HomeMy WebLinkAboutLA201294 - 16392 Jaffna Place-Permit PackRESIDENTIAL BUILDING
PERMIT APPLICATION
CITY OF LAKEVILLE
BUILDING INSPECTIONS DEPARTMENT
20195 HOLYOKE AVENUE
LAKEVILLE, MN 55044
952-985-4440
Office Use Only
__________________
Permit Number
___________________
Received By
___________________
Date Received
___________________
Fee Total
SITE ADDRESS:
MAILING ADDRESS: CITY: STATE: ZIP:
JOB DESCRIPTION:__________________________________ MASTER PLAN: (Number or Address)____________________
LIST OTHER STRUCTURES ON PROPERTY:_______________________________________________________________
ESTIMATED VALUATION: PROPOSED START DATE: END DATE:
(New Residential Only): LEGAL DESCRIPTION: LOT: _____ BLOCK: _____ SUBDIVISION:
APPLICANT IS: RESIDENT OWNER CONTRACTOR EMAIL
NEW MODEL HOME: YES NO (IF YES – ADMINISTRATIVE PERMIT REQUIRED)
PLEASE FILL OUT THE FOLLOWING COMPLETELY (All Contractor information must be as listed on State License)
RESIDENT OWNER
NAME:_______________________________________________________________________________
HOME PHONE #:_____________________________ CELL PHONE:___________________________
GENERAL CONTRACTOR
Homeowner
Contractor
CONTRACTOR:_______________________________________________________________________
LICENSE #:BC______________ LEAD CERTIFICATE#_______________ (PRE 1978 STRUCTURE)
OFFICE PHONE #:_____________________________ CELL PHONE:___________________________
ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________
PLUMBING WORK
Homeowner
Contractor
CONTRACTOR:__________________________________________LICENSE #: PM______________
OFFICE PHONE #:_____________________________ CELL PHONE:___________________________
ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________
MECHANICAL WORK
Homeowner
Contractor
CONTRACTOR:________________________________________ _______________________________
OFFICE PHONE #:_____________________________ CELL PHONE:___________________________
ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________
BOND #:_______________________________________ EXPIRATION DATE____________________
SEWER/WATER CONTRACTOR
New Construction Only
NAME:________________________________________________ ______________________________
HOME PHONE _____________________________ CELL PHONE:______________________________
BOND #:_______________________________________ EXPIRATION DATE____________________
INTEREST EARNINGS ON THE ESCROW ACCOUNTS, IF ANY, ARE RETAINED BY THE CITY TO OFFSET THE
ADMINISTRATIVE COSTS ASSOCIATED WITH PROCESSING THE ESCROW APPLICATION AND REFUND. I HEREBY
APPLY FOR A BUILDING PERMIT AND I ACKNOWLEDGE THAT THE INFORMATION ABOVE IS COMPLETE AND
ACCURATE; THAT THE WORK WILL BE IN CONFORMANCE WITH THE ORDINANCES AND CODES OF THE CITY AND
WITH THE STATE BUILDING CODE, THAT I UNDERSTAND THIS IS NOT A PERMIT AND WORK IS NOT TO START
WITHOUT A PERMIT AND THAT THE WORK WILL BE IN ACCORDANCE WITH THE APPROVED PLAN.
