HomeMy WebLinkAboutItem 06 Pheasant Run of Lakeville Eighth Addition1 | Page
City of Lakeville
Planning Department
Memorandum
To: Planning Commission
From: Kris Jenson, Associate Planner
Date: March 25, 2022
Subject: Packet Material for the April 7, 2022 Planning Commission Meeting
Agenda
Item: Pheasant Run of Lakeville Eighth Addition preliminary plat
Action Deadline: June 4, 2022
BACKGROUND
KJ Walk, Inc. has applied for a preliminary plat to allow the development of 33 detached
townhome lots on just over nine acres to be known as Pheasant Run of Lakeville Eighth
Addition. The Pheasant Run of Lakeville Eighth Addition preliminary plat is located east
of Pilot Knob Road (CSAH 31) and north of 179th Street (future CSAH 9).
The Pheasant Run of Lakeville Eighth Addition preliminary plat plans have been
distributed to Engineering Division and Parks and Recreation Department staff, and the
Parks, Recreation and Natural Resources Committee.
EXHIBITS
A – Aerial Photo Map
B – Zoning Map
C - Cover Sheet
D – Preliminary Plat
E – Grading and Landscaping Plan
F – Erosion Control Plan
G – Sanitary Sewer and Water Main Construction
H - Plat Commission Letter
2 | Page
PLANNING A NALYSIS
PRELIMINARY PLAT
Existing Conditions. The development site consists of one parcel, Outlot D, Pheasant
Run of Lakeville Seventh Addition. Some preliminary grading has occurred on site
(Exhibit A).
Consistency with the Comprehensive Plan. The Pheasant Run of Lakeville Eighth
Addition property is located in Planning District 3 of the 2040 Comprehensive Plan.
Planning District 3 guides the subject property for low/medium density residential where
city sewer is available.
MUSA. The Pheasant Run of Lakeville Eighth Addition preliminary plat area is located
within the current MUSA.
Zoning. The parcel is currently zoned RST-2, Single and Two Family Residential District.
Detached townhomes are a permitted use in the RST-2 District (Exhibit B).
Adjacent Land Uses. Adjacent land uses and zoning are as follows:
North – North Creek, future North Creek Greenway (RST-2 and P/OS)
East – 179th Street (future CSAH 9), North Creek (RST-2)
South – Future stormwater pond (RST-2), 179th Street (Future CSAH 9)
West – Single family home lots (RST-2)
Consistency with the Capital Improvement Plan (CIP). City streets, sanitary sewer and
water improvements for the area of Pheasant Run of Lakeville Eighth Addition will be
financed and constructed by the developer. The development costs associated with the
Pheasant Run of Lakeville Eighth Addition development are not programmed in the
2022–2026 CIP.
Premature Subdivision Criteria. A preliminary plat may be deemed premature if any of
the criteria listed in Chapter 10-2-4-1 of the Subdivision Ordinance exist. Eligible criteria
pertain to a lack of adequate: drainage, water, streets, sanitary sewer, and public service
capacity (police and fire protection). The other pertinent criteria pertain to
inconsistencies with the City Comprehensive Land Use and Capital Improvement Plans
(discussed above). Staff review of the Pheasant Run of Lakeville Eighth Addition
preliminary plat against these criteria finds that it is not a premature subdivision.
Density/Average Lot Size. The Pheasant Run of Lakeville Eighth Addition preliminary
plat consists of 33 detached townhome lots on 9.14 acres. This results in a gross overall
density of 3.61 units per acre. Excluding the future stormwater ponding outlot, the net
density is 3.91 units per acre.
Lot Requirements. The proposed unit lots shown on the Pheasant Run of Lakeville
Eighth Addition preliminary plat have sufficient area to accommodate detached units. A
3 | Page
homeowner’s association will be required to be established for ownership and
maintenance of Lot 16, Block 1, Lot 9, Block 2, and Lot 11, Block 3.
The RST-2 District requires at least 5,000 square feet per unit. The Pheasant Run of
Lakeville Eighth Addition preliminary plat has an average of just over 11,000 square feet
per unit for the detached townhomes area, which exceeds the minimum lot area per unit
requirements of the RST-2 District.
Setbacks. The following minimum requirements for detached townhome building
setbacks in the RST-2 District pertain to the Pheasant Run of Lakeville Eighth Addition
preliminary plat:
Base Lot Between Buildings
(Detached Units)
Front Yard (to ROW)
RST-2 30 feet 14 feet 20 feet (front), 25 feet (garage)
The proposed building pads shown on the Pheasant Run of Lakeville Eighth Addition
grading, drainage and erosion control plan indicate that all 33 detached townhomes have
adequate building pad areas that meet setback requirements.
Exterior Materials. Each townhouse unit must meet the requirements of Section 11-57-
19.B.3, which requires that a minimum of 25% of the area of each elevation of the unit
must have an exterior finish of brick, stucco, and/or natural or artificial stone. Except for
brick, stucco, and/or natural or artificial stone, no single elevation may have more than
75% of one type of finish or have more than 60% of all elevations of one type of finish.
The City has deemed the use of cement fiberboard material as satisfying the minimum
masonry material requirement and is therefore also allowed to exceed the maximum area
limit for non-masonry materials.
Floor Area. The proposed detached townhome units must comply with the minimum
requirements for above grade floor area established by Section 11-17-13.D of the Zoning
Ordinance.
