Loading...
HomeMy WebLinkAboutLA199781 - 20173 Ginseng Way Permit PackRESIDENTIAL BUILDING PERMIT APPLICATION CITY OF LAKEVILLE BUILDING INSPECTIONS DEPARTMENT 20195 HOLYOKE AVENUE LAKEVILLE, MN 55044 952-985-4440 Office Use Only __________________ Permit Number ___________________ Received By ___________________ Date Received ___________________ Fee Total SITE ADDRESS: MAILING ADDRESS: CITY: STATE: ZIP: JOB DESCRIPTION:__________________________________ MASTER PLAN: (Number or Address)____________________ LIST OTHER STRUCTURES ON PROPERTY:_______________________________________________________________ ESTIMATED VALUATION: PROPOSED START DATE: END DATE: (New Residential Only): LEGAL DESCRIPTION: LOT: _____ BLOCK: _____ SUBDIVISION: APPLICANT IS: RESIDENT OWNER CONTRACTOR EMAIL NEW MODEL HOME: YES NO (IF YES – ADMINISTRATIVE PERMIT REQUIRED) PLEASE FILL OUT THE FOLLOWING COMPLETELY (All Contractor information must be as listed on State License) RESIDENT OWNER NAME:_______________________________________________________________________________ HOME PHONE #:_____________________________ CELL PHONE:___________________________ GENERAL CONTRACTOR Homeowner Contractor CONTRACTOR:_______________________________________________________________________ LICENSE #:BC______________ LEAD CERTIFICATE#_______________ (PRE 1978 STRUCTURE) OFFICE PHONE #:_____________________________ CELL PHONE:___________________________ ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________ PLUMBING WORK Homeowner Contractor CONTRACTOR:__________________________________________LICENSE #: PM______________ OFFICE PHONE #:_____________________________ CELL PHONE:___________________________ ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________ MECHANICAL WORK Homeowner Contractor CONTRACTOR:________________________________________ _______________________________ OFFICE PHONE #:_____________________________ CELL PHONE:___________________________ ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________ BOND #:_______________________________________ EXPIRATION DATE____________________ SEWER/WATER CONTRACTOR New Construction Only NAME:________________________________________________ ______________________________ HOME PHONE _____________________________ CELL PHONE:______________________________ BOND #:_______________________________________ EXPIRATION DATE____________________ INTEREST EARNINGS ON THE ESCROW ACCOUNTS, IF ANY, ARE RETAINED BY THE CITY TO OFFSET THE ADMINISTRATIVE COSTS ASSOCIATED WITH PROCESSING THE ESCROW APPLICATION AND REFUND. I HEREBY APPLY FOR A BUILDING PERMIT AND I ACKNOWLEDGE THAT THE INFORMATION ABOVE IS COMPLETE AND ACCURATE; THAT THE WORK WILL BE IN CONFORMANCE WITH THE ORDINANCES AND CODES OF THE CITY AND WITH THE STATE BUILDING CODE, THAT I UNDERSTAND THIS IS NOT A PERMIT AND WORK IS NOT TO START WITHOUT A PERMIT AND THAT THE WORK WILL BE IN ACCORDANCE WITH THE APPROVED PLAN. NAME OF APPLICANT (Please Print)DATE APPLICANT’S SIGNATURE: www.lakevillemn.gov RESIDENTIAL BUILDING PERMIT APPLICATION PAGE 2 OFFICE USE ONLY BUILDING PERMIT TYPE REQUIRED INSPECTIONS SINGLE FAMILY DWELLING BUILDING DUPLEX AS BUILT TOWNHOUSE UNITS BUILDING FINAL DETACHED TOWN HOUSE UNIT DECK FOOTING CONDO FIREPLACE ACESSORY BUILDING FOOTING REROOF FOUNDATION RESIDE FRAMING PORCH FRAMING GARAGES INSULATION RES ADDN/REPAIR/RMDL DECK PORCH GARAGES LATH LOWER LEVEL FINISH LOWER LEVEL FINAL ADDITION OTHER FOUNDATION ONLY PORCH FOOTING MISCELLANEOUS POURED WALL DEMO SEPTIC TANK REMOVAL MOVED SITE MECHANICAL CITY BUILDING VALUATION: $AIR TEST FINAL BUILDING PERMIT FEES ROUGH-IN $PERMIT FEE PLUMBING $PLAN CHECK FINAL $SURCHARGE ROUGH-IN $METRO SAC METER SIZE $CITY WATER HOOKUP UNIT PRESSURE REDUCING VALVE $CITY SEWER HOOKUP UNIT SEWER/WATER $LANDSCAPE ESCROW SEWER/WATER $TREE ESCROW FINAL $MISC ESCROW STREET DRAINTILE $PLUMBING BUILDING INFORMATION $MECHANICAL TYPE OF CONSTRUCTION $SEWER WATER ZONING $OTHER CODE EDITION $TOTAL FIRE SUPPRESSION SYSTEM OCCUPANCY GROUP APPROVED BY: BUILDING INSPECTOR: Date: PLUMBING/MECHANICAL INSPECTOR: Date: COMMENTS: HARDBOARD SIDING ON SIDE AND REAR ELEVATIONS.LP HORIZONTAL LAP SIDINGLP HORIZONTAL LAP SIDINGLP HORIZONTAL LAP SIDINGFACE APPLIED STONE VENEEREXTERIOR MATERIALS % LAP SIDING = 38% STONE = 28% SHAKE = 26% OTHER = 8%LP SHAKE SIDINGLP HORIZONTAL LAP SIDINGFACE APPLIED STONE VENEERHARDBOARD SIDING ON FRONT ELEVATION.20173 Ginseng Way Cedar Hills-2nd Addition Concept Approval ONLYSubject to Field InspectionInspectorDate2020MN BldgCode02/25/2022dmathews CONC. SLAB20" x 8" CONC. FOOTINGFOUNDATION WALLDOUBLE TOP PLATEPER PLANFL. SYSTEM8" T. POURED CONC.1/2" DIA. x 10" ANCHORBOLT AT 72" O.C.R-20 BATT INSUL.2x8 (TR.) SILL PLATEW/ SILL SEALERGRADEEXT. FIN. PER PLANOR APPROV. STRAP3'-6"R-20 SPRAY FOAM INSUL.RIM BOARDR-10 EXT. FDN. INSUL.1/2" SHEATHINGR-5 RIGIDINSULATIONWATERPROOFINGTOP OF FDN. WALLCANT PLATE 1 1/2"SQUASH BLOCKS@ ALL POINT LOADS2x8 STUDS @ 16" O.C.SIDE WALLWALKOUTFDN. ONLY4" WEEPS EVERY 6'WATERPROOFINGSUBFLOORFLOOR JSTS/TRUSSES20"x8" CONC. FOOTING2x6 TOP PLATECONC. SLABPER PLANPER PLAN16" O.C. (TYP)2x6 STUDS @2x6 TREATEDPLATESECURED W/POWDEREDACTUATEDFASTENERS@ 24" O.C.1"4"x1/2" TRT'D.PLYWOOD,HOLD UP 1"FROM FTG.EACH SIDEU.N.O. BY ENGINEERAT FOUNDATION4" D. x 8" H. LEDGEPER PLANSUBFLOORFLOOR SYSTEMRIM BOARDCONC. STOOP8" FIN. FLR. MAX. TO10"30 MIL PVC MEMBRANESEAL ALL SEAMS,CORNERS & EDGES W/35 MIL POLYETHYLENEBACKED SYNTHETICBUTYL RUBBERADHESIVE MEMBRANE1/2" SHEATHING(2") R-10 EXTERIORR-20 SPRAY FOAM INSUL.WATERPROOFINGREQ'D.@ TOP FDN.FOUNDATION INSULATION2x8 SILL PLATEW/ ANCHOR BOLTS1 1/2" CANT'D. ALIGN W/ FDN. WALL6" GRANULAR FILL20"x8" CONC. FOOTINGW/ SILL SEALER(TR) 2x6 SILL PLATEGRADER-20 BATT INS.BOLT AT 72" O.C.1/2" DIA. x 10" ANCHOR8" POURED CONC.FOUNDATION WALL CONC. SLABEXT. FIN. PER PLANDOUBLE TOP PLATEHEADER AT WIN.4 MIL POLY8"2"TYVEK WITH SIDINGPER PLAN(EXT. PER PLAN)VAPOR BARRIERR-10 RIGID INSUL.OR APPROV. STRAPMIN. 