HomeMy WebLinkAboutLA201289 - 16380 Jaffna Place App & Forms wSWPPPRESIDENTIAL BUILDING
PERMIT APPLICATION
CITY OF LAKEVILLE
BUILDING INSPECTIONS DEPARTMENT
20195 HOLYOKE AVENUE
LAKEVILLE, MN 55044
952-985-4440
Office Use Only
__________________
Permit Number
___________________
Received By
___________________
Date Received
___________________
Fee Total
SITE ADDRESS:
MAILING ADDRESS: CITY: STATE: ZIP:
JOB DESCRIPTION:__________________________________ MASTER PLAN: (Number or Address)____________________
LIST OTHER STRUCTURES ON PROPERTY:_______________________________________________________________
ESTIMATED VALUATION: PROPOSED START DATE: END DATE:
(New Residential Only): LEGAL DESCRIPTION: LOT: _____ BLOCK: _____ SUBDIVISION:
APPLICANT IS: RESIDENT OWNER CONTRACTOR EMAIL
NEW MODEL HOME: YES NO (IF YES – ADMINISTRATIVE PERMIT REQUIRED)
PLEASE FILL OUT THE FOLLOWING COMPLETELY (All Contractor information must be as listed on State License)
RESIDENT OWNER
NAME:_______________________________________________________________________________
HOME PHONE #:_____________________________ CELL PHONE:___________________________
GENERAL CONTRACTOR
Homeowner
Contractor
CONTRACTOR:_______________________________________________________________________
LICENSE #:BC______________ LEAD CERTIFICATE#_______________ (PRE 1978 STRUCTURE)
OFFICE PHONE #:_____________________________ CELL PHONE:___________________________
ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________
PLUMBING WORK
Homeowner
Contractor
CONTRACTOR:__________________________________________LICENSE #: PM______________
OFFICE PHONE #:_____________________________ CELL PHONE:___________________________
ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________
MECHANICAL WORK
Homeowner
Contractor
CONTRACTOR:________________________________________ _______________________________
OFFICE PHONE #:_____________________________ CELL PHONE:___________________________
ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________
BOND #:_______________________________________ EXPIRATION DATE____________________
SEWER/WATER CONTRACTOR
New Construction Only
NAME:________________________________________________ ______________________________
HOME PHONE _____________________________ CELL PHONE:______________________________
BOND #:_______________________________________ EXPIRATION DATE____________________
INTEREST EARNINGS ON THE ESCROW ACCOUNTS, IF ANY, ARE RETAINED BY THE CITY TO OFFSET THE
ADMINISTRATIVE COSTS ASSOCIATED WITH PROCESSING THE ESCROW APPLICATION AND REFUND. I HEREBY
APPLY FOR A BUILDING PERMIT AND I ACKNOWLEDGE THAT THE INFORMATION ABOVE IS COMPLETE AND
ACCURATE; THAT THE WORK WILL BE IN CONFORMANCE WITH THE ORDINANCES AND CODES OF THE CITY AND
WITH THE STATE BUILDING CODE, THAT I UNDERSTAND THIS IS NOT A PERMIT AND WORK IS NOT TO START
WITHOUT A PERMIT AND THAT THE WORK WILL BE IN ACCORDANCE WITH THE APPROVED PLAN.