Garage Area. The detached townhome units are all proposed to include a basement so
the minimum area of each garage must be at least 440 square feet. Each garage must have
a minimum interior width of 20 feet.
Unit Landscaping. Landscaping plans for required foundation plantings around the
detached townhome units will be required with the final plat. The Developer must also
provide information to demonstrate conformance with the requirements of Section 11-
57-19.G.
Outlots. There is one outlot totaling 0.70 acres in the Pheasant Run of Lakeville Eighth
Addition preliminary plat. Outlot A will consist of a stormwater management basin that
will be deeded to the City with the final plat.
4 | Page
Phasing. Pheasant Run of Lakeville Eighth Addition is proposed to be developed in one
phase.
Streets. The following is a summary of streets proposed with the Pheasant Run of
Lakeville Eighth Addition preliminary plat. Additional detailed information is outlined in
the Engineering Division memorandum dated March 25, 2022.
179th Street (future CSAH 9) – 179th Street is a future minor arterial highway as identified
in the City’s Transportation Plan. The 120 feet of required right of way was dedicated
with previous Pheasant Run of Lakeville plats, so no additional right of way is required to
be dedicated. Given the proximity of this plat to the crossing of North Creek, the
construction of 179th Street adjacent to the Pheasant Run of Lakeville Eighth Addition
plat will be completed with the future bridge construction over North Creek, in
conjunction with the proposed Brookshire development. The Developer shall provide an
escrow with the final plat for the portion of future 179th Street to be constructed adjacent
to the plat. See the March 25, 2022 Engineering memo for more information.
Ellsworth Drive – Ellsworth Drive will be a 32-foot-wide residential street constructed
within a 60-foot right-of-way. The street will extend from its current terminus east of
Embers Avenue and will connect to 179th Street, which will be a future right-in/right-out
access to 179th Street based on Dakota County access spacing guidelines. A five-foot-wide
concrete sidewalk will be constructed along the south side of the street. If Ellsworth Drive
is constructed prior to 179th Street, the Developer will be required to construct a
temporary cul-de-sac, provide a temporary easement over the temporary cul-de-sac, and
place a “Future Street Extension” sign and barricades at the southeast terminus.
Elkwood Court – Elkwood Court will be a 32-foot-wide residential street constructed
within a 60-foot-wide right-of-way that ends in a permanent cul-de-sac.
All streets meet the minimum width and design requirements of the Subdivision
Ordinance.
Sidewalks/Trails. The developer will construct a five-foot-wide concrete sidewalk along
one side of Ellsworth Drive. The City is partnering with Dakota County to construct a
greenway trail along North Creek later this year. That trail will provide a connection to
the North Creek neighborhood park to the north, which will also be constructed later this
year.
Grading, Drainage, Erosion Control, and Utilities. Proposed grading, drainage, erosion
control, and utilities for the Pheasant Run of Lakeville Eighth Addition preliminary plat is
shown on the grading, drainage and erosion control and utility plans. All existing and
new local utilities shall be placed underground.
Grading, drainage, erosion control, and utilities details are outlined in the March 25, 2022
engineering report prepared by Alex Jordan, Assistant City Engineer and Mac Cafferty,
5 | Page
Environmental Resources Manager. The Engineering Division recommends approval of
the preliminary plat.
Tree Preservation. The site was mass graded with a previous phase of development. No
additional significant trees are proposed to be removed.
Wetlands. There are no wetland impacts with this plat.
Residential Buffer Yard Requirements. Lot 11, Block 3, adjacent to 179th Street, includes
the planting of seven coniferous and overstory trees to provide a landscape buffer to the
detached townhome units. The buffer yard screening must provide an effective minimal
visual screen to a height of 10 feet. The landscape plan must be modified to shift the
evergreen trees such that they are planted a minimum of 25 feet from property lines
adjacent to public right-of-way, to ensure that the mature growth of the evergreen trees
does not extend into the public right of way (Exhibit E). The common area lot must be
sodded to the trail abutting 179th Street.
Park Dedication. Park dedication will be satisfied through a cash contribution with the
final plat. The Parks, Recreation and Natural Resources Committee will review the
preliminary plat at their April 6, 2022 meeting.
Signs. No subdivision identification monument signs are proposed with the Pheasant
Run of Lakeville Eighth Addition preliminary plat.
Plat Commission. The Dakota County Plat Commission reviewed and approved the
preliminary plat at their March 2, 2022 meeting. The Plat Commission letter is included
as Exhibit H.
RECOMMENDATION
Planning Department staff recommends approval of the Pheasant Run of Lakeville Eighth
Addition preliminary plat, subject to the following stipulations:
1. Implementation of the recommendations listed in the March 25, 2022 engineering
report.
2. Park dedication shall be satisfied with a cash contribution paid with the final plat.
3. The developer shall construct a five-foot-wide concrete sidewalk along the south
side of Ellsworth Drive.
4. Outlot A shall be deeded to the City with the final plat.
5. If a subdivision monument sign is proposed for the development, it must be
maintenance free and located on private property. A sign permit is required prior
to installation of the sign.
6. With the final plat, the Developer shall provide an escrow for the portion of future
179th Street to be constructed adjacent to the plat.
6 | Page
7. Prior to City Council consideration, the landscape plan must be modified to
address the City Forester’s comments. Buffer yard landscaping shall be installed
according to the approved landscape plan and a security for the buffer yard
landscaping shall be submitted with the final plat.
