Loading...
HomeMy WebLinkAboutLA201633 - 20490 Ginger Ct Permit PackRESIDENTIAL BUILDING PERMIT APPLICATION CITY OF LAKEVILLE BUILDING INSPECTIONS DEPARTMENT 20195 HOLYOKE AVENUE LAKEVILLE, MN 55044 952-985-4440 Office Use Only __________________ Permit Number ___________________ Received By ___________________ Date Received ___________________ Fee Total SITE ADDRESS: MAILING ADDRESS: CITY: STATE: ZIP: JOB DESCRIPTION:__________________________________ MASTER PLAN: (Number or Address)____________________ LIST OTHER STRUCTURES ON PROPERTY:_______________________________________________________________ ESTIMATED VALUATION: PROPOSED START DATE: END DATE: (New Residential Only): LEGAL DESCRIPTION: LOT: _____ BLOCK: _____ SUBDIVISION: APPLICANT IS: RESIDENT OWNER CONTRACTOR EMAIL NEW MODEL HOME: YES NO (IF YES – ADMINISTRATIVE PERMIT REQUIRED) PLEASE FILL OUT THE FOLLOWING COMPLETELY (All Contractor information must be as listed on State License) RESIDENT OWNER NAME:_______________________________________________________________________________ HOME PHONE #:_____________________________ CELL PHONE:___________________________ GENERAL CONTRACTOR Homeowner Contractor CONTRACTOR:_______________________________________________________________________ LICENSE #:BC______________ LEAD CERTIFICATE#_______________ (PRE 1978 STRUCTURE) OFFICE PHONE #:_____________________________ CELL PHONE:___________________________ ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________ PLUMBING WORK Homeowner Contractor CONTRACTOR:__________________________________________LICENSE #: PM______________ OFFICE PHONE #:_____________________________ CELL PHONE:___________________________ ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________ MECHANICAL WORK Homeowner Contractor CONTRACTOR:________________________________________ _______________________________ OFFICE PHONE #:_____________________________ CELL PHONE:___________________________ ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________ BOND #:_______________________________________ EXPIRATION DATE____________________ SEWER/WATER CONTRACTOR New Construction Only NAME:________________________________________________ ______________________________ HOME PHONE _____________________________ CELL PHONE:______________________________ BOND #:_______________________________________ EXPIRATION DATE____________________ INTEREST EARNINGS ON THE ESCROW ACCOUNTS, IF ANY, ARE RETAINED BY THE CITY TO OFFSET THE ADMINISTRATIVE COSTS ASSOCIATED WITH PROCESSING THE ESCROW APPLICATION AND REFUND. I HEREBY APPLY FOR A BUILDING PERMIT AND I ACKNOWLEDGE THAT THE INFORMATION ABOVE IS COMPLETE AND ACCURATE; THAT THE WORK WILL BE IN CONFORMANCE WITH THE ORDINANCES AND CODES OF THE CITY AND WITH THE STATE BUILDING CODE, THAT I UNDERSTAND THIS IS NOT A PERMIT AND