Loading...
HomeMy WebLinkAboutLA20470 - Approved Anand Dhanasekaran ENG CAD-minEverlight Solar Construction, 7369 Highway 13 W, Savage, MN 55378 Subject: Structural Certification for Installation of Residential Solar re job:Anand Dhanasekaran, 7852 204th Street West, Lakeville, MN 55044 Attn.: To Whom It May Concern ROOF 1: 115 mph Ground Snow:50 psf B Min Roof Snow:NA psf ROOF 1: Current Renewables Engineering Inc. Professional Engineer projects@creng.solar Code:2020 MINNESOTA BUILDING CODE (ASCE 7-16) Ult Wind Speed: Exposure Cat: After review of the field observation report and based on our structural capacity calculations in accordance with applicable building codes, the existing roof framing supporting the proposed solar panel layout has been determined to be: adequate to support the imposed loads. Therefore, no structural upgrades are required. 4/20/2022 A field observation was performed to document the existing framing of the above mentioned address. From the field observation, the existing roof structure was observed as: Shingle roofing supported by 2x4 Truss @ 24 in. OC spacing. The roof is sloped at approximately 33 degrees and has a max beam span of 8 ft between supports. Design Criteria: 4/20/2022 Everlight Solar Construction 7369 Highway 13 W Savage, MN 55378 Attn.: To Whom It May Concern re job:Anand Dhanasekaran 7852 204th Street West Lakeville, MN 55044 Design Criteria: Code:2020 MINNESOTA BUILDING CODE ASCE 7-16 Live Load:20 psf Ult Wind Speed:115 mph Exposure Cat:B Ground Snow:50 psf Min Roof Snow:NA Current Renewables Engineering Inc. Professional Engineer projects@creng.solar 4/20/2022 The following calculations are for the structural engineering design of the photovoltaic panels and are valid only for the structural info referenced in the stamped plan set. The verification of such info is the responsibility of others. After review, I certify that the roof structure has sufficient structural capacity for the applied PV loads. All mounting equipment shall be designed and installed per manufacturer's approved installation specifications. 4/20/2022 Job Code: Anand Dhanasekaran 2 of 6 Roof Properties: Roof Type = Roof Pitch (deg) = Mean Roof Height (ft) = Attachment Trib Width (ft) = Attachment Spacing (ft) = Framing Type = Framing Size = Framing OC Spacing (in.) = Section Thickness, b (in.) = Section Depth, d (in.) = Section Modulus, Sx (in.^3) = Moment of Inertia, Ix (in.^4) = Framing Span (ft) = Deflection Limit D+L (in.) = Deflection Limit S or W (in.) = Framing Upgrade = Sister Size = Wood Species = Wood Fb (psi) = Wood Fv (psi) = Wood E (psi) = CD (Wind) = CD (Snow) = CM = Ct = CL = Ci = CF = Cfu = Cr = F'b_wind (psi) = F'b_snow (psi) = F'v_wind (psi) = F'v_snow (psi) = M_allowable_wind (lb-ft) = M_allowable_snow (lb-ft) = V_allowable_wind (lbs) = V_allowable_snow (lbs) = E' (psi) = Load Calculation: 543 1400000 509 756 155 709 1996 216 1.15 2777 1.5 1.00 1.0 1.6 1.15 135 1400000 SPF #2 875 Adequate NA 1.07 8 1.6 3.1 5.4 1.5 3.5 2x4 24 4 Truss 13 2.75 Shingle 33 Roof 1 Job Code: Anand Dhanasekaran 3 of 6 Panels Dead Load (psf) = Roofing Weight (psf) = Decking Weight (psf) = Framing Weight (psf) = Misc. Additional Weight (psf) = Existing Dead Load (psf) = Total Dead Load (psf) = Ground Snow Load, pg (psf) = Min Flat Snow, pf_min (psf) = Min Sloped Snow, ps_min (psf) = Snow Importance Factor, Ic = Exposure Factor, Ce = Thermal Factor, Ct = Flat Roof Snow, pf (psf) = Slope Factore, Cs = Sloped Roof Snow, ps (psf) = Ultimate Wind Speed (mph) = Directionality Factor, kd = Topographic Factor, kzt = Velocity Press Exp Factor, kz = Ground Elevation Factor, ke = Velocity Pressure, qz (psf) = Array