HomeMy WebLinkAboutItem 09 Superior Sand and Gravel
City of Lakeville
Planning Department
Memorandum
To: Planning Commission
From: Frank Dempsey, AICP, Associate Planner
Date: March 30, 2022
Subject: Packet Material for the April 7, 2022 Planning Commission Meeting
Agenda Item: New Look Contracting/Superior Sand & Gravel Interim Use Permit
Action Deadline: June 7, 2022
BACKGROUND
New Look Contracting, d/b/a Superior Sand & Gravel has submitted an application for an
Interim Use Permit (IUP) to allow grading, filling, and processing operations on property located
in the northeast quadrant of Kenrick Avenue and 195th Street at 19250 Kenrick Avenue. The
property is owned by Ashbury, LP and is approximately 63 acres in area. Asbury, LP has leased
the property to New Look Contracting to complete the final stages of filling and rehabilitation of
the property as outlined in the approved 2011 Interim Use Permit, which expired December 31,
2021 without the site rehabilitation being completed. Gravel mining and processing, as well as
rehabilitation of the property, had been conducted under the terms of Interim Use Permit No.
11-01 approved by the City Council on March 7, 2011. A new Interim Use Permit is required to
allow grading, filling and processing on the property. The applicant requests five additional
years to complete these operations and the site rehabilitation.
EXHIBITS
A. Location Map
B. Zoning Map
2
C. Applicant Plan Narrative
D. 2022 Proposed Site Rehabilitation Plan
E. Public Narrative on New Look Contracting Weblink
F. 2011 Interim Use Permit
New Look Contracting contacted City staff regarding the pending expiration of the 2011 Interim
Use Permit in fall of 2021 suggesting that additional time would be necessary to complete
operations and final rehabilitation of the property. Aggregate mining is complete, however, there
are some small areas of available aggregate in the vicinity of the overburden and topsoil
stockpiles along the perimeter of the south and west boundaries. The larger excavated area east
of the high-pressure gas main has been either completely restored or nearing completion with the
import of additional fill material prior to achieving final grades and establishment of vegetation.
SURROUNDING LAND USES
North – Lake Marion
South – 195th Street/Casperson Park/Gopher Outside Storage
East – Lake Marion
West – Kenrick Avenue and Interstate 35
P LANNING ANALYSIS
The property has operated as a sand and gravel mine at various times since 1965, has been owned
by the Bury family since 1968, was previously operated by Midwest Asphalt Company and now
New Look Contracting since 2020. Midwest Asphalt received approval of an Interim Use Permit
in 2011 to allow expansion of the gravel mining operations to the west side of the CenterPoint
Energy high pressure gas main and adjacent to Kenrick Avenue. The Interim Use Permit expired
December 31, 2021.
New Look Contracting estimates that approximately 160,000 cubic yards of additional fill
material remains to be imported to complete site rehabilitation to the grades required by the
2011 Interim Use Permit. The property west of the gas main is guided Medium to High Density
Residential. Between 2011 and the end of 2021, 709,358 cubic yards of fill material have been
imported for finished grades and site rehabilitation.
MINING AND EXCAVATION
The Zoning Ordinance allows mining and excavation as an interim use in all zoning districts
located outside the current MUSA and MUSA Expansion Area A. Interim use permit
applications must conform to the standards listed in Title 7, Chapter 4 of the City Code.
3
The plans submitted with the interim use permit application outline the proposed materials
processing and rehabilitation in detail. The plans have addressed the information required by
Title 7, Chapter 4 of the City Code.
The gravel pit property is located in Planning District No. 4 of the 2040 Comprehensive Land
Use Plan within MUSA Expansion Area B (2029 - 2038). The sanitary sewer main that would
serve the subject property is presently located approximately three-quarters of a mile to the south
at the end of Kensfield Trail, just north of 205th Street. The sewer main will be extended to the
north as the properties north of Kensfield Trail develop north in a sequential manner. The
Comprehensive Plan guides the property for future medium/high density residential
development west of the high-pressure gas main and low-density residential development east of
the gas main.
A cash escrow or bond must be submitted in favor of the City of Lakeville in accordance with
City Code in the sum of $1,500.00 per acre for the remaining acreage yet to be rehabilitated
according to the plan approved in 2011.
The purpose of this interim use permit application is to allow concrete and bituminous
recycling/processing and to complete the import of fill and final site rehabilitation of the
property for future development when City sanitary sewer and water services are available to the
site.