WORK IS NOT TO START WITHOUT A PERMIT AND THAT THE WORK WILL BE IN ACCORDANCE WITH THE APPROVED PLAN. NAME OF APPLICANT (Please Print)DATE APPLICANT’S SIGNATURE: www.lakevillemn.gov RESIDENTIAL BUILDING PERMIT APPLICATION PAGE 2 OFFICE USE ONLY BUILDING PERMIT TYPE REQUIRED INSPECTIONS SINGLE FAMILY DWELLING BUILDING DUPLEX AS BUILT TOWNHOUSE UNITS BUILDING FINAL DETACHED TOWN HOUSE UNIT DECK FOOTING CONDO FIREPLACE ACESSORY BUILDING FOOTING REROOF FOUNDATION RESIDE FRAMING PORCH FRAMING GARAGES INSULATION RES ADDN/REPAIR/RMDL DECK PORCH GARAGES LATH LOWER LEVEL FINISH LOWER LEVEL FINAL ADDITION OTHER FOUNDATION ONLY PORCH FOOTING MISCELLANEOUS POURED WALL DEMO SEPTIC TANK REMOVAL MOVED SITE MECHANICAL CITY BUILDING VALUATION: $AIR TEST FINAL BUILDING PERMIT FEES ROUGH-IN $PERMIT FEE PLUMBING $PLAN CHECK FINAL $SURCHARGE ROUGH-IN $METRO SAC METER SIZE $CITY WATER HOOKUP UNIT PRESSURE REDUCING VALVE $CITY SEWER HOOKUP UNIT SEWER/WATER $LANDSCAPE ESCROW SEWER/WATER $TREE ESCROW FINAL $MISC ESCROW STREET DRAINTILE $PLUMBING BUILDING INFORMATION $MECHANICAL TYPE OF CONSTRUCTION $SEWER WATER ZONING $OTHER CODE EDITION $TOTAL FIRE SUPPRESSION SYSTEM OCCUPANCY GROUP APPROVED BY: BUILDING INSPECTOR: Date: PLUMBING/MECHANICAL INSPECTOR: Date: COMMENTS: 20490 Ginger Court Cedar Hills-2nd AdditionVinyl Siding on Front Elevation. Vinyl Siding on Side and Rear Elevation. FACE APPLIED STONE VENEER FACE APPLIED STONE VENEER SHAKE SIDING HORIZONTAL LAP SIDING HORIZONTAL LAP SIDING Secure door closed until deck is constructed with a separate permit. Concept Approval ONLY Subject to Field Inspection Inspector Date 2020 MN Bldg Code 05/04/2022dmathews 4" GRANULAR FILL20" x 8" CONC. FTG.W/ SILL SEALER(TR) 2x6 SILL PLATEGRADER-20 BATT INSUL.BOLT AT 72" O.C.1/2" DIA. x 10" ANCHOR8" T. POURED CONC.FOUNDATION WALL CONC. SLABPER PLANEXT. FIN. PER PLANDOUBLE TOP PLATEHEADER AT WIN.4 MIL POLY8"2"TYVEK WITH SIDINGPER PLAN FL. SYSTEM(EXT. PER PLAN)VAPOR BARRIERR-10 RIGID INSUL.OR APPROV. STRAPMIN. 42"WATERPROOFINGREQ'D. @ TOP OFFDN. WALLR-20 INSUL. @ RIMRIM BOARDCONC. SLAB20" x 8" CONC. FOOTINGFOUNDATION WALLDOUBLE TOP PLATEPER PLANFL. SYSTEM8" T. POURED CONC.1/2" DIA. x 10" ANCHORBOLT AT 72" O.C.R-20 BATT INSUL.2x8 (TR.) SILL PLATEW/ SILL SEALERGRADEEXT. FIN. PER PLANOR APPROV. STRAP3'-6"R-20 SPRAY FOAM INSUL.RIM BOARDR-10 EXT. FDN. INSUL.1/2" SHEATHINGR-5 RIGIDINSULATIONWATERPROOFINGTOP OF FDN. WALLCANT PLATE 1 1/2"SQUASH BLOCKS@ ALL POINT LOADS2x8 STUDS @ 16" O.C.SIDE WALLWALKOUTFDN. ONLY4" WEEPS EVERY 6'WATERPROOFINGAT FOUNDATION4" D. x 8" H. LEDGEPER PLANSUBFLOORFLOOR SYSTEMRIM BOARDCONC. STOOP8" FIN. FLR. MAX. TO10"30 MIL PVC MEMBRANESEAL ALL SEAMS,CORNERS & EDGES W/35 MIL POLYETHYLENEBACKED SYNTHETICBUTYL RUBBERADHESIVE MEMBRANE1/2" SHEATHING(2") R-10 EXTERIORR-20 SPRAY FOAM INSUL.WATERPROOFINGREQ'D.