Edge Factor, γE = Solar Equalization Factor, γa = External Pressure Up, GCp_1 = External Pressure Up, GCp_2 = External Pressure Up, GCp_3 = External Pressure Down, GCp = Design Pressure Up, p_1 (psf) = Design Pressure Up, p_2 (psf) = Design Pressure Up, p_3 (psf) = Design Pressure Down, p (psf) =16.0 -31.8 -38.8 0.8 -26.5 -1.8 -2.2 1.25 0.70 -1.5 0.70 1.00 20.2 115 0.85 1.0 Roof 1 35 Wind Load Calculations: 34.65 1.00 Roof 1 1.1 Snow Load Calculations: 50 NA NA 1.0 0.9 6.6 9.6 0.6 1.0 3.0 2.0 Dead Load Calculations: 3.0 Roof 1 Job Code: Anand Dhanasekaran 4 of 6 Hardware Checks: Ref. Widthrawal Value, W (lb/in) = (CM = Ct = Ceg = 1.0) CD = Adjusted Widthrawal Value, W' (lb/in) = Lag Penetration, p (in.) = Allowable Widthrawal Force, W'p (lbs) = Applied Uplift Force (lbs) = Uplift DCR = Ref. Lateral Value, Z (lbs) = (CM = Ct = CΔ = Ceg = 1.0) CD = Adjusted Lateral Value, Z' (lbs) = Applied Laeral Force (lbs) = Angle of Resultant Force, α (deg) = Adjusted Interaction Lateral Value, Z'α (lbs) = Lateral DCR = Roof Framing Checks: LC1: D+S Applied Moment (lb-ft) = Applied Shear (lbs) = Allowable Moment (lb-ft) = Allowable Shear (lbs) = Moment DCR = Shear DCR = LC2: D+0.6W Applied Moment (lb-ft) = Applied Shear (lbs) = Allowable Moment (lb-ft) = Allowable Shear (lbs) = Moment DCR = Shear DCR = LC3: D+0.75(S+0.6W) Applied Moment (lb-ft) = Applied Shear (lbs) = Allowable Moment (lb-ft) =709 456 342 0.29 0.20 709 756 205 154 0.93 0.65 509 543 354 Force Checks: Roof 1 472 396 0.57 226 41 1.15 288 0.24 250 820 -193 328 2.5 205 1.6 Lag Screw Checks: Roof 1 Job Code: Anand Dhanasekaran 5 of 6 Allowable Shear (lbs) = Moment DCR = Shear DCR = LC4: 0.6D+0.6W Applied Moment (lb-ft) = Applied Shear (lbs) = Allowable Moment (lb-ft) = Allowable Shear (lbs) = Moment DCR = Shear DCR = LC1: D+L Deflection (in.) = Deflection Limit (in.) = Deflection DCR = LC2: S Deflection (in.) = Deflection Limit (in.) = Deflection DCR = LC3: W (Down) Deflection (in.) = Deflection Limit (in.) = Deflection DCR = LC4: W (Up) Deflection (in.) = Deflection Limit (in.) = Deflection DCR = Seismic Check: Wall Weight (psf) = Tributary Wall Area (ft2) = Total Wall Weight (lbs) = Roof Weight (psf) = Roof Area (ft2) = Total Roof Weight (lbs) = Total Existing Weight (lbs) = 1000 17000 7 2400 15844 32844 0.04 Existing Weight: 17 -0.05 1.23 1.23 0.03 0.14 0.03 0.17 1.23 1.84 0.04 Deflection Checks (Service Level): Roof 1 0.07 0.15 0.11 709 756 108 81 0.64 0.45 756 Job Code: Anand Dhanasekaran 6 of 6 Total Additional PV Weight (lbs) = (Existing W + Additional W)/(Existing W) =104% The increase in weight as a result of the solar system is less than 10% of the existing structure and therefore no further seismic analysis is required. Limits of Scope of Work and Liability: Existing structure is assumed to have been designed and constructed following appropriate codes at time of erection, and assumed to have appropriate permits. The calculations produced are only for the roof framing supporting the proposed PV installation referenced in the stamped planset and were completed according to generally recognized structural analysis standards and procedures, professional engineering and design experience, opinions and judgements. Existing deficiencies which are unknown or were not observable during time of inspection are not included in this scope of work. All PV modules, racking, and mounting equipment shall be designed and installed per manufacturer's approved installation specifications. The Engineer of Record and the engineering consulting firm assume no responsibility for misuse or improper installation. This analysis is not stamped for water leakage. Framing was determined based on information in provided plans and/or photos, along with engineering judgement. Prior to commencement of work, the contractor shall verify the framing sizes, spacings, and spans noted in the stamped plans, calculations, and cert letter (where applicable) and notify the Engineer of Record of any discrepancies prior to starting construction. Contractor shall also verify that there is no damaged framing that was not addressed in stamped plans, calculations, and cert letter (where applicable) and notify the Engineer of Record of any concerns prior to starting construction. Additional PV Weight: 1252 Weight Increase: Everlight Solar Construction 7369 Highway 13 W Savage, MN 55378 License# BC771658 833.786.4387 ext. 701 CONTRACTOR INFORMATION: SITE INFORMATION Anand Dhanasekaran 7852 204th Street West Lakeville, MN 55044 AC SYSTEM SIZE: 6.576 kW AC DC SYSTEM SIZE: 7.935 kW DC Lat, 44.6526365 Long, -93.224645 (23) Mission Solar MSE345SX5T PV MODULES (12)AP Systems YC600 INVERTER(S) Xcel Energy MN DATE: April 20, 2022 COVER PAGE - PV01 DRAWN BY: SoloCAD 1.INSTALLATION OF SOLAR PHOTOVOLTAIC SYSTEM SHALL BE IN ACCORDANCE WITH NEC ARTICLE 690, AND ALL OTHER APPLICABLE NEC CODES WHERE NOTED OR EXISTING. 2.PROPER ACCESS AND WORKING CLEARANCE AROUND EXISTING AND PROPOSED ELECTRICAL EQUIPMENT WILL COMPLY WITH NEC ARTICLE 110. 3. ALL WIRES, INCLUDING THE GROUNDING ELECTRODE CONDUCTOR SHALL BE PROTECTED FROM PHYSICAL DAMAGE IN ACCORDANCE WITH NEC ARTICLE 250 4. THE PV MODULES ARE CONSIDERED NON-COMBUSTIBLE; THIS SYSTEM IS UTILITY INTERACTIVE PER UL 1741 AND DOES NOT INCLUDE STORAGE BATTERIES OR OTHER ALTERNATIVE STORAGE SOURCES. 5. ALL DC WIRES SHALL BE SIZED ACCORDING TO [NEC 690.8] 6.DC CONDUCTORS SHALL BE WITHIN PROTECTED RACEWAYS IN ACCORDANCE WITH [NEC 690.31] 7. ALL SIGNAGE TO BE PLACED IN ACCORDANCE WITH LOCAL JURISDICTIONAL BUILDING CODE. PHOTOVOLTAIC (PV) SYSTEM SPECIFICATIONS AERIAL VIEW: OCCUPANCY: R-3 ZONING: RESIDENTIAL STREET VIEW: GENERAL NOTES APPLICABLE GOVERNING CODES SITE SPECIFICATIONS 2020 NEC 2020 MRC 2020 MFC 2020 MBC EQUIPMENT: AC SYSTEM SIZE: 6.576 kW AC DC SYSTEM SIZE: 7.935 kW DC (23) Mission Solar MSE345SX5T PV MODULES (12)AP Systems YC600 INVERTER(S) RACKING: Quickbolt - 48" O.C. PV01 COVER PAGE PV02 SITE PLAN PV03 ROOF ATTACHMENTS PV04 MOUNTING DETAIL PV05 LINE DIAGRAM PV06 ELECTRICAL CALCS PV07 LABELS PV08 PLACARD PV09 SITE PHOTOS SHEET INDEX: 4/20/2022 PV M MSP AC PV M MSP AC C JB JB ACAC Everlight Solar Construction 7369 Highway 13 W Savage, MN 55378 License# BC771658 833.786.4387 ext. 701 CONTRACTOR INFORMATION: SITE INFORMATION Anand Dhanasekaran 7852 204th Street West Lakeville, MN 55044 AC SYSTEM SIZE: 6.576 kW AC DC SYSTEM SIZE: 7.935 kW DC Lat, 44.6526365 Long, -93.224645 (23) Mission Solar MSE345SX5T PV MODULES (12)AP Systems YC600 INVERTER(S) Xcel Energy MN DATE: April 20, 2022 FRONT OF HOME 7852 204th Street West VISIBLE, LOCKABLE, LABELED AC DISCONNECT LOCATED WITHIN 10' OF UTILITY METER $//39(48,30(17,167$//(' :,7+,1 2)87,/,7<0(7(5 81(6&257('.(</(66 $&&(666+$//%(3529,'(' 72;&(/(1(5*<)25$// ;&(/(1(5*<2:1(' 0(7(56$1'',6&211(&76 62/$5$55$<,19(57(56 %(+,1'3$1(/6 0$,16(59,&(3$1(/ /2&$7(',16,'( SITE PLAN - PV02 DRAWN BY: SoloCAD MP1MP2 ARRAY DETAILS: MOUNTING PLANE:AZIMUTH:TILT: MP1 91°33° MP2 271°33° CASE #: 04924221 NO CLEARANCE ISSUES AROUND HOME OR SOLAR ARRAY 87,/,7<$&',6&211(&7 EQUIPMENT LEGEND: INVERTERVISIBLE, LOCKABLE, LABELED AC DISCONNECT METER SOCKET (FOR UTILITY PV METER) UTILITY METER MAIN SERVICE PANEL LC LOAD CENTER FIRE ACCESS PATHWAY (3' TYP) C INV PV AC MSP M COMBINER BOX PROPERTY LINE BATT BATTERY(IES) SUB SUB PANEL GREENWOOD AVE60 FTELECTRIC