HomeMy WebLinkAboutItem 06 Bubble Barn Express Car Wash 1 City of Lakeville Planning Department Memorandum To: Planning Commission From: Kris Jenson, Associate Planner Date: April 14, 2022 Subject: Packet Material for the April 21, 2022 Planning Commission Meeting Agenda Item: Bubble Barn Express Car Wash Conditional Use Permit Application Action Deadline: May 24, 2022 (Extended from March 25, 2022) INTRODUCTION Patrick Voss of Greystone Construction, on behalf of Jessica Zazworsky and Bubble Barn Express Car Wash, has submitted an application for a conditional use permit to allow the construction and operation of a commercial car wash in the C-3, General Commercial District. The car wash is proposed to be located northwest of Dodd Boulevard (CSAH 9) and east of Glasgow Avenue within the Cedar and Dodd Retail Addition plat. The site development plans have been reviewed by Planning Department and Engineering Division staff. Given that there are no public street, stormwater, or utility improvements proposed with this development, the Engineering Division has not prepared a staff memo for the proposed development. EXHIBITS A. Aerial Photo Map B. Location and Zoning Map C. Alta Survey D. Grading, Drainage, and Erosion Control Plan E. Utility Plan 2 F. Site Plan G. Floor, Ceiling, and Roof Plan H. Building Elevations I. Color Elevations J. Schematic Site Lighting Plan K. Photometric Plan L. Landscape Plan PLANNING A NALYSIS Existing Conditions: The site is vacant and was mass graded as part of the Cedar and Dodd Retail Addition development. Glasgow Avenue and the sidewalk along the east side of the private drive were constructed at that time. Surrounding Land Uses and Zoning North – Undeveloped land (C-3) East – Dodd Boulevard, Christian Brothers Auto and Subway (PUD) South – Dodd Boulevard, Crossroads commercial development (PUD) West – Glasgow Avenue (private drive), future medical office building (C-3) Setbacks. Setback requirements in the C-3 District are noted below: Yard Public Road Right of Way Interior Lot Lines Setbacks 30 feet 10 feet The proposed commercial car wash meets the C-3 District setback requirements. Grading, Drainage and Erosion Control. The conditional use permit plans include grading, drainage and erosion control, and private utilities construction associated with the proposed site plan. Stormwater ponding is existing within the Cedar and Dodd Retail development and additional ponding is not required to be constructed on this site. The Assistant City Engineer has reviewed the grading, drainage and erosion control, and utility plans and revised plans have been submitted to address the Engineering Division’s comments. CONDITIONAL USE PERMIT Section 11-73-7.D of the Zoning Ordinance allows commercial car washes in the C-3, General Commercial District subject to meeting the following seven criteria: 1. A car wash that is accessory to a convenience store/motor fuel facility shall be included as part of the principal building. 3 The primary use on this parcel will be a car wash; it is not accessory to a convenience store and/or motor fuel facility. 2. Magazine or stacking space is constructed to accommodate six (6) vehicles per wash stall and shall be subject to the approval of the city engineer. Prior to entering the car wash building, there are three payment kiosks at which vehicles will queue, and each lane can accommodate six vehicles. Beyond this point, there is approximately 200 feet of additional stacking space, which can accommodate 10 more vehicles. 3. Magazine or stacking space must not interfere with on site circulation patterns or required on site parking or loading areas. The stacking areas to enter the car wash are separated from the site circulation for vehicles that have gone through the wash and will be exiting the site. 4. Parking or car magazine storage space shall be screened from view of abutting residential districts in compliance with section 11-21-9 of this title. The nearest residential uses are over 500 feet to the west (Springs of Lakeville) and to the north (Cedar Valley townhomes). Between the proposed car wash site and the Springs of Lakeville townhomes to the west is a proposed two-story medical office building and Cedar Avenue and to the Cedar Valley townhomes to the north will be the car wash building as well as future development on the lot north of the proposed car wash. Landscape screening is proposed along Dodd Boulevard to provide screening from headlights of the vehicles entering the wash queue. 