NAME OF APPLICANT (Please Print)DATE
APPLICANT’S SIGNATURE:
www.lakevillemn.gov
RESIDENTIAL BUILDING PERMIT APPLICATION
PAGE 2
OFFICE USE ONLY
BUILDING PERMIT TYPE REQUIRED INSPECTIONS
SINGLE FAMILY DWELLING BUILDING
DUPLEX AS BUILT
TOWNHOUSE UNITS BUILDING FINAL
DETACHED TOWN HOUSE UNIT DECK FOOTING
CONDO FIREPLACE
ACESSORY BUILDING FOOTING
REROOF FOUNDATION
RESIDE FRAMING
PORCH FRAMING
GARAGES
INSULATION
RES ADDN/REPAIR/RMDL
DECK
PORCH
GARAGES LATH
LOWER LEVEL FINISH LOWER LEVEL FINAL
ADDITION OTHER
FOUNDATION ONLY PORCH FOOTING
MISCELLANEOUS POURED WALL
DEMO SEPTIC TANK REMOVAL
MOVED SITE
MECHANICAL
CITY BUILDING VALUATION: $AIR TEST
FINAL
BUILDING PERMIT FEES ROUGH-IN
$PERMIT FEE PLUMBING
$PLAN CHECK FINAL
$SURCHARGE ROUGH-IN
$METRO SAC METER SIZE
$CITY WATER HOOKUP UNIT PRESSURE REDUCING VALVE
$CITY SEWER HOOKUP UNIT SEWER/WATER
$LANDSCAPE ESCROW SEWER/WATER
$TREE ESCROW FINAL
$MISC ESCROW STREET DRAINTILE
$PLUMBING BUILDING INFORMATION
$MECHANICAL TYPE OF CONSTRUCTION
$SEWER WATER ZONING
$OTHER CODE EDITION
$TOTAL FIRE SUPPRESSION SYSTEM
OCCUPANCY GROUP
APPROVED BY:
BUILDING INSPECTOR: Date:
PLUMBING/MECHANICAL
INSPECTOR: Date:
COMMENTS:
Passive (No Fan)
Active (With fan and monitoring
device )
Location (or future location) of Fan:
Other Please Describe Here
Not applicable, all ducts located in conditioned space
Not required per mech. code
Passive
Powered
Interlocked with exhaust device. Describe:
Input in
BTUS:
Capacity in
Gallons:Other, describe:
AFUE or
HSPF%
Cfm's
" round duct OR
" metal duct
Not required per mech. code
Passive
Low: Other, describe:
Low:
Location of fan(s), describe: Cfm's
" round duct OR
" metal duct
Per R401.3 Certificate. A building certificate shall be posted on or in the electrical distribution
panel.
New Construction Energy Code Compliance Certificate
Name of Residential Contractor MN License Number
City Mailing Address of the Dwelling or Dwelling Unit
Rigid, Extruded PolystyreneHeat Recover Ventilator (HRV) Capacity in cfms:
Energy Recover Ventilator (ERV) Capacity in cfms:
Combustion Air Select a Type
Location of duct or system:
Rim Joist (2nd Floor+)
Building envelope air tightness:
Below Entire Slab
Fuel Type
Solar Heat Gain Coefficient (SHGC):
Windows & Doors
Ceiling, vaulted
Bay Windows or cantilevered areas
Floors over unconditioned area
THERMAL ENVELOPE
Foam Open Cell Wall Rigid, Isocynurate Perimeter of Slab on Grade
RADON CONTROL SYSTEM
Total R-Value of all Types of InsulationType: Check All That Apply
Mineral FiberboardInsulation Location Foam, Closed Cell Describe other insulated areas
Ceiling, flat Non or Not ApplicableFiberglass, BlownFiberglass, Batts Foundation Wall
Output
in Tons:
Appliances Cooling System
Location of duct or system:
Heating or Cooling Ducts Outside Conditioned Spaces
Make-up Air Select a Type
Domestic Water
Heater
Model
Heating System
Rim Joist (1st Floor)
Average U-Factor (excludes skylights and one door ) U:
Duct system air tightness:
Rating or Size
Efficiency
Heating Gain Cooling Load
Select Type
Describe any additional or combined heating or cooling systems if installed: (e.g. two furnaces or air source heat pump with gas back-up furnace):
Residential Load
Calculation
SEER
/EER
Capacity continuous ventilation rate in cfms:
Heating Loss
Manufacturer
Total ventilation (intermittent + continuous) rate in cfms:
Balanced Ventilation capacity in cfms:
High:
High:
MECHANICAL VENTILATION SYSTEM
Date Cert. Posted
R-value
MECHANICAL SYSTEMS
Builders Associaton of Minnesota version 101014
Bold/italic values have been manually overridden
Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.