Source: Esri, Maxar, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community
City of Lakeville
Pheasant Run of Lakeville
Eighth Add. preliminary plat
Location Map
EXHIBIT A
Pheasant Run of Lakeville
Eighth Addition
plat location
ELEMENT AVE
ECLIPSE AVEEAGLEVIEW DR&EL
L
SWORTH DREMBERS AVE179TH ST (FUTURE CSAH 9)North Creek
City of Lakeville
Pheasant Run of Lakeville
Eighth Add. preliminary plat
Zoning Map
EXHIBIT B
Pheasant Run of Lakeville
Eighth Addition
plat location
ELEMENT AVE
ECLIPSE AVEEAGLEVIEW DR&EL
LS
WORTH DREMBERS AVE179TH
ST (F
U
TURE
C
SAH 9
)
RST-2
RST-2
RST-2
RS-4
RS-4
RS-4
P/OS
P/OS
P/OS
RS-3
RS-3RST-2
For ReviewMarch 22, 2022I hereby certify that this plan was prepared by me,or under my direct supervision, and that I am aduly registered engineer under the laws of theState of Minnesota.Luke Warren Israelson6001 Egan Drive, Ste 100, Savage, MN 55378Phone: 952.222.4419 Web: www.kjwalk.comDate: Revision:Preliminary Plat SetCoverRegistration #: 51362SHEET 1 of 6Date: 3/22/2022FILE PATH: G:\My Drive\Work Files\Lakeville Projects\Pheasant Run North\Drawings\DWGs\PR8-PrePlat.dwgOriginalOWNER / DEVELOPER / DESIGNER:KJ Walk, Inc.Luke Israelson, PEReg #: 513626001 Egan Drive, Suite 100Savage, MN 55378(952) 222-4419luke@kjwalk.comwarren@kjwalk.comPHEASANT RUN EIGHTHSHEET INDEX1 - Cover2 - Preliminary Plat3 - Preliminary Grading and Landscape Plan4 - Preliminary Erosion Control5 - Preliminary SWPPP6 - Preliminary UtilitiesLegendExisting watermainProposed watermainExisting sanitaryProposed sanitaryExisting stormProposed stormExisting hydrantProposed hydrantExisting gate valveProposed gate valveExisting manholeProposed manholeProposed catchbasinSilt fence5' SidewalkBituminous pathExisting treeContactsDeveloper/ KJ Walk, Inc.Luke IsraelsonEngineer/ 6001 Egan Drive, Ste 100 952.826.9068Contractor Savage, MN 55378CityCity of LakevilleZachary Johnson20195 Holyoke Avenue 952.985.4400Lakeville, MN 55044Charter 16900 Cedar Ave. South Tyler NelsonCommunications Rosemount, MN 55068 651.318.8975Dakota Electric 4300 220th Street West Rick SiebenalerFarmington, MN 55024 651.463.6373Frontier 14450 Burnhaven Drive James LancasterCommunications Burnsville, MN 55306 952.435.4661MN Energy 2665 145th Street West Alan BraithResources Corp. PO Box 455651.322.8932Rosemount, MN 55068Gigabit 656 Mendelssohn Ave NMinnesota Golden Valley, MN 55427 651.888.4444GOPHER STATE ONE CALL: 651.454.0002CALL 48 HRS BEFORE EXCAVATION01/13/2022OF LAKEVILLELAKEVILLE, MNEIGHTH ADDITION060120 180Revised Per City Comments02/04/2022Revised Per City Comments02/15/2022Revised Per City Comments03/08/2022Removed Outlot B and updated Lot 16 Blk 103/22/2022EXHIBIT C
I hereby certify that this plan was prepared by me,or under my direct supervision, and that I am aduly registered engineer under the laws of theState of Minnesota.Luke Warren Israelson6001 Egan Drive, Ste 100, Savage, MN 55378Phone: 952.222.4419 Web: www.kjwalk.comDate: Revision:Preliminary Plat SetPreliminary PlatRegistration #: 51362SHEET 2 of 6Date: 3/22/2022FILE PATH: G:\My Drive\Work Files\Lakeville Projects\Pheasant Run North\Drawings\DWGs\PR8-PrePlat.dwg050100 150OF LAKEVILLELAKEVILLE, MNEIGHTH ADDITIONOriginal30'25'10'ROWTYPICAL DETACHED TOWNHOME LOTSETBACKS AND EASEMENTSROW20'10'10'30'25'ROW14'40'70'TOWNHOMES MINIMUM SETBACKS (RM-1)ROW TO FRONT 25 FEETBETWEEN BLDGS14 FEETSIDE (STREET)20 FEETREAR30 FEETSITE DATATOTAL SITE/GROSS DEVELOPMENT AREA9.139 AC.RIGHT OF WAY 1.694 AC.OUTLOTS0.864 AC.NET DEVELOPABLE AREA(GROSS DEV. AREA - OUTLOTS)8.249 AC.DETACHED TOWNHOUSE LOTS33 LOTSUNIT DENSITYGROSS3.62 UNITS PER AC.NET4.00 UNITS PER AC.10'01/13/2022Revised Per City Comments02/04/2022Revised Per City Comments02/15/2022Revised Per City Comments03/08/2022For ReviewMarch 22, 2022Removed Outlot B and updated Lot 16 Blk 103/22/2022EXHIBIT D
