Loading...
HomeMy WebLinkAboutLA199670 - Electrical application ELECTRICAL PERMIT APPLICATION CITY OF LAKEVILLE BUILDING INSPECTIONS DEPARTMENT 20195 HOLYOKE AVENUE LAKEVILLE, MN 55044 952-985-4440 Office Use Only ___________________ Permit Number ___________________ Received By ___________________ Date Received ___________________ Fee Total DATE YOUR E-MAIL ADDRESS SITE ADDRESS TENANT SUITE NO. THE APPLIANT IS: RESIDENT OWNER CONTRACTOR RESIDENT OWNER NAME_________________________________________________________________________ ADDRESS______________________________________________________________________ CITY _____________________________ STATE_____________ ZIP _____________________ DAYTIME PHONE # WHERE YOU CAN BE REACHED ______________________________ CONTRACTOR Company name must be as appears on State License COMPANY NAME_______________________________________LICENSE #EA___________ ADDRESS_____________________________________________________________________ CITY _____________________________ STATE_____________ ZIP _____________________ OFFICE PHONE # ________________________ FAX #_______________________________ CONTACT NAME______________________________________ PHONE__________________ PERMIT TYPE SINGLE FAMILY TWO FAMILY TOWNHOUSE Meter Bank Single Meter MULTI-FAMILY COMMERCIAL / INDUSTRIAL MANUFACTURED HOME (Contractor Only) INSTITUTIONAL SWIMMING POOL UNDEFINED FIRE ALARM POWER SIGN OTHER (see description) Residential Addition/ Remodel Permits Available on-line TYPE OF WORK NEW MAINTENANCE/REPAIR ADDITION TENANT FINISH ALTER / REMODEL DEMOLITION Only Licensed Electrical Contractors can do work in a Townhouse that has meter bank instead of single meters attached to the units. Only Licensed Electrical Contractors can do work in Manufactured Home Parks. RESIDENTIAL FEES: New Construction: $135.00 + $1.00 State Surcharge (up to three trips) Repairs: + $1.00 State Surcharge (one trip) Additions, Remodel, Lower Level: $70.00 + $1.00 State Surcharge (two trips) COMMERCIAL FEES: Minimum of + $1.00 State Surcharge (one trip)---Remodel Minimum $70.00+$1.00 State Surcharge (two trips) JOB COST: $ Example: $12,000 Job Cost 1-1/2% of contract cost up to $10,000 $10,000.00 x 1.5% = $150.00 1% of cost above $10,000 plus surcharge + $ 2,000.00 x 1% = + 20.00 (Surcharge = Contract Cost x .0005) + $12,000 x.0005 = + 6.00 TOTAL = = $176.00 I hereby apply for an electrical permit and I acknowledge that the information above is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Lakeville and with the Minnesota Electrical Act; that I understand this