HomeMy WebLinkAboutLA199670 - Electrical application
ELECTRICAL PERMIT APPLICATION
CITY OF LAKEVILLE
BUILDING INSPECTIONS DEPARTMENT
20195 HOLYOKE AVENUE
LAKEVILLE, MN 55044
952-985-4440
Office Use Only
___________________
Permit Number
___________________
Received By
___________________
Date Received
___________________
Fee Total
DATE YOUR E-MAIL ADDRESS
SITE ADDRESS
TENANT SUITE NO.
THE APPLIANT IS: RESIDENT OWNER CONTRACTOR
RESIDENT OWNER
NAME_________________________________________________________________________
ADDRESS______________________________________________________________________
CITY _____________________________ STATE_____________ ZIP _____________________
DAYTIME PHONE # WHERE YOU CAN BE REACHED ______________________________
CONTRACTOR
Company name must be as
appears on State License
COMPANY NAME_______________________________________LICENSE #EA___________
ADDRESS_____________________________________________________________________
CITY _____________________________ STATE_____________ ZIP _____________________
OFFICE PHONE # ________________________ FAX #_______________________________
CONTACT NAME______________________________________ PHONE__________________
PERMIT TYPE
SINGLE FAMILY
TWO FAMILY
TOWNHOUSE
Meter Bank
Single Meter
MULTI-FAMILY
COMMERCIAL / INDUSTRIAL
MANUFACTURED HOME
(Contractor Only)
INSTITUTIONAL
SWIMMING POOL
UNDEFINED
FIRE ALARM POWER
SIGN
OTHER (see description)
Residential Addition/ Remodel Permits Available on-line
TYPE OF WORK NEW
MAINTENANCE/REPAIR
ADDITION
TENANT FINISH
ALTER / REMODEL
DEMOLITION
Only Licensed Electrical Contractors can do work in a Townhouse that has meter bank instead of single meters attached to the units.
Only Licensed Electrical Contractors can do work in Manufactured Home Parks.
RESIDENTIAL FEES:
New Construction: $135.00 + $1.00 State Surcharge (up to three trips)
Repairs: + $1.00 State Surcharge (one trip)
Additions, Remodel, Lower Level: $70.00 + $1.00 State Surcharge (two trips)
COMMERCIAL FEES: Minimum of + $1.00 State Surcharge (one trip)---Remodel Minimum $70.00+$1.00 State Surcharge (two trips)
JOB COST: $ Example: $12,000 Job Cost
1-1/2% of contract cost up to $10,000 $10,000.00 x 1.5% = $150.00
1% of cost above $10,000 plus surcharge + $ 2,000.00 x 1% = + 20.00
(Surcharge = Contract Cost x .0005) + $12,000 x.0005 = + 6.00
TOTAL = = $176.00
I hereby apply for an electrical permit and I acknowledge that the information above is complete and accurate; that the work will be in
conformance with the ordinances and codes of the City of Lakeville and with the Minnesota Electrical Act; that I understand this is not a permit
but only an application for a permit and work is not to start without a permit; that the work will be in accordance with the approved plan in the
case of all work which requires review and approval of plans.