I hereby certify that this plan was prepared by me,or under my direct supervision, and that I am aduly registered engineer under the laws of theState of Minnesota.Luke Warren IsraelsonDate: Revision:Preliminary Plat Set Grading andLandscaping PlanRegistration #: 51362SHEET 3 of 6Date: 3/22/2022FILE PATH: G:\My Drive\Work Files\Lakeville Projects\Pheasant Run North\Drawings\DWGs\PR8-PrePlat.dwg050100 150OF LAKEVILLELAKEVILLE, MNEIGHTH ADDITIONOriginalPotential Buried Debris Clean Out LocationLEGENDNOTES:* TREES MINIMUM 5' FROM PROPERTY LINE* TREES STAGGERED WITH 15' SPACING*TREES ON A 2' MINIMUM BERM1/3 TREE
HEIGHT ROOT CROWN ATFINISH GRADE,OR 1-2" ABOVE GRADEFINISH GRADETILLED OR BROKEN UPSOIL MIN 12" DEEP2" SETTLED LAYER OF MULCH2X WIDTH OF ROOTBALLTREE HEIGHT IS MEASUREDFROM THE TOP OF THE ROOTBALL TO THE BOTTOM OFTHE LEADERID#COMMON NAMESIZE#HL HONEY LOCUST2 1/2"1BHS BLACK HILLS SPUCE 8'-0" 3ATARBORVITAE"TECHNY"8'-0" 3TOTAL6Spruce Trees1-HL3-AT3-BHS1/3 TREE
HEIGHT ROOT CROWN ATFINISH GRADE,OR 1-2" ABOVE GRADEFINISH GRADETILLED OR BROKEN UPSOIL MIN 12" DEEP2" SETTLED LAYER OF MULCH2X WIDTH OF ROOTBALL6001 Egan Drive, Ste 100, Savage, MN 55378Phone: 952.222.4419 Web: www.kjwalk.com01/13/2022Revised Per City Comments02/04/2022Revised Per City Comments02/15/2022NOTES:MUST REMOVE ALL TWINE, BURLAP AND WIRE BASKET FROM TOP 1/2 OF ROOT BALL BEFOREBACKFILLING SOILWHEN PLANTING ON A BERM THE BASE OF THE ROOT BALL MUST BE PLACED ON EXISTING SOILOR RECOMPACTED SOILRevised Per City Comments03/08/2022For ReviewMarch 22, 2022Removed Outlot B and updated Lot 16 Blk 103/22/2022EXHIBIT E
I hereby certify that this plan was prepared by me,or under my direct supervision, and that I am aduly registered engineer under the laws of theState of Minnesota.Luke Warren IsraelsonDate: Revision:Preliminary Plat SetErosion Control PlanRegistration #: 51362SHEET 4 of 6Date: 3/22/2022FILE PATH: G:\My Drive\Work Files\Lakeville Projects\Pheasant Run North\Drawings\DWGs\PR8-PrePlat.dwgCB & DROP IN INLET PROTECTORSSEED & BLANKETLEGENDRIP RAPSILT FENCENOTES:MAXIMUM ALLOWABLE SLOPE 3:1PONDS MAY BE USED AS TEMPORARY SEDIMENTATION BASINSDURING CONSTRUCTION, IF A POND IS USED AS A TEMP. SED.BASIN IT MUST BE CLEANED OUT PRIOR TO BEING PUT INTOSERVICE.DRAINAGE TO THE TEMPORARY SEDIMENTATION BASINS MUSTBE MAINTAINED THROUGHOUT THE CONSTRUCTION PROCESS.- MN DOT MIX 35141(59LBS/AC) USED IN RIGHT OF WAY- MN DOT MIX 34262(14.5LBS/AC) USED ON PONDS BELOW HWL-MN DOT MIX 33261(31.5LBS/AC) USED ON PONDS ABOVE HWLSTOCKPILES TO BE STABILIZED IF NOT UTILIZED FOR MORE THAN7 DAYS.Silt Fence to be installed along perimeter ofconstruction area prior to the start of work.DOUBLE SILT FENCE050100 150OF LAKEVILLELAKEVILLE, MNEIGHTH ADDITIONOriginal6001 Egan Drive, Ste 100, Savage, MN 55378Phone: 952.222.4419 Web: www.kjwalk.com01/13/2022Revised Per City Comments02/04/2022Revised Per City Comments02/15/2022Revised Per City Comments03/08/2022For ReviewMarch 22, 2022Removed Outlot B and updated Lot 16 Blk 103/22/2022EXHIBIT F
EX-MH25 to MH28 (ELLSWORTH DRIVE)9109159209259309359409109159209259309359400+001+002+003+004+005+006+007+008+009+0010+00 10+50396' - 8" SDR 35 PVC @ 0.40%102' - 8" SDR 35 PVC @ 0.40%224' - 8" SDR 35 PVC @ 0.40% 28' - 8" SDR 35 PVC @ 0.40%MH28
9.93 BUILD
MH27
10.57 BUILD