is not a permit but only an application for a permit and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of all work which requires review and approval of plans. NAME OF APPLICANT (Please Print) SIGNATURE OF APPLICANT: PLEASE NOTE: SEPARATE PERMITS ARE REQUIRED FOR ANY BUILDING, MECHANICAL & PLUMBING WORK www.lakevillemn.gov $40.00 $40.00 Submit to: permits@lakevillemn.gov FOR OFFICE USE ONLY: TYPE OF WORK INSPECTIONS NEW FINAL ADDITION FIRE ACCEPTANCE TEST ALTER/REMODEL IN FOOR HEAT ROUGH-IN SERVICE TRENCH PERMIT FEE PERMIT FEE: $ SURCHARGE: $ OTHER: $ TOTAL: $ PERMIT ISSUED BY: DATE: MISC. NOTES AND SPECS: PV MODULE 1:(QUANTITY 31) STC: 340; MPV: 33.94; MPI: 10.02; VOC: 40.66; ISC: 10.52 PV MODULE 2:N/A INVERTER 1 (QUANTITY 1) 240V; 10,000W; 42.0A; 1Ø; UL 1741 CERTIFIED INVERTER:N/A --INVERTER(S) ARE 240VAC 1Ø OUTPUT --SYSTEM OUTPUT IS BALANCED 240VAC 1Ø CUST:GABRIEL J GRESETH (952) 201-0485 ELECT. UTILITY:Xcel 3735 Dunlap Street N SITE:20806 Greenwood Avenue, Lakeville, MN 55044 PREMISE#: Arden Hills, MN 55112 SERVICE:120/240V, 1Ø, 3-WIRE, 200A ACCOUNT#: 612-888-9599 PROJ:Greseth, Gabe METER#: SIZE:10.54KW DC 10KW AC APP ID#: TruNorth Solar ELECTRICAL ONE-LINE DIAGRAM 12/20/2021 E1: REV 01 EDIT: BF 51-0012177052-0 304711729 TAG 21314115 0 40 41 NOT FOR CONSTRUCTION UNLESS APPROVED BY MASTER ELECTRICIAN 1 04793499 SOLAR REWARDS Network Communication to Customer Owned Router INTERNET ACCESS GENERAL NOTES:--DESIGN MEETS ALL NEC REQUIREMENTS --GROUNDING CONDUCTORS MAY NOT BE SHOWN --REFER TO ELECTRICAL LABEL SCHEDULE (DWG E2 BELOW) FOR DETAILED LABEL INFO --EQUIPMENT AND WIRE/CONDUIT SCHEDULES FOLLOW (DWG E3 & E4 BELOW) --RAPID SHUTDOWN IS INITIATED BY AC DISCONNECT OR INTEGRATED INVERTER SWITCH DISCONNECT TOMAIN METER: 4' UTILITY AC DISCONNECT VISIBLE-OPEN TYPE LOCKABLE, NEMA 3R READILY ACCESSIBLE W/PROTECTIVE BARRIERSSERVICE RATED60A, 240VAC, 2-POLEFUSED: 60A PRODUCTION METER UTILITY OWNED ONE-WAY 240V, 200A, 1Ø, 3-WIRE DIRECT MEASURESOCKET W/BYPASSSOLAR TO LINE SIDE MAIN METER UTLITY OWNED BIDIRECTIONAL 240V, 200A, 1Ø, 3-WIRE DIRECT MEASUREUPGRADE SOCKETMILBANK COMBOBYPASS METER MAIN INVERTERS (SOLAREDGE) (1) SE10000H-US, 10000W240V, 42A, 1ØTOTAL: 10KW AC, 42AUL 1741 CERTIFIED PV MODULESQ-Cells(31) Q.PEAK DUO-G6 340 BLKSTC: 340, MPV: 33.94, MPI: 10.02VOC: 40.66, ISC: 10.52TOTAL: 10.54KW DC DC-DC OPTIMIZERS: (SOLAREDGE)(31) SE P401, 400W1 MOD. PER OPTIMIZERREQUIREMENTS EACH STR: PV MAX 6000W 8-17 PV MODULES 8-25 OPTIMZERS 2 STR PER INV 1: (PV 16, 15) SYSTEM TIE-IN (TAG 90) MFG PROVIDED UL LISTED, 75°C. MIN. RATING: 60A METER TAP KIT