@ TOP FDN.FOUNDATION INSULATION2x8 SILL PLATEW/ ANCHOR BOLTS1 1/2" CANT'D. ALIGN W/ FDN. WALLSUBFLOORFLOOR JSTS/TRUSSES20"x8" CONC. FOOTING2x6 TOP PLATECONC. SLABPER PLANPER PLAN16" O.C. (TYP)2x6 STUDS @2x6 TREATEDPLATESECURED W/POWDEREDACTUATEDFASTENERS@ 24" O.C.1"4"x1/2" TRT'D.PLYWOOD,HOLD UP 1"FROM FTG.EACH SIDEU.N.O. BY ENGINEERGRADEWINDOW WELL WITH8" POURED CONCRETEPER PLANEGRESS WELLDRAIN FIELDBATT INS.(TR) 2x8" SUBFRAMESOCKED DRAINTILE CONNECTSTO INTERIORN.T.S.MIN. PER EGRESSNOTE:44" MAX. FROMT.O. SLAB TOWIN. EGRESSLADDERPER PLAN HEADER PER PLAN42"4'-4"WATERPROOFINGPER PLANFL. SYSTEMRIM BOARD (BY MFG.)EXT. FIN. PER PLANRIGID INSUL.R-10 EXT. FDN.1/2" EXT. SHEATHINGWATERPROOFING2X8 SILL PLATECANT. 1 1/2"2X8 STUDSPERIMETER OUTSIDE WALLSWATERPROOFING ALLWALLS BELOW GRADE4" WEEPSEVERY 6'4" CONC. SLABFLOOR SYSTEMGARAGE SLAB SLOPE: 4"20" x 8" CONC. FOOTINGPER PLAN20" x 8" CONC. FOOTING8"PER PLANWATERPROOFINGB.O. FTG.GRADE3'-6" MIN.VAPOR BARRIER4" GRANULAR FILL4" CONC. SLABTOP OF CURBTOP OF FDN.TREATED 2x SILLPLATE W/ SILL SEALERSHEATHINGEXT. MTR'L. PER PLANRIM BOARD (BY MFG.)5/8" GYP. SHEATHINGR-10 EXTERIOR FDN.INSULATION10"6"4"2" CERTI-STUD ATFOUNDATION LEDGER-20 SPRAY FOAMINSULATIONWATERPROOFINGREQ'D. AT TOP OFFOUNDATION WALL2x6 SILL PLATEW/ ANCHOR BOLT / STRAPNO CANT. AT GARAGESTD. RIM DETAILHOUSE BASELINE DIM.GAR. OUT TO OUT DIM.NOTE: NO R-5 INSUL.REQ'D. AT GAR./HOUSEINT. COMMON WALLS4" WEEPS EVERY 6'4"(PLATE SIZE PER PLAN)I JOIST FLOOR20" x 8" CONC. FOOTINGSYSTEMPER PLANWATERPROOFINGVAPOR BARRIER4" GRANULAR FILL4" CONC. SLABRIM BOARD (BY MFG.)1/2" EXT. SHEATHINGR-10 EXT. FDN.INSUL. ABOVE GRADE8"2" CERTI STUDWATERPROOFINGREQ'D. AT TOPFDN. WALL2X8 SILL PLATEW/ ANCHOR BOLT(NO CANT.)HOUSE BASELINE DIM.NOTE: NO R-5 INSUL.REQ'D. AT FULL BSMT.2X6 STUDS @ 16" O.C.R-10 EXT. FDN.INSULATION / DRAIN BOARDBELOW GRADER-20 SPRAY FOAMINSUL. (MIN)NOTE: POSSIBLEBLOCKING AT POINTLOAD AREASCANTED I JOIST (1 1/2")XP BOARD4" WEEPS EVERY 6'PER PLANI JOIST FLR.20" x 8" CONC. FOOTINGSYSTEMPER PLANWATERPROOFINGVAPOR BARRIER4" GRANULAR FILL4" CONC. SLABRIM BOARD (BY MFG.)1/2" EXT. SHEATHINGR-10 EXT. FDN.INSUL. ABOVE GRADE8"2" CERTI STUDR-20 SPRAY FOAMINSULATIONWATERPROOFINGREQ'D. AT TOPFDN. WALL2X8 SILL PLATEW/ ANCH. BOLT1 1/2" CANT.HOLD IN 1 1/2" TOHOUSE BASELINE DIM.NOTE: NO R-5 INSUL.REQ'D. AT FULL BSMT.2X6 STUDS @ 16" O.C.R-10 EXT. FDN.INSULATION / DRAIN BOARDBELOW GRADEALIGN W/ FOUNDATION WALL.2X6 FILLER XP BOARD4" WEEPS EVERY 6'PER PLAN5BWPsAboveUFER Ground-Provide 20' Rebar in footing and stubup near electrical service panel.55 GENERAL NOTES:·MAIN FLOOR CEILINGS TO BE 9'-1 1/8" ROUGH CEILING HEIGHT (U.N.O.)·T.O. MAIN FLOOR WINDOWS TO BE FRAMED AT 8'-0" (U.N.O.)·UPPER FLOOR CEILINGS TO BE 8'-1 1/8" ROUGH CEILING HEIGHT (U.N.O.)·UPPER FLOOR WINDOWS TO BE FRAMED AT 6'-11 3/8" (U.N.O.)