MH2614.02 BUILDMH2513.83 BUILDInv = 911.07Inv = 912.08Inv = 913.66Inv = 914.07Rim = 924.00Rim = 924.23Rim = 926.10Rim = 924.90PROPOSED GRADEEXISTING GRADE7.5' MIN. COVER7.5' MIN. COVER992'-8" C900 PVCREMOVE12"x6" REDUCER6" GV&BOXTEMP. FIRE HYDRANT(REUSE)INSTALL 12"X12" TEE WITH 12" TO 8" REDUCER AND PLUGCONNECT TO EXISTING 8" WATER MAIN992'-8" C900 PVC8"x6" TEE(HYD)MH26 TO MH299159209259309359159209259309350+001+002+003+004+00MH26
14.02 BUILD
MH29
10.75 BUILD
341' - 8" SDR 35 PVC @ 0.40%Rim = 926.10Rim = 924.20Inv = 912.08Inv = 913.45EXISTING GRADEPROPOSED GRADE7.5' MIN. COVER367'-8" C900 PVC8" TEE8"x6" REDUCER(HYDRANT)8"x6" TEE(HYD)C.S. 925.833+29, 30.0' RTWYE(1+20)INV 915.5LLE 919.5I hereby certify that this plan was prepared by me,or under my direct supervision, and that I am aduly registered engineer under the laws of theState of Minnesota.Luke Warren IsraelsonDate: Revision:Registration #: 51362SHEET 6 of 6Date: 3/22/2022FILE PATH: G:\My Drive\Work Files\Lakeville Projects\Pheasant Run North\Drawings\DWGs\PR8-PrePlat.dwg050100 150Preliminary Plat SetSanitary Sewer & WaterMain Construction8" 22.5° BENDSTA=38+85, 8'LTWater main to be installed in strictaccordance with the most currentedition of the CEAM specifications.NOTE:INSULATE WATER SERVICES BELOWSANITARY SEWER MAINS8"x6" TEE6" GV&BOXFIRE HYDRANTSTA=3+52, 27'RTTNH=927.22OF LAKEVILLELAKEVILLE, MNEIGHTH ADDITIONC.S. 925.532+55, 30.0' LTWYE(0+46)INV 915.8LLE 919.8C.S. 925.833+10, 30.0' LTWYE(1+00)INV 915.8LLE 919.8C.S. 926.133+64, 30.0' LTWYE(1+54)INV 915.7LLE 919.7C.S. 926.434+18, 30.0' LTWYE(2+08)INV 915.7LLE 919.7C.S. 926.434+90, 30.0' LTWYE(0+27)INV 915.6LLE 919.6C.S. 926.235+44, 30.0' LTWYE(0+81)INV 915.6LLE 919.6C.S. 925.935+98, 30.0' LTWYE(1+35)INV 915.5LLE 919.5C.S. 925.636+52, 30.0' LTWYE(1+89)INV 915.4LLE 919.4C.S. 925.437+06, 30.0' LTWYE(2+43)INV 915.4LLE 919.4C.S. 925.137+60, 30.0' LTWYE(2+97)INV 915.3LLE 919.3C.S. 924.838+14, 30.0' LTWYE(3+51)INV 915.3LLE 919.3C.S. 924.638+51, 30.0' LTWYE(3+88)INV 915.2LLE 919.2C.S. 924.639+09, 30.0' LTWYE(0+55)INV 915.1LLE 919.1C.S. 924.839+48, 30.0' LTWYE(0+92)INV 915.1LLE 919.1C.S. 925.532+75, 30.0' RTWYE(0+66)INV 915.5LLE 919.5C.S. 926.133+83, 30.0' RTWYE(1+74)INV 915.5LLE 919.5C.S. 926.235+22, 30.0' RTWYE(0+60)INV 915.5LLE 919.5C.S. 925.835+93, 30.0' RTWYE(1+31)INV 915.5LLE 919.5C.S. 925.636+47, 30.0' RTWYE(1+85)INV 915.5LLE 919.5C.S. 925.637+11, 30.0' RTWYE(2+49)INV 915.5LLE 919.5C.S. 925.337+75, 30.0' RTWYE(3+13)INV 915.5LLE 919.5C.S. 925.038+39, 30.0' RTWYE(3+77)INV 915.5LLE 919.5C.S. 926.41+66, 30.0' RTWYE(1+59)INV 915.5LLE 919.5C.S. 926.12+29, 30.0' RTWYE(2+30)INV 915.5LLE 919.5C.S. 925.72+78, 51.0' RTWYE(2+85)INV 915.5LLE 919.5C.S. 924.23+23, 59.0' RTWYE(3+14)INV 915.5LLE 919.5C.S. 923.93+54, 41.0' RTWYE(3+29)INV 915.5LLE 919.5C.S. 926.31+87, 30.0' LTWYE(1+84)INV 915.5LLE 919.5C.S. 925.62+95, 47.0' LTWYE(2+56)INV 915.5LLE 919.5C.S. 925.33+32, 56.0' LTWYE(3+11)INV 915.5LLE 919.5C.S. 925.03+62, 30.0' LTWYE(3+23)INV 915.5LLE 919.5Original8" GATE VALVESSTA=34+49, 5'LT8" TEESTA=34+48, 10'LT8" GATE VALVESSTA=34+53, 10'LT8"x6" TEE6" GV&BOXFIRE HYDRANTSTA=0+36, 21'RTTNH=929.058"x6" TEE6" GV&BOXFIRE HYDRANTSTA=37+77, 21'LTTNH=927.438" 45° BEND6001 Egan Drive, Ste 100, Savage, MN 55378Phone: 952.222.4419 Web: www.kjwalk.com01/13/20228" 11.25° BENDSTA=38+55, 10'LTRevised Per City Comments02/04/2022Revised Per City Comments02/15/2022Revised Per City Comments03/08/2022REMOVE 12"X6" REDUCER, 6" GV&BOX AND TEMP. FIRE HYDRANT(REUSE) CONNECT 12"X12" TEE TO EXISTING 12" WATERMAININSTALL 12" PLUG ON EAST SIDE OF TEE AND 12"X8" REDUCER ON THE WEST SIDE OF TEEFor ReviewMarch 22, 2022Removed Outlot B and updated Lot 16 Blk 103/22/2022EXHIBIT G
