HomeMy WebLinkAbout18737 Javelin Court-SURVEYZoning = RS-3The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.*Draintile connection required.EROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION*Maintain 6" between bottom of siding and sod.*No structures in easements.ENGINEERING REVIEWEDDate:__________________03/16/2022lritchiemissing (x4 trees)deaddeadmissing (x2 trees)missing (x3 trees)tree pres.3/21/22 EA