SERVICE PANELEATON 240VAC, 200A, 1Ø OCP: 200A INTERIOR RPA (Reference Point of Applicability):--PoC (Point of DER Connection) --LOCATED AT INVERTER CONNECTION --ANTI-ISLANDING TEST POINT INVERTER 1 ROOFTOP SPD EXT.WEST SIDE OF HOUSE CONDUCTORS ANDJBOX TYPIICAL EXT.WEST SIDE OF HOUSE PRODUCTION METER DISCONNECT 60A, 240VAC, 2-POLE FUSED: 60A LABEL SCHEDULE ORANGE FILL COLOR INDICATES THE LABEL IS REQUIRED LT YELLOW: INDICATES THE LABEL NORMALLY APPLIED TO EQUIPT BY MFG COLOR SHOWN HERE INDICATES WHETHER LABEL APPLIES, NOT PHYSICAL LABEL COLOR.WHITE/NO COLOR: INDICATES THE LABEL DOES NOT APPLY (IGNORE) APPLY:MAIN METER APPLY:AC DISCO, PROD METER, COMBINER, AUX TRANSFORMER APPLY:PV SOURCE RACEWAYS, J-BOX COVERS, ETC. 1 3 APPLY:MAIN METER, MAIN PANEL 2 APPLY:METER COMBO, AC COMBINER, TAP CAN APPLY:INVERTER (DC DISCONNECT) 1 APPLY:PRODUCTION METER 1 1 APPLY:AC DISCO (SOLAR SIDE OF TRANSFORMER) APPLY:UTILITY AC DISCONNECT 1 APPLY:INVERTER (DC DISCONNECT) 1 1 1 APPLY:SOLAR AC COMBINER PANEL APPLY:(MISC. DC DISCONNECT) 1 1 APPLY:EXT. MAIN METER SERVICE PANEL APPLY:SOLAR AC COMBINER PANEL 1 APPLY:SOLAR & UTILITY SERVICE EQUPMENT 2 INPUT CIRCUIT NAME OP. VOLTAGE.OP. CUR. APPLY:EXT. SERVICE DISCONNECT VAC A 1 VAC A VAC A VAC A APPLY:ESS BATTERIES VAC A VAC A APPLY:SOLAR AC COMBINER PANEL APPLY:MISC. APPLY:BACKFED BREAKER IN SERVICE PANEL APPLY:MISC. INPUT CIRCUIT NAME OP. VOLTAGE.OP. CUR. VAC A APPLY:MISC.VAC A APPLY:MAIN METER OR UTILITY SERVICE AREA VAC A 1 VAC A APPLY:MISC.VAC A VAC A CUST:GABRIEL J GRESETH (952) 201-0485 ELECTRIC UTILITY:Xcel 3735 Dunlap Street N SITE:20806 Greenwood Avenue, Lakeville, MN 55044 PREMISE#:Arden Hills, MN 55112 SERVICE:120/240V, 1Ø, 3-WIRE, 200A ACCOUNT#:612-888-9599 PROJ:Greseth, Gabe METER#: SIZE:10.54KW DC 10KW AC APP ID#: UTILITY METER #2 (CUST. SELL) TOTAL RATING OF ALL OVERCURRENT DEVICES EXCLUDING MAIN SUPPLY OVERCURRENT DEVICE ENERGY STORAGE SYSTEM DISCONNECT HT ROLL 999 239 PHOTOVOLTAIC AC DISCONNECT HT ROLL CUST. WARNING: INVERTER OUTPUT CONNECTION DO NOT RELOCATE THIS OVERCURRENT DEVICE HT ROLL 240 MAX AC OPERATING CURRENT: OPERATING AC VOLTAGE: TRUNORTH SOLAR EMERGENCY DISCONNECT, SERVICE DISCONNECT WARNING: THIS EQUIPMENT FED BY MULTIPLE SOURCES 612-888-9599 RAPID SHUTDOWN SWITCH FOR SOLAR PV SYSTEM UTILITY PHOTOVOLTAIC MAIN AC DISCONNECT 42.0 WARNING: TURN OFF PHOTOVOLTAIC AC DISCONNECT PRIOR TO WORKING INSIDE PANEL 499 999 239 WARNING: SOLAR CIRCUITS ONLY DO NOT ADD OTHER LOADS! WARNING: ELECTRIC SHOCK HAZARD - DO NOT MAY BE ENERGIZED IN THE OPEN POSITION TOUCH TERMINALS - LINE AND LOAD TERMINALS