42"WATERPROOFINGREQ'D. @ TOPFDN. WALL5/8" DRYWALL1/2" DRYWALL30 MIL PVC MEMBRANESEAL ALL SEAMS,CORNERS & EDGES W/ 35MIL POLYETHYLENEBACKED SYNTHETIC BUTYLRUBBER ADHESIVEMEMEBRANE6" GRANULAR FILL CONC. SLAB10"VAPOR BARRIERR-10 RIGID INSUL.8"CONC. STOOPAT FOUNDATION2" D.x8" H. LEDGEWATERPROOFING6Top Of WallConnectionsTop Of WallConnectionsUFER Ground-Provide 20' Rebar in footing and stubup near electrical service panel. ·················COVERED DECK65555555Top Of WallConnectionsTop Of WallConnections5PFHPFH-Min. 15" clearance to anyobstruction from center ofW.C., 24" in front(typ). Weyerhaeuser prepared these plans for the specification of Trus Joistproducts based on project information provided to us. This service is solelyintended for product application assurance; and, is not intended to circumventthe need for a design professional as determined by the building codes.The designer of record and/or builder/framer is responsible to assure thesedrawings are compatible with the overall project.Copyright 2009 Weyerhaeuser NR Company. All rights reserved.Anyunauthorized copying of reproduction will constitute an infringement of copyright.Structural Framer'sPocket Guide.Access with your Smart Phone.http://woodbywy.com/document/tj-9001/Have a damaged joist or beam?File an electronic damage report forprompt service from your regionaltechnical office. Scan the QR Codewith your smartphone or go to:www.damagereport.ilevel.comSpecification Teamservice.request@weyerhaeuser.com(888) 453-8358 . . . . . . . . www.woodbywy.com-Sheet1of 2Rev.4ByDateJLH4-15-21CommentsAdjust OHD hdr lengths for shear walls.Drawn By:Justin HOriginal Date:2-2-16Lennar HomesEJ03 Brighton (4508)Elevation A,B,C,DMNArchitectural Drawings Prepared By:LennarStructural Drawings Prepared By:N/ADec 2015N/ADrive nails at anangle to minimizesplitting of plateOne 10d (3") box nail eachside of member at bearing,112" minimum from endSee framing plan (if applicable)or iLevel® Framer's PocketGuide for minimum end andintermediate bearing lengths.TJI® JOIST NAILING REQUIREMENTS at BEARING134" minimum bearing atend support; 312" minimumat intermediate supportTJI® Joist to Bearing PlateShear transfer: Connections equivalent tofloor panel nailing scheduleOne 8d (212") boxnail each side.Drive nails at anangle at least 112"from end.Squash Blocks to TJI® Joist(Load bearing wall above)One 10d (3") box nailinto each flange10'-0" 11'-6"1'-0"1'-0"1'-0" 1'-0" 9'-0"9'-0"6'-0"3'-0"1'-0" 1'-0"1'-0"3601'-0"12'-0"17"13"15'-6"15'-6"SQUARE OR RECTANGULAR HOLE SIZEMinimum distance from edge of hole to inside face of nearest intermediate or cantilever support16'-0"15'-6"21'-0"20'-6"18'-0"17"17'-0"DO NOT cut, notch or drillholes in headers except asindicated in illustrationsand tables.For simple span (5' minimum), uniformly loaded joists used in residential applications, one maximum size round hole may be locatedat the center of the joist span provided no other holes occur in the joist.Distances are based on the maximum uniform loads shown in current Trus Joist® product guides. For other load conditions or holeconfigurations contact your Weyerhaeuser representative.15"8" 10"6"4"12"17"15"12"10"8"6"4"16'-0"15'-6"Holes may be located vertically anywhere within the web. Leave 18" of web (minimum) at top and bottom of hole.Knockouts are located in web at approximately 12" on-center; they do not affect hole placement.1'-0"1'-0"1'-0"1'-0"Rectangular holes based on measurement of longest side.18"20"1'-0"5605603603601'-0"1'-0"1'-0"1'-0" 1'-6"1'-0"2'-0"3'-0"3'-0"6'-0"6'-0"12'-0"5'-6"16'-6"11'-0"15'-0"10'-0"6'-0"9'-0"6'-0"3'-0"1'-6"4'-0"1'-0"1'-0"1'-0"1'-0"16'-6"18'-0"16'-6"14'-0"8'-6"7'-0"9'-0"11'-6" 16'-6"12'-6"14'-6"19'-6"17'-6'19'-0"20'-0"19'-6"10'-0"17"11'-0"13"10'-6"ROUND HOLE SIZETable B - Intermediate or Cantilever Support10'-6"9'-6"15'-0"13'-6"4'-0" 8'-0"2'-6"2303'-0"1'-0"1'-0"1'-0"1'-0"3'-0"3'-0"1'-0"1'-0"4'-0"1'-0"2'-0"1'-0"1'-0"1'-0"1'-0"1'-0"16"14"2305603601'-0"1'-0"1'-0"2305602103601'-0"1'-0"1'-0"1'-0"1178"1'-0"2303601102105602'-0"1'-0"1'-6"3602101103'-0"1'-0"1'-0"9'-0"5'-0"1'-0" 2'-6"1'-0"1'-0"1'-0"1'-6"2'-6"3'-0"1'-0"1'-0"1'-6"2'-0"1'-0"5'-6"5'-6"3'-0"11'-0"10'-0"4'-0"7'-0"6'-6"6'-6"10'-0"13'-6"12'-6"5'-6"9'-6"3'-0"8'-6"5'-6"2'-6" 5'-0"4'-0"1'-0"4'-6"7'-0"2'-0"8'-0"5'-6"2'-0"1'-6"4'-6"4'-0"9'-0"9'-6"11'-0"4'-6"12'-0"8'-0"9'-0"8'-0"6"3"1'-0"1'-0"1'-0"1'-0"1'-0"2'-6"2'-6"DEPTH912"TJI®2101102"2'-0"1'-6"18"20"1'-0"3605605603601'-0"1'-0"1'-0"5601'-0"4"4"3'-6"3'-0"612"7'-6"7'-6"878"11"1'-0" 2'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"8"10"1'-0"10'-0"5'-0"11'-0"5'-0"1'-0"2'-0"7'-0"7'-0"3'-0"12"6'-6"15"7'-6"3'-0"2'-6" 4'-6"4'-6"2'-0"1'-6"3'-6"2'-6"1'-0"1'-0"1'-0"3'-0"1'-0"1'-0"2'-0"4'-6"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"2'-0"1'-0"3'-0"3'-0"1'-0"1'-0"12'-6"6'-0"2'-0" 10'-0"10'-6"13'-6"12'-0"10'-6"14'-6"13'-0"1'-0"3'-6"2'-0"5'-0"9'-0"7'-6"1'-0"5'-0"4'-0"2'-6" 6'-0"4'-6"10'-0"9'-0"13'-0"16'-0"14'-6"13'-0"12'-6"15'-0"14'-0"9'-6"12'-0"11'-0"10'-0"10'-0"8'-0"3'-6"5'-0"1'-0"6'-0"9'-6"5'-0"10'-6"5'-6"3'-0"2'-6"8'-0"7'-6"6'-6"12'-0"9'-0"9'-0"1'-0"6"1'-6"1'-0"1'-0"3"1'-0"3'-0"2'-6"2'-0"1'-6"2"1'-0"1'-0"1'-0"1'-0"1'-0"4"4'-0"3'-6"4"612"7'-0"6'-6"11"878"10'-0"12'-0"11'-6"11'-0"10'-0"5'-0"6'-6"4'-0"2'-6"11'-0"9'-6"8'-0"1'-0"8"1'-6"10"13'-6"14'-6"14'-6"14'-0"12'-6'11'-0"15"12"13"11'-0"10'-6"SQUARE OR RECTANGULAR HOLE SIZE13"6'-0"6'-6"ROUND HOLE SIZEMinimum distance from edge of hole to inside face of nearest end support1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"2'-0"2'-0"1'-6"1'-6"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"56016"14"1'-0"3602102305601'-0"1'-0"1'-0"2102301101'-0"1'-0"1'-0"1178"912"1102303602101'-0"1'-0"1'-0"1'-0"1102303602101'-0"1'-0"1'-6"1'-0"8'-0"1'-6" 3'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0" 1'-0"1'-0"8'-0"5'-6"1'-6"2'-0"6'-0"3'-6"4'-0"9'-0"3'-0"3'-6"2'-6"6'-0"6'-6"5'-0"1'-0"1'-0"1'-6"1'-0"1'-0"2'-6"2'-0"1'-6"2'-0"2'-6"3'-0"2'-0"4'-0"3'-6"2'-6"3'-0"5'-0"6'-0"7'-0"5'-6"Table A - End Support3"DEPTH TJI®2" 4"878" 11"1'-6"2'-0"1'-0"2'-6"2'-0"1'-0"2'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-6"1'-0"5'-0"3'-6" 8'-0"2'-6"1'-0"1'-0"1'-0"1'-6"1'-0"1'-0"3'-6"1'-0"1'-0"1'-0"2'-0"2'-0"1'-6"9'-6"8'-0"9'-0"8'-0"10'-0"7'-0"6'-6"9'-0"9'-0"8'-6"8'-0"7'-0"6'-0"6'-6"1'-6"2'-6"2'-0"2'-0"2'-6"4'-0"3'-0"3'-0"3'-6"3'-0"2'-6"2'-6" 3'-6"5'-0"4'-6"4'-0"7'-6"7'-0"6'-6"6'-0"3"2" 4"11"878"Also see detail B2612"5'-0"5'-0"5'-6"6'-0"2'-6"3'-0"4'-6"2'-6"1'-0"1'-6"1'-0"2'-6"1'-0"1'-0"2'-6"5'-0"1'-0"1'-0"612"4'-6"5'-0"5'-0"5'-6"5'-0"5'-6"6'-6"4'-6"3'-6"4'-0"4'-0"6'-6"3'-0"2'-6"5'-6"7'-0"5'-0"4'-0"3'-0"3'-6"5'-0"2'-6"1'-6"2'-0"1'-0"3'-0"1'-0"1'-0"3'-0"5'-6"1'-0"1'-0"5'-6"5'-6"6'-6"4'-6"4'-0"4'-6"5'-0"7'-0"3'-6"3'-6"6'-6"7'-6"6'-0"5'-0"5"5"7"7"1'-0"1'-0"1'-0"5"4'-0"4'-6"2'-6"3'-0"6'-6"5'-6"1'-0"5'-6"3'-6"3'-6"3'-6"1'-0"2'-0"1'-0"1'-0"1'-0"1'-0"5'-0"7"4'-0"3'-0"2'-0"3'-6"4'-0"3'-6"1'-0"6'-6"6'-0"5'-6"7'-6"2'-6"8'-6"5'-0"7"5"5'-6"6'-6"3'-6"2'-6"5'-6"4'-0"4'-0"2'-0"7'-0"5'-6"5'-0"7'-0"2'-6"8'-0"7'-6"4'-6"4'-0"6'-0"8'-0"11'-0"6'-0"9'-6"8'-6"10'-0"11'-0"5'-6"7'-6"8'-6"10'-0"6'-0"7'-0"7'-0"5"1'-0"1'-0"1'-0"1'-0"7"1'-0"1'-0"1'-0"1'-0"5" 7"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"3'-0"4'-0"5"1'-0"1'-0"1'-0"1'-0"1'-6"1'-0"1'-0"1'-0"7"5"1'-0"1'-0"3'-6"1'-6" 6'-6"4'-0"6'-0"8'-6"7"1.3E TimberStrand® LSL allowed hole zoneddMicrollam® LVL andParallam® PSLallowed hole zonemiddle 13 span1.3E TimberStrand®LSL hole zoneMicrollam® LVLand Parallam®PSL hole zone2 x diameter of thelargest hole (minimum)d13 depth1"2"134"MAXIMUM ROUNDHOLE SIZEHEADER DEPTH438"714" to 20"512"See illustration for Allowed Hole ZoneOther Trus Joist® Trus Joist® Headers and Beams1.55E TimberStrand®LSL