5. Provisions are made to control and reduce noise and special precautions shall be taken to limit the effects of noise associated with the car wash operation, dryer and vacuum machines. According to a narrative from the applicant, the facility will use “noise reduction technology to help alleviate excessive noise in the tunnel and vacuum lot.” Given the site’s proximity to Dodd Boulevard and Cedar Avenue, it is likely that any noise from the car wash will not be heard by residents at the townhomes to the north or west. 6. The location and operation of vacuum machines must not interfere with magazines or stacking areas, on site circulation or on site parking and loading areas, and may not be located in a yard abutting residentially zoned property. The vacuum machines are located along the exit routes for vehicles and do not interfere with the stacking areas for vehicles entering the car wash. 7. Untreated water from the car wash shall not be discharged into the storm sewer. If the water is to be pretreated and discharged into the storm sewer, the pretreatment plans shall be subject to review and approval of the city engineer and building official, and subject to applicable requirements of Metropolitan Council Environmental Services and MPCA. 4 The site will utilize a water reclamation system to reduce the amount of fresh water required to wash vehicles. The water reclamation and discharge system must be reviewed and approved by the city engineer and building official prior to issuance of a building permit. GENERAL P ERFORMANCE STANDARDS In addition to the criteria for commercial car washes listed above, Section 11-4-7 lists the following performance standards for conditional use permits: A. The use and the site in question shall be served by a street of sufficient capacity to accommodate the type and volume of traffic which would be generated and adequate right of way shall be provided. The site has access from Glasgow Avenue, a private street within the Cedar and Dodd Retail development, and abuts Dodd Boulevard, a major collector in the City’s Transportation Plan. These streets are of sufficient capacity to serve the site. B. The site design for access and parking shall minimize internal as well as external traffic conflicts and shall be in compliance with chapter 19 of the Zoning Ordinance. A single driveway access to the private drive (Glasgow Avenue) is proposed on the west side of the site. The access location aligns with the access location to the medical office building site proposed to be built on the west side of Glasgow Avenue, as reviewed and recommended for approval by the Planning Commission at their April 7, 2022 meeting. No access to Dodd Boulevard is permitted from the site. C. If applicable, a pedestrian circulation system shall be clearly defined and appropriate provisions made to protect such areas from encroachment by parked or moving vehicles. A sidewalk currently exists along the east side of Glasgow Avenue and a bituminous trail along the west side of Dodd Boulevard, both adjacent to the site. D. Adequate off street parking and off street loading shall be provided in compliance with chapters 19 and 20 of the Zoning Ordinance. Section 11-19-13 of the Zoning Ordinance requires 10 spaces for a drive through car wash. The Bubble Barn site includes 26 parking spaces, 19 of which have vacuum equipment adjacent to the spaces for use by the customers. E. Loading areas and drive-up facilities shall be positioned so as to minimize internal site access problems and maneuvering conflicts, to avoid visual or noise impacts on any "adjacent" residential use or district, and provided in compliance with chapter 20 of this title. The site plan (Exhibit F) includes truck turning radii for a large vehicle visiting the site. The car wash building does not include a loading dock, but the site layout allows for a large vehicle to have access around the building. 