·SEE DETAILS SHEET, DETAIL #'s 11 & 12 FOR TYPICAL WINDOW FRAMING·ALL EXTERIOR HOUSE WALLS TO BE 2x6 @ 16" O.C. (U.N.O.)·GARAGE/HOUSE COMMON WALLS TO BE 2x6 @ 16" O.C. (U.N.O.)·INTERIOR WALLS TO BE 2x4, WITH EXCEPTION TO THE 2x6 PLUMBING AND BEARINGWALLS PER PLAN (U.N.O.) ALL INTERIOR WALLS TO BE FRAMED @ 16" O.C. MAINFLOOR BEARING WALLS SHALL BE FRAMED W/ STUDS ALIGNING WITH I-JOISTSABOVE. REFER TO I-JOIST LAYOUTS·WINDOW AND DOOR HEADERS TO BE (2) 2x10 (U.N.O.)·ALL DIMENSIONS ARE TO ROUGH FRAME (U.N.O.)·S.R.O. SIZES LISTED ARE THE FINISHED SHEETROCK OPENING WIDTH AND HEIGHTPER PLAN (EXAMPLE: 2680 OR 2/6x8/0 = 2'-6"x8'-0")· INDICATES A LOAD BEARING POINT, IF NOT SHOWN ON PLAN MINIMUM BEARINGOF (2) 2x4 IS REQUIRED AT END OF ALL HEADERS.· INDICATES NUMBER OF TRIM JACKS & KING STUDS AT WINDOW HEADERS,UNLESS A 2 STORY WALL SITUATION IS PRESENT·FLOOR BREAK INDICATES CHANGE IN FLOORING MATERIAL, REFER TO THESPECIFICATIONS FOR ACTUAL FLOORING MATERIALS SELECTED·REFER TO SPECIFICATION INFORMATION FOR ALL APPLIANCES & THE APPROPRIATEELECTRIC OR GAS HOOK-UP REQUIREMENTS FOR EACH·REFER TO SPECIFICATION INFORMATION FOR ALL TUB AND SHOWER SURROUNDMATERIALS·REFER TO SPECIFICATION INFORMATION FOR ALL KITCHEN & BATH CABINETFEATURES WHERE AVAILABLE PER CABINET SUPPLIER·ALL CLOSETS, PANTRYS, & LINENS TO RECEIVE WIRE SHELVING, (U.N.O.)·BLOCK SLIDING GLASS PATIO DR TO PREVENT OPENING PAST 4" MAX·ALL WASHERS ON LEFT SIDE & ALL DRYERS ON RIGHT SIDE·WINDOW FALL PROTECTION TO BE PROVIDED IN ACCORDANCE W/ R312.2(1) KING(2) TRIM3.53.523.5-Min. 15" clearance to anyobstruction from center ofW.C., 24" in front(typ).3.55PFHPFHBWPsAbove6658558553.56Verify loads with girdertruss specs, may requireremoval of top plates atbearing due to crushing. Weyerhaeuser prepared these plans for the specification of Trus Joistproducts based on project information provided to us. This service is solelyintended for product application assurance; and, is not intended to circumventthe need for a design professional as determined by the building codes.The designer of record and/or builder/framer is responsible to assure thesedrawings are compatible with the overall project.Copyright 2009 Weyerhaeuser NR Company. All rights reserved.Anyunauthorized copying of reproduction will constitute an infringement of copyright.Lennar MNEK05 Lewis E/I (prev. 5006)Elevation BMNSheet1of 3Structural Framer'sPocket Guide.Access with your Smart Phone.http://woodbywy.com/document/tj-9001/Have a damaged joist or beam?File an electronic damage report forprompt service from your regionaltechnical office. Scan the QR Codewith your smartphone or go to:www.damagereport.woodbywy.comSpecification Teamservice.request@weyerhaeuser.com(888) 453-8358 . . . . . . . . www.woodbywy.comDrawn By:Chuck EOriginal Date:7/15/14Rev.ByDateJLH6-1-21CommentsAdded notes for B3B, C3C, D3D