A VAC 1Ø 42.0 PRODUCTION METER DISCONNECT PHOTOVOLTAIC AC DISCONNECT A VAC 1Ø PHOTOVOLTAIC AC DISCONNECT MAX AC OPERATING CURRENT: OPERATING AC VOLTAGE: 4 5 240 MAX AC OPERATING CURRENT: OPERATING AC VOLTAGE: MAIN (BIDIRECTIONAL) METER906 WARNING: DUAL POWER SOURCES, SECOND SOURCE IS PV SYSTEM HT ROLL SOLAR PRODUCTION METER909 705 497 A 1 2 (FIELD) 3 42.0 6 999 SOLAR DC DISCONNECT 239 SOLAR COMBINER PANEL V (SM) (MED) (LG) WARNING: PHOTOVOLTAIC POWER SOURCE WARNING: PHOTOVOLTAIC POWER SOURCE WARNING: PHOTOVOLTAIC POWER SOURCE 47.5240INV 3 INVERTER 1, INVERTER 2… ETC. INVERTER 1 240 904 905 910 999 999 TruNorth Solar 51-0012177052-02131411504793499 4 5 SOLAR DC DISCONNECT 480.0MAXIMUM DC VOLTAGE V MAXIMUM DC VOLTAGE SOLAR DC DISCONNECT V 999 MAXIMUM DC VOLTAGE SOLAR DC DISCONNECT A VAC 1Ø ALL LABELS ARE DURABLE , PERMANENT AND NEC 690 COMPLIANT. EXTERIOR LABELS ARE WEATHERPROOF. EXACT LABEL TEXT AND FORMAT MAY VARY IF MEANING IS CLEAR AND MEETS CODE REQUI9REMENTS. 12/20/2021 NOT FOR CONSTRUCTION UNLESS APPROVED BY MASTER ELECTRICIAN WWW.TRUNORTHSOLAR.COM 304711729 ELECTRICAL LABEL SCHEDULE SHALL NOT EXCEED AMPACITY OF BUSBAR E2: REV 01EDIT: BF 240 999 SOLAR COMBINER PANEL nn OPERATING AC VOLTAGE:VAC 1Ø (FIELD) 1 2 47.5 INV 1 INV 2 MAXIMUM DC VOLTAGE: 400V 239 PHOTOVOLTAIC AC DISCONNECT MAX AC OPERATING CURRENT: 6 3 CAUTION: MULTIPLE SOURCES OF POWER TO BE CREATED: SITE SPECIFIC DIAGRAM SHOWING LOCATIONS OF ASSOCIATED EQUIPMENT SUCH AS: --MAIN METER --UTILITY SERVICE DISCO --SOLAR AC DISCO --PRODUCTION METER --INVERTERS, COMBINERS, LOCAL DISCOS AS NEEDED --SOLAR PV ARRAYS --BATTERIES, STANDBY GENERATOR (AS NEEDED) --INCLUDES ORIENTATION OF NORTH DC EQUIPMENT INVERTERS AC EQUIPMENT 3735 Dunlap Street N ELECTRICAL EQUIPMENT SCHEDULEArden Hills, MN 55112 Greseth, Gabe CUST:GABRIEL J GRESETH (952) 201-0485 612-888-9599 10.54KW DC 10KW AC SITE:20806 Greenwood Avenue, Lakeville, MN 55044 84 90 UTILITY OWNED1 UTLITY OWNED 1 MILBANK OR SIMILAR 86 1 99 240V, 200A, 1Ø, 3-WIRE 93 1 240V, 200A, 1Ø, 3-WIRE DELTA OR SIMILAR PRODUCTION METER MILBANK 1 INV. COMMUNICATIONS KIT 1 SOLAREDGE 14 Q-Cells STC: 340; MPV: 33.94; MPI: 10.02; VOC: 40.66; ISC: 10.52 JBOX (SOLAR)1 SPECS P401 EQUIPMENT SCHEDULE TAG MFG NOTESDESCRIPTION OR ID SOLAREDGE QUANT 31 AS NEEDED FOR WIRE TRANSITIONS, MAY NOT BE SHOWNNEMA3R Q.PEAK DUO-G6 340 BLK PART# DC-DC OPTIMIZER 15 81 1 74 UTILITY OWNED851 80 600V, 200A, 1Ø, 3-WIRE, BYPASS, NEMA3R COMBOUPGRADE TO MILBANK METER MAIN MFG PROVIDED 95 96 91 94 U6281-XL-200-5T9 BIDIRECTIONAL MAIN METER SOCKET 1 UL, 300V, 100A TAP CONNECTOR KIT 