Headers and BeamsALLOWABLE HOLES - Headers and Beams13 depth2 x diameter of thelargest hole (minimum)2 x diameter of thelargest hole (minimum)Allowed hole zone8"8"See illustration for allowed hole zone1114"-11 78"14" to 16"914"-912"HEADER DEPTHMAXIMUM ROUNDHOLE SIZE358"458"3"No holes in headers or beams in plank orientation.Round holes onlyGeneral NotesGeneral NotesNo holes in headers or beams in plank orientation.Allowed hole zone suitable for uniformly loaded headers and beams only.Round holes onlyNo holes in cantilevers.BEAM ATTACHMENT at BEARINGThis sheet is intended as a supplement to the Trus Joist® Framer's Pocket Guide, which should be referenced for additional information.THINK SAFETY-READ INSTALLATION INFORMATION BEFORE PROCEEDINGAllowable Load400475Allowable load determined in accordance with AC 124.Corrosion-resistant fasteners required for wet-service applications.114" TimberStrand®LSL rim boardEXTERIOR DECK ATTACHMENTStructural exterior sheathingSee fastenertable below. Maintain2" distance (minimum) fromedge of ledger to fastener.8" diameter maximum hole for 1178" -16" deep blocking panels; 6" diametermaximum for TJI® blocking panels912" deep or shorter than 12" long.Do not cut flanges.GENERAL TRUS JOIST PRODUCT ASSEMBLY DETAILSE1E1WWeb stiffenersrequired eachside at E1WBacker block: Install tightto top flange (tight tobottom flange with facemount hangers). Attachwith ten 10d (3") boxnails, clinched whenpossible.H2Backer blockboth sides of webwith single TJI®joistFiller block: Attach with ten 10d (3") boxnails, clinched. Use ten 16d (312") boxnails from each side with 312" TJI® joistflange widths. Use fifteen nails withTJI® joist depths greater than 16".12" lag boltLA38" lag boltFastenerFlashingTreated 2x_ledger400N.A.118" Trus Joist®rim boardWeb stiffener each side.See sizes below.WTight fitWEB STIFFENER ATTACHMENTGap:18" minimum234" maximumThree 8d (212") box nails, clinched(Three 16d (312") box nails at 312"TJI® joist flange widths112"112"Load bearing or shear wall above(must stack over wall below)TJI® blockingpanelWeb stiffenersrequired each side atB1W and B2WB2B1B1WB2W116"2x4 minimumsquash blocksUse 2x4 minimum squash blocks totransfer load around TJI® joistCSLoad from above2x4 minimumsquash blocks116"With top flange hangers, backer block requiredonly for downward loads exceeding 250 lbs or foruplift conditions.NOTE: STUCTURAL DOCUMENTS FOR THIS PROJECT PER THE DESIGN PROFESSIONAL OF RECORD SHALLSUPERCEDE ALL ASSEMBLIES SHOWN IN THIS SECTION, ALSO REFER TO TRUS JOIST® PLACEMENT PLANS(AND MATERIAL SCHEDULES) FOR REQUIRED MATERIAL.Coordinate load requirements with the design professional of record.Lack of proper bracing during construction can result in seriousaccidents. Observe the following guidelines:1. All blocking, hangers, rim boards and rim joists at the end supports of the TJI® joists must be completely installed and properly nailed.2. Laterial strength, like braced end wall or an existing deck, must be established at the ends of the bay. This can also beaccomplished by a temporary or permanent deck (sheathing) fastened to the first 4 feet of joists at the end of the bay.3. Safety bracing of 1x4 (minimum) must be nailed to a braced end wall or sheathed area (as in note 2) and to each joist.Without this bracing, buckling sideways or rollover is highly probable under light construction loads - such as a worker orone layer of unnailed sheathing.5. Ends of cantilevers require safety bracing on both the top and bottom flanges.6. The flanges must remain straight within 1/2" from true alignment.4. Sheathing must be completely attached to each TJI® joist before additional loads can be placed on the system.WARNING NOTES:WARNINGJoists are unstable until braced laterallyBracing Includes:BlockingHangersSheathingRim BoardStrut LinesRim JoistDO NOT stack buildingmaterials on unsheathedjoists. Stack only overbeams or walls.DO NOT walk on joiststhat are lying flat.DO NOT walk on joistsuntil braced.INJURY MAY RESULT.Weyerhaeuser, Microllam®, Parallam®, Silent Floor®, TimberStrand®, TJI®, and Trus Joist® are registered trademarksof Weyerhaeuser NR. © 2009 Weyerhaeuser NR Company. All rights reserved.TimberStrand® LSL, TrusJoist® rim board, or(Microllam® LVL with EORapproval) see placement plan.TimberStrand® LSL, TrusJoist® rim board, or (Microllam®LVL with EOR approval)TimberStrand® LSL, TrusJoist® rim board, or (Microllam®LVL with EOR approval)TimberStrand® LSL, TrusJoist® rim board, or (Microllam®LVL with EOR approval) seeplacement plan.B4End of joist at centerline of support. Blocking panels required.Load bearing or shear wall above (must stack over wall below when present)Plate nail - 16d (0.135" x 312")at 16" on-center*Floor panel nail - 8d (0.131" x 212")at 6" on-center*A3WWToe nail - 10d (0.131" x 3")at 6" on-center*When sheathing thickness exceeds 78",trim sheathing tongue at rim boardWeb Stiffeners requiredeach side at A3._WA3A3.2A3.1 A3.3A3.1WA3.2WA3.3TimberStrand® LSL, Trus Joist®rim board, or (Microllam® LVL withEOR approval) see placement plan.For rim board thicker than 1 34"- Attach TJI® Joist to rim board with one 10d (0.128"x3")nail. Top nail from TJI® joist into rim board.- Connect corner with four 10d (0.128"x3") nails. Toe nailfrom side of parallel closure into rim board.*Conventional construction code minimum for use withA3 only. See the Trus Joist TJI® Specifier's Guide, #TJ-4000,and the Trus Joist® Rim Board Specifier's Guide, #TJ-8000,for A3.1-A3.3 installation specifications and applications.Doubletop plateStudKingstudHeader platestops at insideface oftrimmersHeader - per plan(bears directly ontrimmers)Trimmers- per planHeadercrippleTypical Header DetailWindow/Door OpeningOnly header openings and roof loads which affect Trus Joistproduct sizes have been denoted on this layout. In addition toany CS detail callouts shown, solid blocking and/or squashblocks are required to provide vertical load transfer from allconcentrated load locations to foundation below. See pocketframer guide for appropriate detail(s).ASSUMED BEARING LENGTH FOR BEAMSAt parallel walls assume 1-1/2" end bearing, at perpendicular wallsassume full wall width end bearing UNO.ALLOWABLE JOIST SHIFTSIndividual joists can be shifted up to 3" maximum from their on-centerspacing to avoid hanger interference/plumbing drops/post.(DO NOT EXCEED 24" O.C. MAXIMUM SPACING)CANTILEVERS/TRUSSESDesign assumes all trusses at floor cantilevers are connected to thewall and NOT to the Trus Joist rimboard. If trusses need to connectto the Trus Joist rimboard, contact Weyerhaeuser for a connectiondetail prior to installation.JOIST & BEAM HANGER FACE NAILING REQUIREMENTS* FOR3 & 4 PLY SUPPORTING MEMBERSFor IUS or THF Hangers - Use 10d (0.148") x 3" nails.For MIU, HU, HHUS, HGUS or HD, THD, THDH Hangers - Use 16d(0.162") x 3-1/2" nails.