5 F. Whenever a nonresidential use "is adjacent to" a residential use or district, a buffer area with screening and landscaping shall be provided in compliance with chapter 21 of this title. Not applicable G. General site screening and landscaping shall be provided in compliance with chapter 21 of this title. Plantings are proposed around the site but there are no overstory trees proposed along Dodd Boulevard due to the transmission line easement, which limits the height of vegetation within the easement. The landscape plan must be revised to show plantings around the trash enclosure and plantings or fencing to screen the ground-level transformer. An escrow is required to be submitted with the SIPA to ensure the landscaping is completed. H. All exterior lighting shall be so directed so as not to cast glare toward or onto the public right of way or neighboring residential uses or districts, and shall be in compliance with section 11-16- 17 of the Zoning Ordinance. Schematic site lighting and photometric plans (Exhibits J and K) show the locations of four light poles within the parking lot area with additional lighting mounted to the building. All lighting is proposed to be shielded, downcast type fixtures to prevent glare onto adjacent streets and properties. While the site plan shown on the photometric plan is based on a previous version, the fixture locations remain the same and indicate that all site lighting meets the maximum allowed threshold of one-foot candle at the property line. I. Potential exterior noise generated by the use shall be identified and mitigation measures as may be necessary shall be imposed to ensure compliance with section 11-16-25 of the Zoning Ordinance. As noted earlier in this memo, the facility will use “noise reduction technology to help alleviate excessive noise in the tunnel and vacuum lot.” Also, landscaping or fencing added to screen the ground transformer will help to mitigate noises that may come from the transformer. J. The site drainage system shall be subject to the review and approval of the city engineer. The Engineering Division has reviewed and approved the site drainage and utility plans. K. The architectural appearance and functional design of the building and site shall not be so dissimilar to the existing or potential buildings and area so as to cause a blighting influence. All sides of the principal and accessory structures are to have essentially the same or coordinated, harmonious exterior finish materials and treatment. The proposed building is a one story building, approximately 24 feet in height, meant to emulate a red barn. The center of the roof includes a cupula, with an overall height of just over 30 feet, which is below the maximum height of 35 feet for the C-3 District. 6 The primary exterior materials are brick, stone, and glass, which make up at least 65% of each elevation and 73.6% of the exterior in total. The remainder of the building is fiber cement siding, which is the building trim, barn doors, and material used in the peaks of the roof on both ends of the building (Exhibits H and I). Section 11-17-9 of the Zoning Ordinance requires that commercial uses have an exterior finish of at least three Grade A materials that make up at least 65% of the exterior building finish and that not more than 35% of the exterior be Grade B or C materials. Brick, stone, and glass satisfy the Grade A materials requirement and fiber cement siding is a Grade C material. The proposed materials meet the requirements of the Zoning Ordinance. L. Provisions shall be made for daily litter control, an interior location for recycling, and trash handling and storage or an outdoor, enclosed receptacle area shall be provided in compliance with section 11-18-11 of the Zoning Ordinance. A trash/recyclables enclosure is proposed to be located on the south side of the parcel, near the entrance to the site. The enclosure includes a roof and maintenance free gate and with fiber cement siding and stone exterior materials that match the materials and colors of the primary structure. As previously noted, the landscape plan must be revised to add plantings around the trash enclosure prior to City Council consideration of the CUP. M. All signs and informational or visual communication devices shall be in compliance with chapter 23 of the Zoning Ordinance. A freestanding sign location is indicated on the site plan (Exhibit F) at the corner of Dodd Boulevard and Glasgow Avenue. Wall sign locations are also shown on the building elevation plans. All signs must meet Zoning Ordinance requirements and sign permits must be issued by the City prior to the installation of any signs N. The use and site shall be in compliance with any federal, state or county law or regulation that is applicable and any related permits shall be obtained and documented to the city. Bubble Barn car wash is required to obtain any permits from Metropolitan Council relating to the water reclamation and recycling system, if applicable. O. Any applicable business licenses mandated by this code are approved and obtained. Not applicable. P. The hours of operation may be restricted when there is judged to be an incompatibility with a residential use or district. The hours of operation are proposed to be 8:00 am to 8:00 pm, Monday through Saturday and 9:00 am to 6:00 pm on Sundays. The hours of operation are not expected to be incompatible with the surrounding commercial area. 7 Q. The use complies with all applicable performance standards of the zoning district in which it is located and where applicable, any nonconformities shall be eliminated. Not applicable. R. All additional conditions pertaining to a specific site are subject to change when the council, upon investigation in relation to a formal request, finds that the general welfare and public betterment can be served as well or better by modifying or expanding the conditions set forth herein. Not applicable. RECOMMENDATION The Bubble Barn commercial car wash conditional use permit is consistent with the requirements of the Zoning Ordinance. Planning Department staff recommends approval subject to the following conditions: 1. The site shall be developed in accordance with the plans approved by the City Council. 2. Trash and recycle bins shall be stored inside the trash enclosure constructed in accordance with the plans submitted with the conditional use permit application and approved by the City Council. 3. Prior to consideration by the City Council, the landscape plan must be revised to show plantings around the trash enclosure and ground-level transformer for screening. A security for landscaping must be submitted with a SIPA prior to recording of the conditional use permit. 4. The water reclamation and discharge system must be reviewed and approved by the city engineer and building official prior to issuance of a building permit. Findings of fact are attached. Source: Esri, Maxar, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User CommunityCEDAR AVE (CSAH 23)GLACIER WAY City of Lakeville Bubble Barn Car Wash Conditional Use Permit Aerial Location Map Proposed Bubble Barn Car Wash EXHIBIT A DODD BL VD (C S AH 9 ) 1 7 5 T H S T GL ASGOW AVE& CEDAR AVE (CSAH 23)GLACIER WAY City of Lakeville Bubble Barn Car Wash Conditional Use Permit Zoning Map EXHIBIT B 1 7 5 T H S T PUD PUD PUD PUD PUD C-3 O-R C-3 C-3 C-3 RM-2 PUD RS-3 GLASGOW A V E GLASGOW AVEDODD B O U LEVARD (CSAH 9)Proposed Bubble Barn Car Wash location & EXHIBIT C Bubble Barn Express Car Wash Operations Narrative Bubble Barn Express Car Wash is aimed at offering customers superior quality, convenience, and value. Soft brushes are paired with a high-pressure wash and rinse to ensure a superior level of clean compared to a traditional frictionless gas station wash. A wash takes only three minutes, plus the system can wash 100+ cars an hour, vs. 15 at traditional washes, resulting in shorter wait times, particularly on good wash days in the winter when lines can be long. Customers can choose a single wash, starting at $6, or an unlimited monthly pass, so they can wash as often as they like. To ensure a clean car inside and out, free self-serve vacuums are offered after their wash is complete. Three to four full-time employees are on-site to help personally facilitate customers throughout their wash experience. Staff’s purpose is to keep building and landscaping impeccably maintained as well as ensuring the safety of customers. Proposed hours of operations is Monday through Saturday 8:00 am to 8:00 pm, Sunday 9:00 am to 6:00 