NAME OF APPLICANT (Please Print)DATE
APPLICANT’S SIGNATURE:
www.lakevillemn.gov
RESIDENTIAL BUILDING PERMIT APPLICATION
PAGE 2
OFFICE USE ONLY
BUILDING PERMIT TYPE REQUIRED INSPECTIONS
SINGLE FAMILY DWELLING BUILDING
DUPLEX AS BUILT
TOWNHOUSE UNITS BUILDING FINAL
DETACHED TOWN HOUSE UNIT DECK FOOTING
CONDO FIREPLACE
ACESSORY BUILDING FOOTING
REROOF FOUNDATION
RESIDE FRAMING
PORCH FRAMING
GARAGES
INSULATION
RES ADDN/REPAIR/RMDL
DECK
PORCH
GARAGES LATH
LOWER LEVEL FINISH LOWER LEVEL FINAL
ADDITION OTHER
FOUNDATION ONLY PORCH FOOTING
MISCELLANEOUS POURED WALL
DEMO SEPTIC TANK REMOVAL
MOVED SITE
MECHANICAL
CITY BUILDING VALUATION: $AIR TEST
FINAL
BUILDING PERMIT FEES ROUGH-IN
$PERMIT FEE PLUMBING
$PLAN CHECK FINAL
$SURCHARGE ROUGH-IN
$METRO SAC METER SIZE
$CITY WATER HOOKUP UNIT PRESSURE REDUCING VALVE
$CITY SEWER HOOKUP UNIT SEWER/WATER
$LANDSCAPE ESCROW SEWER/WATER
$TREE ESCROW FINAL
$MISC ESCROW STREET DRAINTILE
$PLUMBING BUILDING INFORMATION
$MECHANICAL TYPE OF CONSTRUCTION
$SEWER WATER ZONING
$OTHER CODE EDITION
$TOTAL FIRE SUPPRESSION SYSTEM
OCCUPANCY GROUP
APPROVED BY:
BUILDING INSPECTOR: Date:
PLUMBING/MECHANICAL
INSPECTOR: Date:
COMMENTS:
Passive (No Fan)
Active (With fan and monitoring
device )
Location (or future location) of Fan:
Other Please Describe Here
Not applicable, all ducts located in conditioned space
Not required per mech. code
Passive
Powered
Interlocked with exhaust device.
Describe:
Input in
BTUS:
Capacity in
Gallons:
Other, describe:
AFUE or
HSPF%
Cfm's
" round duct OR
" metal duct
Not required per mech. code
Passive
Low: Other, describe:
Low:
Location of fan(s), describe: Cfm's
" round duct OR
" metal duct
Per R401.3 Certificate. A building certificate shall be posted on or in the electrical distribution
panel.
New Construction Energy Code Compliance Certificate
Name of Residential Contractor MN License Number
City Mailing Address of the Dwelling or Dwelling Unit
Rigid, Extruded PolystyreneHeat Recover Ventilator (HRV) Capacity in cfms:
Energy Recover Ventilator (ERV) Capacity in cfms:
Combustion Air Select a Type
Location of duct or system:
Rim Joist (2nd Floor+)
Building envelope air tightness:
Below Entire Slab
Fuel Type
Solar Heat Gain Coefficient (SHGC):
Windows & Doors
Ceiling, vaulted
Bay Windows or cantilevered areas
Floors over unconditioned area
THERMAL ENVELOPE
Foam Open Cell Wall Rigid, Isocynurate Perimeter of Slab on Grade
RADON CONTROL SYSTEM
Total R-Value of all Types of InsulationType: Check All That Apply
Mineral FiberboardInsulation Location Foam, Closed Cell Describe other insulated areas
Ceiling, flat Non or Not ApplicableFiberglass, BlownFiberglass, Batts Foundation Wall
Output
in Tons:
Appliances Cooling System
Location of duct or system:
Heating or Cooling Ducts Outside Conditioned Spaces
Make-up Air Select a Type
Domestic Water
Heater
Model
Heating System
Rim Joist (1st Floor)
Average U-Factor (excludes skylights and one door ) U:
Duct system air tightness:
Rating or Size
Efficiency
Heating Gain Cooling Load
Select Type
Describe any additional or combined heating or cooling systems if installed: (e.g. two furnaces or air
source heat pump with gas back-up furnace):
Residential Load
Calculation
SEER
/EER
Capacity continuous ventilation rate in cfms:
Heating Loss
Manufacturer
Total ventilation (intermittent + continuous) rate in cfms:
Balanced Ventilation capacity in cfms:
High:
High:
MECHANICAL VENTILATION SYSTEM
Date Cert. Posted
R-value
MECHANICAL SYSTEMS
Builders Associaton of Minnesota version 101014
Bold/italic values have been manually overridden
Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.
2021-Dec-10 07:53:53
Right-Suite® Universal 2021 21.0.08 RSU29636 Page 1
... JAFFNA PLACE - 2620 LEFT EXT (ELY) - SOUTH.rup Calc = MJ8 Front Door faces: S
2620 Ext (Ely)Job:Load Short Form 12/9/2021Date:Entire House Energy Diagnostics, Inc.By:
Energy Diagnostics, Inc.
