HomeMy WebLinkAbout18629 Harcourt Path SurveyThe curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.
*Draintile connection required.
EROSION CONTROL
MUST BE INSTALLEDBEFORE EXCAVATION
*Maintain 6" between bottom of siding and sod.
*No structures in easements.
ENGINEERING REVIEWED
Date:__________________03/09/2022 lritchie
Planning DepartmentApprovedDate:__________________01/24/2022 dmorey