NAME OF APPLICANT (Please Print)
SIGNATURE OF APPLICANT:
PLEASE NOTE: SEPARATE PERMITS ARE REQUIRED FOR ANY BUILDING, MECHANICAL & PLUMBING WORK
www.lakevillemn.gov
$40.00
$40.00
Submit to: permits@lakevillemn.gov
FOR OFFICE USE ONLY:
TYPE OF WORK INSPECTIONS
NEW FINAL
ADDITION FIRE ACCEPTANCE TEST
ALTER/REMODEL IN FOOR HEAT
ROUGH-IN
SERVICE
TRENCH
PERMIT FEE
PERMIT FEE: $
SURCHARGE: $
OTHER: $
TOTAL: $
PERMIT ISSUED BY: DATE:
MISC. NOTES AND SPECS:
PV MODULE 1:(QUANTITY 31) STC: 340; MPV: 33.94; MPI: 10.02; VOC: 40.66; ISC: 10.52
PV MODULE 2:N/A
INVERTER 1 (QUANTITY 1) 240V; 10,000W; 42.0A; 1Ø; UL 1741 CERTIFIED
INVERTER:N/A
--INVERTER(S) ARE 240VAC 1Ø OUTPUT
--SYSTEM OUTPUT IS BALANCED 240VAC 1Ø
CUST:GABRIEL J GRESETH (952) 201-0485 ELECT. UTILITY:Xcel
3735 Dunlap Street N SITE:20806 Greenwood Avenue, Lakeville, MN 55044 PREMISE#:
Arden Hills, MN 55112 SERVICE:120/240V, 1Ø, 3-WIRE, 200A ACCOUNT#:
612-888-9599 PROJ:Greseth, Gabe METER#:
SIZE:10.54KW DC 10KW AC APP ID#:
TruNorth Solar
ELECTRICAL ONE-LINE DIAGRAM
12/20/2021
E1: REV 01
EDIT: BF
51-0012177052-0
304711729
TAG
21314115
0
40
41
NOT FOR CONSTRUCTION UNLESS
APPROVED BY MASTER ELECTRICIAN
1
04793499 SOLAR REWARDS
Network Communication to Customer Owned Router
INTERNET ACCESS
GENERAL NOTES:--DESIGN MEETS ALL NEC REQUIREMENTS
--GROUNDING CONDUCTORS MAY NOT BE SHOWN
--REFER TO ELECTRICAL LABEL SCHEDULE (DWG E2 BELOW) FOR DETAILED LABEL INFO
--EQUIPMENT AND WIRE/CONDUIT SCHEDULES FOLLOW (DWG E3 & E4 BELOW)
--RAPID SHUTDOWN IS INITIATED BY AC DISCONNECT OR INTEGRATED INVERTER SWITCH
DISCONNECT TOMAIN METER: 4'
UTILITY AC DISCONNECT
VISIBLE-OPEN TYPE
LOCKABLE, NEMA 3R
READILY ACCESSIBLE
W/PROTECTIVE BARRIERSSERVICE RATED60A, 240VAC, 2-POLEFUSED: 60A
PRODUCTION METER
UTILITY OWNED
ONE-WAY
240V, 200A, 1Ø, 3-WIRE
DIRECT MEASURESOCKET W/BYPASSSOLAR TO LINE SIDE
MAIN METER
UTLITY OWNED
BIDIRECTIONAL
240V, 200A, 1Ø, 3-WIRE
DIRECT MEASUREUPGRADE SOCKETMILBANK COMBOBYPASS METER MAIN
INVERTERS (SOLAREDGE)
(1) SE10000H-US, 10000W240V, 42A, 1ØTOTAL: 10KW AC, 42AUL 1741 CERTIFIED
PV MODULESQ-Cells(31) Q.PEAK DUO-G6 340 BLKSTC: 340, MPV: 33.94, MPI: 10.02VOC: 40.66, ISC: 10.52TOTAL: 10.54KW DC
DC-DC OPTIMIZERS: (SOLAREDGE)(31) SE P401, 400W1 MOD. PER OPTIMIZERREQUIREMENTS EACH STR:
PV MAX 6000W
8-17 PV MODULES
8-25 OPTIMZERS
2 STR PER INV 1: (PV 16, 15)
SYSTEM TIE-IN (TAG 90)
MFG PROVIDED
UL LISTED, 75°C.
MIN. RATING: 60A
METER TAP KIT
SERVICE PANELEATON
240VAC, 200A, 1Ø
OCP: 200A
INTERIOR
RPA (Reference Point of Applicability):--PoC (Point of DER Connection)
--LOCATED AT INVERTER CONNECTION
--ANTI-ISLANDING TEST POINT
INVERTER 1
ROOFTOP
SPD
EXT.WEST SIDE OF HOUSE
CONDUCTORS ANDJBOX TYPIICAL
EXT.WEST SIDE OF HOUSE
PRODUCTION METER DISCONNECT
60A, 240VAC, 2-POLE
FUSED: 60A
LABEL SCHEDULE
ORANGE FILL COLOR INDICATES THE LABEL IS REQUIRED
LT YELLOW: INDICATES THE LABEL NORMALLY APPLIED TO EQUIPT BY MFG
COLOR SHOWN HERE INDICATES WHETHER LABEL APPLIES, NOT PHYSICAL LABEL COLOR.WHITE/NO COLOR: INDICATES THE LABEL DOES NOT APPLY (IGNORE)
APPLY:MAIN METER APPLY:AC DISCO, PROD METER, COMBINER, AUX TRANSFORMER APPLY:PV SOURCE RACEWAYS, J-BOX COVERS, ETC.