*For hangers that have joist fasteners/connections, fill all holes withthe manufacturer's recommended fasteners.**FLOOR & ROOF DESIGN PARAMETERS**Face mounthangerTop flangehangerVerify column capacityand beam bearinglength. See currentiLevel® literature.L5L1BEARING ATCOLUMNColumnSee current Trus Joist® literaturefor framing connectorsL6Additional nailing or bolting may berequired with side-loaded multiple-memberbeams. Refer to current product literature.CONNECTION OF MULTIPLE PIECESOF TOP-LOADED BEAMS (1)Minimum of 3 rows 10d (3" x 0.128") nails at 12" o.c.Minimum of 4 rows 10d (3" x 0.128") nails at 12" o.c.for 14" and deeper beamsIf using 12d (314") or larger nails, the number ofnailing rows may be reduced by one.(1) Load must be applied evenly across entirebeam width. Otherwise, use connections forside-loaded beams.312" Width Pieces:Minimum of 2 rows 12" bolts at24" o.c. staggered134" Width Pieces:L2L3Protect untreatedwood from directcontact withconcreteL4BEARING AT WALLBEARING FOR DOOROR WINDOW HEADERStrap per code if top plateis not continuous overheaderBEAM TO BEAMCONNECTIONBEARING ATCONCRETE WALLTimberStrand® LSL, Trus Joist® rimboard, (Microllam® LVL with EORapproval), or TJI® blocking for lateral supportBEAM DETAILS2'TJI® JOIST2"2x6 (min.) solid sawn or 4 12" wideTimberstrand® LSL rim board, full lengthin bay and tight to each joist flange. Connectto plate with 8d (0.113" x 2 38") nails at 6"on-center.2416 span rated sheathing (716" Min.).Attach with 8d (0.113" x 2 38") nails at6" on-center along panel edges and infield. Use pressure treated plywoodfor ground level cantilevers.E1 ALTWARNINGJoists are unstable until braced laterally,Safety bracing required during installation.Lateral load transfer for this detail is180 PLF (pounds per lineal foot).Additional connections may be requiredto transfer lateral loads from wall above.16' maxdeck2'11 7/8" - 16" TJI®2"6"16' maxdeck2'9 1/2" TJI®6"2x_ Furring2416 span rated sheathing (716" Min.).Attach with 8d (0.113" x 2 38") nails at6" on-center along panel edges and infield. Use pressure treated plywoodfor ground level cantilevers.Inverted hanger (seehanger list on Trus Joiststructural layout)Treated ledger1 18" x 11 7/8" Trus Joist® rim boardInverted hanger (seehanger list on iLevelstructural layout)Treated ledgerE1 ALT LA2416 span rated sheathing (716" Min.).Attach with 8d (0.113" x 2 38") nails at6" on-center along panel edges and infield. Use pressure treated plywoodfor ground level cantilevers.E1 ALT LA 9.52x6 (min.) solid sawn or 4 12" wideTimberstrand® LSL rim board, full lengthin bay and tight to each joist flange. Connectto plate with 8d (0.113" x 2 38") nails at 6"on-center.Timberstrand ® LSL rim boardto match TJI® depth2x6 (min.) solid sawn or 4 12" wideTimberstrand® LSL rim board, full lengthin bay and tight to each joist flange. Connectto plate with 8d (0.113" x 2 38") nails at 6"on-center.WARNINGJoists are unstable until braced laterally,Safety bracing required during installation.Lateral load transfer for this detail is180 PLF (pounds per lineal foot).Additional connections may be requiredto transfer lateral loads from wall above.WARNINGJoists are unstable until braced laterally,Safety bracing required during installation.Lateral load transfer for this detail is180 PLF (pounds per lineal foot).Additional connections may be requiredto transfer lateral loads from wall above.Attach reinforcementto TJI® joist with 8d (212")common nails at 6" on-center. When reinforcingboth sides, stagger nails.E3E22'-0"maximumFace grainhorizontal4'-0" length of34" reinforcementon one side at E2,both sides at E3ALT ALTTimberstrand ® LSL rim boardto match TJI® depth2x6 (min.) solid sawn or 4 12" wideTimberstrand® LSL rim board, full lengthin bay and tight to each joist flange. Connectto plate with 8d (0.113" x 2 38") nails at 6"on-center.2416 span rated sheathing (716" Min.).Attach with 8d (0.113" x 2 38") nails at6" on-center along panel edges and infield. Use pressure treated plywoodfor ground level cantilevers.WARNINGJoists are unstable until braced laterally,Safety bracing required during installation.Lateral load transfer for this detail is180 PLF (pounds per lineal foot).Additional connections may be requiredto transfer lateral loads from wall above.Timberstrand ® LSL rim boardto match TJI® depthUNLESS NOTED OTHERWISEFLOOR LIVE LOAD DEFLECTION CRITERIA: L/480FLOOR LIVE LOAD: 40 PSFFLOOR DEAD LOAD: 10 PSFSNOW LIVE LOAD: 35 PSFROOF DEAD LOAD: 20 PSF (TRUSSED ROOFS)ROOF DEAD LOAD: 15 PSF* (TJI/RAFTER)*Dead Loads are adjusted for slope correctionTJI® blockingpanelA1PB113 joist span8' max.Apply subflooradhesive to allcontact surfacesOption #3:Option #1:Option #2:TJI® Joist blocking with endblocks installed at 13 joist-spanlocations usingtwo 8d (0.113" x 212")nails or2 12" screws,typical2x_ strapping installed at 13joist-span locations using two2 12" screws per joist, typicalDirectly applied ceilingWhen specified on the layout, one ofthe above bracing options is requiredAdditional Notes ProductsPlotID Length ProductPlies Net QtyM1-3 14' 0" 1 3/4" x 9 1/2" 2.0E Microllam LVL 3 3PPt1 8' 0" 5 1/4" x 5 1/4" 1.8E Parallam PSL 1 1TS1-3 26' 0" 1 3/4" x 11 7/8" 1.55E TimberStrand LSL 33BBO1-3 5' 0" 2 x 10 SPF No.1/No.2 3 3LEVEL NOTESCurrent Date:5/27/2021File Name:4508 A,B,C,D.jvlLevel Name:MainBuilding Code - Design Methodology:IBC 2006Members with Design Overridden:FLOORFloor Container:FC5Use/Occupancy:ResidentialLivingAreasFloor Area Loading is:40.0 lb/ft² Live Load & 15.0 lb/ft² Dead LoadOperator Added Additional LoadsFloor Maximum Allowed DeflectionL/480 Live Load & L/240 Total LoadWalkout HeadersPlotID Length Product Plies Net QtyBBOHd2-2 7' 0" 2 x 10 SPF No.1/No.2 2 2BBOHd4-3 6' 0" 2 x 10 SPF No.1/No.2 3 6BBOHd3-2 6' 0" 2 x 10 SPF No.1/No.2 2 2Lookout HeadersPlotID Length Product Plies Net QtyBBOHd4-3 6' 0" 2 x 10 SPF No.1/No.2 3 6BBOHd3-2 6' 0" 2 x 10 SPF No.1/No.2 2 4Wall FramingPlotID Length Product Plies Net QtyBBOHd1-2 4' 0" 2 x 10 SPF No.1/No.2 2 2Screen Porch Option - Add ListPlotID Length Product Plies Net QtyBB01 14' 0" 3-1/2" x 12-3/8" Glu-Lam Trted 1 1BB03 12' 0" Treated 2x12 3 3H1 Simpson HUC412 hanger 1 1H2 Simpson HUC210-3 hanger 1 2Standard Deck - Add ListPlotID Length Product Plies Net QtyBB01 14' 0" 3-1/2" x 12-3/8" Glu-Lam Trtd 1 1BB03 12' 0" Treated 2x10 2 2H1 Simpson HUC412 hanger 1 1H2 Simpson HUC210-2 hanger 1 24-Season Porch Option - Add ListPlotID Length ProductPlies Net QtyBB01 16' 0" 1 3/4" x 11 7/8" 1.55E Timberstrand LSL 2 2BB03 14' 0" 1 3/4" x 16" 2.0E Microllam LVL 2 2BBOHd2-2 BBOHd3-2PPt1BBOHd3-2BBOHd3-2M1-3TS1-3BBOHd4-3BBOHd4-3BM1BBO1-3BBOHd1-2BBO1BBO3H1H2H2Lookout FoundationWalkout FoundationWdw headers the same onfor Lookout and Walkout Fdn.4-2x42-2x616" Floor Trusses15,464#Floor truss aboveScreen Porch