HomeMy WebLinkAbout17842 Graphite Lane-SURVEYThe curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected and
accepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.
*Draintile connection required.
ENGINEERING REVIEWED
Date:__________________01/21/2022 corlowsky EROSION CONTROL
MUST BE INSTALLEDBEFORE EXCAVATION
*Maintain 6" between bottom of siding and sod.
*No structures in easements.
Planning DepartmentApprovedDate:__________________03/16/2022 kjenson