2021-Dec-10 06:39:37
Right-Suite® Universal 2021 21.0.08 RSU29636 Page 1
...5 JAFFNA PLACE - 2625 INT (FAIRFAX) - SOUTH.rup Calc = MJ8 Front Door faces: S
2625 INT (FAIRFAX)Job:Load Short Form 12/9/2021Date:Entire House Energy Diagnostics, Inc.By:
Energy Diagnostics, Inc.
405 E Archer Way, Valparaiso, IN 46383 Phone: 219-464-4457 Fax: 219-464-0035
Project Information
DR Horton MNFor:
16445 Jaffna Place, Lakeville, MN 55044
Design Information
InfiltrationClgHtg
Blower doorMethod88-15Outside db (°F)
4 (substantial) / 2Shielding / stories7570Inside db (°F)
50 Pa / 813 cfmPressure / AVF1385Design TD (°F)
M-Daily range
5050Inside humidity (%)
3555Moisture difference (gr/lb)
HEATING EQUIPMENT COOLING EQUIPMENT
Make Bryant Make Bryant
Trade Bryant Legacy Line 92 Gas Furn... Trade BRYANT HEATING AND COOLING SYS...
Model 912SD36040E17 Cond BA13NA024BNG0G
AHRI ref 0 Coil CNPVU3017ALA++TDR
AHRI ref 201810140
Efficiency 92.1 AFUE Efficiency 10.5 EER, 13 SEER
Heating input Btuh40000 Sensible cooling Btuh15820
Heating output Btuh37000 Latent cooling Btuh6780
Temperature rise °F47 Total cooling Btuh22600
Actual air flow cfm745 Actual air flow cfm745
Air flow factor cfm/Btuh0.031 Air flow factor cfm/Btuh0.064
Static pressure in H2O0 Static pressure in H2O0
Space thermostat Load sensible heat ratio 0.77
ROOM NAME Area Htg load Clg load Htg AVF Clg AVF
(ft²)(Btuh)(Btuh)(cfm)(cfm)
1/2 BATH 32 71 0 2 0
OWNERS SUITE 202 2274 1106 69 71
LAUNDRY 53 90 515 3 33
BATH 2 86 693 137 21 9
BED 2 150 2356 1182 72 76
OWNERS BATH 132 2735 463 83 30
OWNERS WIC 48 82 45 2 3
BED 3 139 2969 1238 91 79
KITCHEN/MUD RM 214 3084 3412 94 219
GREAT ROOM/FOYER 540 9295 2529 284 162
MECH 55 94 52 3 3
OFFICE 60 102 721 3 46
UPPER HALL 224 571 226 17 15
Bold/italic values have been manually overridden
Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.
2021-Dec-10 06:39:37
Right-Suite® Universal 2021 21.0.08 RSU29636 Page 2
...5 JAFFNA PLACE - 2625 INT (FAIRFAX) - SOUTH.rup Calc = MJ8 Front Door faces: S
Entire House 1935 24418 11624 745 745
Other equip loads 7519 246
Equip. @ 0.93 RSM 11040
Latent cooling 3483
TOTALS 1935 31937 14523 745 745
Bold/italic values have been manually overridden
Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.
2021-Dec-10 06:39:37Right-Suite® Universal 2021 21.0.08 RSU29636 Page 1...5 JAFFNA PLACE - 2625 INT (FAIRFAX) - SOUTH.rup Calc = MJ8 Front Door faces: S
2625 INT (FAIRFAX)Job:Project Summary 12/9/2021Date:Entire House Energy Diagnostics, Inc.By:
Energy Diagnostics, Inc.
