Loading...
HomeMy WebLinkAbout9815 189th Street-SurveyZoning = RS-3 removedremoved removed removed tree preservation notes: 4/19/22 EA/SB *Maintain 6" between bottom of siding and sod. *No structures in easements. The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies will be released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection. *Draintile connection required. EROSION CONTROLMUST BE INSTALLED BEFORE EXCAVATION ENGINEERING REVIEWED Date:__________________04/22/2022 lritchie