pm. Conscious environmental practices are a priority to leave the smallest environmental footprint possible. High efficiency process and extensive water reclamation will allow us to save millions of gallons of water annually vs. a traditional car wash. Washes and vacuums will utilize VFD technology to adjust power based on equipment usage, while LED lighting systems will maximize lighting efficiency.99% efficient hot water systems will enable the heating of cleaning soaps, resulting in reduced chemical usage. Wash will feature best-in-class noise reduction technology to help alleviate excessive noise in the tunnel and vacuum lot. Customers will enter the property off Glasgow Avenue, follow the pavement marking and wayfinding signage to the point of sale kiosks at the entrance canopy. Upon payment, they will follow curb lines and be assisted by staff to enter the wash and provided instructions on use. After existing, customers will have the option to utilize the free vacuum stalls or exit the site again via pavement markings and wayfinding signage. EXHIBIT F EXHIBIT G EXHIBIT H EXHIBIT J Project: Details: Date:1/24/2022 These drawings are for conceptual use only and are not intended for construction. Fixture runs and quantities should be verified prior to order. Values represented are an approximation generated from manufacturers photometric inhouse or independent lab tests with data supplied by lamp manufacturers. Page Size: 24x36 Bubble Barn Luma Agent: K Kasmiskie Drawn By: Joe Frey Scale: 1" = 20' Version 2 LS952-3906 Bubble Barn.AGI Scale: 1 inch= 20 Ft. NORTHDODD BLVDGLASGOW AVENUES 68%%D14'38" E 264.66 N 89%%D17'11" E 28.28 S 00%%D26'22" E161.65S 21%%D44'00" W116.68R=743.51L=222.62=17%%D09'20"R=300.00L=273.02=52%%D08'37" PROPOSED BUILDING 250W METAL HALIDE FIXTURE OR LED EQUIVALENT WITH DOWNCAST SHIELD MOUNTED TO POLE AT 20 FT A.F.F. LIGHT THROW INDICATES APPROX. .5 FT/CANDLES (2 THUS) TWIN 250W METAL HALIDE FIXTURE OR LED EQUIVALENT WITH DOWNCAST SHIELD MOUNTED TO POLE AT 20 FT A.F.F. LIGHT THROW INDICATES APPROX. .5 FT/CANDLES (2 THUS) 250W METAL HALIDE FIXTURE OR LED EQUIVALENT WITH DOWNCAST SHIELD MOUNTED TO BUILDING AT 12'-0" A.F.F. LIGHT THROW INDICATES APPROX. .5 FT/CANDLES (4 THUS) DR A INA G E AN D UTILI T Y E A S EM E NT DRAINAGE AND UTILITY EASEMENTDRAINAGE AND UTILITY EASEMENTTRANSMISSION LINE EASEMENTPLAN NOTES: 1. SITE LIGHTING PLAN IS SCHEMATIC AND MUST BE VERIFIED WITH A PHOTOMETRIC STUDY 2. MAX 115 FT CANDLE ANYWHERE 3. MAX 1 FT CANDLE AT PROPERTY LINE 4. 90 DEGREE CUT OFF SHIELD REQUIRED L1 1 SCHEMATIC SITE LIGHTING PLAN 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.2 0.2 0.1 0.1 0.1 0.2 0.3 0.3 0.3 0.3 0.2 0.2 0.2 0.2 0.3 0.4 0.5 0.5 0.4 0.3 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.8 0.6 0.4 0.2 0.5 0.6 0.7 0.8 1.0 1.2 1.3 1.3 1.0 0.6 0.3 0.1 0.7 0.9 1.0 1.1 1.3 1.5 1.9 2.1 1.9 1.3 0.7 0.3 0.2 0.1 0.8 1.1 1.4 1.6 1.8 2.2 2.8 3.3 3.1 2.6 1.7 0.9 0.4 0.3 0.2 1.1 1.5 1.9 2.3 2.8 3.6 4.2 4.1 3.7 2.6 1.7 1.0 0.6 0.4 0.3 0.2 0.9 1.4 1.9 2.3 2.9 3.3 3.9 4.4 4.9 4.1 2.5 1.6 1.0 0.8 0.6 0.4 0.2 1.2 1.8 2.4 2.8 2.9 3.0 3.2 4.8 6.5 4.8 2.6 1.6 1.3 1.1 0.9 0.6 0.3 0.1 1.3 1.8 2.6 3.1 3.2 2.8 2.5 2.5 3.4 4.9 4.4 2.7 2.0 1.9 1.7 1.3 0.8 0.4 0.1 2.0 3.0 4.1 4.1 3.4 2.6 2.0 1.9 2.4 3.4 3.0 2.9 2.9 3.0 2.6 1.8 1.0 0.4 0.1 0.1 3.2 4.4 4.6 4.7 3.6 2.5 1.8 1.7 2.2 2.8 3.4 4.2 4.8 4.5 3.5 2.2 1.2 0.5 0.1 0.1 2.7 3.8 4.5 5.6 7.1 4.6 2.7 1.8 1.7 2.2 3.1 4.4 5.7 6.5 6.0 3.8 2.4 1.4 0.6 0.2 0.1 0.1 2.8 3.5 4.0 6.0 6.7 5.4 3.0 1.8 1.5 2.0 3.0 4.3 6.6 9.7 9.4 5.1 2.8 1.8 1.0 0.4 0.2 0.1 2.5 3.1 3.7 4.7 5.8 4.6 3.0 1.7 1.3 1.5 2.3 3.3 6.3 10.8 10.2 5.8 3.5 2.4 1.4 0.7 0.3 0.1 2.6 3.5 4.6 5.5 5.7 4.3 2.8 1.6 1.0 1.1 1.8 2.8 4.6 7.2 7.3 5.6 4.0 2.6 1.7 1.0 0.5 0.2 0.1 1.9 2.9 4.3 5.8 6.8 6.5 4.3 2.7 1.7 1.0 1.0 1.6 2.6 4.0 5.1 5.2 4.3 3.1 2.3 1.6 1.0 0.6 0.3 0.2 1.7 2.7 4.1 6.5 9.9 9.9 5.5 3.0 2.0 1.3 1.1 1.5 2.4 3.1 3.4 3.1 2.5 2.2 1.8 1.3 0.9 0.6 0.3 0.2 0.1 1.2 2.1 3.2 6.0 10.7 10.3 6.1 3.8 2.7 1.8 1.4 1.6 2.1 2.3 2.0 1.9 2.0 2.0 1.6 1.1 0.7 0.5 0.3 0.2 0.1 0.8 1.7 2.6 4.4 7.0 7.2 5.8 4.3 3.1 2.2 1.8 1.9 2.1 1.9 1.4 1.0 2.5 2.6 1.8 1.1 0.6 0.4 0.2 0.1 0.1 0.1 0.6 1.4 2.5 3.9 5.1 5.3 4.6 3.7 3.1 2.6 2.4 2.7 2.6 1.8 1.0 0.7 3.5 4.4 2.5 1.3 0.6 0.3 0.2 0.1 0.1 0.1 0.6 