Dakota County Surveyor’s Office
Western Service Center 14955 Galaxie Avenue Apple Valley, MN 55124
952.891 -7087 Fax 952.891 -7127 www.co.dakota.mn.us
March 4, 2022
City of Lakeville
20195 Holyoke Ave.
Lakeville, MN 55044
Re: PHEASANT RUN OF LAKEVILLE EIGHTH ADDITION
The Dakota County Plat Commission met on March 2, 2022, to consider the preliminary plat of the
above referenced plat. The plat is adjacent to Future County Road 179th St. W. and is therefore subject
to the Dakota County Contiguous Plat Ordinance.
The proposed plat is a replat of Outlot D, PHEASANT RUN OF LAKEVILLE SEVENTH ADDITION. No
additional right of way required along future CR (179th Street). Restricted access should be shown along
all of 179th Street except for Ellsworth Drive. A quit claim deed to Dakota County for restricted access is
required with the recording of the plat mylars.
The Plat Commission has approved the preliminary and final plat, provided that the described conditions
are met, and will recommend approval to the County Board of Commissioners on March 22, 2022.
Traffic volumes on Future County Road 179th St. W. are yet to be determined. Traffic volumes may
indicate that current Minnesota noise standards for residential units could be exceeded for the
proposed plat. Residential developments along County highways commonly result in noise complaints.
In order for noise levels from the highway to meet acceptable levels for adjacent residential units,
substantial building setbacks, buffer areas, and other noise mitigation elements should be incorporated
into this development.
No work shall commence in the County right of way until a permit is obtained from the County
Transportation Department and no permit will be issued until the plat has been filed with the County
Recorder’s Office. The Plat Commission does not review or approve the actual engineering design of
proposed accesses or other improvements to be made in the right of way. Nothing herein is intended to
restrict or limit Dakota County’s rights with regards to Dakota County rights of way or property. The Plat
Commission highly recommends early contact with the Transportation Department to discuss the
permitting process which reviews the design and may require construction of highway improvements,
including, but not limited to, turn lanes, drainage features, limitations on intersecting street widths,
medians, etc. Please contact Gordon McConnell regarding permitting questions at (952) 891-7115 or
Todd Tollefson regarding Plat Commission or Plat Ordinance questions at (952) 891-7070.
Sincerely,
Todd B. Tollefson
Secretary, Plat Commission
c: Luke Israelson, KJ Walk
EXHIBIT H
City of Lakeville
Public Works – Engineering Division
Memorandum
To: Kris Jenson, Associate Planner
From: Alex Jordan, Assistant City Engineer
McKenzie L. Cafferty, Environmental Resources Manager
John Hennen, Parks and Recreation Director
Copy: Zach Johnson, City Engineer
Daryl Morey, Planning Director
Jerilyn Erickson, Finance Director
Gene Abbott, Building Official
Date: March 25, 2022
Subject: Pheasant Run of Lakeville Eighth Addition
• Preliminary Plat Review
• Preliminary Grading and Erosion Control Plan Review
• Preliminary Utility Plan Review
BBAACCKKGGRROOUUNNDD
KJ Walk, Inc. has submitted a preliminary plat named Pheasant Run of Lakeville Eighth
Addition. This is the second phase of the Pheasant Run North preliminary plat approved by
the City Council at their September 8, 2020 meeting. The proposed subdivision is located east
of Pilot Knob Road (CSAH 31), north of and adjacent to 179th Street (Future CSAH 9) and south
of and adjacent to North Creek. The parent parcel is Outlot D, Pheasant Run of Lakeville
Seventh Addition, zoned RST-2, Single and Two Family Residential District.
The plat consists of thirty-three (33) detached townhome lots, 3 HOA common lots, and one
(1) outlot within three (3) blocks on 9.14 acres.
The proposed development will be completed by:
Developer: KJ Walk, Inc.
Engineer/Surveyor: KJ Walk, Inc.
The outlot created with the plat shall have the following use:
PPHHEEAASSAANNTT RRUUNN OOFF LLAAKKEEVVIILLLLEE EEIIGGHHTTHH AADDDDIITTIIOONN–– PPRREELLIIMMIINNAARRYY PPLLAATT
MMAARRCCHH 2255,, 22002222
PPAAGGEE 22 OOFF 66
Outlot A: Stormwater management basin; to be deeded to the City (0.70 acres)
SSIITTEE CCOONNDDIITTIIOONNSS
The Pheasant Run of Lakeville Eighth Addition site is undeveloped agricultural land. The
Developer previously stockpiled construction fill on the south side of the parent parcel per
the stockpile permit approved May 2, 2019. A wastewater treatment plant was previously
located on the parent parcel, which has been removed. The Developer has prepared a Phase 1
ESA, Phase 2 ESA and Response Action Plan for approval by the MPCA for remediation of the
possible waste disposal or abandonment of structures, wastewater sludge and demotion
debris. The RAP recommends:
• Excavation and removal off site of soils and wastes in two locations
• An environmental professional must be present to conduct vial inspections during
excavation with periodic screening using PID to confirm absences of VOC or
petroleum contaminates
• Any excavated soils found to have organic vapors above screening criteria must be
segregated and stockpiled for testing to determine any special disposal requirements.
