HomeMy WebLinkAbout18877 Ivorra Avenuve-SURVEY 032122Zoning = RS-3The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.*Draintile connection required.EROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION*Maintain 6" between bottom of siding and sod.*No structures in easements.ENGINEERING REVIEWEDDate:__________________04/08/2022lritchieall trees present and in good condition,tree preservation checks out4/14/22 EA