405 E Archer Way, Valparaiso, IN 46383 Phone: 219-464-4457 Fax: 219-464-0035
Project Information
DR Horton MNFor:
16439 Jaffna Place, Lakeville, MN 55044
Design Information
InfiltrationClgHtg
Blower doorMethod88-15Outside db (°F)
4 (substantial) / 2Shielding / stories7570Inside db (°F)
50 Pa / 813 cfmPressure / AVF1385Design TD (°F)
M-Daily range
5050Inside humidity (%)
3555Moisture difference (gr/lb)
HEATING EQUIPMENT COOLING EQUIPMENT
Make Bryant Make Bryant
Trade Bryant Legacy Line 92 Gas Furn... Trade BRYANT HEATING AND COOLING SYS...
Model 912SD42060E17 Cond BA13NA024BNG0G
AHRI ref 0 Coil CNPVU3017ALA++TDR
AHRI ref 201810140
Efficiency 92.1 AFUE Efficiency 10.5 EER, 13 SEER
Heating input Btuh60000 Sensible cooling Btuh15820
Heating output Btuh56000 Latent cooling Btuh6780
Temperature rise °F67 Total cooling Btuh22600
Actual air flow cfm780 Actual air flow cfm780
Air flow factor cfm/Btuh0.026 Air flow factor cfm/Btuh0.056
Static pressure in H2O0 Static pressure in H2O0
Space thermostat Load sensible heat ratio 0.80
ROOM NAME Area Htg load Clg load Htg AVF Clg AVF
(ft²)(Btuh)(Btuh)(cfm)(cfm)
1/2 BATH 32 417 38 11 2
OWNERS SUITE 202 2037 1044 52 59
LAUNDRY 53 90 492 2 28
BATH 2 86 1719 424 44 24
BED 2 150 2130 1117 55 63
OWNERS BATH 130 2504 440 64 25
OWNERS WIC 51 796 123 20 7
BED 3 139 2598 1162 67 66
KITCHEN/MUD RM 214 2715 3241 70 183
GREAT ROOM/FOYER 420 8039 2239 207 126
MECH 55 746 121 19 7
OFFICE 60 765 1026 20 58
UPPER HALL 224 571 217 15 12
DINING ROOM 120 5183 2128 133 120
Bold/italic values have been manually overridden
Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.
2021-Dec-10 07:53:53
Right-Suite® Universal 2021 21.0.08 RSU29636 Page 2
... JAFFNA PLACE - 2620 LEFT EXT (ELY) - SOUTH.rup Calc = MJ8 Front Door faces: S
Entire House 1935 30311 13812 780 780
Other equip loads 7519 246
Equip. @ 0.93 RSM 13074
Latent cooling 3483
TOTALS 1935 37831 16558 780 780
Bold/italic values have been manually overridden
Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.
2021-Dec-10 07:53:53Right-Suite® Universal 2021 21.0.08 RSU29636 Page 1... JAFFNA PLACE - 2620 LEFT EXT (ELY) - SOUTH.rup Calc = MJ8 Front Door faces: S
2620 Ext (Ely)Job:Project Summary 12/9/2021Date:Entire House Energy Diagnostics, Inc.By:
Energy Diagnostics, Inc.
