HomeMy WebLinkAbout18689 Harcourt Path SurveyThe curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.
EROSION CONTROL
MUST BE INSTALLEDBEFORE EXCAVATION
*Maintain 6" between bottom of siding and sod.
*No structures in easements.
ENGINEERING REVIEWED
Date:__________________03/09/2022 lritchie
Planning DepartmentApprovedDate:__________________01/24/2022 dmorey
Include GPS coordinates (location
and elevation) and label all public
utilities (i.e. storm sewer culverts
and catch basins, water service
curb box casting and draintile
clean-out)