Loading...
HomeMy WebLinkAbout18694 Hancock Avenue-SurveyThe curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with the landscape inspection. *Maintain 6" between bottom of siding and sod.*No structures in easements. EROSION CONTROLMUST BE INSTALLED BEFORE EXCAVATION ENGINEERING REVIEWED Date:__________________02/22/2022 lritchie Planning DepartmentApprovedDate:__________________02/25/2022 dmorey