SERVICE LINES ARE UNDERGROUND NOT OVERHEAD 139'-4" 98'-5" 4/20/2022 PV M MSP AC PV M MSP AC C JB JB ACAC EQUIPMENT INFORMATION:ROOF INFO:PHOTOVOLTAIC ARRAY STRUCTURAL CRITERIA: RAIL MANUFACTURER:IronRidge ROOF TYPE:Asphalt Shingle PV MODULE COUNT:23 RAIL PART NUMBER:XR-10 ROOF FRAMING:Traditional Framing (Stick Framing)ARRAY AREA:MODULE COUNT * 19.83 ft² = 456.09 ATTACHMENTS Quickbolt RAFTER/TOP CHORD SIZE:2x4 ROOF AREA:2803 ft² ATTACHMENT QTY:48 RAFTER/TOP CHORD SPACING:24"PERCENT OF ROOF COVERED:16% SPLICE QTY:6 ATTACHMENT SPACING:48''ARRAY WEIGHT:MODULE COUNT * 45 lbs = 1035 lbs MIDCLAMP QTY:34 DISTRIBUTED LOAD:ARRAY LBS/ATTACHMENTS = 21.56 ENDCLAMP QTY:24 POINT LOAD: (lbs/ft²)(ARRAY) WEIGHT/AREA = 2.27 lbs/ft² Everlight Solar Construction 7369 Highway 13 W Savage, MN 55378 License# BC771658 833.786.4387 ext. 701 CONTRACTOR INFORMATION: SITE INFORMATION Anand Dhanasekaran 7852 204th Street West Lakeville, MN 55044 AC SYSTEM SIZE: 6.576 kW AC DC SYSTEM SIZE: 7.935 kW DC Lat, 44.6526365 Long, -93.224645 (23) Mission Solar MSE345SX5T PV MODULES (12)AP Systems YC600 INVERTER(S) Xcel Energy MN DATE: April 20, 2022 ROOF ATTACHMENTS - PV03 DRAWN BY: SoloCAD 18" TYP 36" FIRE ACCESS PATHWAY36" FIRE ACCESS PATHWAY 18" TYP 4/20/2022 5$,/ /)227$77$&+0(17%5$&.(7 ( 522))5$0,1* 48,&.%2/7 )/$6+,1* 3902'8/( ( &2036+,1*/(522) /$<(5 5$,/ (1'&/$03 3902'8/( 0,'&/$03 3902'8/(  0,1 '(37+ 5$,/ 5$,/ )/$6+,1* 48,&.%2/7 2'-8" MIN - 3'-10" MAX  5$,/ 3902'8/( " MAX."1'-8" MAX.  FRONT VIEW 10" MIN - 1'-4" MAX2'-8" MIN - 3'-10" MAX 10" MIN - 1'-4" MAX SIDE VIEW ( 5$)7(5723&+25'6 ( 5$)7(5723&+25' DETAIL, MOUNTING AND FLASHING END CLAMP DETAILS MID CLAMP DETAILS   EQUIPMENT INFORMATION:ROOF INFO:PHOTOVOLTAIC ARRAY STRUCTURAL CRITERIA: RAIL MANUFACTURER:IronRidge ROOF TYPE:Asphalt Shingle PV MODULE COUNT:23 RAIL PART NUMBER:XR-10 ROOF FRAMING:Traditional Framing (Stick Framing)ARRAY AREA:MODULE COUNT * 19.83 ft² = 456.09 ATTACHMENTS Quickbolt RAFTER/TOP CHORD SIZE:2x4 ROOF AREA:2803 ft² ATTACHMENT QTY:48 RAFTER/TOP CHORD SPACING:24"PERCENT OF ROOF COVERED:16% SPLICE QTY:6 ATTACHMENT SPACING:48''ARRAY WEIGHT:MODULE COUNT * 45 lbs = 1035 lbs MIDCLAMP QTY:34 DISTRIBUTED LOAD:ARRAY LBS/ATTACHMENTS = 21.56 ENDCLAMP QTY:24 POINT LOAD: (lbs/ft²)(ARRAY) WEIGHT/AREA = 2.27 lbs/ft² Everlight Solar Construction 7369 Highway 13 W Savage, MN 55378 License# BC771658 833.786.4387 ext. 701 CONTRACTOR INFORMATION: SITE INFORMATION Anand Dhanasekaran 7852 204th Street West Lakeville, MN 55044 AC SYSTEM SIZE: 6.576 kW AC DC SYSTEM SIZE: 7.935 kW DC Lat, 44.6526365 Long, -93.224645 (23) Mission Solar MSE345SX5T PV MODULES (12)AP Systems YC600 INVERTER(S) Xcel Energy MN DATE: April 20, 2022 MOUNTING DETAIL - PV04 DRAWN BY: SoloCAD 4/20/2022 J-BOX STRING (1): 15.96 A AC, 14 MODULES STRING (2): 11.40 A AC, 9 MODULES N G 3 AC COMBINER BOX SOLAR LOADS ONLYUL 1741 COMPLIANT AC DC AC DC5 INVERTERS AC DC AC DC7 INVERTERS J-BOX (N) 100A (2) 20A-2P J-BOX1 2 1 2 4 (E) LOADS N G (E) GROUNDING ELECTRODE SUPPLY SIDE CONNECTION: NEC 230.46, NEC 230.79, NEC 705.12(A). K4977-INT MILBANK LUG KIT TO BE ADDED (E) 150A-2P (E) 150A MAIN SERVICE PANEL (E) (E) UTILITY METER 120/240 VAC TO UTILITY GRID 1-PH, 240V RATED SERVICE LUG KIT CANNOT BE SPLICING TYPE UTILITY PV PRODUCTION METER LOAD SIDE 4 4 4 (N) 35A FUSES VISIBLE-OPEN TYPE, LOCKABLE, READILY ACCESSIBLE, LABELED, 240V, 2-POLE VISIBLE-OPEN TYPE, LOCKABLE, READILY ACCESSIBLE, LABELED, 240V, 2-POLE, FUSED 60A60A LINE SIDE 1-PH, 3-WIRE, 120/240V, 200A NO LOADS OR STAGE SYSTEM ON DER SIDE OF PRODUCTION METER THE PV PRODUCTION METER SOCKET MUST HAVE LEVER BYPASS 5()(5(1&(32,172)$33/,&$%,/,7< UTILITY AC DISCONNECT PHOTOVOLTAIC