Option - changebeam to Treated 3-2x124-Season Porch Option - change beam to(2) 16" LVL, run long at 6x6 post, bear onwall at house (no hanger)4-Season Porch Option - change beam to(2)11-7/8" LSL, butt into beam at post (1.75"brg), bear on wall at house (no hanger)Elevation A,B,CPlotID Length ProductPlies Net QtyTS1-2 18' 0" 1 3/4" x 11 7/8" 1.55E TimberStrand LSL 22TS4-2 14' 0" 1 3/4" x 9 1/2" 1.55E TimberStrand LSL 2 2TS2-2 12' 0" 1 3/4" x 9 1/2" 1.55E TimberStrand LSL 2 2TSHd2-2 8' 0" 1 3/4" x 9 1/2" 1.55E TimberStrand LSL 22TS6 18' 0" 3 1/2" x 7 1/4" 1.3E TimberStrand LSL 1 1TS7 6' 0" 3 1/2" x 7 1/4" 1.3E TimberStrand LSL 1 1BBOHd1-2 7' 0" 2 x 10 SPF No.1/No.2 2 8BBOHd2-2 5' 0" 2 x 10 SPF No.1/No.2 2 2BBOHd3-2 4' 0" 2 x 10 SPF No.1/No.2 2 2BBOHd3-2 3' 0" 2 x 10 SPF No.1/No.2 2 6Elevation A,B,CPlotID Qty Manuf Product Backer Blks Web StiffH1 2 Simpson HUC48 No NoH2 1 User HUC410 Not Required Not RequiredH3 1 User HUC48 Not Required Not RequiredH4 1 User HUCQ410-SDS Not Required Not RequiredElevation B and C Add ListPlotID Length ProductPlies Net QtyTS5-2 10' 0" 1 3/4" x 9 1/2" 1.55E TimberStrand LSL 2 2TS9 2' 0" 3 1/2" x 7 1/4" 1.3E TimberStrand LSL 1 1Elevation B and C Add ListPlotID Qty Manuf Product Backer Blks Web StiffH2 1 User HUC410 Not Required Not RequiredElevation B and C Remove ListPlotID Length ProductPlies Net QtyTS6 18' 0" 3 1/2" x 7 1/4" 1.3E TimberStrand LSL 1 1TS7 6' 0" 3 1/2" x 7 1/4" 1.3E TimberStrand LSL 1 1Elevation B and C Remove ListPlotID Qty Manuf Product Backer Blks Web StiffH1 1 Simpson HUC48 No NoH3 1 User HUC48 Not Required Not RequiredElevation DPlotID Length ProductPlies Net QtyM1-2 18' 0" 1 3/4" x 14" 2.0E Microllam LVL 2 2TS2-2 12' 0" 1 3/4" x 9 1/2" 1.55E TimberStrand LSL 2 2TSHd2-2 8' 0" 1 3/4" x 9 1/2" 1.55E TimberStrand LSL 22TS7 6' 0" 3 1/2" x 7 1/4" 1.3E TimberStrand LSL 1 1BBOHd1-2 7' 0" 2 x 10 SPF No.1/No.2 2 8BBOHd2-2 5' 0" 2 x 10 SPF No.1/No.2 2 2BBOHd3-2 4' 0" 2 x 10 SPF No.1/No.2 2 2BBOHd3-2 3' 0" 2 x 10 SPF No.1/No.2 2 6Elevation DPlotID Qty Manuf Product Backer Blks Web StiffH3 2 User HUC48 Not Required Not RequiredH4 1 User HUCQ410-SDS Not Required Not RequiredElev A and D 3rd stall garage option - Add ListPlotID Length ProductPlies Net QtyTSHd1-2 10' 0" 1 3/4" x 9 1/2" 1.55E TimberStrand LSL2 2Elev B w/ 3rd stall garage - Add ListPlotID Length ProductPlies Net QtyTS3-2 20' 0" 1 3/4" x 11 7/8" 1.55E TimberStrand LSL 22TS5-2 10' 0" 1 3/4" x 9 1/2" 1.55E TimberStrand LSL 2 2TSHd1-2 10' 0" 1 3/4" x 9 1/2" 1.55E TimberStrand LSL2 2TS8 4' 0" 3 1/2" x 7 1/4" 1.3E TimberStrand LSL 1 1Elev B w/ 3rd stall garage - Add ListPlotID Qty Manuf Product Backer Blks Web StiffH2 1 User HUC410 Not Required Not RequiredElev B3S, C w/ 3rd stall garage - Add ListPlotID Length ProductPlies Net QtyM2-2 20' 0" 1 3/4" x 14" 2.0E Microllam LVL 2 2TS5-2 10' 0" 1 3/4" x 9 1/2" 1.55E TimberStrand LSL 2 2TSHd1-2 10' 0" 1 3/4" x 9 1/2" 1.55E TimberStrand LSL2 2TS8 4' 0" 3 1/2" x 7 1/4" 1.3E TimberStrand LSL 1 1Elev B3S, C w/ 3rd stall garage - Add ListPlotID Qty Manuf Product Backer Blks Web StiffH2 1 User HUC410 Not Required Not RequiredElev B w/ 3rd stall garage - Remove ListPlotID Length ProductPlies Net QtyTS6 18' 0" 3 1/2" x 7 1/4" 1.3E TimberStrand LSL 1 1TS7 6' 0" 3 1/2" x 7 1/4" 1.3E TimberStrand LSL 1 1Elev B w/ 3rd stall garage - Remove ListPlotID Qty Manuf Product Backer Blks Web StiffH1 1 Simpson HUC48 No NoH3 1 User HUC48 Not Required Not RequiredElev B3S, C w/ 3rd stall garage - Remove ListPlotID Length ProductPlies Net QtyTS6 18' 0" 3 1/2" x 7 1/4" 1.3E TimberStrand LSL 1 1TS7 6' 0" 3 1/2" x 7 1/4" 1.3E TimberStrand LSL 1 1Elev B3S, C w/ 3rd stall garage - Remove ListPlotID Qty Manuf Product Backer Blks Web StiffH1 1 Simpson HUC48 No NoH3 1 User HUC48 Not Required Not RequiredElev A,B,C: 4-Season Porch Option - Remove ListPlotID Qty Manuf Product Backer Blks Web StiffH2 1 User HUC410 Not Required Not RequiredH4 1 User HUCQ410-SDS Not Required Not RequiredElev A,B,C: 4-Season Porch Option - Remove ListPlotID Length ProductPlies Net QtyTS4-2 14' 0" 1 3/4" x 9 1/2" 1.55E TimberStrand LSL 2 2TS2-2 12' 0" 1 3/4" x 9 1/2" 1.55E TimberStrand LSL 2 2Elev D: 4-Season Porch Option - Remove ListPlotID Qty Manuf Product Backer Blks Web StiffH4 1 User HUCQ410-SDS Not Required Not RequiredElev D: 4-Season Porch Option - Remove ListPlotID Length ProductPlies Net QtyTS2-2 12' 0" 1 3/4" x 9 1/2" 1.55E TimberStrand LSL 2 2Elev A2S, A3S,B2S Add ListPlotID Length Product Plies Net QtyM1-2 18' 0" 1 3/4" x 14" 2.0E Microllam LVL 2 2Elev A2S, A3S,B2S Remove ListPlotID Length ProductPlies Net QtyTS1-2 18' 0" 1 3/4" x 11 7/8" 1.55E TimberStrand LSL 22BBOHd1-2BBOHd1-2BBOHd1-2TSHd2-2BBOHd1-2BBOHd2-2TS1-2TS2-2BM1TS7TS6BBOHd3-2BM1TS4-2BBOHd3-2 BBOHd3-2BBOHd2-2BBOHd1-2TS1-2BM1TS5-2TS9H1H2BBOHd3-2 BBOHd3-2BBOHd1-2TSHd2-2BBOHd1-2BBOHd1-2BBOHd3-2BBOHd2-2M1-2TS2-2BM1TS7BBOHd1-2H2H4BM2TSHd1-2BBOHd2-2BBOHd1-2TS3-2BM3TS5-2TS8BM2TSHd1-2H2H1M2-2H3H3H4BBOHd3-2BBOHd3-2BBOHd3-2H1H1H3M1-2Elevation A3"ElevationB and CElevation D3"Garage Header designed to meetL/600 TL deflection for Stone.3-2x6 Flat3-2x6 Flat3-2x6 Flat3-2x6 Flat3-2x6 Flat3-2x6 Flat3-2x6 Flat3-2x6 Flat3-2x6 Flat3"3-2x6 thrutop plates8,088#8,088#Elevation A and D3rd stall garageoption.Elevation B and C with3rd stall Garage3-2x6 Flat3-2x6 FlatElev B (without Ext Stone)Elev B3S / Elev C (with Ext Stone)Garage Header designed to meetL/600 TL deflection for Stone.10,257#3-2x6 thrutop plates9,131#Run TS2-2 beam long at 6x6 postButt TS4-2 into TS2-2 at 6x6 post4-Season Porch option:remove beams and hangers,replace with walls per plan4-Season Porch option:remove beams and hangers,replace with walls per planGarage Header designed to meetL/600 TL deflection for Stone.Elev A2S/ A3S / B2S (with Ext Stone)Elev A (without Ext Stone)Weyerhaeuser prepared these plans for the specification of Trus Joistproducts based on project information provided to us. This service is solelyintended for product application assurance; and, is not intended to circumventthe need for a design professional as determined by the building codes.The designer of record and/or builder/framer is responsible to assure thesedrawings are compatible with the overall project.Copyright 2009 Weyerhaeuser NR Company. All rights reserved.Anyunauthorized copying of reproduction will constitute an infringement of copyright.Architectural Drawings Prepared By:LennarStructural Drawings Prepared By:N/ADec 2015N/ALennar HomesEJ03 Brighton (4508)Elevation A,B,C,DMNRev.4ByDateJLH4-15-21CommentsAdjust OHD hdr lengths for shear walls.Drawn By:Justin HOriginal Date:2-2-16Framing PlanScale: 3/16" = 1'-0"-Sheet2of 2Structural Framer'sPocket Guide.Access with your Smart Phone.http://woodbywy.com/document/tj-9001/Have a damaged joist or beam?File an electronic damage report forprompt service from your