HomeMy WebLinkAbout19026 Ivorra Court SurveyZoning = RS-3The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.*Draintile connection required.*Maintain 6" between bottom of siding and sod.*No structures in easements.EROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATIONENGINEERING REVIEWEDDate:__________________02/22/2022lritchiecherryash13"2/23/22 EAtree preservation notes: