Loading...
HomeMy WebLinkAbout7355 204th Street West-SurveyGATEWAY DRIVESAN SAN SAN SAN SAN SAN SANSANSANSANSANSANSANSANSAN STO STO STO STO STO WAT WAT WAT WAT WAT WAT WATWATWATWATWATWATWATWATWATWAT891 2 CS STO204TH STR E E T W E S T LOT 1 Drainage and Utility Easement per the plat of CEDAR HILLS 2ND ADDITION Building Pad per Grading Plan Building Setback 60 foot Right of Way 5 Garage Porch 1007.7 (1007.8) 1009.1 (1008.9) (1010.4) XX (1008.5)10Proposed House McKinley EN11, Elev. C3 Full Basement 3 Additional Step Condition Lowest Floor Elev. = (1005.13)SidewalkMorning Room X 1007 .10TC(7.4%)Drain Tile Cleanout Egress Well 5 1010 10 101060 foot Right of Way1010.8 (1010.8) 1015.8 (1016.2)N05°10'51"E 158.81N6 2 ° 0 2 ' 0 8 " W 1 3 9 . 5 2 28.49S27°57'52"WL=89.01R=405.00Δ=12°35'32"22.85S78°52'3 3 " E L=69.82 R=830.00 Δ=4°49'12" (1010.70)25.5041.2446.3824.790.1225.0829.17 10.0016.75 10.003.83 33.7512.755.006.12 16.4611.00 4.6720.00 15.00 16.1229.88 9.50 9.55 X 1007.76TC1009.97 TC X X 1011 .56TCX 1012 .08TCX 1013 .85TCX 1015 .84TC25.2649.8783.681007.07 1007.10 1008.43 1009.76 Proposed SidewalkX (1016.26)X (1014.27) (1 0 1 2 . 5 0 ) X X 1009 .21TCProposed Sidewalk16.00 TT X 1006.9X 1007.41007.4 X1007.8 X166481.24 N526574.69 E166474.93 N 526532.82 E 16 6 4 5 1 . 6 2 N 52 6 5 7 7 . 6 5 E 0.12 6.1319.004.335.83 4.339.50 X (1012.5)(1012.5) XX (1012.0)X (1012.0)(1010.3) X (1012.2) X 1010 101210141016 101 0 1010100 8 1010 1012 S S N:\0025850.01\DWG\SURVEY\2ND ADD\0025850.01B06L01 2ND.DWG1 1 04/01/2022 MJW BTW SHEET NUMBER: DATE: OF .FIELD CREW: DRAWN: CHECKED: Phone (952) 937-5150 12701 Whitewater Drive, Suite #300 Fax (952) 937-5822 Minnetonka, MN 55343 Toll Free (888) 937-5150 Œ:HVWZRRG3URIHVVLRQDO6HUYLFHV,QF Common Ground Alliance Call 48 Hours before digging: 811 or call811.com Lakeville, Minnesota Cedar Hills Certificate of SurveyLennar PROJECT NUMBER: 0025850.01 0'20'40' 1) Curb & gutter and utilities are existing. 2) Building dimensions do not reflect brick facing. 3) Grading Plan by Westwood Professional Services Inc. initial submittal date 02/06/20. 4) Building shown reflects McKinley foundation plan, sheet A3, dated 12/01/2021. Lot 1, Block 6, CEDAR HILLS 2ND ADDITION, according to the recorded plat thereof, Dakota County, Minnesota. Address- 7355 204th Street West LEGEND CABLE TV BOXTV NATURAL GAS METERG STREET LIGHT ELECTRIC BOXE ELECTRIC METERE SANITARY MANHOLES SEWER CLEANOUTCO CATCH BASIN STORM MANHOLEST TELEPHONE BOXT GATE VALVE HYDRANT WATER METERW CURB STOP BOXCS WATERMAIN SANITARY SEWER STORM SEWER SAN STO WAT FLARED END SECTION Garage Floor Elev. = (1010.70)(at overhead d Top of Poured Foundation Wall Elev. = (101 3 Additional Step Condition Lowest Floor Elev. = (1005.13) I hereby certify that this survey was prepared by me or under my direct supervision and that I am a duly Licensed Land Surveyor under the laws of the State of Minnesota. 04/06/2022 Mathew J. Welinski Date Minnesota License No. 53596 matt.welinski@westwoodps.com Denotes iron monument found Denotes iron monument set x xxx.x Denotes existing elevation x (xxx.xx) Denotes proposed elevation Benchmark- Minnesota Department of Transportation Control Point "1914 H", Elevation = 959.11 (N.A.V.D. 1988), not graphically shown. IMPERVIOUS SURFACE CALCULATIONS Lot area = 15,132 sq. ft. House area = 2,289 sq. ft. Porch area = 147 sq. ft. Driveway and Sidewalk = 753 sq. ft. Impervious area 3,189 sq. ft. / 21.1% of total of lot area LOT GRADING CALCULATIONS Basement Excavation = 133 cubic yards Finished Lot Grading= 578 cubic yards Material (excess/needed)445 cubic yards (needed) Zoning = RST-2FY - 20' House, 25' GarageSY - 7' Interior, 20' CornerRY - 30'SY Buffer - 30'RY Buffer - 50' The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection. *Draintile connection required. *Maintain 6" between bottom of siding and sod. *No structures in easements.EROSION CONTROLMUST BE INSTALLED BEFORE EXCAVATION ENGINEERING REVIEWED Date:__________________04/18/2022 lritchie