Loading...
HomeMy WebLinkAbout8175 187th St SurveyThe curb box, drain tile cleanout, and catch basin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection. *Maintain 6" between bottom of siding and sod. *No structures in easements. EROSION CONTROLMUST BE INSTALLED BEFORE EXCAVATION ENGINEERING REVIEWED Date:__________________03/09/2022 lritchie Include GPS coordinates (location and elevation) and label all public utilities (i.e. storm sewer culverts and catch basins, water service curb box casting and draintile clean-out) Planning DepartmentApprovedDate:__________________01/21/2022 dmorey