Loading...
HomeMy WebLinkAbout18650 Hancock Ave-SurveyThe curb box, drain tile cleanout, and catch basin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection. *Draintile connection required. EROSION CONTROLMUST BE INSTALLED BEFORE EXCAVATION *Maintain 6" between bottom of siding and sod. *No structures in easements. ENGINEERING REVIEWED Date:__________________04/07/2022 lritchie Planning DepartmentApprovedDate:__________________04/11/2022 dmorey