1 Main Level 1,205 18,297 381 6-6 441 11,094 1,855 520 520 2 Upper Level 1,228 19,688 410 8-6 406 13,610 2,461 638 638 3 Lower Level 1,205 12,066 251 2-6 456 3,819 1,014 179 179 Ventilation 4,550 340 1,352 System 1 total 3,638 54,601 1,042 28,863 6,682 1,336 1,336 System 1 Main Trunk Size:24x10 in. Velocity:802 ft./min Loss per 100 ft.:0.090 in.wg Cooling System Summary Cooling Tons Sensible/Latent Split Sensible Btuh Latent Btuh Total Btuh Net Required:2.96 81% / 19%28,863 6,682 35,545 Actual:1.00 77% / 23%9,240 2,760 12,000 Equipment Data Heating System Cooling System Type:Natural Gas Furnace Standard Air Conditioner Model:QC-F38-E78-G QC-C12 Indoor Model:S12 Brand:Quikcool FE Series Quikcool AS Series Description:Hi Efficiency Furnace Standard Efficiency Air Condit Efficiency:78.3 AFUE 12.4 SEER Sound:8.1 bels Capacity:38,000 Btuh 12,000 Btuh Sensible Capacity:n/a 9,240 Btuh Latent Capacity:n/a 2,760 Btuh C:\ ...\19977 HARRISBURG LAKEVILLE 01032022.rhv Monday, January 3, 2022, 11:50 AM Builders Associaton of Minnesota version 101014 Date Certificate Posted x Passive (No Fan) Active (With fan and monometer or other system monitoring Location (or future location) of Fan: Other Please Describe Here x 10/15 x x x 20 x 20 x 21 x 49 x x x x x Not applicable, all ducts located in conditioned space x Not required per mech. code Passive Powered Interlocked with exhaust device. Describe:Input in BTUS: 70,000 Capacity in Gallons: Other, describe: AFUE or HSPF% 93% Cfm's " round duct OR " metal duct Not required per mech. code x Passive Low: Other, describe: x Low: Location of fan(s), describe: Cfm's 4" " round duct OR Flex " metal duct ML193UH070 Heating Loss Manufacturer Lennox Natural Gas Output in Tons: 3 Ton50 Total ventilation (intermittent + continuous) rate in cfms: Balanced Ventilation capacity in cfms: High: High: MECHANICAL VENTILATION SYSTEM Capacity continuous ventilation rate in cfms: 200CFM Select Type Describe any additional or combined heating or cooling systems if installed: (e.g. two furnaces or air source heat pump with gas back-up furnace): 28,863Residential Load Calculation SEER /EER Location of duct or system: Heating or Cooling Ducts Outside Conditioned Spaces Electric Make-up Air Select a Type AO Smith Domestic Water Heater MECHANICAL SYSTEMS Rating or Size Efficiency 13 Seer Building envelope air tightness: Rim Joist (1st Floor) GPVL-50 13ACXN042-230 Model Heating System Natrual Gas Lennox Fiberglass, Batts Foundation Wall R-value Average U-Factor (excludes skylights and one door) U: Duct system air tightness: Cooling SystemTotal R-Value of all Types of InsulationType: Check All That Apply Mineral Fiberboard Insulation Location Foam, Closed Cell0.22 Describe other insulated areas Fiberglass, BlownTHERMAL ENVELOPE Foam Open Cell Wall Rigid, Isocynurate Perimeter of Slab on Grade RADON CONTROL SYSTEM Non or Not ApplicableAttic Fuel Type Solar Heat Gain Coefficient (SHGC): Windows & Doors Ceiling, vaulted Bay Windows or cantilevered areas Floors over unconditioned area Rim Joist (2nd Floor+) 0.30 Appliances Mech Room Heat Recover Ventilator (HRV) Capacity in cfms: Energy Recover Ventilator (ERV) Capacity in cfms: 54,601 Heating Gain Cooling Load Per R401.3 Certificate. A building certificate shall be posted on or in the electrical distribution panel. Place your logo here New Construction Energy Code Compliance Certificate Name of Residential Contractor Stone Cottage Construction Inc. MN License Number Lakeville19977 Harrisburg Way BC636874 City Mailing Address of the Dwelling or Dwelling Unit Combustion Air Select a Type Location of duct or system: 35,545 Below Entire Slab Rigid, Extruded Polystyrene Ceiling, flat NEW RESIDENTIAL CONSTRUCTION SWPPP VERIFICATION This form must be completed and submitted with all new residential permit applications. New residential building permits WILL NOT be issued without this completed form. Project Site Address: _____________________________________________________________________ Company Name: _________________________________________________________________________ Primary Contact: _________________________________________________________________________ Phone # (24 hr Contact): ______________________ Email: ______________________________________ Description of Land Disturbing Activity: _____________________________________________________ NPDES Construction Stormwater Permit # C000 ___ ___ ___ ___ ___ or # SUB00 ___ ___ ___ ___ ___ If you are not covered under a NPDES Construction Stormwater Permit administered by the MPCA, an erosion and sediment control plan MUST be submitted with the residential building permit application. “The permittee(s) shall ensure that the individuals are trained by local, state, federal agencies, professional organizations or other entities in erosion prevention, sediment control, permanent Stormwater management and the Minnesota NPDES/SDS Construction Stormwater Permit.” (NPDES Construction Stormwater Permit, MPCA) “The permittee(s) must ensure that a trained person (as identified in Part III.A.3.a) will routinely inspect the entire construction site at least once every seven (7) days during active construction and within 24 hours after a rainfall event greater than 0.5 inches in 24 hours.” (NPDES Construction Stormwater Permit, MPCA) Contact information of person CERTIFIED to provide weekly onsite erosion and sediment control inspections and corrective actions: Name of Person: ________________________________Company: _______________________________ Phone # (24 hr Contact): ______________________ Email: ______________________________________ Entity that Provided Training: ________________________ Certification Expiration Date: ____________ NOTE: Prior to any land-disturbing activity, all erosion and sediment controls must be installed on the project site and on individual lots. No land disturbing activity may begin until a residential building permit has been issued. I understand, the above information to be true and I will have read, understood, and accepted all terms and conditions of the National Pollutant Discharge Elimination System (NPDES) Permit (MN R 100001). The City of Lakeville may issue a STOP WORK ORDER; withhold building inspections; or, draw on securities/escrows to bring the site into compliance with the NPDES Construction Stormwater Permit (MN R 100001) or erosion and sediment control plan. Signature: ________________________________________________ Date:_________________________ Contact the City of Lakeville with questions at erosion@lakevillemn.gov or 952-985-4500 01/24/22 X KP