10 0 11 EXT. METER AREA240V; 10,000W; 42.0A; 1Ø; UL 1741 1 2 D222NRB ONE-WAY 40 13 2 16 EATON LA302 71 UTLITY TRANSFORMER 240VAC, 60A, 2-POLE, FUSED, NEMA3R, SVC RATED 240VAC, 60A, 2-POLE, FUSED, NEMA3R, SVC RATED E3: REV 01 EDIT: BF12/20/2021 60A EXT. METER AREA SQUARE-D OR SIM. 250VAC EXT. METER AREA TruNorth Solar UTILITY AC DISCO FUSE UTILITY AC DISCO 17 41 87 31 PRODUCTION METER SOCKET MODULE 1 SOLADECK/OTHER U4801-XL-5T9 400W; 1 PV MODULE PER OPTIMIZER SE10000H-US 600V, 200A, 1Ø, 3-WIRE, BYPASS, NEMA3R PRODUCTION METER DISCONNECT INTERNET ROUTER SERVICE PANEL SPD - SURGE PROTECTIVE DEVICE 68 92 SIEMENS OR SIM. 50 73 72 82 53 54 67 MILBANK OR SIMILAR 47 51 66 65 2 63 1 240VAC, 200A, 1Ø 70 1 MAIN UTILITY METER K4977-EXTSYSTEM TIE-IN HARDWARE 43 1 60 MONITORING DATA ACCESS TO INTERNET 1 FOR WIRELESS OR HARDWIRE, 1 EACH INVERTER IF CELLULAR CUSTOMER OWNED 62 52 46 61 42 SOLAR SERVICE, UTILITY SERVICETYPES 1 & 2 INVERTER 1 SOLAREDGE DC CIRCUITS AC CIRCUITS WIRE & CONDUIT SCHEDULE 3735 Dunlap Street NArden Hills, MN 55112 Greseth, Gabe CUST:GABRIEL J GRESETH (952) 201-0485 612-888-9599 10.54KW DC 10KW AC SITE:20806 Greenwood Avenue, Lakeville, MN 55044 OUTPUT TO AC DISCO 42 50 40 1 13 6 AC CIRCUIT OR SEGMENT NAME 12 CIRCUIT QUANT. 4 #WIRES EACH CIRCUIT PV 22 1-WAY LEN. (FT) 50 2 0 1 2 103 1 101 AUX. GROUNDING ELECTRODE & CONDUCTOR TAG MIN.WIRE SIZE 8 11 10 70 51 41 PRODUCTION METER 7 DC CONDUCTOR (FREE AIR)10 AWG 104 1 15 14 CU-THWN2 EGC 68 52 53 1 1 6 AWG CU-THWN2 CU-THWN2 DC CIRCUIT OR SEGMENT NAME INVERTER 1 CU CONDUIT TYPE 6 CU-THWN2 EMT NOTES 2 PRODUCTION METER DISCONNECT CU-THWN2 UTILITY AC DISCO NOTES 70 2 4 WIRE TYPE WIRE AND CONDUIT SCHEDULE 5 TAG 12 AWG WIRE TYPE EMT2 + N, G 0.75''DC CONDUCTOR MIN. CONDUIT SIZE #WIRES EACH CIRCUIT 2 + N, G EMT 0.75'' MIN. CONDUIT SIZE 6 1-WAY LEN. (FT) 6 AWG 1006 AWG 2 + N, G 6 6 AWG 6 AWG 6 2 + N, G CU-PVWIRE PV MODULE 1 OUTPUT JBOX OUTPUT TO INVERTER CONDUIT TYPE 12 AWG 0.75''TO SYSTEM TIE-IN POINT (TAG 90) TO PRODUCTION METER 0.75'' NOT FOR CONSTRUCTION UNLESS APPROVED BY MASTER ELECTRICIAN E4: REV 01EDIT: BF 12/20/2021 0.75''EMT AS NEEDED PER NEC 690.47, FOR DC: 250.166; FOR AC: TABLE 250.66 10 AWG ALLOWED WHERE PROTECTED TO PRODUCTION METER DISCONNECT 102 1 EMT 31 MIN.WIRE SIZE 91 TruNorth Solar 71 CU 72 73 1 CIRCUIT QUANT. (NOT SHOWN) PV MODULE LEADS OPTIMIZER DC CIRCUITS TO JBOX 7 PHASES1 1 1 1 1 1 NOTES FOR INDICATED COLUMN: WIRE SIZE SPECIFIED IN ONE-LINE TYPICALLY INCLUDES CONSIDERATION FOR VOLTAGE DROP AND CONNECTION TERMINAL/LUG REQUIREMENTS FOR DC OPTIMIZER STRING: (SUM OF PV