Loading...
HomeMy WebLinkAbout8056 186th Street West-SurveyThe curb box, drain tile cleanout and catch basin(if applicable) must be inspected and accepted before As-built escrow monies will be released. All structures must be flush with the sod. This will be scheduled with the landscape inspection. *Maintain 6" between bottom of siding and sod. *No structures in easements. *Draintile connection required. EROSION CONTROLMUST BE INSTALLED BEFORE EXCAVATION ENGINEERING REVIEWED Date:__________________04/15/2022 lritchie Planning DepartmentApprovedDate:__________________04/21/2022 dmorey