1 3
APPLY:MAIN METER, MAIN PANEL
2
APPLY:METER COMBO, AC COMBINER, TAP CAN APPLY:INVERTER (DC DISCONNECT)
1
APPLY:PRODUCTION METER 1
1
APPLY:AC DISCO (SOLAR SIDE OF TRANSFORMER)
APPLY:UTILITY AC DISCONNECT 1 APPLY:INVERTER (DC DISCONNECT)
1
1
1
APPLY:SOLAR AC COMBINER PANEL APPLY:(MISC. DC DISCONNECT)
1 1
APPLY:EXT. MAIN METER SERVICE PANEL APPLY:SOLAR AC COMBINER PANEL 1
APPLY:SOLAR & UTILITY SERVICE EQUPMENT
2
INPUT CIRCUIT NAME OP. VOLTAGE.OP. CUR.
APPLY:EXT. SERVICE DISCONNECT VAC A
1 VAC A
VAC A
VAC A
APPLY:ESS BATTERIES VAC A
VAC A
APPLY:SOLAR AC COMBINER PANEL
APPLY:MISC.
APPLY:BACKFED BREAKER IN SERVICE PANEL
APPLY:MISC.
INPUT CIRCUIT NAME OP. VOLTAGE.OP. CUR.
VAC A
APPLY:MISC.VAC A
APPLY:MAIN METER OR UTILITY SERVICE AREA VAC A
1 VAC A
APPLY:MISC.VAC A
VAC A
CUST:GABRIEL J GRESETH (952) 201-0485 ELECTRIC UTILITY:Xcel
3735 Dunlap Street N SITE:20806 Greenwood Avenue, Lakeville, MN 55044 PREMISE#:Arden Hills, MN 55112 SERVICE:120/240V, 1Ø, 3-WIRE, 200A ACCOUNT#:612-888-9599 PROJ:Greseth, Gabe METER#:
SIZE:10.54KW DC 10KW AC APP ID#:
UTILITY METER #2 (CUST. SELL)
TOTAL RATING OF ALL OVERCURRENT DEVICES
EXCLUDING MAIN SUPPLY OVERCURRENT DEVICE
ENERGY STORAGE SYSTEM DISCONNECT
HT ROLL
999
239 PHOTOVOLTAIC AC DISCONNECT
HT ROLL
CUST.
WARNING: INVERTER OUTPUT CONNECTION
DO NOT RELOCATE THIS OVERCURRENT DEVICE
HT ROLL
240
MAX AC OPERATING CURRENT:
OPERATING AC VOLTAGE:
TRUNORTH SOLAR
EMERGENCY DISCONNECT,
SERVICE DISCONNECT
WARNING: THIS EQUIPMENT FED BY MULTIPLE SOURCES
612-888-9599
RAPID SHUTDOWN SWITCH FOR SOLAR PV SYSTEM
UTILITY PHOTOVOLTAIC MAIN AC DISCONNECT
42.0
WARNING: TURN OFF PHOTOVOLTAIC AC DISCONNECT
PRIOR TO WORKING INSIDE PANEL
499
999
239
WARNING: SOLAR CIRCUITS ONLY
DO NOT ADD OTHER LOADS!
WARNING: ELECTRIC SHOCK HAZARD - DO NOT
MAY BE ENERGIZED IN THE OPEN POSITION
TOUCH TERMINALS - LINE AND LOAD TERMINALS
A
VAC 1Ø
42.0
PRODUCTION METER DISCONNECT
PHOTOVOLTAIC AC DISCONNECT
A
VAC 1Ø
PHOTOVOLTAIC AC DISCONNECT
MAX AC OPERATING CURRENT:
OPERATING AC VOLTAGE:
4
5
240
MAX AC OPERATING CURRENT:
OPERATING AC VOLTAGE:
MAIN (BIDIRECTIONAL) METER906
WARNING: DUAL POWER SOURCES,
SECOND SOURCE IS PV SYSTEM
HT ROLL
SOLAR PRODUCTION METER909
705
497
A
1
2
(FIELD)
3
42.0
6
999 SOLAR DC DISCONNECT
239
SOLAR COMBINER PANEL
V
(SM)
(MED)
(LG)
WARNING: PHOTOVOLTAIC POWER SOURCE
WARNING: PHOTOVOLTAIC POWER SOURCE
WARNING: PHOTOVOLTAIC POWER SOURCE
47.5240INV 3
INVERTER 1, INVERTER 2… ETC.