405 E Archer Way, Valparaiso, IN 46383 Phone: 219-464-4457 Fax: 219-464-0035
Project Information
DR Horton MNFor:16445 Jaffna Place, Lakeville, MN 55044
Notes:
Design Information
Minneapolis, Crystal AP, MN, USWeather:
Winter Design Conditions Summer Design Conditions
Outside db °F-15 Outside db °F88Inside db °F70 Inside db °F75Design TD °F85 Design TD °F13Daily range MRelative humidity %50Moisture difference gr/lb35
Heating Summary Sensible Cooling Equipment Load Sizing
Structure Btuh24418 Structure Btuh11624Ducts Btuh0 Ducts Btuh0Central vent (SER=64% 49 cfm) Btuh1610 Central vent (SER=64% 49 cfm) 246 BtuhHeat recovery Heat recoveryHumidification Btuh5909 Blower Btuh0Piping Btuh0Equipment load Btuh31937 Use manufacturer's data nRate/swing multiplier 0.93InfiltrationEquipment sensible load Btuh11040
Method Latent Cooling Equipment Load SizingBlower doorShielding / stories 4 (substantial) / 250 Pa / 813 cfmPressure / AVF Structure Btuh2330Ducts Btuh0Central vent (49 cfm) Btuh1154CoolingHeatingHeat recovery19351935Area (ft²) Equipment latent load Btuh34831626916269Volume (ft³)Air changes/hour 0.130.31 Equipment Total Load (Sen+Lat)Btuh14523Equiv. AVF (cfm) 3685 Req. total capacity at 0.70 SHR ton1.3
Heating Equipment Summary Cooling Equipment Summary
Make Bryant Make BryantTrade Bryant Legacy Line 92 Gas Furn... Trade BRYANT HEATING AND COOLING SYS...Model 912SD36040E17 Cond BA13NA024BNG0GAHRI ref 0 Coil CNPVU3017ALA++TDRAHRI ref 201810140Efficiency 92.1 AFUE Efficiency 10.5 EER, 13 SEERHeating input Btuh40000 Sensible cooling Btuh15820Heating output Btuh37000 Latent cooling Btuh6780Temperature rise °F47 Total cooling Btuh22600Actual air flow cfm745 Actual air flow cfm745Air flow factor cfm/Btuh0.031 Air flow factor cfm/Btuh0.064Static pressure in H2O0 Static pressure in H2O0Space thermostat Load sensible heat ratio 0.77
Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.
2021-Dec-10 06:39:37
Right-Suite® Universal 2021 21.0.08 RSU29636 Page 1
...5 JAFFNA PLACE - 2625 INT (FAIRFAX) - SOUTH.rup Calc = MJ8 Front Door faces: S
2625 INT (FAIRFAX)Job:Loads for Multiple Orientations 12/9/2021Date:Entire House Energy Diagnostics, Inc.By:
Energy Diagnostics, Inc.
405 E Archer Way, Valparaiso, IN 46383 Phone: 219-464-4457 Fax: 219-464-0035
Project Information
DR Horton MNFor:
16445 Jaffna Place, Lakeville, MN 55044
Design Conditions
Location: CoolingHeatingIndoor:
7570Indoor temperature (°F)Minneapolis, Crystal AP, MN, US
1385Design TD (°F)ft869Elevation:
5050Relative humidity (%)°N45Latitude:
Outdoor:35.554.5Moisture difference (gr/lb)CoolingHeating
Infiltration:88-15Dry bulb (°F)
)M(20-Daily range (°F)
73-Wet bulb (°F)
7.515.0Wind speed (mph)
Front Door North Northeast East Southeast South Southwest West Northwest
Sensible Load (Btuh) 11711 13978 13970 12567 11040 12823 13653 13135
Latent Load (Btuh) 3483 3483 3483 3483 3483 3483 3483 3483
Total Load (Btuh) 15194 17461 17453 16051 14523 16306 17136 16618
Heating AVF (cfm) 745 745 745 745 745 745 745 745
Cooling AVF (cfm) 745 745 745 745 745 745 745 745
Building Orientation Cooling Load
Total Cooling Load (Btuh)Direction Front Door faces
0
5000
10000
15000
20000
N NE E SE S SW W NW
Front Door faces SouthCurrent Orientation:
Front Door faces NortheastHighest Cooling Load:
2021-Dec-10 06:39:40
Right-Suite® Universal 2021 21.0.08 RSU29636 Page 1
...5 JAFFNA PLACE - 2625 INT (FAIRFAX) - SOUTH.rup Calc = MJ8 Front Door faces: S
2625 INT (FAIRFAX)Job:Manual S Compliance Report 12/9/2021Date:Entire House Energy Diagnostics, Inc.By:
Energy Diagnostics, Inc.
