HomeMy WebLinkAbout17935 Gresford Lane-SURVEYThe curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected and
accepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.
*Draintile connection required.
*Maintain 6" between bottom of siding and sod.
*No structures in easements.
EROSION CONTROL
MUST BE INSTALLEDBEFORE EXCAVATION
ENGINEERING REVIEWED
Date:__________________03/01/2022 lritchie
Planning DepartmentApprovedDate:__________________03/18/2022 kjenson