AC DISCONNECT Everlight Solar Construction 7369 Highway 13 W Savage, MN 55378 License# BC771658 833.786.4387 ext. 701 CONTRACTOR INFORMATION: SITE INFORMATION Anand Dhanasekaran 7852 204th Street West Lakeville, MN 55044 AC SYSTEM SIZE: 6.576 kW AC DC SYSTEM SIZE: 7.935 kW DC Lat, 44.6526365 Long, -93.224645 (23) Mission Solar MSE345SX5T PV MODULES (12) AP Systems YC600 INVERTER(S) Xcel Energy MN DATE: April 20, 2022 LINE DIAGRAM - PV05 DRAWN BY: SoloCAD AP Systems YC600 Specs MAX INPUT VOLTAGE:55 V MAX DC SHORT CIRCUIT CURRENT:12 A MAXIMUM OUTPUT POWER:548 W MAXIMUM OUTPUT CURRENT:2.28 A NOM. OUTPUT VOLTAGE:240 V MAX UNITS PER 20A CIRCUIT:7 1-Phase, 60 HZ, UL 1741 Listed Mission Solar MSE345SX5T Specs POWER MAX (PMAX):345W OPEN CIRCUIT VOLTAGE (VOC):41V MAX POWER-POINT CURRENT (IMP):10.34A MAX POWER-POINT VOLTAGE (VMP):33.37V SHORT CIRCUIT CURRENT (ISC):10.92A SERIES FUSE RATING:20A CASE #: 04924221 VISIBLE, LOCKABLE, LABELED AC DISCONNECT LOCATED WITHIN 10' OF UTILITY METER Conduit & Conductor Schedule TAG QTY WIRE GAUGE DESCRIPTION CONDUIT SIZE 1 (2)12-2 TC-ER, THWN-2, COPPER (L1, L2)N/A - FREE AIR(1)6 AWG THWN-2 COPPER - (GROUND) 2 (2)10 AWG THHN/THWN-2, COPPER - (L1, L2)3/4" EMT(1)10 AWG THWN-2 COPPER - (GROUND) 3 (4)10 AWG THHN/THWN-2, COPPER - (L1, L2)3/4" EMT(1)10 AWG THWN-2 COPPER - (GROUND) 4 (3)8 AWG THWN-2 COPPER - (L1, L2, NEUTRAL)3/4" EMT(1)10 AWG THWN-2 COPPER - (GROUND) DESIGN SHALL MEET NEC REQUIREMENTS Equipment Schedule TYPE:QTY:DESCRIPTION:RATING: MODULES:(23)Mission Solar MSE345SX5T 345 W INVERTERS:(12)AP Systems YC600 548 W AC DISCONNECTS:(1)PV AC Disconnect, 240V, 2-Pole 60 A ALL PV EQUIPMENT INSTALLED WITHIN 10' OF UTILITY METER INTERCONNECTION NOTES 1. GROUND FAULT PROTECTION IN ACCORDANCE WITH [NEC 215.9] & [NEC 230.95] 2. SUPPLY SIDE INTERCONNECTION ACCORDING TO [NEC705.12(A)] WITH SERVICE ENTRANCE CONDUCTORS IN ACCORDANCE WITH [NEC 240.21(B)] DISCONNECT NOTES 1. DISCONNECTING SWITCHES SHALL BE WIRED SUCH THAT WHEN THE SWITCH IS OPENED THE CONDUCTORS REMAINING LIVE ARE CONNECTED TO THE TERMINALS MARKED “LINE SIDE” (TYPICALLY THE UPPER TERMINALS) 2. AC DISCONNECT MUST BE ACCESSIBLE TO QUALIFIED UTILITY PERSONNEL, BE LOCKABLE, AND BE A VISIBLE-BREAK SWITCH. 3. FUSED AC DISCONNECT TO BE USED. GROUNDING & GENERAL NOTES: 1. PV INVERTER IS UNGROUNDED, TRANSFORMER-LESS TYPE. 2. DC GEC AND AC EGC TO BE SPLICED TO EXISTING ELECTRODE 3. ANY EXISTING WIRING INVOLVED WITH PV SYSTEM CONNECTION THAT IS FOUND TO BE INADEQUATE PER CODE SHALL BE CORRECTED PRIOR TO FINAL INSPECTION. 4. JUNCTION BOX QUANTITIES, AND PLACEMENT SUBJECT TO CHANGE IN THE FIELD - JUNCTION BOXES DEPICTED ON ELECTRICAL DIAGRAM REPRESENT WIRE TYPE TRANSITIONS. 5. AC DISCONNECT NOTED IN EQUIPMENT SCHEDULE OPTIONAL IF OTHER AC DISCONNECTING MEANS IS LOCATED WITHIN 10' OF SERVICE DISCONNECT. STRING CALCULATIONS MAX AC CURRENT: MICRO INVERTERS IN SERIES NOMINAL STRING VOLTAGE: MAX AC OUTPUT POWER ARRAY DC POWER: TOTAL MAX AC CURRENT: STRING #1 15.96A 7 240V 3836W 7935W 27.36A STRING #2 11.40A 5 240V 2740W AP Systems YC600 Everlight Solar Construction 7369 Highway 13 W Savage, MN 55378 License# BC771658 833.786.4387 ext. 701 CONTRACTOR INFORMATION: SITE INFORMATION Anand Dhanasekaran 7852 204th Street West Lakeville, MN 55044 AC SYSTEM SIZE: 6.576 kW AC DC SYSTEM SIZE: 7.935 kW DC Lat, 44.6526365 Long, -93.224645 (23) Mission Solar MSE345SX5T PV MODULES (12) AP Systems YC600 INVERTER(S) Xcel Energy MN DATE: April 20, 2022 ELECTRICAL CALCS - PV06 DRAWN BY: SoloCAD Conduit & Conductor Schedule TAG QTY WIRE GAUGE DESCRIPTION CONDUIT SIZE CONDUCTOR RATING CONDUCTOR TEMP. RATE AMBIENT TEMP TEMP. DERATE # OF CONDUCTORS DERATE