405 E Archer Way, Valparaiso, IN 46383 Phone: 219-464-4457 Fax: 219-464-0035
Project Information
DR Horton MNFor:
16445 Jaffna Place, Lakeville, MN 55044
Cooling Equipment
Design Conditions
°F75.3Entering coil DB:Btuh11871Sensible gain:°F88.0Outdoor design DB:
°F63.0Entering coil WB:Btuh3483Latent gain:°F73.0Outdoor design WB:
Btuh15354Total gain:°F75.0Indoor design DB:
cfm745Estimated airflow:%50Indoor RH:
Manufacturer's Performance Data at Actual Design Conditions
Split ACEquipment type:
BA13NA024BNG0G+CNPVU3017ALA++TDRModel:BryantManufacturer:
cfm745Actual airflow:
% of load151Btuh17936Sensible capacity:
% of load123Btuh4299Latent capacity:
%81SHR:% of load145Btuh22234Total capacity:
Heating Equipment
Design Conditions
°F67.9Entering coil DB:Btuh31937Heat loss:°F-15Outdoor design DB:
°F70.0Indoor design DB:
Manufacturer's Performance Data at Actual Design Conditions
Gas furnaceEquipment type:
912SD36040E17Model:BryantManufacturer:
cfm745Actual airflow:
°F50Temp. rise:% of load116Btuh37000Output capacity:
Meets all requirements of ACCA Manual S.
2021-Dec-10 06:39:40
Right-Suite® Universal 2021 21.0.08 RSU29636 Page 1
...5 JAFFNA PLACE - 2625 INT (FAIRFAX) - SOUTH.rup Calc = MJ8 Front Door faces: S
2625 INT (FAIRFAX)Job:Parts Order 12/9/2021Date:
Energy Diagnostics, Inc.By:
Energy Diagnostics, Inc.
405 E Archer Way, Valparaiso, IN 46383 Phone: 219-464-4457 Fax: 219-464-0035
BILL TO: SHIP TO:
Attn: Attn:
Phone: Phone:
Fax: Fax:
Notes:
Ship viaDate requiredPurchase order #Ordered byOrder date
ExtensionDiscUnit listTotalQtyDescriptionPart #Src pricepieces
Rheia Duct System Equipment
RHEA 000895.08953-in Duct Uninsulated10-00-190
RHEA 00098.098.03-in ferrule10-01-010
RHEA 00038.038.0Duct board Take Off Inside10-01-040
RHEA 00038.038.0Duct board Take Off Outside10-01-050
RHEA 00014.014.0Ceiling Boot Assembly10-01-220
RHEA 00014.014.0Ceiling Diffuser Assembly10-04-230
RHEA 00052.052.0Hanger Bar Assembly00-00-240
RHEA 00018.018.0Elbow Extension10-01-020
RHEA 00024.024.0High Sidewall Boot Assembly10-01-200
RHEA 00024.024.0Slotted Diffuser10-04-090
RHEA 00011.011.0Coupler10-01-030
0Subtotal, Rheia Duct System Equipment
Duct System Equipment
WSF 4.3004.301.01.0Round metal duct, D = 13"DDMt13
PGM 20.80020.801.01.0Plenum round take off, size 13"FPLG-13
WSF 81.0004.5018.018.0Round metal duct, D = 14"DDMt14
PGM 28.00028.001.01.0Round smooth elbow, size 14"FDELS-14
WSF 0001.01.0Return boot from round duct, size 14"FBTO-14
WSF 0001.01.0Plenum side round take off with trans, size 14"FPLJ-14
WSF 0001.01.0Rectangular metal floor two way grill, 12"x12"FRGRMFT-1212
134.10Subtotal, Duct System Equipment
134.10Overall total
2021-Dec-10 06:39:40
Right-Suite® Universal 2021 21.0.08 RSU29636 Page 2
...5 JAFFNA PLACE - 2625 INT (FAIRFAX) - SOUTH.rup Calc = MJ8 Front Door faces: S
2021-Dec-10 06:39:40
Right-Suite® Universal 2021 21.0.08 RSU29636 Page 1
...5 JAFFNA PLACE - 2625 INT (FAIRFAX) - SOUTH.rup Calc = MJ8 Front Door faces: S
2625 INT (FAIRFAX)Job:Parts Pull Order 12/9/2021Date:
Energy Diagnostics, Inc.By:
Energy Diagnostics, Inc.