WATTAGE)/(DC VOLTAGE REQUIRED BY INVERTER). FOR AC CIRCUITS, TYPICALLY INVERTER OUTPUT RATING PV CIRCUITS = COLUMN 8 * 1.25. OPTIMIZER CIRCUITS = MAXIMUM CONTINUOUS OPTIMIZER OUTPUT RATING. INVERTER OUTPUT CIRCUIT = INVERTER CONTINUOUS RATING. TEMPERATURE OF CONDUCTOR ENVIROMENT (FAHRENHEIT) TEMPERATURE CORRECTION FACTOR FROM TABLE 310.15(B)(1) QUANTITY OF CURRENT CARRYING CONDUCTORS IN THE CONDUIT FROM TABLE 310.15(C)(1) COMBINE ADJUSTMENTS AND CORRECTION FACTORS, COLUMN 11 * COLUMN 13 TEST #1 = COLUMN 9 * 1.25 -- NEC 690.8(B)(1), MAXIMUM CIRCUIT CURRENT * 1.25. THIS IS ALSO THE VALUE USED FOR OCP SIZING. TEST #2 = COLUMN 9 / COLUMN 14 -- NEC 690.8(B)(2), MAX. CIRCUIT CURRENT WITH ADJUSTMENTS AND CORRECTION FACTORS FROM TABLE 310.16 OR 310.17. LARGEST SIZE RESULTING FROM CALCULATIONS IN COLUMNS 15 & 16 NEC TABLE REFERENCED ONE WAY LENGTH. NOTE THIS IS ONLY FOR THE SEGMENT SPECIFIED. ADDITIONAL SEGMENTS WILL ADD TO THE TOTAL VOLTAGE DROP OF A CIRCUIT. VOLTAGE DROP PERCENTAGE USING THE OPERATING VOLTAGE AND NOMINAL CURRENT FOR THE SEGMENT CONDUCTOR SIZING CALCULATIONS 3735 Dunlap Street NArden Hills, MN 55112 Greseth, Gabe CUST:GABRIEL J GRESETH 612-888-9599 10.54KW DC 10KW AC SITE:20806 Greenwood Avenue, Lakeville, MN 55044 CU-THWN2 6 AWG 240 42 42 50 1.15 3 1 1.15 52.5 36.5 8 AWG 52.51286426 AWG 42 16 AWG 14 AWG 6 AWG 6 AWG 6 AWG 21.1 15 42 42 18.8 18.8 52.5 52.5 0.71 1 1 1 1 1 1 1 1 0 2 2 2 0.71 1 1 1 1 140 86 86 86 15 42 42 42 13.6 13.6 42 42 ADJUSTMENT FACTOR - # WIRES IN CONDUITCOMBINED CORRECTION FACTORSUTILITY AC DISCO PRODUCTION METER CU-PVWIRE CU-THWN2 CU-THWN2 CU-THWN2 CU-THWN2 400 400 240 240 10 AWG 12 AWG 6 AWG MAX. CIRCUIT CURRENTTAGCIRCUIT QUANT.CIRCUIT OR SEGMENT NAME CONDUCTOR TYPESIZE SPECIFIEDVOLTAGE1 1 1 DC CONDUCTOR (FREE AIR) DC CONDUCTOR INVERTER 1 51 70 CONDUCTOR ENVIRONMENTAL TEMPERATURE13 14 15 16 17 4 5 6 40 41 42 50 68 71 72 11 12 6 AWG 15 8 9 10 2 2 240 73 1 PRODUCTION METER DISCONNECT TruNorth Solar EDIT: BF 12/20/2021 NOT FOR CONSTRUCTION UNLESS APPROVED BY MASTER ELECTRICIAN CONDUCTOR SIZING CALCULATIONS 1 2 3 4 5 6 8 9 10 11 12 13 14 15 16 17 E5: REV 01CORRECTION FACTOR - ENV. TEMPERTATURE# OF POWER CONDUCTORS IN CONDUITNOM. SOURCE CURRENTCONTINUOUS CURRENT CALC. 1 (690.8(B)(1))CONTINUOUS CURRENT CALC. 2 (690.8(B)(2))LARGEST SIZE AS PER CALCS 1 & 2 (MINIMUM REQUIREMENT)5 6 20 20 VOLTAGE DROP (%) FOR SIZE SPECIFIED IN COL 50.59% 0.67% 0.10% 0.10% 0.10% 0.10% 19 SEGMENT LENGTH (FEET)70 50 6 6 6 18 19 18 NEC TABLE REFERENCED OR OTHER NOTESTABLE 310.17 (FREE AIR) TABLE 310.16 TABLE 310.16 TABLE 310.16 TABLE 310.16