New Look Contracting requests that concrete and/or bituminous demolition material continue
to be allowed to be brought onto the site for processing and exported from the site as an
incentive to contractors to bring clean compactable fill onto the property to achieve final
rehabilitation grades. Demolition concrete and reclaimed asphalt is proposed to be recycled on
the property and used as MNDOT certified road construction material. This operation would
continue the demolition material crushing and sorting that has been on-going with previous
operations. All sand, gravel, and recyclable demolition materials will be hauled from the site.
There is no proposed asphalt or concrete production facilities with this operation nor will that
activity be permitted. Washing of aggregate material is not permitted on the property.
The hours of operation shall be limited to 7:00 AM to 7:00 PM Monday through Friday. No
crushing operations may occur on Saturdays and Sundays. Noise generated from the site must
be in compliance with the Minnesota Pollution Control Agency and the Federal Environmental
Protection Agency rules and regulations.
Sedimentation basins will treat storm water by settling out sediments prior to storm water
leaving the site. Prevention of soil erosion will be controlled by establishing vegetation as
rehabilitation proceeds.
4
Dust will be controlled as necessary by using water and a pumping truck from the water available
in the settling ponds. Any water obtained from a City water hydrant will require a permit from
the City. Gravel and dust tracked onto Kenrick Avenue must be promptly removed by the
operator.
New Look Contracting is required to apply for an annual mining and excavation (rehabilitation)
permit at which time staff determines whether the mine is complying with the stipulations of the
approved interim use permit. The site is inspected periodically during the year to confirm
compliance with the approved permit. Failure to comply with the approved plans may result in
the annual permit not being issued whereby the operator cannot continue to operate until any
noted irregularities are addressed.
The finished grades will include a minimum of three inches of topsoil as proposed in the
rehabilitation plan. Slopes, graded areas and backfill areas shall be surfaced with adequate topsoil
to secure and hold ground cover. Such ground cover shall be tended as necessary until it is self-
sustained.
New Look Contracting states in their narrative that complaints will be addressed by telephone
within one working day. The City is also typically notified if calls are made to the operator. The
applicant will be required to submit an annual report with their annual excavation and mining
(rehabilitation) application to show how the operation is in compliance with the approved plan.
Complaints. Planning Department staff recorded 14 complaints received from three nearby
residents during the period between 2011 and 2021. Most complaints were in regard to truck
noise on Kenrick Avenue and noise created by trailer gates closing and banging after deliveries of
recyclable material or fill. Other complaints were primarily about dirt and dust on Kenrick
Avenue or the need for general dust control during operations. The gravel mine operators
during this period were generally quick to respond to the complaints Planning staff forwarded to
them.
Site Improvement Performance Agreement and Financial Guarantee. The Zoning Ordinance
for interim use permit administration and the City Code require the submittal of a site
improvement performance agreement to guarantee the completion of work as allowed by the
approved interim use permit. The finance guarantee will be required as surety for the
completion of the property rehabilitation as required by the City Code and as outlined in the
planning report.
Public Engagement of New Application. In lieu of an in-person neighborhood meeting, the
applicant prepared a website to allow public review of their request that included a link to present
5
questions of the applicant. The public did not register comments or questions on the applicant’s
website at the time this planning report was finalized.
RECOMMENDATION
The request for the Interim Use Permit will be a policy decision of the City Council with the
recommendation of the Planning Commission. Findings of fact for the Planning Commission to
recommend that the City Council either approve or deny the requested Interim Use Permit have
been prepared by City staff. If the Planning Commission elects to recommend approval of the
Interim Use Permit application, Planning Department staff recommends approval of the findings
of fact subject to the following stipulations:
1. The boundaries of the processing, grading, and rehabilitation areas shall be limited to the
areas identified in the approved plans.
2. Rehabilitation, grading, drainage, erosion and sedimentation control, and finished grades
shall occur consistent with the Excavation and Grading plan developed by Sathre
Berquist, Inc., dated January 7, 2011 as amended for the proposed Interim Use Permit
submitted by New Look Contracting.
3. Perimeter side slopes shall be back filled to a maximum grade of 3:1 (33%). No
Trespassing signs shall be installed and maintained at regular intervals at the perimeter of
the mine adjacent to Kenrick Avenue and 195th Street.
4. Vegetation shall be reestablished as an ongoing part of the site rehabilitation. Ground
vegetation shall consist of grass seed mixture.