regionaltechnical office. Scan the QR Codewith your smartphone or go to:www.damagereport.wSpecification Teamservice.request@weyerhaeuser.com(888) 453-8358 . . . . . . . . www.woodbywy.comRoof Header/Porch Beam PlanScale: 3/16" = 1'-0"Lack of proper bracing during construction can result in seriousaccidents. Observe the following guidelines:WARNING NOTES:WARNINGJoists are unstable until braced laterallyBracing Includes:BlockingHangersSheathingRim BoardStrut LinesRim JoistDO NOT stack buildingmaterials on unsheathedjoists. Stack only overbeams or walls.DO NOT walk on joiststhat are lying flat.DO NOT walk on joistsuntil braced.INJURY MAY RESULT.Weyerhaeuser, Microllam, Parallam, TimberStrand, TJI, TJ, and Trus Joist are registered trademarks ofWeyerhaeuser NR. © 2014 Weyerhaeuser NR Company. All rights reserved.1. All blocking, hangers, rim boards and rim joists at the end supports of the TJI® joists must be completely installed and properly nailed.2. Laterial strength, like braced end wall or an existing deck, must be established at the ends of the bay. This can also beaccomplished by a temporary or permanent deck (sheathing) fastened to the first 4 feet of joists at the end of the bay.3. Safety bracing of 1x4 (minimum) must be nailed to a braced end wall or sheathed area (as in note 2) and to each joist.Without this bracing, buckling sideways or rollover is highly probable under light construction loads - such as a worker orone layer of unnailed sheathing.5. Ends of cantilevers require safety bracing on both the top and bottom flanges.6. The flanges must remain straight within 1/2" from true alignment.4. Sheathing must be completely attached to each TJI® joist before additional loads can be placed on the system.THINK SAFETY - READ INSTALLATION INFORMATION BEFORE PROCEEDINGA COMPLETE JAVELIN® LAYOUT INCLUDES THE WEYERHAEUSER FRAMER'S POCKET GUIDE.Only header openings and roof loads which affectWeyerhaeuser product sizes have been denoted onthis layout. In addition to any'CS' detail calloutsshown, solid blocking and/or squash blocks arerequired to provide vertical load transfer from allconcentrated load locations to foundation below.See Pocket Framer's Guide for appropriate detail(s).Joists may be shifted up to 3" if floor paneledge is supported and span rating is notexceeded.DO NOT CUT JOIST FLANGES.This drawing may contain deviations fromthe original project documents. It is theresponsibility of the contractor to notify theproject Design Professional of thesedeviations to verify conformance with theoriginal design intent of the project.This layout is intended for the use of Trus Joist®engineered wood products only. The substitution ofother engineered wood products with this layout isNOT PERMITTED. Please identify the TJI®,TimberStrand® LSL, Microllam® LVL, andParallam® PSL stamps on the product to ensurethat this layout is valid for the products actuallyinstalled. ©                                                                               ©             ©Project Number:Date:S31Sheets: of13407 Kilmer Lane NSuite 4Plymouth, MN 55441Tel 612-708-3572www.hansongroupmn.comBrighton/EJ03 Model"C" ElevationMinnesota ConstructionCOPYRIGHT HANSON GROUP, LLC 2020April 7, 20200.138THIS SHEET/S REPRESENTS A COMPLETE DESIGN OF THE "MAIN WINDFORCE RESISTING SYSTEM" FOR THE ENTIRERESIDENTIAL STRUCTURE. THE LOCATION AND LENGTH OF EACH BRACED WALL PANEL AND ENGINEERED WINDRESISTING ELEMENT THAT IS REQUIRED FOR THE HANSON GROUP'S DESIGN IS SHOWN ON THE STRUCTURALDRAWINGS. WALLS NOT SPECIFICALLY LABELED ON THE PLANS MAY BE STANDARD FRAMING.SECTIONS SHOWN DEPICT CONNECTIONS OF BRACED WALL PANELS TOROOF TRUSSES ABOVE, TO JOISTS/TRUSSES/BLOCKING ABOVE, AND TOJOISTS/TRUSSES/BLOCKING BELOW. THESE PANELS ARE NOT NECESSARILYREQUIRED TO ALIGN, BUT MAY DEPENDING ON PLAN LAYOUT.ROOFTRUSSESBRACEDWALL PANELFLAT 2x6 @ 24" O.C.(MIN. (3) PER BRACEDWALL PANEL)SIMPSONA35FRAMINGANGLEEACH END(4) 0.131"Øx 3" NAILSPROVIDE 12" WIDTH WEBSTIFFENER FOR ATTACHMENTOF FRAMING ANGLEBRACEDWALL PANEL(4) 0.131"Øx 3" NAILSSIMPSONA35FRAMINGANGLEEACH ENDFLOORJOISTSPROVIDE 12" WIDTH WEBSTIFFENER FOR ATTACHMENTOF FRAMING ANGLEBRACEDWALL PANEL(4) 0.131"Øx 3" NAILSSIMPSONA35FRAMINGANGLEEACH ENDFLOORJOISTSBRACEDWALL PANEL(4) 0.131"Øx 3" NAILSSIMPSONLTP4FRAMINGPLATEEACH ENDFLOORTRUSSESFLAT 2x6 @ 24" O.C.(MIN. (3) PER BRACEDWALL PANEL)FLAT 2x6 @ 24" O.C.(MIN. (3) PER BRACEDWALL PANEL)FLAT 2x6 @ 24" O.C.(MIN. (3) PER BRACEDWALL PANEL)BRACEDWALL PANEL(4) 0.131"Øx 3" NAILSSIMPSONLTP4FRAMINGPLATEEACH ENDFLOORTRUSSESFLAT 2x6 @ 24" O.C.(MIN. (3) PER BRACEDWALL PANEL)BRACED WALL CONNECTIONBRACED WALL CONNECTIONBRACED WALL CONNECTION(ROOF TRUSSES)(FLOOR JOISTS)(FLOOR TRUSSES)DETAILS SHOWN ABOVE AREALTERNATIVE CONNECTIONS TO BEUSED WHEN BRACED WALL PANELDOES NOT ALIGN WITH FRAMING.EXTERIOR NON-BEARING WALLFRAME 2x4 BOXAROUND SPACEBETWEEN TRUSS w/SAME SHEATHINGAND FASTENING ASWALL BELOW(OR REPLACE w/ADEQUATE DEPTH2x MEMBER)#12 x 312" WOODSCREWS @ 16" O.C.INSTALLED INADDITION TO NAILS(MAIN/UPPERLEVEL ROOFTRUSS BEARINGWALLS ONLY)#12 x 312" WOODSCREWS @ 16" O.C.INSTALLED INADDITION TO NAILS(MAIN/UPPERLEVEL ROOFTRUSS BEARINGWALLS ONLY)EXTERIOR BEARING WALLREPRESENTSFIGURER602.10.8.2(3)INDICATES INTERIOR BRACED WALL PANEL w/ GYPSUMSHEATHING BOTH FACES WITH EITHER FASTENER OPTIONLISTED IN NOTE 3, SPACED AT 4" O.C. PROVIDE INCREASEDFASTENING REQUIREMENTS AS SHOWN BELOW.INDICATES ENGINEERED WIND RESISTING ELEMENTS TOBE CONSTRUCTED AS SHOWN IN THE DETAIL SHEETS.(MIN. LENGTH)INDICATES EXTERIOR BRACED WALL PANEL w/ SHEATHING ONEXTERIOR FACE IN ACCORDANCE w/ NOTE 2. PROVIDEINCREASED FASTENING REQUIREMENTS AS SHOWN BELOW.(MIN. LENGTH)w/ JOISTSw/ TRUSSESw/ JOISTSw/ TRUSSESw/ JOISTSw/ TRUSSESw/ JOISTSw/ TRUSSESSCOPEDESIGN AND DETAIL OF THE MAIN WINDFORCE RESISTING SYSTEM FOR A SINGLE-FAMILY RESIDENCE. CONSTRUCTION ISTO BE IN ACCORDANCE WITH THIS DOCUMENT, STANDARD INDUSTRY PRACTICE, AND THE CODE.NOTES1.THESE DOCUMENTS APPLY TO STRUCTURAL ONLY. REFER TO CONSTRUCTION DOCUMENTS FOR MORE INFORMATION.2.ALL EXTERIOR WALLS ARE TO BE CONSTRUCTED IN ACCORDANCE WITH THE FOLLOWING CRITERIA, U.N.O., WHICHMEETS OR EXCEEDS THE REQUIREMENTS OF CODE SECTION R602.10.4-WSP AND CS-WSP.A.2x6 STUDS SPACED @ 16" O.C.B.EXTERIOR SHEATHING: 716" MIN. STRUCTURAL PANEL SHEATHING w/ 8d COMMON NAILS @ 6" O.C AT PANEL EDGESAND 12" O.C. AT INTERMEDIATE SUPPORTS OR 134" 16 GAUGE STAPLES @ 3" / 6" SPACING.3.ALL INTERIOR WALLS ARE TO BE CONSTRUCTED IN ACCORDANCE WITH THE FOLLOWING CRITERIA, U.N.O.A.2x4 OR 2x6 STUDS SPACED @ 16" O.C.B.WALL SHEATHING: 12" MIN. GYPSUM SHEATHING FASTENED TO FRAMING w/ 5d COOLER NAILS @ 8" O.C. MAX. ORTYPE S/W WALLBOARD SCREWS @ 16" O.C. MAX. (58" MINIMUM STUD PENETRATION)4.ALL FLOORS ARE TO BE CONSTRUCTED IN ACCORDANCE WITH THE FOLLOWING CRITERIA.A.FLOOR FRAMING SPACED AT A MAXIMUM