Loading...
HomeMy WebLinkAbout18672 Hancock Avenue-Survey for PermitThe curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flush with the sod. This will be scheduled with thelandscape inspection. *Draintile connection required. EROSION CONTROLMUST BE INSTALLED BEFORE EXCAVATION *Maintain 6" between bottom of siding and sod.*No structures in easements. ENGINEERING REVIEWED Date:__________________03/21/2022 lritchie Planning DepartmentApprovedDate:__________________03/22/2022 dmorey