Loading...
HomeMy WebLinkAbout18673 Hancock Ave-Survey*Maintain 6" between bottom of siding and sod.*No structures in easements. The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection. *Draintile connection required. EROSION CONTROLMUST BE INSTALLED BEFORE EXCAVATION ENGINEERING REVIEWED Date:__________________03/30/2022 lritchie Planning DepartmentApprovedDate:__________________04/08/2022 dmorey