CONDUCTOR RATING W/DERATES CONDUIT FILL 1 (2)12-2 TC-ER, THWN-2, COPPER (L1, L2)N/A - FREE AIR 30A 90°C 32°C 0.96 N/A - FREE AIR 28.8A N/A - FREE AIR(1)6 AWG THWN-2 COPPER - (GROUND) 2 (2)10 AWG THHN/THWN-2, COPPER - (L1, L2)3/4" EMT 40A 90°C 32°C 0.96 1 38.4A 11.9%(1)10 AWG THWN-2 COPPER - (GROUND) 3 (4)10 AWG THHN/THWN-2, COPPER - (L1, L2)3/4" EMT 40A 90°C 32°C 0.96 0.8 30.72A 19.8%(1)10 AWG THWN-2 COPPER - (GROUND) 4 (3)8 AWG THWN-2 COPPER - (L1, L2, NEUTRAL)3/4" EMT 50A 75°C 32°C 0.96 1 48A 24.6%(1)10 AWG THWN-2 COPPER - (GROUND) SYSTEM OCPD CALCULATIONS INVERTER MODEL(S):AP Systems YC600 # OF INVERTERS:12 MAX OUTPUT CURRENT:2.28A (# OF INVERTERS) X (MAX OUTPUT CURRENT) X 125% <= OCPD RATING (12 X 2.28A X 1.25) = 34.2A <= 35A, OK BUSBAR CALCULATIONS - 120% RULE MAIN BUSBAR RATING:150A MAIN DISCONNECT RATING:150A PV OCPD RATING:35A (MAIN BUS RATING X 120%) - MAIN DISCONNECT RATING >= OCPD RATING (150A X 1.2) - 150A = 30A, >= 35A, OK NUMBER OF CURRENT CARRYING CONDUCTORS PERCENT OF VALUES 4-6 .80 7-9 .70 10-20 .50 Everlight Solar Construction 7369 Highway 13 W Savage, MN 55378 License# BC771658 833.786.4387 ext. 701 CONTRACTOR INFORMATION: SITE INFORMATION Anand Dhanasekaran 7852 204th Street West Lakeville, MN 55044 AC SYSTEM SIZE: 6.576 kW AC DC SYSTEM SIZE: 7.935 kW DC Lat, 44.6526365 Long, -93.224645 (23) Mission Solar MSE345SX5T PV MODULES (12) AP Systems YC600 INVERTER(S) Xcel Energy MN DATE: April 20, 2022 LABELS - PV07 DRAWN BY: SoloCAD 352'8&7,210(7(5 LABEL 15 PLACARD TO BE PLACED AT BI-DIRECTIONAL METER PER XCEL ENERGY. 15 LABEL 6 MARKED AT AC DISCONNECTING MEANS. [NEC 690.54] LABEL 5 EQUIPMENT CONTAINING OVERCURRENT DEVICES IN CIRCUITS SUPPLYING POWER TO A BUSBAR OR CONDUCTOR SUPPLIED FROM MULTIPLE SOURCES SHALL BE MARKED TO INDICATE THE PRESENCE OF ALL SOURCES.[NEC 705.12(B)(2)(3)(c)] LABEL 3 PLACED ADJACENT TO THE BACK-FED BREAKER FROM THE INVERTER IF TIE IN CONSISTS OF LOAD SIDE CONNECTION TO BUSBAR. [NEC 705.12(B)(2)(3)(c)] *ELECTRICAL DIAGRAM SHOWN ABOVE IS FOR LABELING PURPOSES ONLY. NOT AN ACTUAL REPRESENATION OF EQUIPMENT AND CONNECTIONS TO BE INSTALLED. LABEL LOCATIONS PRESENTED MAY VERY DEPENDING ON TYPE OF INTERCONNECTION METHOD AND LOCATION PRESENTED ON THE ELECTRICAL DIAGRAM PAGE. JUNCTION BOX OR COMBINER BOX MAIN SERVICE PANEL AC DISCONNECT EXISTING SUB PANEL (IF WHERE POINT OF INTERCONNECTION IS MADE) PV COMBINER SUBPANEL - IF USED TO COMBINE PV OUTPUT CIRCUITS AC DC INVERTER (S) INTEGRATED DC DISCONNECT 2 8 6 9 5 (ONLY IF PV INTERCONNECTION CONSISTS OF LOAD SIDE BREAKER) 7 1 1 1 5 (ONLY IF PV INTERCONNECTION CONSISTS OF LOAD SIDE BREAKER) 7 3 LABELING DIAGRAM: LABEL 7 AT DIRECT-CURRENT EXPOSED RACEWAYS, CABLE TRAYS, COVERS AND ENCLOSURES OF JUNCTION BOXES, AND OTHER WIRING METHODS; SPACED AT MAXIMUM 10FT SECTION OR WHERE SEPARATED BY ENCLOSURES, WALLS, PARTITIONS, CEILINGS, OR FLOORS. [NEC 690.31(D)(2)] LABEL 9 SIGN LOCATED ON OR NO MORE THAN 3FT FROM INITIATION DEVICE [NEC 690.56(C)(2)]. LABEL 8 FOR PV SYSTEMS THAT SHUT DOWN THE ARRAY AND CONDUCTORS LEAVING THE ARRAY: SIGN TO BE LOCATED ON OR NO MORE THAN 3 FT AWAY FROM SERVICE DISCONNECTING MEANS TO WHICH THE PV SYSTEMS ARE CONNECTED AND SHALL INDICATE THE LOCATION OF ALL IDENTIFIED RAPID SHUTDOWN SWITCHES IF NOT AT THE SAME LOCATION. [NEC 690.56(C)(1)(A)] LABEL 1 PLACED ON THE MAIN DISCONNECTING MEANS FOR THE PV SYSTEM. [NEC 690.13(B)] LABELING NOTES: 1. LABELS CALLED OUT ACCORDING TO ALL COMMON CONFIGURATIONS. ELECTRICIAN TO DETERMINE EXACT REQUIREMENTS IN THE FIELD PER CURRENT NEC AND LOCAL CODES AND MAKE APPROPRIATE ADJUSTMENTS. 2. LABELING REQUIREMENTS BASED ON THE 2020 NATIONAL ELECTRIC CODE, OSHA STANDARD 19010.145, ANSI Z535. 