405 E Archer Way, Valparaiso, IN 46383 Phone: 219-464-4457 Fax: 219-464-0035
BILL TO: SHIP TO:
Attn: Attn:
Phone: Phone:
Fax: Fax:
Notes:
Ship viaDate requiredPurchase order #Ordered byOrder date
QtyQtyTotalQtyDescriptionPart #Src returnedissuedpieces
Rheia Duct System Equipment
RHEA 8958953-in Duct Uninsulated10-00-190
RHEA 98.0983-in ferrule10-01-010
RHEA 38.038Duct board Take Off Inside10-01-040
RHEA 38.038Duct board Take Off Outside10-01-050
RHEA 14.014Ceiling Boot Assembly10-01-220
RHEA 14.014Ceiling Diffuser Assembly10-04-230
RHEA 52.052Hanger Bar Assembly00-00-240
RHEA 18.018Elbow Extension10-01-020
RHEA 24.024High Sidewall Boot Assembly10-01-200
RHEA 24.024Slotted Diffuser10-04-090
RHEA 11.011Coupler10-01-030
Duct System Equipment
WSF 1.01.0Round metal duct, D = 13"DDMt13
PGM 1.01.0Plenum round take off, size 13"FPLG-13
WSF 18.018Round metal duct, D = 14"DDMt14
PGM 1.01.0Round smooth elbow, size 14"FDELS-14
WSF 1.01.0Return boot from round duct, size 14"FBTO-14
WSF 1.01.0Plenum side round take off with trans, size 14"FPLJ-14
WSF 1.01.0Rectangular metal floor two way grill, 12"x12"FRGRMFT-1212
2021-Dec-10 06:39:40
Right-Suite® Universal 2021 21.0.08 RSU29636 Page 1
...5 JAFFNA PLACE - 2625 INT (FAIRFAX) - SOUTH.rup Calc = MJ8 Front Door faces: S
2625 INT (FAIRFAX)Job:Duct System Summary 12/9/2021Date:Entire House Energy Diagnostics, Inc.By:
Energy Diagnostics, Inc.