405 E Archer Way, Valparaiso, IN 46383 Phone: 219-464-4457 Fax: 219-464-0035
Project Information
DR Horton MNFor:16439 Jaffna Place, Lakeville, MN 55044
Notes:
Design Information
Minneapolis, Crystal AP, MN, USWeather:
Winter Design Conditions Summer Design Conditions
Outside db °F-15 Outside db °F88Inside db °F70 Inside db °F75Design TD °F85 Design TD °F13Daily range MRelative humidity %50Moisture difference gr/lb35
Heating Summary Sensible Cooling Equipment Load Sizing
Structure Btuh30311 Structure Btuh13812Ducts Btuh0 Ducts Btuh0Central vent (SER=64% 49 cfm) Btuh1610 Central vent (SER=64% 49 cfm) 246 BtuhHeat recovery Heat recoveryHumidification Btuh5909 Blower Btuh0Piping Btuh0Equipment load Btuh37831 Use manufacturer's data nRate/swing multiplier 0.93InfiltrationEquipment sensible load Btuh13074
Method Latent Cooling Equipment Load SizingBlower doorShielding / stories 4 (substantial) / 250 Pa / 813 cfmPressure / AVF Structure Btuh2330Ducts Btuh0Central vent (49 cfm) Btuh1154CoolingHeatingHeat recovery19351935Area (ft²) Equipment latent load Btuh34831626916269Volume (ft³)Air changes/hour 0.130.31 Equipment Total Load (Sen+Lat)Btuh16558Equiv. AVF (cfm) 3685 Req. total capacity at 0.70 SHR ton1.6
Heating Equipment Summary Cooling Equipment Summary
Make Bryant Make BryantTrade Bryant Legacy Line 92 Gas Furn... Trade BRYANT HEATING AND COOLING SYS...Model 912SD42060E17 Cond BA13NA024BNG0GAHRI ref 0 Coil CNPVU3017ALA++TDRAHRI ref 201810140Efficiency 92.1 AFUE Efficiency 10.5 EER, 13 SEERHeating input Btuh60000 Sensible cooling Btuh15820Heating output Btuh56000 Latent cooling Btuh6780Temperature rise °F67 Total cooling Btuh22600Actual air flow cfm780 Actual air flow cfm780Air flow factor cfm/Btuh0.026 Air flow factor cfm/Btuh0.056Static pressure in H2O0 Static pressure in H2O0Space thermostat Load sensible heat ratio 0.80
Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.
2021-Dec-10 07:53:53
Right-Suite® Universal 2021 21.0.08 RSU29636 Page 1
... JAFFNA PLACE - 2620 LEFT EXT (ELY) - SOUTH.rup Calc = MJ8 Front Door faces: S
2620 Ext (Ely)Job:Loads for Multiple Orientations 12/9/2021Date:Entire House Energy Diagnostics, Inc.By:
Energy Diagnostics, Inc.
405 E Archer Way, Valparaiso, IN 46383 Phone: 219-464-4457 Fax: 219-464-0035
Project Information
DR Horton MNFor:
16439 Jaffna Place, Lakeville, MN 55044
Design Conditions
Location: CoolingHeatingIndoor:
7570Indoor temperature (°F)Minneapolis, Crystal AP, MN, US
1385Design TD (°F)ft869Elevation:
5050Relative humidity (%)°N45Latitude:
Outdoor:35.554.5Moisture difference (gr/lb)CoolingHeating
Infiltration:88-15Dry bulb (°F)
)M(20-Daily range (°F)
73-Wet bulb (°F)
7.515.0Wind speed (mph)
Front Door North Northeast East Southeast South Southwest West Northwest
Sensible Load (Btuh) 13473 15073 14994 14524 13074 14400 14658 14711
Latent Load (Btuh) 3483 3483 3483 3483 3483 3483 3483 3483
Total Load (Btuh) 16956 18556 18477 18008 16558 17883 18141 18195
Heating AVF (cfm) 780 780 780 780 780 780 780 780
Cooling AVF (cfm) 780 780 780 780 780 780 780 780
Building Orientation Cooling Load
Total Cooling Load (Btuh)Direction Front Door faces
0
5000
10000
15000
20000
N NE E SE S SW W NW
Front Door faces SouthCurrent Orientation:
Front Door faces NortheastHighest Cooling Load:
2021-Dec-10 07:53:56
Right-Suite® Universal 2021 21.0.08 RSU29636 Page 1
... JAFFNA PLACE - 2620 LEFT EXT (ELY) - SOUTH.rup Calc = MJ8 Front Door faces: S
2620 Ext (Ely)Job:Manual S Compliance Report 12/9/2021Date:Entire House Energy Diagnostics, Inc.By:
Energy Diagnostics, Inc.
