HomeMy WebLinkAbout17959 Gresford Lane SurveyGRESFORD LANE20.3331.335.005.00R:999.94FD IPFD
IPFD IP
FD
IP
OS 5
.17HUB=997.03OS 31
.17HUB=997.29OS 5.17HUB=1000.35OS
3
2
.
1
7HUB
=
1
0
0
1
.
0
0
TNH1003.03E
X
I
S
T
I
N
G
HO
U
S
E N60°50
'10
"E
90
.00S29°09'50"E 50.00N60°50
'10
"E
90
.00S29°09'50"E50.00 59
.67 12.67 10
.50 6.17 5
.67 21.00 2
7
.00 0.17 30
.83 13.67
3
.00 26.00995.8995.5997.2997.11000.11000.01000.31000.41000.21000.11000.21000.0999.9999.91000.01000.21000.0999.7999.7(996
.9
)
(996
.5
)
(996
.1
)
(996
.9
)
(996
.5
)
(996
.0
)
(1001
.4
)
(1000
.9
)
(1001
.7
)
(1001
.2
)
(1000
.7
)ACPROPOSEDHOUSEGARAGEPORCHS.W.VACANT LOT1' CANT
.9.3%(1003.07)1
0
0
2
.
3
9
9
7
.
8
SIDEWALKEX.
SOD
E
X
.
SOD (1001.8)
(996
.0
)
(995
.8
)
(
1
0
0
1
.9
)DENOTES EXISTING CATCH BASINDENOTES EXISTING HYDRANTDENOTES EXISTING SANITARY MANHOLEDENOTES EXISTING STORM MANHOLEDENOTES EXISTING UTILITY BOXDENOTES EXISTING SERVICE OR CLEANOUTDENOTES IRON MONUMENT FOUNDDENOTES IRON MONUMENT SETDENOTES EXISTING POWER POLEDENOTES EXISTING LIGHT POLEDENOTES EXISTING CONSERVATION POSTOR WET LAND BUFFER POSTDENOTES EXISTING TREE8" TREE000.0DENOTES WOOD HUBDENOTES NAILDENOTES EXISTING RETAINING WALLDENOTES PROPOSED RETAINING WALLDENOTES EXISTING ELEVATIONDENOTES PROPOSED ELEVATIONDENOTES AS BUILT ELEVATION(000.0)000.0DENOTES EXISTING TREELINEDENOTES DIRECTION OF SURFACE DRAINAGEDENOTES EXISTING FENCELEGENDDENOTES EXISTING F.E.S.LOT AREA : 4,500 SQ. FT.HOUSE AREA : 2,247 SQ. FT.PORCH AREA : 193 SQ. FT.COVERGAGE AREA : 2,440 SQ. FT. (54.2%)DRIVEWAY AREA : 868 SQ. FT.Legal Description:= FINISHED GARAGE FLOOR ELEVATION= BASEMENT FLOOR ELEVATION= TOP OF FOUNDATION ELEVATION(1003.07)(1003.40)(994.40)1. No specific soils investigation has been performed on this lotby the surveyor. The suitability of the soils to support thespecific house is not the responsibility of the surveyor.2.No title information was provided for this survey. This surveydoes not purport to show all easements of record.3. See architectural plans for final building dimensions.CERTIFICATE OF SURVEYPlanning DepartmentApprovedDate:__________________12/16/2021kjensonThe curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.ENGINEERING REVIEWEDDate:__________________12/17/2021corlowskyEROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION*Maintain 6" between bottom of siding and sod.*No structures in easements.