elevations.Architectural Drawings Prepared By:LennarStructural Drawings Prepared By:N/A7/15/14N/ADrive nails at anangle to minimizesplitting of plateOne 10d (3") box nail eachside of member at bearing,112" minimum from endSee framing plan (if applicable)or iLevel® Framer's PocketGuide for minimum end andintermediate bearing lengths.TJI® JOIST NAILING REQUIREMENTS at BEARING134" minimum bearing atend support; 312" minimumat intermediate supportTJI® Joist to Bearing PlateShear transfer: Connections equivalent tofloor panel nailing scheduleOne 8d (212") boxnail each side.Drive nails at anangle at least 112"from end.Squash Blocks to TJI® Joist(Load bearing wall above)One 10d (3") box nailinto each flange10'-0" 11'-6"1'-0"1'-0"1'-0" 1'-0" 9'-0"9'-0"6'-0"3'-0"1'-0" 1'-0"1'-0"3601'-0"12'-0"17"13"15'-6"15'-6"SQUARE OR RECTANGULAR HOLE SIZEMinimum distance from edge of hole to inside face of nearest intermediate or cantilever support16'-0"15'-6"21'-0"20'-6"18'-0"17"17'-0"DO NOT cut, notch or drillholes in headers except asindicated in illustrationsand tables.For simple span (5' minimum), uniformly loaded joists used in residential applications, one maximum size round hole may be locatedat the center of the joist span provided no other holes occur in the joist.Distances are based on the maximum uniform loads shown in current Trus Joist® product guides. For other load conditions or holeconfigurations contact your Weyerhaeuser representative.15"8" 10"6"4"12"17"15"12"10"8"6"4"16'-0"15'-6"Holes may be located vertically anywhere within the web. Leave 18" of web (minimum) at top and bottom of hole.Knockouts are located in web at approximately 12" on-center; they do not affect hole placement.1'-0"1'-0"1'-0"1'-0"Rectangular holes based on measurement of longest side.18"20"1'-0"5605603603601'-0"1'-0"1'-0"1'-0" 1'-6"1'-0"2'-0"3'-0"3'-0"6'-0"6'-0"12'-0"5'-6"16'-6"11'-0"15'-0"10'-0"6'-0"9'-0"6'-0"3'-0"1'-6"4'-0"1'-0"1'-0"1'-0"1'-0"16'-6"18'-0"16'-6"14'-0"8'-6"7'-0"9'-0"11'-6" 16'-6"12'-6"14'-6"19'-6"17'-6'19'-0"20'-0"19'-6"10'-0"17"11'-0"13"10'-6"ROUND HOLE SIZETable B - Intermediate or Cantilever Support10'-6"9'-6"15'-0"13'-6"4'-0" 8'-0"2'-6"2303'-0"1'-0"1'-0"1'-0"1'-0"3'-0"3'-0"1'-0"1'-0"4'-0"1'-0"2'-0"1'-0"1'-0"1'-0"1'-0"1'-0"16"14"2305603601'-0"1'-0"1'-0"2305602103601'-0"1'-0"1'-0"1'-0"1178"1'-0"2303601102105602'-0"1'-0"1'-6"3602101103'-0"1'-0"1'-0"9'-0"5'-0"1'-0" 2'-6"1'-0"1'-0"1'-0"1'-6"2'-6"3'-0"1'-0"1'-0"1'-6"2'-0"1'-0"5'-6"5'-6"3'-0"11'-0"10'-0"4'-0"7'-0"6'-6"6'-6"10'-0"13'-6"12'-6"5'-6"9'-6"3'-0"8'-6"5'-6"2'-6" 5'-0"4'-0"1'-0"4'-6"7'-0"2'-0"8'-0"5'-6"2'-0"1'-6"4'-6"4'-0"9'-0"9'-6"11'-0"4'-6"12'-0"8'-0"9'-0"8'-0"6"3"1'-0"1'-0"1'-0"1'-0"1'-0"2'-6"2'-6"DEPTH912"TJI®2101102"2'-0"1'-6"18"20"1'-0"3605605603601'-0"1'-0"1'-0"5601'-0"4"4"3'-6"3'-0"612"7'-6"7'-6"878"11"1'-0" 