3. MATERIAL BASED ON THE REQUIREMENTS OF THE AUTHORITY HAVING JURISDICTION. 4. LABELS TO BE OF SUFFICIENT DURABILITY TO WITHSTAND THE ENVIRONMENT INVOLVED [NEC 110.21] 5. LABELS TO BE A MINIMUM LETTER HEIGHT OF 3/8", WHITE ON RED BACKGROUND; REFLECTIVE, AND PERMANENTLY AFFIXED [IFC 605.11.1.1] 3 4 1 LABEL 4 PLACED ON EQUIPMENT CONTAINING OVERCURRENT DEVICES IN CIRCUITS SUPPLYING POWER TO A BUSBAR OR CONDUCTOR SUPPLIED FROM MULTIPLE SOURCES [NEC 705.10(C)] 2 3 4 1 LABEL 2 FOR PV DISCONNECTING MEANS WHERE THE LINE AND LOAD TERMINALS MAY BE ENERGIZED IN THE OPEN POSITION. [NEC 690.13(B)] :$51,1*! 7(50,1$/6217+(/,1($1' /2$'6,'(60$<%((1(5*,=(' ,17+(23(1326,7,21 !:$51,1* 7+,6(48,30(17,6)('%<08/7,3/( 6285&(6727$/5$7,1*2)$// 29(5&855(17'(9,&(6(;&/8',1* 0$,16833/<29(5&855(17 '(9,&(6+$//127(;&((' $03$&,7<2)%86%$5 3+27292/7$,&$&',6&211(&7 5$7('$&287387&855(17 120,1$/23(5$7,1*$&92/7$*( (/(&75,&6+2&.+$=$5' 0$,13+27292/7$,& 6<67(0',6&211(&7 :$51,1*! 32:(56285&(287387&211(&7,21 '21275(/2&$7(7+,629(5&855(17'(9,&( :$51,1*!'8$/32:(56285&( 6(&21'6285&(,63+27292/7$,&6<67(0 3+27292/7$,&32:(56285&( TURN RAPID SHUTDOWN SWICH TO THE "OFF" POSITION TO SHUT DOWN PV SYSTEM AND REDUCE SHOCK HAZARD IN ARRAY SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN SOLAR ELECTRIC PV PANELS 5$3,'6+87'2:1 6:,7&+)25 62/$5396<67(0 27 240 PV M MSP AC PV M MSP AC C JB JB ACAC Everlight Solar Construction 7369 Highway 13 W Savage, MN 55378 License# BC771658 833.786.4387 ext. 701 CONTRACTOR INFORMATION: SITE INFORMATION Anand Dhanasekaran 7852 204th Street West Lakeville, MN 55044 AC SYSTEM SIZE: 6.576 kW AC DC SYSTEM SIZE: 7.935 kW DC Lat, 44.6526365 Long, -93.224645 (23) Mission Solar MSE345SX5T PV MODULES (12) AP Systems YC600 INVERTER(S) Xcel Energy MN DATE: April 20, 2022 POWER TO THIS BUILDING IS ALSO SUPPLIED FROM ROOF MOUNTED SOLAR ARRAYS WITH SAFETY DISCONNECTS AS SHOWN: CAUTION DIRECTORY PERMANENT PLAQUE OR DIRECTORY PROVIDING THE LOCATION OF THE SERVICE DISCONNECTING MEANS AND THE PHOTOVOLTAIC SYSTEM. (ALL PLAQUES AND SIGNAGE WILL BE INSTALLED AS OUTLINED WITHIN: NEC 690.56(B)&(C), [NEC 705.10]) 7852 204th Street West, Lakeville MN 55044 FRONT OF HOMEMAIN DISTRIBUTION UTILITY DISCONNECT RAPID SHUTDOWN AC DISCONNECT SWITCH PLACARD - PV08 DRAWN BY: SoloCAD COMBINER PV ARRAY SYSTEM UTILIZES MICROINVERTERS LOCATED UNDER EACH MODULE Everlight Solar Construction 7369 Highway 13 W Savage, MN 55378 License# BC771658 833.786.4387 ext. 701 CONTRACTOR INFORMATION: SITE INFORMATION Anand Dhanasekaran 7852 204th Street West Lakeville, MN 55044 AC SYSTEM SIZE: 6.576 kW AC DC SYSTEM SIZE: 7.935 kW DC Lat, 44.6526365 Long, -93.224645 (23) Mission Solar MSE345SX5T PV MODULES (12) AP Systems YC600 INVERTER(S) Xcel Energy MN DATE: April 20, 2022 SITE PHOTOS: SITE PHOTOS - PV09 DRAWN BY: SoloCAD Everlight Solar Construction 7369 Highway 13 W Savage, MN 55378 License# BC771658 833.786.4387 ext. 701 CONTRACTOR INFORMATION: SITE INFORMATION Anand Dhanasekaran 7852 204th Street West Lakeville, MN 55044 AC SYSTEM SIZE: 6.576 kW AC DC SYSTEM SIZE: 7.935 kW DC Lat, 44.6526365 Long, -93.224645 (23) Mission Solar MSE345SX5T PV MODULES (12) AP Systems YC600 INVERTER(S) Xcel Energy MN DATE: April 20, 2022 SITE PHOTOS: FRONT/BACK VIEWS - PV09.1 DRAWN BY: SoloCAD Everlight Solar Construction 7369 Highway 13 W Savage, MN 55378 License# BC771658 833.786.4387 ext. 701 CONTRACTOR INFORMATION: SITE INFORMATION Anand Dhanasekaran 7852 204th Street West Lakeville, MN 55044 AC SYSTEM SIZE: 6.576 kW AC DC SYSTEM SIZE: 7.935 kW DC Lat, 44.6526365 Long, -93.224645 (23) Mission Solar MSE345SX5T PV MODULES (12) AP Systems YC600 INVERTER(S) Xcel Energy MN DATE: April 20, 2022 