405 E Archer Way, Valparaiso, IN 46383 Phone: 219-464-4457 Fax: 219-464-0035
Project Information
DR Horton MNFor:
16439 Jaffna Place, Lakeville, MN 55044
Cooling Equipment
Design Conditions
°F75.3Entering coil DB:Btuh14058Sensible gain:°F88.0Outdoor design DB:
°F63.0Entering coil WB:Btuh3483Latent gain:°F73.0Outdoor design WB:
Btuh17542Total gain:°F75.0Indoor design DB:
cfm780Estimated airflow:%50Indoor RH:
Manufacturer's Performance Data at Actual Design Conditions
Split ACEquipment type:
BA13NA024BNG0G+CNPVU3017ALA++TDRModel:BryantManufacturer:
cfm780Actual airflow:
% of load122Btuh17162Sensible capacity:
% of load126Btuh4378Latent capacity:
%80SHR:% of load123Btuh21540Total capacity:
Heating Equipment
Design Conditions
°F68.0Entering coil DB:Btuh37831Heat loss:°F-15Outdoor design DB:
°F70.0Indoor design DB:
Manufacturer's Performance Data at Actual Design Conditions
Gas furnaceEquipment type:
912SD42060E17Model:BryantManufacturer:
cfm780Actual airflow:
°F58Temp. rise:% of load148Btuh56000Output capacity:
Meets all requirements of ACCA Manual S.
2021-Dec-10 07:53:56
Right-Suite® Universal 2021 21.0.08 RSU29636 Page 1
... JAFFNA PLACE - 2620 LEFT EXT (ELY) - SOUTH.rup Calc = MJ8 Front Door faces: S
2620 Ext (Ely)Job:Parts Order 12/9/2021Date:
Energy Diagnostics, Inc.By:
Energy Diagnostics, Inc.
405 E Archer Way, Valparaiso, IN 46383 Phone: 219-464-4457 Fax: 219-464-0035
BILL TO: SHIP TO:
Attn: Attn:
Phone: Phone:
Fax: Fax:
Notes:
Ship viaDate requiredPurchase order #Ordered byOrder date
ExtensionDiscUnit listTotalQtyDescriptionPart #Src pricepieces
Rheia Duct System Equipment
RHEA 000901.09013-in Duct Uninsulated10-00-190
RHEA 00096.096.03-in ferrule10-01-010
RHEA 00038.038.0Duct board Take Off Inside10-01-040
RHEA 00038.038.0Duct board Take Off Outside10-01-050
RHEA 00014.014.0Ceiling Boot Assembly10-01-220
RHEA 00014.014.0Ceiling Diffuser Assembly10-04-230
RHEA 00052.052.0Hanger Bar Assembly00-00-240
RHEA 00016.016.0Elbow Extension10-01-020
RHEA 00024.024.0High Sidewall Boot Assembly10-01-200
RHEA 00024.024.0Slotted Diffuser10-04-090
RHEA 00010.010.0Coupler10-01-030
0Subtotal, Rheia Duct System Equipment
Duct System Equipment
WSF 4.3004.301.01.0Round metal duct, D = 13"DDMt13
PGM 20.80020.801.01.0Plenum round take off, size 13"FPLG-13
WSF 84.6004.7018.018.0Round metal duct, D = 15"DDMt15
PGM 29.40029.401.01.0Round smooth elbow, size 15"FDELS-15
PGM 39.40039.401.01.0Return boot from round duct, size 15"FBTO-15
PGM 23.20023.201.01.0Plenum round take off with trans, size 15"FPLJ-15
WSF 0001.01.0Rectangular metal floor two way grill, 12"x12"FRGRMFT-1212
201.70Subtotal, Duct System Equipment
201.70Overall total
2021-Dec-10 07:53:56
Right-Suite® Universal 2021 21.0.08 RSU29636 Page 2
... JAFFNA PLACE - 2620 LEFT EXT (ELY) - SOUTH.rup Calc = MJ8 Front Door faces: S
2021-Dec-10 07:53:56
Right-Suite® Universal 2021 21.0.08 RSU29636 Page 1
... JAFFNA PLACE - 2620 LEFT EXT (ELY) - SOUTH.rup Calc = MJ8 Front Door faces: S
2620 Ext (Ely)Job:Parts Pull Order 12/9/2021Date:
Energy Diagnostics, Inc.By:
Energy Diagnostics, Inc.
