Loading...
HomeMy WebLinkAbout18562 Hancock Avenue-Survey for PermitPlanning DepartmentApprovedDate:__________________04/11/2022 dmorey The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with the landscape inspection. *Maintain 6" between bottom of siding and sod.*No structures in easements. *Draintile connection required. EROSION CONTROLMUST BE INSTALLED BEFORE EXCAVATION ENGINEERING REVIEWED Date:__________________04/13/2022 lritchie