HomeMy WebLinkAboutCordelia Building 1 Survey 17986-88-90-92-94-9673S32°24'17"E 127.6717475767778S60°27'04"W 76.50S29°32'56"E 151.66N60°27
'04
"E
76
.50S29°32'56"E 151.66LEGEND:1. SURVEY PREPARED FROM ALLIANTENGINEERING, INC. GRADING PLAN DATED8/5/21.2. BEARINGS ARE ASSUMED PER PLAT3.BUILDING DIMENSIONS SHOWN ARE TOOUTSIDE FRAMING OF FIRST FLOOR PLAN.ALL DIMENSIONS AND LOCATIONS ARE TOBE VERIFIED IN THE FIELD WITH THEARCHITECTURAL PLANS.Checked By:Field Crew:Date Staked:Drawn By:Alliant Job #Pulte Job #:JDTBuilding 1219-0197-Building 1733 Marquette Ave, Ste 700Minneapolis, MN 55402612.758.3080 612.758.3099www.alliant-inc.comMAINAlliant Engineering, Inc.FAXDA12-20-2021DECEMBER 21 , 2021LANDSCAPE LEGEND:PETER GOERS44110PGI hereby certify that this survey, plan, or report was prepared by me orunder my direct supervision and that I am a duly Licensed LandSurveyor under the laws of the state of Minnesota.____________________________________________________________Print Name____________________________________________________________Signature____________________________________________________________Date License NumberNOTES:BENCH MARK: THE SOUTHWEST BUILDINGSETBACK IRON HAS AN ELEVATION OF 947.44.BENCH MARK:*Maintain 6" between bottom of siding and sod.*No structures in easements.EROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATIONENGINEERING REVIEWEDDate:__________________12/29/2021corlowskyThe curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.Planning DepartmentApprovedDate:__________________03/02/2022kjenson