405 E Archer Way, Valparaiso, IN 46383 Phone: 219-464-4457 Fax: 219-464-0035
BILL TO: SHIP TO:
Attn: Attn:
Phone: Phone:
Fax: Fax:
Notes:
Ship viaDate requiredPurchase order #Ordered byOrder date
QtyQtyTotalQtyDescriptionPart #Src returnedissuedpieces
Rheia Duct System Equipment
RHEA 9019013-in Duct Uninsulated10-00-190
RHEA 96.0963-in ferrule10-01-010
RHEA 38.038Duct board Take Off Inside10-01-040
RHEA 38.038Duct board Take Off Outside10-01-050
RHEA 14.014Ceiling Boot Assembly10-01-220
RHEA 14.014Ceiling Diffuser Assembly10-04-230
RHEA 52.052Hanger Bar Assembly00-00-240
RHEA 16.016Elbow Extension10-01-020
RHEA 24.024High Sidewall Boot Assembly10-01-200
RHEA 24.024Slotted Diffuser10-04-090
RHEA 10.010Coupler10-01-030
Duct System Equipment
WSF 1.01.0Round metal duct, D = 13"DDMt13
PGM 1.01.0Plenum round take off, size 13"FPLG-13
WSF 18.018Round metal duct, D = 15"DDMt15
PGM 1.01.0Round smooth elbow, size 15"FDELS-15
PGM 1.01.0Return boot from round duct, size 15"FBTO-15
PGM 1.01.0Plenum round take off with trans, size 15"FPLJ-15
WSF 1.01.0Rectangular metal floor two way grill, 12"x12"FRGRMFT-1212
2021-Dec-10 07:53:56
Right-Suite® Universal 2021 21.0.08 RSU29636 Page 1
... JAFFNA PLACE - 2620 LEFT EXT (ELY) - SOUTH.rup Calc = MJ8 Front Door faces: S
2620 Ext (Ely)Job:Duct System Summary 12/9/2021Date:Entire House Energy Diagnostics, Inc.By:
Energy Diagnostics, Inc.
405 E Archer Way, Valparaiso, IN 46383 Phone: 219-464-4457 Fax: 219-464-0035
Project Information
DR Horton MNFor:
16439 Jaffna Place, Lakeville, MN 55044
System Totals
0.130Coil pressure loss (in H2O)CoolingDesign mode
0.131Supply duct pressure loss (in H2O)
0.192Return system pressure loss (in H2O)780Total design airflow (cfm)
0.452Total system pressure loss (in H2O)780Total actual airflow (cfm)
Room Details
AVF DiffAct AVFDsn AVFHtg AVFClg AVFHtg LoadClg LoadRoom Name
(%)(cfm)(cfm)(cfm)(cfm)(Btuh)(Btuh)
34092112417381/2 BATH
116559525920371044OWNERS SUITE
-15242822890492LAUNDRY
2242444241719424BATH 2
147263556321301117BED 2
2252564252504440OWNERS BATH
38107207796123OWNERS WIC
107266676625981162BED 3
-191481837018327153241KITCHEN/MUD RM
1114012620712680392239GREAT ROOM/FOYER
44107197746121MECH
-10525820587651026OFFICE
-512121512571217UPPER HALL
-411612013312051832128DINING ROOM
2021-Dec-10 07:53:56
Right-Suite® Universal 2021 21.0.08 RSU29636 Page 2
... JAFFNA PLACE - 2620 LEFT EXT (ELY) - SOUTH.rup Calc = MJ8 Front Door faces: S
Supply Run Details
LengthDamp PosVelocityDiamAct AVFDsn AVFReturnTrunkRun Name
(ft)(fpm)(in)(cfm)(cfm)
315178392rb1dmn11/2 BATH-A
22423031212rb1dmn1BATH 2-A
22423031212rb1dmn1BATH 2-B
47231331716rb1dmn1BED 2
45232831716rb1dmn1BED 2-A
43135731916rb1dmn1BED 2-B
43135831916rb1dmn1BED 2-C
46232631716rb1dmn1BED 3