405 E Archer Way, Valparaiso, IN 46383 Phone: 219-464-4457 Fax: 219-464-0035
Project Information
DR Horton MNFor:
16445 Jaffna Place, Lakeville, MN 55044
System Totals
0.120Coil pressure loss (in H2O)HeatingDesign mode
0.123Supply duct pressure loss (in H2O)
0.194Return system pressure loss (in H2O)745Total design airflow (cfm)
0.436Total system pressure loss (in H2O)745Total actual airflow (cfm)
Room Details
AVF DiffAct AVFDsn AVFHtg AVFClg AVFHtg LoadClg LoadRoom Name
(%)(cfm)(cfm)(cfm)(cfm)(Btuh)(Btuh)
31992207101/2 BATH
37269697122741106OWNERS SUITE
2359333390515LAUNDRY
12121219693137BATH 2
17272727623561182BED 2
-12738383302735463OWNERS BATH
27492238245OWNERS WIC
-207291917929691238BED 3
498949421930843412KITCHEN/MUD RM
-826128428416292952529GREAT ROOM/FOYER
233103339452MECH
498193346102721OFFICE
719171715571226UPPER HALL
2021-Dec-10 06:39:40
Right-Suite® Universal 2021 21.0.08 RSU29636 Page 2
...5 JAFFNA PLACE - 2625 INT (FAIRFAX) - SOUTH.rup Calc = MJ8 Front Door faces: S
Supply Run Details
LengthDamp PosVelocityDiamAct AVFDsn AVFReturnTrunkRun Name
(ft)(fpm)(in)(cfm)(cfm)
315172392rb1dmn11/2 BATH-A
22140232121rb1dmn1BATH 2-A
48133331818rb1dmn1BED 2
45134031818rb1dmn1BED 2-A
42134931918rb1dmn1BED 2-B
45134131818rb1dmn1BED 2-C
46133931823rb1dmn1BED 3
44134431823rb1dmn1BED 3-A
49132931723rb1dmn1BED 3-B
41135331923rb1dmn1BED 3-C
4163133432rb1dmn1GREAT
ROOM/FOYER-A 7161433332rb1dmn1GREAT
ROOM/FOYER-B 12155232932rb1dmn1GREAT
ROOM/FOYER-C 17149732632rb1dmn1GREAT
ROOM/FOYER-D 12150932732rb1dmn1GREAT
ROOM/FOYER-E 7155432932rb1dmn1GREAT
ROOM/FOYER-F 25143232332rb1dmn1GREAT
ROOM/FOYER-G 17149632632rb1dmn1GREAT
ROOM/FOYER-H 10163333432rb1dmn1GREAT ROOM/FOYER-I
13423731316rb1dmn1KITCHEN/MUD RM-C
18334031816rb1dmn1KITCHEN/MUD RM-E
29330031616rb1dmn1KITCHEN/MUD RM-G
21333631816rb1dmn1KITCHEN/MUD RM-H
22331431716rb1dmn1KITCHEN/MUD RM-I
29331731716rb1dmn1KITCHEN/MUD RM-K
205174393rb1dmn1LAUNDRY-A
951803103rb1dmn1MECH
175175392rb1dmn1OFFICE-A
145177392rb1dmn1OFFICE-B
13145732428rb1dmn1OWNERS BATH
18147532528rb1dmn1OWNERS BATH-A
14145032428rb1dmn1OWNERS BATH-B
21332031717rb1dmn1OWNERS SUITE-A
18332531717rb1dmn1OWNERS SUITE-B
22331831717rb1dmn1OWNERS SUITE-C
16238932117rb1dmn1OWNERS SUITE-D
185176392rb1dmn1OWNERS WIC-A
41135231917rb1dmn1UPPER HALL
Supply Trunk Details
TrunkLengthDuctH x WDiamVelocClgHtgName
(ft)Material(in)(in)(fpm)(cfm)(cfm)
st10ShtMetl24x1212372745745dmn1
1ShtMetl0x013808745745st1
2021-Dec-10 06:39:40
Right-Suite® Universal 2021 21.0.08 RSU29636 Page 3
...5 JAFFNA PLACE - 2625 INT (FAIRFAX) - SOUTH.rup Calc = MJ8 Front Door faces: S
Return Branch Details
TrunkDuctStud/JoistH x WDiamVelocTELClgHtgGrilleName
MatlOpening (in)(in)(in)(fpm)(in)(cfm)(cfm)Size (in)
ShMt0x014697887457450x0rb1
Job #: 2625 INT (FAIRFAX)
Performed by Energy Diagnostics, Inc. for:
DR Horton MN
16445 Jaffna PlaceLakeville, MN 55044
Energy Diagnostics, Inc.