5. Use of demolition explosives shall not occur on the property.
6. A site improvement performance agreement and annual permits shall be submitted by
the applicant along with security as required by Title 7, Chapter 4 of the City Code and
Section 11-5-13 of the Zoning Ordinance. A security deposit shall be submitted by the
operator for each acre of land remaining to be rehabilitated in an amount approved by
the City Council to complete the approved rehabilitation plan. The annual permit
application shall include figures stating the amount of aggregate material exported from
the property and fill material imported to the property.
7. Abandoned or inoperable machinery or equipment and rubbish shall not be stored on the
site.
6
8. The maximum noise level at the perimeter of the site shall be within the limits set by the
Minnesota Pollution Control Agency and the Federal Environmental Protection Agency.
9. Grading and hauling operations may occur between 7:00 a.m. and 7:00 p.m., Monday
through Saturday. Crushing and processing operations shall not occur on Saturdays and
Sundays.
10. Operators shall comply with all applicable city, county, state, and federal regulations for
the protection of water quality, including the Minnesota Pollution Control Agency and
Federal Environmental Protection Agency regulations for the protection of water quality.
No waste products or processed residue shall be deposited in any lake, stream or natural
drainage system.
11. Asphalt or concrete production is not permitted on the property.
12. All topsoil shall be retained at the site until complete rehabilitation of the site has taken
place according to the rehabilitation plan. Slopes, graded areas and backfill areas shall be
surfaced with adequate topsoil to secure and hold ground cover. Such ground cover shall
be tended as necessary until it is self-sustained.
13. Earthen screening berms along Kenrick Avenue and 195th Street shall remain in place
during the life of the grading and rehabilitation operation. Earthen berms shall not be
located within 50 feet of 195th Street and Kenrick Avenue.
14. Access to and from the site shall be exclusive to Kenrick Avenue.
15. Any flammable liquids stored on the site shall be in above ground storage containers and
shall meet Minnesota Pollution Control and Fire Code requirements.
16. All rehabilitation of the site shall be completed by December 31, 2026.
17. Excavation is prohibited below an elevation of 1004 (sea level datum).
18. The first 400 feet of the access road shall remain paved with bituminous and shall be
swept regularly to keep gravel off of Kenrick Avenue. Kenrick Avenue shall be swept
regularly as needed. Any water used by the operator that is acquired from a City water
hydrant will require a permit from the City.
Exhibit A
Exhibit B
Exhibit C
Exhibit D
SRN □ & GRRVEL
February 8, 2022
To Whom It May Concern,
Superior Products for
Superior Customers
14045 Northdale Blvd.
Rogers, MN 5537 4
Main: 763-290-1914
www .s uperiorsand. net
sales@superiorsand.net
You are receiving this letter because you have been identified as owning property within 500 feet of
the Lake Marion gravel pit property located 19250 Kenrick Avenue. This letter is to notify the public that
Superior Sand & Gravel is seeking an amendment to the Interim Use Permit for the aforementioned
property. The portion of the Interim Use Permit Superior Sand & Gravel is requesting be amended is the
expiration date from December 31, 2021 to December 31, 2026. The reason for this request is to allow more
time to restore the property as required by the mining permit and the original Interim Use Permit approved in
2011.
No additional mining and gravel excavation for export will occur on the property, only hauling off-site of
previously mined, sorted, and stockpiled aggregate material. Superior Sand & Gravel will be asking to continue
recycle operations on the site, as it will ensure viability in the road construction/commercial materials market
where opportunities exist to import clean fill into the site in greater volume. Recycled materials are an important
re-use of natural resources and by maximizing products available in the pit, already stockpiled and continuing
recycle operations, we hope to keep our existing customer base which will shorten the time needed for
restoration. The import and grading of clean fill material will occur to raise the finished grade to a level in
compliance with the previous Interim Use Permit, and to prepare the property for future development in
accordance with the City's Comprehensive Plan. The request is for additional time to restore the property to
complete the final grading. Our estimate is that an additional five years is needed to procure the fill material and
reestablish the site to the previously approved grading plan.
We have created a website to inform the public of operations on site, the restoration plan for the
property, and to allow a forum for public questions and answers about the restoration process and the proposed
Interim Use Permit. The weblink is www.lakemarioniup2022.com
We will monitor the website and answer questions submitted from the public. We hope this will give
the public an opportunity to learn more about our request and be informed for the public hearing. This
information will be available to the City of Lakeville as they consider our Interim Use Permit application.
