Loading...
HomeMy WebLinkAbout18695 Hancock Ave SurveyThe curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flush with the sod. This will be scheduled with thelandscape inspection. EROSION CONTROLMUST BE INSTALLED BEFORE EXCAVATION *Maintain 6" between bottom of siding and sod. *No structures in easements. ENGINEERING REVIEWED Date:__________________02/22/2022 lritchie Planning DepartmentApprovedDate:__________________02/25/2022 dmorey