The RAP must be approved by the MPCA prior to site grading.
EEAASSEEMMEENNTTSS
The parent parcel contains the following easements that will remain with the plat:
• Drainage and Utility Easement per the Pheasant Run of Lakeville Seventh Addition
final plat.
SSTTRREEEETT AANNDD SSUUBBDDIIVVIISSIIOONN LLAAYYOOUUTT
179th Street (Future CSAH 9)
Pheasant Run of Lakeville Eighth Addition is located northwest of and adjacent to 179th Street
(Future CSAH 9), a future minor arterial highway, as identified in the City’s Transportation
Plan. The right-of-way for 179th Street was dedicated with previous phases of Pheasant Run of
Lakeville. 179th Street is designated as a future County Roadway, as identified in the Dakota
County East-West Corridor Preservation Study completed in 2006. The current Dakota County
Plat Review Needs Map indicates a 120-foot-wide right-of-way requirement and designates
this roadway as a three-lane roadway over its entire length adjacent to the plat. Given its
proximity to the North Creek crossing, construction of 179th Street adjacent to the plat will be
completed with the future bridge construction over North Creek, in conjunction with the
proposed Brookshire development. The Developer shall provide an escrow with the final plat
for the portion of future 179th Street to be constructed within the plat.
The Developer must grade the right-of-way area of future 179th Street to its ultimate profile to
avoid future grading impacts on the adjacent lots. The Developer shall also design the plat’s
storm sewer and stormwater management basins with sufficient capacity to convey and treat
the runoff generated from future 179th Street adjacent to the plat. Additionally, the Developer
PPHHEEAASSAANNTT RRUUNN OOFF LLAAKKEEVVIILLLLEE EEIIGGHHTTHH AADDDDIITTIIOONN–– PPRREELLIIMMIINNAARRYY PPLLAATT
MMAARRCCHH 2255,, 22002222
PPAAGGEE 33 OOFF 66
shall grant to the City temporary grading easements with the final plat the future
construction of 179th Street.
Ellsworth Drive
Development of Pheasant Run of Lakeville Eighth Addition includes the construction and
extension of Ellsworth Avenue, a local roadway. Ellsworth Avenue is designed as a 32-foot
wide, two-lane urban roadway with a five-foot wide concrete sidewalk along one side of the
street. The Developer is dedicating 60-feet of right-of-way for the local roadway. Ellsworth
Drive will provide a future right-in/right-out access to 179th Street based on the County’s
Access Spacing Guidelines.
If Ellsworth Drive is constructed prior to the construction of 179th Street, the Developer shall
construct a temporary cul-de-sac, grant an easement over the cul-de-sac, and install a “Future
Street Extension” sign and barricades at the southeastern terminus of Ellsworth Drive until it is
extended in the future.
Elkwood Court
Development of Pheasant Run of Lakeville Eighth Addition includes the construction of
Elkwood Court, a local roadway terminating in a cul-de-sac. The local roadway is designed as
32-foot wide, two-lane urban roadway. The Developer is dedicating 60-feet of right-of-way for
Elkwood Court.
CCOONNSSTTRRUUCCTTIIOONN AACCCCEESSSS
A single construction traffic access and egress for grading, utility and street construction shall
be from 179th Street. No access to the adjacent local residential roadways will be permitted.
PPAARRKKSS,, TTRRAAIILLSS AANNDD SSIIDD EEWWAALLKKSS
Development of Pheasant Run of Lakeville Eighth Addition includes the construction of
public sidewalks. A five-foot wide concrete sidewalk, with pedestrian curb ramps, will be
installed along one side of the Ellsworth Drive.
The North Creek Regional Greenway is located on the northeast side of the parent parcel. The
City and County are partnering on the final engineering design for the greenway trail and
construction is programmed for 2022. The necessary park area for the greenway trail was
dedicated with the Pheasant Run of Lakeville Seventh Addition final plat. No additional park
land is necessary from the parent parcel. The North Creek Regional Greenway will connect
Pheasant Run of Lakeville Eighth Addition to the North Creek Neighborhood Park that will be
constructed this year.
The Park Dedication requirement has not been satisfied for the parent parcel and will be
required to be satisfied through a cash dedication with the final plat.
PPHHEEAASSAANNTT RRUUNN OOFF LLAAKKEEVVIILLLLEE EEIIGGHHTTHH AADDDDIITTIIOONN–– PPRREELLIIMMIINNAARRYY PPLLAATT
MMAARRCCHH 2255,, 22002222
PPAAGGEE 44 OOFF 66
UUTTIILLIITTIIEESS
SSAANNIITTAARRYY SSEEWWEERR
Pheasant Run of Lakeville Eighth Addition is located within subdistrict NC-20020 of the North
Creek sanitary sewer district, as identified in the City’s Comprehensive Sewer Plan. Public
sanitary sewer will be extended within the subdivision to provide sewer service to the
development. Wastewater will be conveyed to the MCES Farmington Interceptor and
continue to the Empire Wastewater Treatment Facility.
The Sanitary Sewer Availability Charge has not been collected on the parent parcel and shall
be paid with the final plat. The fee will be based on the rate in effect at the time of final plat
approval.
