HomeMy WebLinkAbout18673 Hancock Ave-Survey*Maintain 6" between bottom of siding and sod.*No structures in easements.
The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.
*Draintile connection required.
EROSION CONTROLMUST BE INSTALLED
BEFORE EXCAVATION
ENGINEERING REVIEWED
Date:__________________03/30/2022 lritchie
Planning DepartmentApprovedDate:__________________04/08/2022 dmorey