2'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"8"10"1'-0"10'-0"5'-0"11'-0"5'-0"1'-0"2'-0"7'-0"7'-0"3'-0"12"6'-6"15"7'-6"3'-0"2'-6" 4'-6"4'-6"2'-0"1'-6"3'-6"2'-6"1'-0"1'-0"1'-0"3'-0"1'-0"1'-0"2'-0"4'-6"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"2'-0"1'-0"3'-0"3'-0"1'-0"1'-0"12'-6"6'-0"2'-0" 10'-0"10'-6"13'-6"12'-0"10'-6"14'-6"13'-0"1'-0"3'-6"2'-0"5'-0"9'-0"7'-6"1'-0"5'-0"4'-0"2'-6" 6'-0"4'-6"10'-0"9'-0"13'-0"16'-0"14'-6"13'-0"12'-6"15'-0"14'-0"9'-6"12'-0"11'-0"10'-0"10'-0"8'-0"3'-6"5'-0"1'-0"6'-0"9'-6"5'-0"10'-6"5'-6"3'-0"2'-6"8'-0"7'-6"6'-6"12'-0"9'-0"9'-0"1'-0"6"1'-6"1'-0"1'-0"3"1'-0"3'-0"2'-6"2'-0"1'-6"2"1'-0"1'-0"1'-0"1'-0"1'-0"4"4'-0"3'-6"4"612"7'-0"6'-6"11"878"10'-0"12'-0"11'-6"11'-0"10'-0"5'-0"6'-6"4'-0"2'-6"11'-0"9'-6"8'-0"1'-0"8"1'-6"10"13'-6"14'-6"14'-6"14'-0"12'-6'11'-0"15"12"13"11'-0"10'-6"SQUARE OR RECTANGULAR HOLE SIZE13"6'-0"6'-6"ROUND HOLE SIZEMinimum distance from edge of hole to inside face of nearest end support1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"2'-0"2'-0"1'-6"1'-6"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"56016"14"1'-0"3602102305601'-0"1'-0"1'-0"2102301101'-0"1'-0"1'-0"1178"912"1102303602101'-0"1'-0"1'-0"1'-0"1102303602101'-0"1'-0"1'-6"1'-0"8'-0"1'-6" 3'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0" 1'-0"1'-0"8'-0"5'-6"1'-6"2'-0"6'-0"3'-6"4'-0"9'-0"3'-0"3'-6"2'-6"6'-0"6'-6"5'-0"1'-0"1'-0"1'-6"1'-0"1'-0"2'-6"2'-0"1'-6"2'-0"2'-6"3'-0"2'-0"4'-0"3'-6"2'-6"3'-0"5'-0"6'-0"7'-0"5'-6"Table A - End Support3"DEPTH TJI®2" 4"878" 11"1'-6"2'-0"1'-0"2'-6"2'-0"1'-0"2'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"1'-6"1'-0"5'-0"3'-6" 8'-0"2'-6"1'-0"1'-0"1'-0"1'-6"1'-0"1'-0"3'-6"1'-0"1'-0"1'-0"2'-0"2'-0"1'-6"9'-6"8'-0"9'-0"8'-0"10'-0"7'-0"6'-6"9'-0"9'-0"8'-6"8'-0"7'-0"6'-0"6'-6"1'-6"2'-6"2'-0"2'-0"2'-6"4'-0"3'-0"3'-0"3'-6"3'-0"2'-6"2'-6" 3'-6"5'-0"4'-6"4'-0"7'-6"7'-0"6'-6"6'-0"3"2" 4"11"878"Also see detail B2612"5'-0"5'-0"5'-6"6'-0"2'-6"3'-0"4'-6"2'-6"1'-0"1'-6"1'-0"2'-6"1'-0"1'-0"2'-6"5'-0"1'-0"1'-0"612"4'-6"5'-0"5'-0"5'-6"5'-0"5'-6"6'-6"4'-6"3'-6"4'-0"4'-0"6'-6"3'-0"2'-6"5'-6"7'-0"5'-0"4'-0"3'-0"3'-6"5'-0"2'-6"1'-6"2'-0"1'-0"3'-0"1'-0"1'-0"3'-0"5'-6"1'-0"1'-0"5'-6"5'-6"6'-6"4'-6"4'-0"4'-6"5'-0"7'-0"3'-6"3'-6"6'-6"7'-6"6'-0"5'-0"5"5"7"7"1'-0"1'-0"1'-0"5"4'-0"4'-6"2'-6"3'-0"6'-6"5'-6"1'-0"5'-6"3'-6"3'-6"3'-6"1'-0"2'-0"1'-0"1'-0"1'-0"1'-0"5'-0"7"4'-0"3'-0"2'-0"3'-6"4'-0"3'-6"1'-0"6'-6"6'-0"5'-6"7'-6"2'-6"8'-6"5'-0"7"5"5'-6"6'-6"3'-6"2'-6"5'-6"4'-0"4'-0"2'-0"7'-0"5'-6"5'-0"7'-0"2'-6"8'-0"7'-6"4'-6"4'-0"6'-0"8'-0"11'-0"6'-0"9'-6"8'-6"10'-0"11'-0"5'-6"7'-6"8'-6"10'-0"6'-0"7'-0"7'-0"5"1'-0"1'-0"1'-0"1'-0"7"1'-0"1'-0"1'-0"1'-0"5" 7"1'-0"1'-0"1'-0"1'-0"1'-0"1'-0"3'-0"4'-0"5"1'-0"1'-0"1'-0"1'-0"1'-6"1'-0"1'-0"1'-0"7"5"1'-0"1'-0"3'-6"1'-6" 6'-6"4'-0"6'-0"8'-6"7"1.3E TimberStrand® LSL allowed hole zoneddMicrollam® LVL andParallam® PSLallowed hole