Loading...
HomeMy WebLinkAbout7356 204th St SurveyGATEWAY DRIVE204TH S T R E E T LOT 10 Drainage and Utility Easement per the plat of CEDAR HILLS 2ND ADDITION Building Pad per Grading Plan Building Setback 6 Proposed House Bristol EN12, Elev. B3 Lookout Lowest Floor Elev. = (1002.93) Top of Foundation @ Lookout Elev.= (1006.10) SAN SAN SAN SAN SAN SAN SAN SANSANSANSANSANSANSANSAN STO STO STO STO STO STO STO WAT WAT WAT WAT WAT WATWATWATWATWATWATWATWATWATWAT671 2 CS STO(1008.6) X (1007.9) 1007.1 (989.8) 990.8 (1008.5) 1007.5 10 1010 1010(1010.6) 1010.3 L=61.69 R=770.00 Δ=4°35'24" 22.85 N78°52' 3 3 " W N06°29'17"E 176.87N87°02'08"W 118.62 L=169.92R=405.00Δ=24°02'20"Proposed SidewalkProposed S idewalk (1010.60) 10.00 2.0020.00 20.7914.87 30.7538.7526.046.1323.5019.97 14.88 20.7915.00 16.05 Garage PorchSidewalk(5.5%)29.4651.5495.871002.90 1007.52 1008.31 1007.46X 1007.09TCX 1008.24TC1009.80 T C X X 1010.69TCX 101 0. 5 4 T C X 101 0. 1 3 T C X 10 0 9. 49 T C X 10 0 8.7 1T C X 1007.70TCX (1010 .96 )X (1010.55)X (1009.91)X (1009.13)28.389.95 92.27105 5 ETV 1008.2 XX 1007 .8 X 10 05. 5 1005.4 X 166411.36 N526537.47 E 166419.64 N 526570.43 E 166388.15 N526582.10 EX (996.1)X (1 0 0 5 . 4 ) X (1005.4 )X (1004 .9 )(1004.9) X100810061008 1010 10041002 10001002 1000 998 996 994 992 990 99 8 10 0 0 1 0 0 2 10061008101015.00 6.120.12 166392.91 N 526562.23 E Drain Tile Cleanout X (1008.12)60 foot Righ t o f W a y 31.00 60 foot Right of Way10 1 0 S S 16.78 1004 N:\0025850.01\DWG\SURVEY\2ND ADD\0025850.01B06L10 2ND.DWG1 1 02/28/2022 MJW BTW SHEET NUMBER: DATE: OF .FIELD CREW: DRAWN: CHECKED: Phone (952) 937-5150 12701 Whitewater Drive, Suite #300 Fax (952) 937-5822 Minnetonka, MN 55343 Toll Free (888) 937-5150 Œ:HVWZRRG3URIHVVLRQDO6HUYLFHV,QF Common Ground Alliance Call 48 Hours before digging: 811 or call811.com Lakeville, Minnesota Cedar Hills Certificate of SurveyLennar PROJECT NUMBER: 0025850.01 0'20'40' 1) Curb & gutter and utilities are existing. 2) Building dimensions do not reflect brick facin 3) Grading Plan by Westwood Professional Servi initial submittal date 02/06/20. 4) Building shown reflects Bristol foundation pla sheet A2, dated 12/01/2021. Lot 10, Block 6, CEDAR HILLS 2ND ADDITION, according to the recorded plat thereof, Dakota County, Minnesota. Address- 7356 204th Street LEGEND CABLE TV BOXTV NATURAL GAS METERG STREET LIGHT ELECTRIC BOXE ELECTRIC METERE SANITARY MANHOLES SEWER CLEANOUTCO CATCH BASIN STORM MANHOLEST TELEPHONE BOXT GATE VALVE HYDRANT WATER METERW CURB STOP BOXCS WATERMAIN SANITARY SEWER STORM SEWER SAN STO WAT FLARED END SECTION Garage Floor Elev. = (1010.60)(at overhead door) Top of Poured Foundation Wall Elev. = (1010.93) Lowest Floor Elev. = (1002.93) Top of Foundation Wall @ Lookout Elev. = (1006.10) I hereby certify that this survey was prepared by me or under my direct supervision and that I am a duly Licensed Land Surveyor under the laws of the State of Minnesota. 03/22/2022 Mathew J. Welinski Date Minnesota License No. 53596 matt.welinski@westwoodps.com Denotes iron monument found Denotes iron monument set x xxx.x Denotes existing elevati x (xxx.xx) Denotes proposed eleva Benchmark- Minnesota Departmen Transportation Control Point "1914 Elevation = 959.11 (N.A.V.D. 1988), graphically shown. IMPERVIOUS SURFACE CALCULATIONS Lot area = 16,420 sq. ft. House area = 1,824 sq. ft. Porch area = 92 sq. ft. Driveway and Sidewalk = 812 sq. ft. Impervious area 1,728 sq. ft. / 16.6% of total of lot area LOT GRADING CALCULATIONS Basement Excavation = 125 cubic yards Finished Lot Grading=215 cubic yards Material (needed)90 cubic yards (needed) Zoning = RST-2FY - 20' House, 25' Garage SY - 7' Interior, 20' CornerRY - 30'SY Buffer - 30' RY Buffer - 50' The curb box, drain tile cleanout, and catch basin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection. *Draintile connection required. EROSION CONTROLMUST BE INSTALLED BEFORE EXCAVATION *Maintain 6" between bottom of siding and sod. *No structures in easements. ENGINEERING REVIEWED Date:__________________03/22/2022 lritchie