SITE PHOTOS: SIDE VIEWS - PV09.2 DRAWN BY: SoloCAD Everlight Solar Construction 7369 Highway 13 W Savage, MN 55378 License# BC771658 833.786.4387 ext. 701 CONTRACTOR INFORMATION: SITE INFORMATION Anand Dhanasekaran 7852 204th Street West Lakeville, MN 55044 AC SYSTEM SIZE: 6.576 kW AC DC SYSTEM SIZE: 7.935 kW DC Lat, 44.6526365 Long, -93.224645 (23) Mission Solar MSE345SX5T PV MODULES (12) AP Systems YC600 INVERTER(S) Xcel Energy MN DATE: April 20, 2022 SITE PHOTOS: METER/OPEN MSP - PV09.3 DRAWN BY: SoloCAD Everlight Solar Construction 7369 Highway 13 W Savage, MN 55378 License# BC771658 833.786.4387 ext. 701 CONTRACTOR INFORMATION: SITE INFORMATION Anand Dhanasekaran 7852 204th Street West Lakeville, MN 55044 AC SYSTEM SIZE: 6.576 kW AC DC SYSTEM SIZE: 7.935 kW DC Lat, 44.6526365 Long, -93.224645 (23) Mission Solar MSE345SX5T PV MODULES (12) AP Systems YC600 INVERTER(S) Xcel Energy MN DATE: April 20, 2022 DRAWN BY: SoloCAD TEST PROCEDURE Contact Info and General 1. Name of Customer who owns service, the Xcel Energy “customer of record” for existing services 2. Installation premise address shall match application address 2.1 Address shall match the premise address for existing customer/services 3. Application OID, SRC, or case number assigned to the project 4. A note stating “All testing shall be performed by qualified personnel" Testing Applicable to all DER 5. The procedure shall provide steps to verify fixed power factor settings for each inverter meet the project requirements 6. The unintentional islanding test shall at minimum contain the following steps: 6.1 Steps that verify DER system is ready to be energized 6.2 Steps to verify labeling for the Main Service Panel, DER Protection, DC Disconnect, AC disconnect, Utility AC disconnect, Production Meter (when applicable) and other relevant labelling and signage 6.3 Steps to energize the DER system 6.4 While in normal operation, steps to verify the voltages at the DER AC terminals are within 5% of the combined DER AC voltage ratings and all LEDs, alarms, and/or LCD codes are “normal” 6.5 While in normal operation, steps to verify that all DER units are operational and producing power 6.6 Steps to simulate the loss of utility source11 for the unintentional islanding test shall be listed 6.6.1 Clearly identify the disconnection device being used to simulate this utility power outage 6.7 Using a voltmeter, verify the voltage at the inverter side of the AC disconnect has dropped to zero 6.7.1 Only customer-owned equipment shall be used for this verification. Xcel Energy will not provide special equipment for this verification. Xcel ` Energy provided meters shall not be used for this verification. 6.8 Using an ammeter or the DER’s display/metering, verify the DER has ceased to energize within two seconds. For three phase systems, three phase monitoring may be required. 7. Verify DER LEDs, alarms, and/or LCD codes are appropriate for loss of Utility source 8. Steps to restore the lost Utility source shall be listed 9. A step to verify that the inverter system delays five (5) minutes before resuming power output after the Utility source is restored shall be listed CASE #: 04924221 THESE SHEETS, DESIGNS, AND SPECS ARE PROPERTY OF SUN INCORPORATED. NO PART SHALL BE DUPLICATED OR USED FOR NONE OTHER THAN ITS SPECIFIC PROJECT WITHOUT WRITTEN CONSENT FROM SUN INCORPORATED.MOUNT SHEETSheet: 5File: SUN-SERVERSun Incorporated Jos MasterEuipmentMOUNTSQUICK MOUNTQMPV-datasheet-QMHSS-LS-QuicHooSM-we.pdMissing or invalid reerenceSheet: 2File: SUN-SERVERSun Incorporated Jos MasterEuipmentMOUNTSQUICK MOUNTQMPV-datasheet-QMHSS-LS-QuicHooSM-we.pdMissing or invalid reerence