Loading...
HomeMy WebLinkAbout18689 Harcourt Path SurveyThe curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection. EROSION CONTROL MUST BE INSTALLEDBEFORE EXCAVATION *Maintain 6" between bottom of siding and sod. *No structures in easements. ENGINEERING REVIEWED Date:__________________03/09/2022 lritchie Planning DepartmentApprovedDate:__________________01/24/2022 dmorey Include GPS coordinates (location and elevation) and label all public utilities (i.e. storm sewer culverts and catch basins, water service curb box casting and draintile clean-out)