405 E Archer WayValparaiso, IN 46383
Phone: 219-464-4457 Fax: 219-464-0035
Scale: 1 : 93
Page 1Right-Suite® Universal 2021
21.0.08 RSU296362021-Dec-10 06:40:08
...- 2625 INT (FAIRFAX) - SOUTH.rup
N
MAIN
KITCHEN/MUD RM
1/2 BATHMAIN RIGHT UNIT
GREAT ROOM/FOYER
MAIN LEFT UNIT
1/2 BATH-A
9 cfm3.1 " Ceiling Round
rb1745 cfm
12 "
Insulated duct OR
air barrer and
insulation need forduct routes of bed
2/3
GREAT ROOM/FOYER-F29 cfm
3.1 " Ceiling Round
GREAT ROOM/FOYER-A34 cfm
3.1 " Ceiling Round
GREAT ROOM/FOYER-B
33 cfm3.1 " Ceiling Round
GREAT ROOM/FOYER-C29 cfm
3.1 " Ceiling Round
GREAT ROOM/FOYER-D26 cfm
3.1 " Ceiling Round
GREAT ROOM/FOYER-E27 cfm
3.1 " Ceiling Round
KITCHEN/MUD RM-G16 cfm
3.1 " Sidewall Slot
KITCHEN/MUD RM-H18 cfm
3.1 " Ceiling Round
KITCHEN/MUD RM-I17 cfm
3.1 " Sidewall Slot
KITCHEN/MUD RM-C
13 cfm3.1 " Ceiling Round
KITCHEN/MUD RM-E
18 cfm3.1 " Ceiling Round
GREAT ROOM/FOYER-G
23 cfm
3.1 " Ceiling Round
GREAT ROOM/FOYER-H
26 cfm3.1 " Ceiling Round
GREAT ROOM/FOYER-I
34 cfm3.1 " Ceiling Round
KITCHEN/MUD RM-K
17 cfm3.1 " Ceiling Round
Job #: 2625 INT (FAIRFAX)
Performed by Energy Diagnostics, Inc. for:
DR Horton MN
16445 Jaffna PlaceLakeville, MN 55044
Energy Diagnostics, Inc.
405 E Archer WayValparaiso, IN 46383
Phone: 219-464-4457 Fax: 219-464-0035
Scale: 1 : 93
Page 2Right-Suite® Universal 2021
21.0.08 RSU296362021-Dec-10 06:40:08
...- 2625 INT (FAIRFAX) - SOUTH.rup
N
UPPER
OWNERS SUITE
LAUNDRY
BATH 2
BED 3 BED 2
OWNERS BATH
OWNERS WIC
UPPPER RIGHT UNIT
MECH
OFFICE
UPPER HALL
UPPER LEFT UNIT
OWNERS WIC-A
9 cfm3.1 " Sidewall Slot
OWNERS BATH-A
25 cfm3.1 " Sidewall Slot
OWNERS BATH
24 cfm3.1 " Sidewall Slot
MECH
10 cfm
3.1 " Sidewall Slot
OWNERS SUITE-B17 cfm
3.1 " Sidewall Slot
LAUNDRY-A9 cfm
3.1 " Sidewall Slot
OWNERS SUITE-A17 cfm
3.1 " Sidewall Slot
OWNERS SUITE-C
17 cfm3.1 " Sidewall Slot
UPPER HALL
19 cfm3.1 " Sidewall Slot
BED 3-A18 cfm
3.1 " Sidewall Slot
BED 318 cfm
3.1 " Sidewall Slot BED 218 cfm
3.1 " Sidewall Slot
BED 3-B17 cfm
3.1 " Sidewall Slot
BATH 2-A
21 cfm3.1 " Sidewall Slot
DOWNFLOW
FURNACE
BED 3-C19 cfm
3.1 " Sidewall Slot
OFFICE-A
9 cfm
3.1 " Sidewall Slot
OFFICE-B
9 cfm3.1 " Sidewall Slot
OWNERS BATH-B24 cfm
3.1 " Sidewall Slot
Furnace:912SD36040E17
Coil: CNPVU3017ALA
OWNERS SUITE-D
21 cfm3.1 " Sidewall Slot
BED 2-A
18 cfm
3.1 " Sidewall Slot
BED 2-B19 cfm
3.1 " Sidewall Slot
BED 2-C18 cfm
3.1 " Sidewall Slot