44233031816rb1dmn1BED 3-A
49133931816rb1dmn1BED 3-B
41136431916rb1dmn1BED 3-C
7157233030rb1dmn1DINING ROOM
12156933030rb1dmn1DINING ROOM-A
12152532830rb1dmn1DINING ROOM-C
17151332730rb1dmn1DINING ROOM-D
7251732725rb1dmn1GREAT ROOM/FOYER
4253132825rb1dmn1GREAT
ROOM/FOYER-C 10165333525rb1dmn1GREAT
ROOM/FOYER-D 16149432625rb1dmn1GREAT
ROOM/FOYER-E 25144532425rb1dmn1GREAT
ROOM/FOYER-G 18149532631rb1dmn1KITCHEN/MUD RM-E
28139932131rb1dmn1KITCHEN/MUD RM-G
21148332631rb1dmn1KITCHEN/MUD RM-H
13153632831rb1dmn1KITCHEN/MUD RM-I
23143432331rb1dmn1KITCHEN/MUD RM-J
27144932431rb1dmn1KITCHEN/MUD RM-K
20144732428rb1dmn1LAUNDRY-A
951853107rb1dmn1MECH
18146232529rb1dmn1OFFICE-A
14151832729rb1dmn1OFFICE-B
13423831312rb1dmn1OWNERS BATH
18424031312rb1dmn1OWNERS BATH-A
18423631315rb1dmn1OWNERS SUITE-B
22332831715rb1dmn1OWNERS SUITE-C
19333631815rb1dmn1OWNERS SUITE-D
18333431815rb1dmn1OWNERS SUITE-E
1851823107rb1dmn1OWNERS WIC-A
41421931212rb1dmn1UPPER HALL
Supply Trunk Details
TrunkLengthDuctH x WDiamVelocClgHtgName
(ft)Material(in)(in)(fpm)(cfm)(cfm)
st10ShtMetl24x1213390780780dmn1
1ShtMetl0x013846780780st1
2021-Dec-10 07:53:56
Right-Suite® Universal 2021 21.0.08 RSU29636 Page 3
... JAFFNA PLACE - 2620 LEFT EXT (ELY) - SOUTH.rup Calc = MJ8 Front Door faces: S
Return Branch Details
TrunkDuctStud/JoistH x WDiamVelocTELClgHtgGrilleName
MatlOpening (in)(in)(in)(fpm)(in)(cfm)(cfm)Size (in)
ShMt0x015636887807800x0rb1
Job #: 2620 Ext (Ely)
Performed by Energy Diagnostics, Inc. for:
DR Horton MN
16439 Jaffna Place
Lakeville, MN 55044
Energy Diagnostics, Inc.
405 E Archer Way
Valparaiso, IN 46383
Phone: 219-464-4457 Fax: 219-464-0035
Scale: 1 : 86
Page 1
Right-Suite® Universal 2021
21.0.08 RSU296362021-Dec-10 07:54:31
... 2620 LEFT EXT (ELY) - SOUTH.rup
N
MAIN
KITCHEN/MUD RM
DINING ROOM
1/2 BATHMAIN RIGHT UNIT
GREAT ROOM/FOYER
DINING ROOM-C
28 cfm
3.1 " Ceiling Round
DINING ROOM
30 cfm
3.1 " Ceiling Round
DINING ROOM-D
27 cfm3.1 " Ceiling Round
DINING ROOM-A
30 cfm
3.1 " Ceiling Round
1/2 BATH-A
9 cfm
3.1 " Ceiling Round
rb1
780 cfm
12 "
Insulated Duct OR Air
barrier/insulation for
Bed 2/3
GREAT ROOM/FOYER
27 cfm
3.1 " Ceiling Round
GREAT ROOM/FOYER-C
28 cfm3.1 " Ceiling Round
GREAT ROOM/FOYER-D
35 cfm3.1 " Ceiling Round
GREAT ROOM/FOYER-E
26 cfm
3.1 " Ceiling Round
GREAT ROOM/FOYER-G24 cfm3.1 " Ceiling Round
KITCHEN/MUD RM-G21 cfm
3.1 " Sidewall Slot
KITCHEN/MUD RM-H
26 cfm
3.1 " Ceiling Round
KITCHEN/MUD RM-I
28 cfm
3.1 " Ceiling Round
KITCHEN/MUD RM-J23 cfm
3.1 " Sidewall Slot
KITCHEN/MUD RM-E
26 cfm
3.1 " Ceiling Round
KITCHEN/MUD RM-K24 cfm
3.1 " Ceiling Round
Job #: 2620 Ext (Ely)
Performed by Energy Diagnostics, Inc. for:
DR Horton MN
16439 Jaffna Place
Lakeville, MN 55044
Energy Diagnostics, Inc.
