HomeMy WebLinkAbout18562 Hancock Avenue-Survey for PermitPlanning DepartmentApprovedDate:__________________04/11/2022 dmorey
The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with the
landscape inspection.
*Maintain 6" between bottom of siding and sod.*No structures in easements.
*Draintile connection required.
EROSION CONTROLMUST BE INSTALLED
BEFORE EXCAVATION
ENGINEERING REVIEWED
Date:__________________04/13/2022 lritchie