WWAATTEERRMMAAIINN
Development of Pheasant Run of Lakeville Eighth Addition includes the extension of public
watermain. Watermain will be extended within the development from watermain
constructed in Ellsworth Drive and the north side of Eclipse Avenue within Outlot C, Pheasant
Run of Lakeville 6th Addition to provide water service to the subdivision.
Final locations and sizes of all storm sewer facilities will be reviewed by City staff with the final
construction plans.
DDRRAAIINNAAGGEE AANNDD GGRR AADDIINNGG
Pheasant Run of Lakeville Eighth Addition is located within subdistrict NCL-71 and NCL-72 of
the North Creek stormwater district as identified in the City’s Water Resources Management
Plan.
Development of Pheasant Run of Lakeville Eighth Addition includes expansion of public
stormwater management basin to collect and treat the stormwater runoff generated from the
site. The basin will provide water quality treatment and rate control of the stormwater runoff
generated from the subdivision and from future 179th Street adjacent to the plat. The
stormwater management basin will be located within Outlot A which will be deeded to the
City with the final plat.
The final grading plan shall identify all fill lots in which the building footings will be placed on
fill material. The grading specifications shall also indicate that all embankments meet
FHA/HUD 79G specifications. The Developer shall certify to the City that all lots with footings
placed on fill material are appropriately constructed. Building permits will not be issued until
a soils report and an as-built certified grading plan have been submitted and approved by
City staff.
Pheasant Run of Lakeville Eighth Addition contains more than one acre of site disturbance. A
National Pollution Discharge Elimination System General Stormwater Permit for construction
activity is required from the Minnesota Pollution Control Agency for areas exceeding one acre
PPHHEEAASSAANNTT RRUUNN OOFF LLAAKKEEVVIILLLLEE EEIIGGHHTTHH AADDDDIITTIIOONN–– PPRREELLIIMMIINNAARRYY PPLLAATT
MMAARRCCHH 2255,, 22002222
PPAAGGEE 55 OOFF 66
being disturbed by grading. A copy of the Notice of Stormwater Permit Coverage must be
submitted to the City.
SSTTOORRMM SSEEWWEERR
Development of Pheasant Run of Lakeville Eighth Addition includes the construction of a
public storm sewer system. Storm sewer will be installed within the subdivision to collect and
convey stormwater runoff generated from within the public right-of-way and lots to the
public stormwater management basin located within Outlot A. The storm sewer design will
be reviewed with the final construction plans to ensure it is in accordance with the future
storm sewer design along 179th Street.
Draintile construction is required in areas of non-granular soils within Pheasant Run of
Lakeville Eighth Addition for the street sub-cuts and lots. Any draintile construction, including
perimeter draintile required for building footings, which is deemed necessary during
construction shall be the Developer’s responsibility to install and finance.
The Trunk Storm Sewer Area Charge has not been collected on the parent parcel, and must be
paid with the final plat. The fee will be based on the rate in effect at the time of final plat
approval.
Final locations and sizes of all storm sewer facilities will be reviewed by City staff with the final
construction plans.
FEMA FLOODPLAIN ANALYSIS
Pheasant Run of Lakeville Eighth Addition is shown on the Flood Insurance Rate Map (FIRM)
as Zone X with some northern portions as Zone AE by the Federal Emergency Management
Agency (FEMA). Based on this designation, there are no areas in the plat located within a
Special Flood Hazard Area (SFHA), as determined by FEMA.
WWEETTLLAANNDDSS
There are no wetland impacts associated with the plat. All wetland and creek buffers will be
placed in outlots dedicated to the City with the final plat. Natural area signs are required to be
installed along all wetland/creek buffer areas. Final sign locations will be identified in the
field.
TTRREEEE PPRREESSEERRVVAATT IIOONN
The site was mass graded with the previous phase of the development. No additional trees
will be removed with this phase.
PPHHEEAASSAANNTT RRUUNN OOFF LLAAKKEEVVIILLLLEE EEIIGGHHTTHH AADDDDIITTIIOONN–– PPRREELLIIMMIINNAARRYY PPLLAATT
MMAARRCCHH 2255,, 22002222
PPAAGGEE 66 OOFF 66
EERROOSSIIOONN CCOO NNTTRROOLL
A management plan including a schedule for the establishment of the Outlots for a minimum
of 3 years of maintenance must be submitted to the City for review prior to issuance of any
building permits. The Developer shall provide a security to ensure proper seeding and
maintenance.
The Developer is responsible for meeting all the requirements of the MPCA Construction
Permit. The permit requires that all erosion and sediment BMPS be clearly outlined in a site’s
SWPPP. Changes made throughout construction must be documented in the SWPPP.
Erosion control blanket and seeding is required in all rear yard lot swales and ditches that are
within 200 feet of a storm sewer inlet. It is the developer’s responsibility to establish all
stormwater basin and City owned Outlots with the appropriate native seed mix. The
developer must install silt fence around the basins once the basins are graded. The silt fence
north of block 1 must be move to the property line and outside the City outlot.
Additional erosion control measures may be required during construction as deemed
necessary by City staff. Any additional measures required shall be installed and maintained by
the Developer.
RREECCOOMMMMEENNDDAATTIIOONN
Engineering recommends approval of the Pheasant Run of Lakeville Eighth Addition
preliminary plat, grading and erosion control plan, and utility plan subject to the
requirements and stipulations within this report.