Loading...
HomeMy WebLinkAbout17935 Gresford Lane-SURVEYThe curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected and accepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection. *Draintile connection required. *Maintain 6" between bottom of siding and sod. *No structures in easements. EROSION CONTROL MUST BE INSTALLEDBEFORE EXCAVATION ENGINEERING REVIEWED Date:__________________03/01/2022 lritchie Planning DepartmentApprovedDate:__________________03/18/2022 kjenson