OF 24" O.C.B.FLOOR SHEATHING: 34" STRUCTURAL PANEL SHEATHING w/ 8d COMMON NAILS @ 6" O.C AT PANEL EDGES AND 12"O.C. AT INTERMEDIATE SUPPORTS.5.ALL ROOFS ARE TO BE CONSTRUCTED IN ACCORDANCE WITH THE FOLLOWING CRITERIA.A.ROOF FRAMING SPACED AT A MAXIMUM OF 24" O.C.B.FASTEN ALL ROOF FRAMING TO TOP PLATES WITH SIMPSON H2.5 CLIP OR EQUIVALENT AND (4) 0.131"Ø x 3"TOENAILS.C.ROOF SHEATHING: 12" STRUCTURAL PANEL SHEATHING w/ 8d COMMON NAILS @ 6" O.C AT PANEL EDGES AND 12"O.C. AT INTERMEDIATE SUPPORTS OR 134" 16 GAUGE STAPLES @ 3" / 6" SPACING.6.ALONG LENGTH OF WALLS, LAP WALL TOP PLATES A MINIMUM OF 24" AND FASTEN TOGETHER WITH (12) 0.131"Ø x 3" INLAP ZONE. AT CORNERS AND INTERSECTIONS, LAP PLATES AND PROVIDE (3) 0.131"Ø x 3" FACE NAILS.7.CONNECTIONS NOT SPECIFICALLY NOTED ARE TO BE IN ACCORDANCE WITH CODE TABLE R602.3(1).8.TALL WOOD WALL FRAMING IS TO BE DESIGNED BY SUPPLIER FOR GRAVITY AND OUT-OF-PLANE WIND LOADS.9.THE ENTRY PORCH IS CONSIDERED TO BE A PRIMARILY OPEN, NON-ESSENTIAL PORTION OF THE STRUCTURE AND ISEXCLUDED FROM THE OVERALL MAIN WINDFORCE SYSTEM OF THE HOME. PROVIDE CODE REQUIRED UPLIFTCONNECTIONS AT ALL POSTS.MATERIALSWALL STUDS (10' OR LESS):SPF STUD GRADE OR BETTERWALL STUDS (OVER 10'):SPF NO.2 GRADE OR BETTERDIMENSIONAL LUMBER:SPF NO.2 GRADE OR BETTERTREATED LUMBER:SYP NO.2 GRADE OR BETTERLSL:134" WIDTH - 1.55E OR BETTERLVL:134" WIDTH - 1.9E OR BETTERLOADSROOF SNOW LOAD: 35-42 PSFROOF DEAD LOAD: 15 PSFFLOOR LIVE LOAD: 40 PSFFLOOR DEAD LOAD: 15 PSFWIND LOAD:115 MPH ULTIMATE EXP. BCODE2020 MINNESOTA RESIDENTIAL CODEHARDWAREALTERNATETABLESIMPSONPRODUCTUSPPRODUCTA34MP34A35MPA1H2.5RT7HTT5HTT45LSTASTRAPSAMELTP4MP4FMSTCSTRAPSAMESTHD14/RJSTAD14/RJTITEN HDWEDGEBOLTHARDWARE IN SAMEROW MAY BE USEDINTERCHANGEABLYIN THIS DOCUMENTROOF TRUSSESFASTENED TO PLATESw/ (4) 0.131"Ø x 3"TOENAILS & SIMPSONH2.5 CLIPNAIL BOTTOM PLATETO RIM/JOIST/BLOCKING w/ (3) 16dNAILS EVERY 16"NAIL BOTTOM PLATETO RIBBON BRACE /TRUSS w/ (3) 16dNAILS EVERY 16"NAIL EACH JOIST TOTOP PLATES w/ (3)0.131"Ø x 3" NAILS2x4 BLOCKINGBETWEENTRUSSES NAILEDTO TOP PLATESw/ (3) 0.131"Ø x 3"NAILS EACHNAIL EACH TRUSS TOTOP PLATES w/ (3)0.131"Ø x 3" TOENAILSROOF TRUSSFASTENED TOPLATES w/0.131"Ø x 3"TOENAILS@ 6" O.C.NAIL BOTTOMPLATE TO RIM/JOIST/BLOCKINGw/ (3) 16d NAILSEVERY 16"NAIL RIM TOPPLATES w/0.131"Ø x 3"TOENAILS@ 6" O.C.NAIL BOTTOMPLATE TO LADDERTRUSS w/ (3) 16dNAILS EVERY 16"NAIL LADDERTRUSS TO TOPPLATES w/0.131"Ø x 3"NAILS @ 6" O.C.INTERIOR WALLPERPENDICULAR TO FRAMINGINTERIOR WALLPARALLEL w/ FRAMING2x4 BLOCKING BETWEENROOF TRUSSES NAILEDTO TOP PLATES w/ (3)0.131"Ø x 3" NAILS EACHNAIL BOTTOM PLATE TOBLOCKING w/ (3) 16dNAILS EVERY 16"PROVIDE FULL DEPTHBLOCKING BETWEEN JOISTSNAILED TO TOP PLATES w/(3) 0.131"Ø x 3" NAILS EACHNAIL EACH JOIST TO TOPPLATE w/ (3) 0.131"Ø x 3" NAILSNAIL BOTTOM PLATE TOBLOCKING w/ (3) 16dNAILS EVERY 16"PROVIDE FULL DEPTHBLOCKING BETWEEN TRUSSESNAILED TO TOP PLATES w/(3) 0.131"Ø x 3" NAILS EACHNAIL EACH TRUSS TO TOP PLATEw/ (3) 0.131"Ø x 3" TOENAILSPROVIDE ROOF TRUSSDIRECTLY IN LINE w/BRACED WALL PANELFASTENED TO PLATESw/ 0.131"Ø x 3"TOENAILS @ 6" O.C.NAIL BOTTOM PLATETO BLOCKING w/ (3)16d NAILS EVERY 16"PROVIDE JOIST DIRECTLYIN LINE w/ BRACED WALLPANEL FASTENED TOPLATES w/ 0.131"Ø x 3"TOENAILS @ 6" O.C.NAIL BOTTOM PLATETO BLOCKING w/ (3)16d NAILS EVERY 16"PROVIDE TRUSS DIRECTLYIN LINE w/ BRACED WALLPANEL FASTENED TOPLATES w/ 0.131"Ø x 3"TOENAILS @ 6" O.C.(5-FT)(5-FT)(5-FT)(5-FT)(6-FT)BRACED WALL LINE BRACED WALL LINETHE REQUIREMENTS SHOWN DIRECTLY ABOVE ONLY APPLY TO WALKOUT FOUNDATIONSTHE REQUIREMENTS SHOWN DIRECTLY ABOVE ONLY APPLY TO LOOKOUT FOUNDATIONSPARTIAL LOWER LEVEL HOUSE PLANSHOWN FOR LOCATION REFERENCE ONLY(ACTUAL LAYOUT MAY BE MIRRORED)1S3REFERENCE PLANw/ 3-CAR GARAGEw/ 4-SEASON PORCHMAIN LEVEL HOUSE PLAN SHOWNFOR LOCATION REFERENCE ONLY(ACTUAL LAYOUT MAY BE MIRRORED)2S3REFERENCE PLANALTERNATEHOLDOWN AALTERNATEHOLDOWN BPOST-INSTALLED HOLDOWN OPTIONS5S3FRAMING DETAILUSP HTT45 HOLDOWNANCHOR AT LOCATIONSSHOWN NAILED TO DOUBLESTUDS & 12"Ø x 12" LONGSIMPSON TITEN HD SCREW-INANCHOR INTO CONCRETEUSP MSTCM40 STRAP ATLOCATIONS SHOWN NAILEDTO DOUBLE STUDS & 14" x214" CONCRETE SCREWS(TAPCON, TITEN, OR EQUIV.)INTO FOUNDATIONCONCRETEFOUNDATIONBELOWALTERNATE B HOLDOWNS ARE TO HAVECORROSION PROTECTION BY OTHERSIF USED IN AN EXTERIOR APPLICATIONEXPOSED TO THE ELEMENTS.(4-FT)(4-FT) (5-FT)(5-FT)(5-FT)(5-FT)(3-FT)(3-FT)(3-FT)(4-FT)(4-FT)(5-FT)(5-FT)(5-FT)(6-FT) BRACED WALL LINE BRACED WALL LINE BRACED WALL LINE BRACEDWALL LINEBRACEDWALL LINEBRACEDWALL LINE(4-FT)(4-FT)(3.5-FT)(3.5-FT)(6-FT)(6-FT)BRACEDWALL LINEBRACEDWALL LINEPROVIDE TOP OF WALLCONNECTIONS SHOWN FORBRACED WALL PANELS ALONGINDICATED PORTION OF WALLPROVIDE TOP OF WALLCONNECTIONS SHOWN FORBRACED WALL PANELS ALONGINDICATED PORTION OF WALLPROVIDE TOP OF WALLCONNECTIONS SHOWN FORBRACED WALL PANELS ALONGINDICATED PORTION OF WALLPROVIDE TOP OF WALLCONNECTIONS SHOWN FORBRACED WALL PANELS ALONGINDICATED PORTION OF WALLS3FRAMING DETAILGARAGE SHEARWALL3FASTEN FRAMING ABOVE AS SHOWNFOR BRACED WALL PANELS ALONGTHIS SHEARWALL AS WELL ASABOVE OVERHEAD DOORHATCHED AREA INDICATES 716" ORTHICKER PLYWOOD/OSB EXTERIORSHEATHING FASTENED TO STUDS w/8d NAILS @ 4" O.C. AT PANEL EDGES& @ 12" O.C. AT INTERIOR SUPPORTSSIMPSON STHD14 HOLDOWN ANCHORFASTENED TO DOUBLE STUDS(REFER TO 5/S3 FOR POST-INSTALLEDHOLDOWN OPTION)(2) 12" Ø ANCHOR BOLTS(7" MIN. EMBED)TYPICAL 2x6 STUDS @ 16" O.C.PROVIDE DOUBLE STUDSAT END OF SHEARWALLHEADER & BEARING/KINGSTUDS AT SIDES OFOPENINGS BY SUPPLIERCONSTRUCTSHEARWALL ASSHOWN IN 3/S3CONSTRUCTSHEARWALL ASSHOWN IN 3/S3MIRROREDCONSTRUCT PORTALFRAME AS SHOWN IN 4/S3S3FRAMING DETAILGARAGE FRONT PORTAL FRAME4NOTEINFO APPLIES SYMMETRICALLY ACROSS DETAIL.16'-3"±NOT TO EXCEED 12'-0"FASTEN TOP PLATE TO HEADER w/ (2)ROWS 16d SINKER NAILS @ 3" O.C.(1) 2x6 BEARING STUD & (1) 2x6 FULLHEIGHT STUD EACH END OF HEADERLOCATE PANEL JOINT WITHIN 2'-0" FROMCENTER OF HEADER HEIGHT AS REQ'D (2x SOLIDBLOCKING REQUIRED AT SHEATHING JOINT)(2) 2x6 BEARING STUDS MIN.