Loading...
HomeMy WebLinkAbout18605 Harcourt Path SurveyThe curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection. *Maintain 6" between bottom of siding and sod.*No structures in easements. *Draintile connection required.EROSION CONTROLMUST BE INSTALLED BEFORE EXCAVATION ENGINEERING REVIEWED Date:__________________03/09/2022 lritchie Planning DepartmentApprovedDate:__________________01/25/2022 dmorey