Loading...
HomeMy WebLinkAbout17911 Hawksbill Drive-SURVEYZoning = RS-4 The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with the landscape inspection. *Draintile connection required. EROSION CONTROLMUST BE INSTALLED BEFORE EXCAVATION *Maintain 6" between bottom of siding and sod.*No structures in easements. ENGINEERING REVIEWED Date:__________________02/22/2022 lritchie