HomeMy WebLinkAbout18672 Hancock Avenue-Survey for PermitThe curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flush
with the sod. This will be scheduled with thelandscape inspection.
*Draintile connection required.
EROSION CONTROLMUST BE INSTALLED
BEFORE EXCAVATION
*Maintain 6" between bottom of siding and sod.*No structures in easements.
ENGINEERING REVIEWED
Date:__________________03/21/2022 lritchie
Planning DepartmentApprovedDate:__________________03/22/2022 dmorey