1.3 2.3 3.1 3.5 3.4 3.1 3.1 3.0 3.2 4.0 4.5 3.0 1.6 0.7 7.3 6.0 3.7 1.7 0.7 0.4 0.2 0.1 0.1 0.0 0.5 1.1 1.8 2.4 2.6 2.7 3.0 3.3 3.2 3.1 4.1 5.7 6.2 4.9 2.1 0.9 0.4 0.2 0.1 0.1 0.0 0.0 0.5 1.0 1.6 2.3 3.0 3.8 4.5 3.8 2.3 1.8 6.1 4.9 2.3 1.0 0.5 0.2 0.1 0.1 0.0 0.0 0.5 0.9 1.5 2.7 3.6 3.1 5.7 1.8 1.2 3.1 2.0 1.0 0.5 0.2 0.1 0.1 0.0 0.0 0.4 0.8 1.6 2.9 4.5 1.5 3.5 4.1 2.9 1.5 1.8 1.2 0.6 0.3 0.2 0.1 0.1 0.0 0.0 0.0 0.3 0.7 1.4 2.8 5.5 6.5 2.6 2.1 2.3 2.8 2.3 1.5 1.0 0.8 0.5 0.3 0.2 0.1 0.1 0.0 0.0 0.0 0.3 0.5 1.1 2.4 5.5 6.0 1.1 2.5 4.1 3.5 2.2 1.8 1.5 1.0 0.6 0.4 0.3 0.2 0.1 0.1 0.1 0.0 0.2 0.3 0.7 1.7 3.7 5.6 6.3 0.3 1.1 2.1 2.2 1.5 1.3 1.1 0.8 0.5 0.3 0.2 0.1 0.1 0.1 0.0 0.1 0.2 0.5 1.1 2.1 3.5 2.1 0.2 0.7 1.0 0.9 0.7 0.5 0.5 0.4 0.2 0.1 0.1 0.1 0.1 0.2 0.3 0.7 1.2 1.7 1.3 0.6 0.4 0.5 0.4 0.3 0.2 0.2 0.2 0.1 0.1 0.1 0.1 0.2 0.4 0.6 0.7 0.5 0.2 0.2 0.2 0.2 0.1 0.1 0.1 0.0 0.1 0.1 0.2 0.3 0.3 0.1 0.1 0.1 0.1 0.1 0.1 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Luminaire Schedule Symbol Qty Label Arrangement Lum. Lumens LLF Description Lum. Watts Total Watts 8 WP Single 6057 0.900 XWM-FT-LED-06L-40 44.7 357.6 2 P1 Single 19324 0.900 MRM-LED-18L-SIL-FT-40-70CRI 135 270 2 P2 Back-Back 19324 0.900 MRM-LED-18L-SIL-FT-40-70CRI 135 540 Calculation Summary Label CalcType Units Avg Max Min Avg/Min Max/Min CalcPts_1 Illuminance Fc 1.94 10.8 0.0 N.A.N.A.EXHIBIT K EXHIBIT L 1 CITY OF LAKEVILLE DAKOTA COUNTY, MINNESOTA CONDITIONAL USE PERMIT FINDINGS OF FACT AND RECOMMENDATION On April 21, 2022, the Lakeville Planning Commission met at its regularly scheduled meeting to consider the application of Jessica Zazworsky and Bubble Barn Express Car Wash for a conditional use permit to allow a commercial car wash at 17453 Dodd Boulevard. The Planning Commission conducted a public hearing on the conditional use permit application preceded by published and mailed notice. The applicant was present and the Planning Commission heard testimony from all interested persons wishing to speak. FINDINGS OF FACT 1. The subject property is located in Comprehensive Planning District 5, which guides the property for commercial land uses. 2. The subject site is zoned C-3, General Commercial District. 3. Legal description of the property is: Lot 3, Block 1, Cedar and Dodd Retail Addition 4. Chapter 4 of the City of Lakeville Zoning Ordinance provides that a conditional use permit may not be issued unless certain criteria are satisfied. The criteria and our findings regarding them are: a. The proposed action has been considered in relation to the specific policies and provisions of and has been found to be consistent with the official City Comprehensive Plan. Finding: The proposed commercial car wash facility is consistent with the Comprehensive Plan’s guided commercial land use and the C-3, General Commercial District zoning of the property. b. The proposed use is or will be compatible with present and future land uses of the area. Finding: The proposed commercial car wash facility will be compatible with the present and future commercial land uses in the surrounding area. c. The proposed use conforms to all performance standards contained in the Zoning Ordinance and the City Code. Finding: The commercial car wash facility will conform to all performance standards contained in the Zoning Ordinance. 2 d. The proposed use can be accommodated with existing public services and will not overburden the City’s service capacity. Finding: The property is served with City sanitary sewer and water. The proposed commercial car wash facility will not overburden the City’s service capacity. e. Traffic generated by the proposed use is within capabilities of streets serving the property. Finding: The traffic generated by the proposed commercial car wash facility will not overburden the street serving the property. 5. The report dated April 14, 2022 prepared by Associate Planner Kris Jenson is incorporated herein. RECOMMENDATION The Planning Commission recommends that the City Council approve the conditional use permit conditioned upon compliance with the planning report prepared by Kris Jenson, Associate Planner, dated April 14, 2022. DATED: April 21, 2022 LAKEVILLE PLANNING COMMISSION BY: __________________________ Jeff Witte, Chair