HomeMy WebLinkAbout18540 Hancock Avenue-Survey*Maintain 6" between bottom of siding and sod.*No structures in easements.
The curb box, drain tile cleanout and catch basin
(if applicable) must be inspected and acceptedbefore As-built escrow monies will be released.
All structures must be flush with the sod. Thiswill be scheduled with the landscape inspection.
*Draintile connection required.
EROSION CONTROL
MUST BE INSTALLEDBEFORE EXCAVATION
ENGINEERING REVIEWED
Date:__________________04/15/2022 lritchie
Planning DepartmentApprovedDate:__________________04/21/2022 dmorey