Exhibit E
Exhibit F
1
CITY OF LAKEVILLE
DAKOTA COUNTY, MINNESOTA
NEW LOOK CONTRACTING D/B/A SUPERIOR SAND & GRAVEL
APPROVAL OF
INTERIM USE PERMIT
FINDINGS OF FACT AND RECOMMENDATION
The Lakeville Planning Commission met at its regularly scheduled meeting on April 7, 2022 to
consider the application of New Look Contracting d/b/a Superior Sand & Gravel for an interim
use permit to allow grading, filling, processing, and rehabilitation operations on property located
at 19250 Kenrick Avenue. The Planning Commission conducted a public hearing on the
application preceded by published and mailed notice. The applicant was present and the Planning
Commission heard testimony from all interested persons wishing to speak.
FINDINGS OF FACT
1. The subject property is guided for both Medium/High Density Residential and Low Density
Residential land use by the 2040 Comprehensive Plan.
2. The subject site is zoned RM-2, Medium Density Residential District and RS-3, Single Family
Residential District, and is included in the RAO, Rural Overlay District and the Shoreland
Overlay District.
3. The legal description of the property is as follows:
That part of Government Lots 6 and 7, Section 24, Township 114, Range 21, lying East of the
Easterly right of way line of Trunk Highway No. 35, northerly of the east – west quarter line of
said Section 24 and southerly and westerly of the shore line of Lake Marion. Subject to a street or
road easement for 195th Street West. Except the following described property: That part of
Government Lot 7 of Section 24, Township 114, Range 21, Dakota County, Minnesota lying
Easterly of the Easterly right of way line of Trunk Highway Number 35 (as now located and
established) including the accretions and relictions and all other riparian rights thereto; which lies
Westerly of a line run parallel with and distant 135 feet Easterly of line 1 described below: Line 1:
Beginning at a point on the West and East quarter line of Section 13, Township 114, Range 21,
distant 1421 feet East of the West quarter corner thereof; thence run Southerly at an angle of 92
2
degrees 6 minutes 00 seconds from said East and West quarter line (measured from East to South)
for 3707.3 feet and there terminating.
4. Chapter 11-5-3 of the City of Lakeville Zoning Ordinance provides that an interim use
permit shall comply with the same criteria as a conditional use permit. The criteria and our
findings regarding them are:
a. The proposed action has been considered in relation to the specific policies and
provisions of and has been found to be consistent with the official City Comprehensive
Plan.
Finding: Mining and excavation activity on the subject property predated most residential
and commercial uses in the area. The 2040 Comprehensive Land Use Plan states that gravel
resources be accessed in a manner that protects Lakeville’s environment, is compatible with
adjoining land uses, and is consistent with the City’s long-range planning. Furthermore,
consider compatibility with surrounding land uses and mitigation measures in the location
and operation of gravel mining operations to reduce nuisance concerns such as noise, dust,
traffic, etc.
The proposed grading, filling, processing, and rehabilitation operations are consistent with
the 2040 Lakeville Comprehensive Plan, which establishes objectives and criteria for these
types of activities in areas located within MUSA Expansion Area B. The operational
activities associated with site rehabilitation on the property are considered compatible with
the nearby residential uses and the natural environment.
b. The proposed use is or will be compatible with present and future land uses of the area.
Finding: The proposed use will be compatible with nearby existing land uses given
compliance with the stipulations listed in the March 30, 2022 planning report. The
proposed grading, filling and rehabilitation plans have been developed to incorporate
future low density residential and medium/high density residential land uses consistent
with the 2040 Comprehensive Land Use Plan.
c. The proposed use conforms to all performance standards contained in the Zoning
Ordinance and the City Code.
Finding: The proposed development will comply with requirements of the Zoning
Ordinance and City Code in accordance with the stipulations outlined in the March 30,
2022 planning report.
3
d. The proposed use can be accommodated with existing public services and will not
overburden the City’s service capacity.
Finding: The subject site is located in MUSA Expansion Area B of the 2040 Comprehensive
Land Use Plan and is not served by City sanitary sewer and water services.
e. Traffic generated by the proposed use is within capabilities of streets serving the
property.
Finding: Traffic generated by the proposed use can be accommodated by Kenrick Avenue,
a minor arterial street as designated in the 2040 Transportation Plan.
5. The report dated March 30, 2022 prepared by Frank Dempsey, Associate Planner is
incorporated herein.
RECOMMENDATION
The Planning Commission recommends that the City Council approve the interim use permit
based upon the foregoing information, findings, and the considerations outlined in the Planning
Report dated March 30, 2022 prepared by Frank Dempsey, Associate Planner.