INVERTER 1
240
904
905
910
999
999
TruNorth Solar 51-0012177052-02131411504793499
4
5
SOLAR DC DISCONNECT
480.0MAXIMUM DC VOLTAGE V
MAXIMUM DC VOLTAGE
SOLAR DC DISCONNECT
V
999
MAXIMUM DC VOLTAGE
SOLAR DC DISCONNECT
A
VAC 1Ø
ALL LABELS ARE DURABLE , PERMANENT AND NEC 690 COMPLIANT. EXTERIOR LABELS ARE WEATHERPROOF.
EXACT LABEL TEXT AND FORMAT MAY VARY IF MEANING IS CLEAR AND MEETS CODE REQUI9REMENTS.
12/20/2021
NOT FOR CONSTRUCTION UNLESS
APPROVED BY MASTER ELECTRICIAN
WWW.TRUNORTHSOLAR.COM
304711729
ELECTRICAL LABEL SCHEDULE
SHALL NOT EXCEED AMPACITY OF BUSBAR
E2: REV 01EDIT: BF
240
999 SOLAR COMBINER PANEL nn
OPERATING AC VOLTAGE:VAC 1Ø
(FIELD)
1
2
47.5
INV 1
INV 2
MAXIMUM DC VOLTAGE: 400V
239 PHOTOVOLTAIC AC DISCONNECT
MAX AC OPERATING CURRENT:
6
3
CAUTION: MULTIPLE SOURCES OF POWER
TO BE CREATED: SITE SPECIFIC DIAGRAM SHOWING
LOCATIONS OF ASSOCIATED EQUIPMENT SUCH AS:
--MAIN METER
--UTILITY SERVICE DISCO
--SOLAR AC DISCO
--PRODUCTION METER
--INVERTERS, COMBINERS, LOCAL DISCOS AS NEEDED
--SOLAR PV ARRAYS
--BATTERIES, STANDBY GENERATOR (AS NEEDED)
--INCLUDES ORIENTATION OF NORTH
DC EQUIPMENT
INVERTERS
AC EQUIPMENT
3735 Dunlap Street N ELECTRICAL EQUIPMENT SCHEDULEArden Hills, MN 55112 Greseth, Gabe CUST:GABRIEL J GRESETH (952) 201-0485
612-888-9599 10.54KW DC 10KW AC SITE:20806 Greenwood Avenue, Lakeville, MN 55044
84
90
UTILITY OWNED1
UTLITY OWNED
1 MILBANK OR SIMILAR
86
1
99
240V, 200A, 1Ø, 3-WIRE
93
1
240V, 200A, 1Ø, 3-WIRE
DELTA OR SIMILAR
PRODUCTION METER
MILBANK
1
INV. COMMUNICATIONS KIT
1
SOLAREDGE
14
Q-Cells STC: 340; MPV: 33.94; MPI: 10.02; VOC: 40.66; ISC: 10.52
JBOX (SOLAR)1
SPECS
P401
EQUIPMENT SCHEDULE
TAG MFG NOTESDESCRIPTION OR ID
SOLAREDGE
QUANT
31
AS NEEDED FOR WIRE TRANSITIONS, MAY NOT BE SHOWNNEMA3R
Q.PEAK DUO-G6 340 BLK
PART#
DC-DC OPTIMIZER
15
81
1
74
UTILITY OWNED851
80
600V, 200A, 1Ø, 3-WIRE, BYPASS, NEMA3R COMBOUPGRADE TO MILBANK METER MAIN
MFG PROVIDED
95
96
91
94
U6281-XL-200-5T9
BIDIRECTIONAL
MAIN METER SOCKET
1
UL, 300V, 100A TAP CONNECTOR KIT
10
0
11
EXT. METER AREA240V; 10,000W; 42.0A; 1Ø; UL 1741
1
2
D222NRB
ONE-WAY
40
13
2
16
EATON
LA302
71
UTLITY TRANSFORMER
240VAC, 60A, 2-POLE, FUSED, NEMA3R, SVC RATED
240VAC, 60A, 2-POLE, FUSED, NEMA3R, SVC RATED
E3: REV 01
EDIT: BF12/20/2021
60A
EXT. METER AREA
SQUARE-D OR SIM.
