HomeMy WebLinkAbout18817 Hammond Drive SurveyThe curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.ENGINEERING REVIEWEDDate:__________________07/19/2021jpesikEROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION*Maintain 6" between bottom of siding and sod.*No structures in easements.*Draintile connection required.Planning DepartmentApprovedDate:__________________07/20/2021dmorey