405 E Archer Way
Valparaiso, IN 46383
Phone: 219-464-4457 Fax: 219-464-0035
Scale: 1 : 86
Page 2
Right-Suite® Universal 2021
21.0.08 RSU296362021-Dec-10 07:54:32
... 2620 LEFT EXT (ELY) - SOUTH.rup
N
UPPER
OWNERS SUITE
LAUNDRY
BATH 2
BED 3 BED 2
OWNERS BATH
OWNERS WIC
UPPPER RIGHT UNIT
MECH
OFFICE
UPPER HALL
20'-9"
OWNERS BATH
13 cfm3.1 " Sidewall Slot
MECH10 cfm
3.1 " Sidewall Slot
OWNERS SUITE-B
13 cfm
3.1 " Sidewall Slot
LAUNDRY-A
24 cfm
3.1 " Sidewall Slot
OWNERS SUITE-C
17 cfm3.1 " Sidewall Slot
UPPER HALL
12 cfm
3.1 " Sidewall Slot
BED 3-A
18 cfm
3.1 " Sidewall Slot
BED 2-A
17 cfm3.1 " Sidewall Slot
BED 3
17 cfm3.1 " Sidewall Slot
BED 3-B
18 cfm
3.1 " Sidewall Slot
BATH 2-A
12 cfm
3.1 " Sidewall Slot
Downflow
furnace
OFFICE-A25 cfm
3.1 " Sidewall Slot
OFFICE-B
27 cfm
3.1 " Sidewall Slot
OWNERS WIC-A
10 cfm
3.1 " Sidewall Slot
Furnace:
912SD42060E17
Coil:
CNPVU3017ALA
OWNERS BATH-A13 cfm
3.1 " Sidewall Slot
OWNERS SUITE-D
18 cfm3.1 " Sidewall Slot
BED 2-B19 cfm
3.1 " Sidewall SlotBED 217 cfm3.1 " Sidewall Slot
BED 2-C19 cfm
3.1 " Sidewall Slot
BATH 2-B12 cfm
3.1 " Sidewall Slot
BED 3-C
19 cfm
3.1 " Sidewall Slot
OWNERS SUITE-E18 cfm
3.1 " Sidewall Slot
NEW RESIDENTIAL CONSTRUCTION SWPPP VERIFICATION
This form must be completed and submitted with all new residential permit applications.
New residential building permits WILL NOT be issued without this completed form.
Project Site Address: _____________________________________________________________________
Company Name: _________________________________________________________________________
Primary Contact: _________________________________________________________________________
Phone # (24 hr Contact): ______________________ Email: ______________________________________
Description of Land Disturbing Activity: _____________________________________________________
NPDES Construction Stormwater Permit # C000 ___ ___ ___ ___ ___ or # SUB00 ___ ___ ___ ___ ___
If you are not covered under a NPDES Construction Stormwater Permit administered by the MPCA, an
erosion and sediment control plan MUST be submitted with the residential building permit application.
“The permittee(s) shall ensure that the individuals are trained by local, state, federal agencies, professional organizations or other entities
in erosion prevention, sediment control, permanent Stormwater management and the Minnesota NPDES/SDS Construction Stormwater
Permit.” (NPDES Construction Stormwater Permit, MPCA)
“The permittee(s) must ensure that a trained person (as identified in Part III.A.3.a) will routinely inspect the entire construction site at least
once every seven (7) days during active construction and within 24 hours after a rainfall event greater than 0.5 inches in 24 hours.”
(NPDES Construction Stormwater Permit, MPCA)
Contact information of person CERTIFIED to provide weekly onsite erosion and sediment control
inspections and corrective actions:
Name of Person: ________________________________Company: _______________________________
Phone # (24 hr Contact): ______________________ Email: ______________________________________
Entity that Provided Training: ________________________ Certification Expiration Date: ____________
NOTE: Prior to any land-disturbing activity, all erosion and sediment controls must be installed on the project site and on individual lots.
No land disturbing activity may begin until a residential building permit has been issued.
I understand, the above information to be true and I will have read, understood, and accepted all terms and conditions of the National
Pollutant Discharge Elimination System (NPDES) Permit (MN R 100001). The City of Lakeville may issue a STOP WORK ORDER;
withhold building inspections; or, draw on securities/escrows to bring the site into compliance with the NPDES Construction Stormwater
Permit (MN R 100001) or erosion and sediment control plan.
Signature: ________________________________________________ Date:_________________________
Contact the City of Lakeville with questions at erosion@lakevillemn.gov or 952-985-4500