250VAC
EXT. METER AREA
TruNorth Solar
UTILITY AC DISCO FUSE
UTILITY AC DISCO
17
41
87
31
PRODUCTION METER SOCKET
MODULE 1
SOLADECK/OTHER
U4801-XL-5T9
400W; 1 PV MODULE PER OPTIMIZER
SE10000H-US
600V, 200A, 1Ø, 3-WIRE, BYPASS, NEMA3R
PRODUCTION METER DISCONNECT
INTERNET ROUTER
SERVICE PANEL
SPD - SURGE PROTECTIVE DEVICE
68
92
SIEMENS OR SIM.
50
73
72
82
53
54
67
MILBANK OR SIMILAR
47
51
66
65
2
63
1
240VAC, 200A, 1Ø
70
1
MAIN UTILITY METER
K4977-EXTSYSTEM TIE-IN HARDWARE
43
1
60
MONITORING DATA ACCESS TO INTERNET
1 FOR WIRELESS OR HARDWIRE, 1 EACH INVERTER IF CELLULAR
CUSTOMER OWNED
62
52
46
61
42
SOLAR SERVICE, UTILITY SERVICETYPES 1 & 2
INVERTER 1 SOLAREDGE
DC CIRCUITS
AC CIRCUITS
WIRE & CONDUIT SCHEDULE
3735 Dunlap Street NArden Hills, MN 55112 Greseth, Gabe CUST:GABRIEL J GRESETH (952) 201-0485
612-888-9599 10.54KW DC 10KW AC SITE:20806 Greenwood Avenue, Lakeville, MN 55044
OUTPUT TO AC DISCO
42
50
40 1
13
6
AC CIRCUIT OR SEGMENT NAME
12
CIRCUIT
QUANT.
4
#WIRES
EACH
CIRCUIT
PV
22
1-WAY
LEN.
(FT)
50
2
0
1
2
103 1
101
AUX. GROUNDING ELECTRODE & CONDUCTOR
TAG MIN.WIRE
SIZE
8
11
10
70
51
41
PRODUCTION METER
7
DC CONDUCTOR (FREE AIR)10 AWG
104
1
15
14
CU-THWN2
EGC
68
52
53
1
1
6 AWG
CU-THWN2
CU-THWN2
DC CIRCUIT OR SEGMENT NAME
INVERTER 1
CU
CONDUIT
TYPE
6
CU-THWN2 EMT
NOTES
2
PRODUCTION METER DISCONNECT CU-THWN2
UTILITY AC DISCO
NOTES
70 2
4
WIRE TYPE
WIRE AND CONDUIT SCHEDULE
5
TAG
12 AWG
WIRE TYPE
EMT2 + N, G
0.75''DC CONDUCTOR
MIN.
CONDUIT
SIZE
#WIRES
EACH
CIRCUIT
2 + N, G
EMT
0.75''
MIN.
CONDUIT
SIZE
6
1-WAY
LEN.
(FT)
6 AWG
1006 AWG
2 + N, G
6
6 AWG
6 AWG
6
2 + N, G
CU-PVWIRE
PV MODULE 1 OUTPUT
JBOX OUTPUT TO INVERTER
CONDUIT
TYPE
12 AWG
0.75''TO SYSTEM TIE-IN POINT (TAG 90)
TO PRODUCTION METER
0.75''
NOT FOR CONSTRUCTION UNLESS
APPROVED BY MASTER ELECTRICIAN
E4: REV 01EDIT: BF
12/20/2021
0.75''EMT
AS NEEDED PER NEC 690.47, FOR DC: 250.166; FOR AC: TABLE 250.66
10 AWG ALLOWED WHERE PROTECTED
TO PRODUCTION METER DISCONNECT
102 1
EMT
31
MIN.WIRE
SIZE
91
TruNorth Solar
71
CU
72
73
1
CIRCUIT
QUANT.
(NOT SHOWN) PV MODULE LEADS
OPTIMIZER DC CIRCUITS TO JBOX
7
PHASES1
1
1
1
1
1
NOTES FOR INDICATED COLUMN:
WIRE SIZE SPECIFIED IN ONE-LINE TYPICALLY INCLUDES CONSIDERATION FOR VOLTAGE DROP AND CONNECTION TERMINAL/LUG REQUIREMENTS
FOR DC OPTIMIZER STRING: (SUM OF PV WATTAGE)/(DC VOLTAGE REQUIRED BY INVERTER). FOR AC CIRCUITS, TYPICALLY INVERTER OUTPUT RATING
PV CIRCUITS = COLUMN 8 * 1.25. OPTIMIZER CIRCUITS = MAXIMUM CONTINUOUS OPTIMIZER OUTPUT RATING. INVERTER OUTPUT CIRCUIT = INVERTER CONTINUOUS RATING.
