HomeMy WebLinkAbout17936 Evershed Way SurveyZoning = RS-4
The curb box, drain tile cleanout and catch basin(if applicable) must be inspected and accepted
before As-built escrow monies will be released. All structures must be flush with the sod. This
will be scheduled with the landscape inspection.
*Maintain 6" between bottom of siding and sod.
*No structures in easements.
*Draintile connection required.
EROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION
ENGINEERING REVIEWED
Date:__________________03/04/2022 lritchie