DATED: April 7, 2022
LAKEVILLE PLANNING COMMISSION
BY: __________________________
Jenna Majorowicz, Vice Chair
1
CITY OF LAKEVILLE
DAKOTA COUNTY, MINNESOTA
NEW LOOK CONTRACTING D/B/A SUPERIOR SAND & GRAVEL
DENIAL OF
INTERIM USE PERMIT
FINDINGS OF FACT AND RECOMMENDATION
The Lakeville Planning Commission met at its regularly scheduled meeting on April 7, 2022 to
consider the application of New Look Contracting d/b/a Superior Sand & Gravel for an interim
use permit to allow grading, filling, processing, and rehabilitation operations on property located
at 19250 Kenrick Avenue. The Planning Commission conducted a public hearing on the
application preceded by published and mailed notice. The applicant was present and the Planning
Commission heard testimony from all interested persons wishing to speak.
FINDINGS OF FACT
1. The subject property is guided for both Medium/High Density Residential and Low Density
Residential land use by the 2040 Comprehensive Plan.
2. The subject site is zoned RM-2, Medium Density Residential District and RS-3, Single Family
Residential District, and is included in the RAO, Rural Overlay District and the Shoreland
Overlay District.
3. The legal description of the property is as follows:
That part of Government Lots 6 and 7, Section 24, Township 114, Range 21, lying East of the
Easterly right of way line of Trunk Highway No. 35, northerly of the east – west quarter line of
said Section 24 and southerly and westerly of the shore line of Lake Marion. Subject to a street or
road easement for 195th Street West. Except the following described property: That part of
Government Lot 7 of Section 24, Township 114, Range 21, Dakota County, Minnesota lying
Easterly of the Easterly right of way line of Trunk Highway Number 35 (as now located and
established) including the accretions and relictions and all other riparian rights thereto; which lies
Westerly of a line run parallel with and distant 135 feet Easterly of line 1 described below: Line 1:
Beginning at a point on the West and East quarter line of Section 13, Township 114, Range 21,
distant 1421 feet East of the West quarter corner thereof; thence run Southerly at an angle of 92
2
degrees 6 minutes 00 seconds from said East and West quarter line (measured from East to South)
for 3707.3 feet and there terminating.
4. Chapter 11-5-3 of the City of Lakeville Zoning Ordinance provides that an interim use
permit shall comply with the same criteria as a conditional use permit. The criteria and our
findings regarding them are:
a. The proposed action has been considered in relation to the specific policies and
provisions of and has been found to be consistent with the official City Comprehensive
Plan.
Finding: The 2040 Comprehensive Land Use Plan states that gravel resources be accessed
in a manner that protects Lakeville’s environment, is compatible with adjoining land uses,
and is consistent with the City’s long-range planning. Furthermore, consider compatibility
with surrounding land uses and mitigation measures in the location and operation of gravel
mining operations to reduce nuisance concerns such as noise, dust, traffic, etc.
The proposed grading, processing and rehabilitation activities are not consistent with the
2040 Lakeville Comprehensive Plan, which includes operational activities that are not
compatible with the nearby residential neighborhoods and the environment of Lake
Marion including noise from on-site equipment, semi-trucks and trailers hauling materials
in and out of the gravel pit site as well as airborne dust and sediment entering Lake Marion.
b. The proposed use is or will be compatible with present and future land uses of the area.
Finding: The proposed use will not be compatible with present land uses of the area due to
noise from equipment and from vehicles entering and exiting the property and from
airborne dust and sediment.
c. The proposed use conforms to all performance standards contained in the Zoning
Ordinance and the City Code.
Finding: The proposed development may comply with requirements of the Zoning
Ordinance and City Code in accordance with the stipulations outlined in the March 30,
2022 planning report.
d. The proposed use can be accommodated with existing public services and will not
overburden the City’s service capacity.
3
Finding: The subject site is located in MUSA Expansion Area B of the 2040 Comprehensive
Land Use Plan and is not served by City sanitary sewer and water services.
e. Traffic generated by the proposed use is within capabilities of streets serving the
property.
Finding: Traffic generated by the proposed use can be accommodated by Kenrick Avenue,
a minor arterial street designated in the 2040 Transportation Plan.
5. The report dated March 30, 2022 prepared by Frank Dempsey, Associate Planner is
incorporated herein.
RECOMMENDATION
The Planning Commission recommends that the City Council deny the interim use permit based
upon the foregoing information, findings, and the considerations outlined in the Planning Report
dated March 30, 2022 prepared by Frank Dempsey, Associate Planner.
DATED: April 7, 2022
LAKEVILLE PLANNING COMMISSION
BY: __________________________
Jenna Majorowicz, Vice Chair