TEMPERATURE OF CONDUCTOR ENVIROMENT (FAHRENHEIT)
TEMPERATURE CORRECTION FACTOR FROM TABLE 310.15(B)(1)
QUANTITY OF CURRENT CARRYING CONDUCTORS IN THE CONDUIT
FROM TABLE 310.15(C)(1)
COMBINE ADJUSTMENTS AND CORRECTION FACTORS, COLUMN 11 * COLUMN 13
TEST #1 = COLUMN 9 * 1.25 -- NEC 690.8(B)(1), MAXIMUM CIRCUIT CURRENT * 1.25. THIS IS ALSO THE VALUE USED FOR OCP SIZING.
TEST #2 = COLUMN 9 / COLUMN 14 -- NEC 690.8(B)(2), MAX. CIRCUIT CURRENT WITH ADJUSTMENTS AND CORRECTION FACTORS
FROM TABLE 310.16 OR 310.17. LARGEST SIZE RESULTING FROM CALCULATIONS IN COLUMNS 15 & 16
NEC TABLE REFERENCED
ONE WAY LENGTH. NOTE THIS IS ONLY FOR THE SEGMENT SPECIFIED. ADDITIONAL SEGMENTS WILL ADD TO THE TOTAL VOLTAGE DROP OF A CIRCUIT.
VOLTAGE DROP PERCENTAGE USING THE OPERATING VOLTAGE AND NOMINAL CURRENT FOR THE SEGMENT
CONDUCTOR SIZING CALCULATIONS
3735 Dunlap Street NArden Hills, MN 55112 Greseth, Gabe CUST:GABRIEL J GRESETH
612-888-9599 10.54KW DC 10KW AC SITE:20806 Greenwood Avenue, Lakeville, MN 55044
CU-THWN2 6 AWG 240 42 42 50 1.15 3 1 1.15 52.5 36.5 8 AWG
52.51286426 AWG 42
16 AWG
14 AWG
6 AWG
6 AWG
6 AWG
21.1
15
42
42
18.8
18.8
52.5
52.5
0.71
1
1
1
1
1
1
1
1
0
2
2
2
0.71
1
1
1
1
140
86
86
86
15
42
42
42
13.6
13.6
42
42 ADJUSTMENT FACTOR - # WIRES IN CONDUITCOMBINED CORRECTION FACTORSUTILITY AC DISCO
PRODUCTION METER
CU-PVWIRE
CU-THWN2
CU-THWN2
CU-THWN2
CU-THWN2
400
400
240
240
10 AWG
12 AWG
6 AWG MAX. CIRCUIT CURRENTTAGCIRCUIT QUANT.CIRCUIT OR SEGMENT NAME
CONDUCTOR TYPESIZE SPECIFIEDVOLTAGE1
1
1
DC CONDUCTOR (FREE AIR)
DC CONDUCTOR
INVERTER 1
51
70 CONDUCTOR ENVIRONMENTAL TEMPERATURE13
14
15
16
17
4
5
6
40
41
42
50
68
71
72
11
12
6 AWG
15
8
9
10
2
2
240
73 1 PRODUCTION METER DISCONNECT
TruNorth Solar
EDIT: BF
12/20/2021
NOT FOR CONSTRUCTION UNLESS
APPROVED BY MASTER ELECTRICIAN
CONDUCTOR SIZING CALCULATIONS
1 2 3 4 5 6 8 9 10 11 12 13 14 15 16 17
E5: REV 01CORRECTION FACTOR - ENV. TEMPERTATURE# OF POWER CONDUCTORS IN CONDUITNOM. SOURCE CURRENTCONTINUOUS CURRENT CALC. 1 (690.8(B)(1))CONTINUOUS CURRENT CALC. 2 (690.8(B)(2))LARGEST SIZE AS PER CALCS 1 & 2 (MINIMUM REQUIREMENT)5
6
20
20
VOLTAGE DROP (%) FOR SIZE SPECIFIED IN COL 50.59%
0.67%
0.10%
0.10%
0.10%
0.10%
19
SEGMENT LENGTH (FEET)70
50
6
6
6
18
19
18
NEC TABLE REFERENCED OR OTHER NOTESTABLE 310.17 (FREE AIR)
TABLE 310.16
TABLE 310.16
TABLE 310.16
TABLE 310.16