(VERIFY w/ SUPPLIER)PROVIDE 2x6 INFILL WALLABOVE HEADER AS REQ'DSIMPSON STHD14 EMBEDDED HOLDOWNANCHOR AT LOCATIONS SHOWN(REFER TO 5/S3 FOR ALTERNATIVE OPTION)FOUNDATION WALL BELOWLENGTH OF CONTINUOUS HEADER58" Ø ANCHOR BOLT (7" MIN. EMBED)w/ 2" x 2" x 316" PLATE WASHERSNAIL SHEATHING TO HEADER w/ 8dNAILS @ 3" O.C. EA. WAY TYP.SMALL HATCH AREA INDICATES 716" ORTHICKER PLYWOOD OR OSB SHEATHINGAPPLIED TO EXTERIOR SIDE OF STUDS(NAIL SHEATHING AROUND PERIMETER w/ (2)ROWS 8d NAILS @ 3" O.C. STAGGERED & TOPLATES / BLOCKING @ 3" O.C.)SIMPSON MSTC40 STRAP ON INSIDE FACEOF WALL (PROVIDE SPACER TO FLUSHOUT HEADER TO WALL STUD THICKNESS)FASTEN KING STUD TO HEADER w/(2) ROWS 16d SINKER NAILS @ 3" O.C.LARGE HATCH AREA INDICATES 716" OR THICKERPLYWOOD OR OSB SHEATHING APPLIED TO EXTERIORSIDE OF STUDS w/ STANDARD 6"/12" NAILINGFASTEN FRAMING ABOVE AS SHOWNFOR BRACED WALL PANELS1'-1012"±CONTINUOUS LSL/LVL HEADER TOSUPPORT VERTICAL LOADS BY SUPPLIER(MIN.312" WIDTH & MIN.1114" DEPTH REQ'D)1'-1012"±(5-FT)(4-FT)OPTIONALWINDOWDateRevisionPrint Name:Signed: License Number:Ryan Mack46673Date:I hereby certify that this plan, specification or reportwas prepared by me or under my direct supervisionand that I am a duly Licensed Professional Engineerunder the laws of the State of Minnesota.Lennar Corporation16305 36th Ave N. Suite 600Plymouth, MN 55446PLANS SHOWN LIGHT IN BACKGROUND ARE FORLOCATION REFERENCE ONLY. PLAN NOTES ANDELEMENTS SHOWN LIGHT MAY NOT NECESSARILYSUPPORT THE HANSON GROUP'S DESIGN.Description4-20-21MAIN LEVEL w/ BASEMENT(4-FT)(5-FT)(5-FT)4-20-211Main Level W/ Basement 40,000 X X 40,000 40,000 3000 3000 3000 40,000 40,000 13.33 13.33 66000 1584 1584 .53 .53 .47 .47 6.3 2.8 240 375 375 3473 520 520 -145 130 65 20173 Ginseng Way Date Certificate Posted X Passive (No Fan ) Active (With fan and monometer or other system monitoring device) Location (or future location) of Fan: Other Please Describe Here X R-15 X X X R-20 X R-20 X R-20 X R-49 X R-49 X R-30 X R-30 X X Not applicable, all ducts located in conditioned space X Not required per mech. code Passive Powered Interlocked with exhaust device. Describe: Input in BTUS:66,000 Capacity in Gallons:Other, describe: AFUE or HSPF% 93% Cfm's " round duct OR " metal duct Not required per mech. code X Passive X Low: Other, describe: Low: Location of fan(s), describe: Cfm's 6 " round duct OR " metal duct Duct system air tightness: Heating or Cooling Ducts Outside Conditioned Spaces Ceiling, vaulted Bay Windows or cantilevered areas Floors over unconditioned area Describe other insulated areas Building envelope air tightness: Windows & Doors Average U-Factor (excludes skylights and one door ) U: 0.31 Solar Heat Gain Coefficient (SHGC):0.29 R-value MECHANICAL SYSTEMS Make-up Air Select a Type Appliances Heating System Domestic Water Heater Cooling System Nat Gas Nat Gas Elect GPVL-50 13ACXN24-230 Fuel Type Manufacturer Lennox AOSmith Lennox Model ML193UH070XE36B 13 Location of duct or system: Rating or Size 50 Output in Tons:2 Efficiency SEER /EER Residential Load Calculation Heating Loss Heating Gain Cooliing 49,806 16,646 19,994 MECHANICAL VENTILATION SYSTEM Describe any additional or combined heating or cooling systems if installed: (e.g. two furnaces or air source heat pump with gas back-up furnace): Combustion Air Select a Type Select Type Heat Recover Ventilator (HRV) Capacity in cfms:130 MN License Number Lennar 1413 THERMAL ENVELOPE RADON CONTROL SYSTEM Type: Check All That Apply Insulation Location Total R-Value of all Types of InsulationNon or Not ApplicableFiberglass, BlownFiberglass, BattsFoam, Closed CellFoam Open CellMineral FiberboardRigid, Extruded PolystyreneRigid, IsocynurateNew Construction Energy Code Compliance Certificate Per R401.3 Certificate. A building certificate shall be posted on or in the electrical distribution panel.2/10/2022 Mailing Address of the Dwelling or Dwelling Unit City Lakeville20173 Ginseng Way Name of Residential Contractor Below Entire Slab Foundation Wall Perimeter of Slab on Grade Rim Joist (1st Floor) Rim Joist (2nd Floor+) Wall Ceiling, flat Interior R5 + R10 Exterior Interior Interior Balanced Ventilation capacity in cfms:Mech Room Capacity continuous ventilation rate in cfms: Total ventilation (intermittent + continuous) rate in cfms: 65 High: Energy Recover Ventilator (ERV) Capacity in cfms:High: Location of duct or system: 000000Builders Associaton of Minnesota version 101014 NEW RESIDENTIAL CONSTRUCTION SWPPP VERIFICATION This form must be completed and submitted with all new residential permit applications. New residential building permits WILL NOT be issued without this completed form. Project Site Address: _____________________________________________________________________ Company Name: _________________________________________________________________________ Primary Contact: _________________________________________________________________________ Phone # (24 hr Contact): ______________________ Email: ______________________________________ Description of Land Disturbing Activity: _____________________________________________________ NPDES Construction Stormwater Permit # C000 ___ ___ ___ ___ ___ or # SUB00 ___ ___ ___ ___ ___ If you are not covered under a NPDES Construction Stormwater Permit administered by the MPCA, an erosion and sediment control plan MUST be submitted with the residential building permit application. “The permittee(s) shall ensure that the individuals are trained by local, state, federal agencies, professional organizations or other entities in erosion prevention, sediment control, permanent Stormwater management and the Minnesota NPDES/SDS Construction Stormwater Permit.”(NPDES Construction Stormwater Permit, MPCA) “The permittee(s) must ensure that a trained person (as identified in Part III.A.3.a) will routinely inspect the entire construction site at least once every seven (7) days during active construction and within 24 hours after a rainfall event greater than 0.5 inches in 24 hours.” (NPDES Construction Stormwater Permit, MPCA) Contact information of person CERTIFIED to provide weekly onsite erosion and sediment control inspections and corrective actions: Name of Person: ________________________________Company: _______________________________ Phone # (24 hr Contact): ______________________ Email: ______________________________________ Entity that Provided Training: ________________________ Certification Expiration Date: ____________ NOTE: Prior to any land-disturbing activity, all erosion and sediment controls must be installed on the project site and on individual lots. No land disturbing activity may begin until a residential building permit has been issued. I understand, the above information to be true and I will have read, understood, and accepted all terms and conditions of the National Pollutant Discharge Elimination System (NPDES) Permit (MN R 100001). The City of Lakeville may issue a STOP WORK ORDER; withhold building inspections; or, draw on securities/escrows to bring the site into compliance with the NPDES Construction Stormwater Permit (MN R 100001) or erosion and sediment control plan. Signature: ________________________________________________ Date:_________________________ Contact the City of Lakeville with questions at erosion@lakevillemn.gov or 952-985-4500 20173 Ginseng Way U.S. Home Corp d/b/a Lennar Jesse Schwarzrock 612-346-2648 Jesse.Schwarzrock@Lennar.com Residential Development 57174 Chad Johnson Stantec 651-325-6860 chad.johnson@stantec.com University of Minnesota 5/31/23 2/10/2022Kurt NiskaDigitally signed by Kurt Niska Date: 2022.02.10 07:41:14 -06'00' 2/23/22 AM Y