zonemiddle 13 span1.3E TimberStrand®LSL hole zoneMicrollam® LVLand Parallam®PSL hole zone2 x diameter of thelargest hole (minimum)d13 depth1"2"134"MAXIMUM ROUNDHOLE SIZEHEADER DEPTH438"714" to 20"512"See illustration for Allowed Hole ZoneOther Trus Joist® Trus Joist® Headers and Beams1.55E TimberStrand®LSL Headers and BeamsALLOWABLE HOLES - Headers and Beams13 depth2 x diameter of thelargest hole (minimum)2 x diameter of thelargest hole (minimum)Allowed hole zone8"8"See illustration for allowed hole zone1114"-11 78"14" to 16"914"-912"HEADER DEPTHMAXIMUM ROUNDHOLE SIZE358"458"3"No holes in headers or beams in plank orientation.Round holes onlyGeneral NotesGeneral NotesNo holes in headers or beams in plank orientation.Allowed hole zone suitable for uniformly loaded headers and beams only.Round holes onlyNo holes in cantilevers.BEAM ATTACHMENT at BEARINGThis sheet is intended as a supplement to the Trus Joist® Framer's Pocket Guide, which should be referenced for additional information.THINK SAFETY-READ INSTALLATION INFORMATION BEFORE PROCEEDINGAllowable Load400475Allowable load determined in accordance with AC 124.Corrosion-resistant fasteners required for wet-service applications.114" TimberStrand®LSL rim boardEXTERIOR DECK ATTACHMENTStructural exterior sheathingSee fastenertable below. Maintain2" distance (minimum) fromedge of ledger to fastener.8" diameter maximum hole for 1178" -16" deep blocking panels; 6" diametermaximum for TJI® blocking panels912" deep or shorter than 12" long.Do not cut flanges.GENERAL TRUS JOIST PRODUCT ASSEMBLY DETAILSE1E1WWeb stiffenersrequired eachside at E1WBacker block: Install tightto top flange (tight tobottom flange with facemount hangers). Attachwith ten 10d (3") boxnails, clinched whenpossible.H2Backer blockboth sides of webwith single TJI®joistFiller block: Attach with ten 10d (3") boxnails, clinched. Use ten 16d (312") boxnails from each side with 312" TJI® joistflange widths. Use fifteen nails withTJI® joist depths greater than 16".12" lag boltLA38" lag boltFastenerFlashingTreated 2x_ledger400N.A.118" Trus Joist®rim boardWeb stiffener each side.See sizes below.WTight fitWEB STIFFENER ATTACHMENTGap:18" minimum234" maximumThree 8d (212") box nails, clinched(Three 16d (312") box nails at 312"TJI® joist flange widths112"112"Load bearing or shear wall above(must stack over wall below)TJI® blockingpanelWeb stiffenersrequired each side atB1W and B2WB2B1B1WB2W116"2x4 minimumsquash blocksUse 2x4 minimum squash blocks totransfer load around TJI® joistCSLoad from above2x4 minimumsquash blocks116"With top flange hangers, backer block requiredonly for downward loads exceeding 250 lbs or foruplift conditions.NOTE: STUCTURAL DOCUMENTS FOR THIS PROJECT PER THE DESIGN PROFESSIONAL OF RECORD SHALLSUPERCEDE ALL ASSEMBLIES SHOWN IN THIS SECTION, ALSO REFER TO TRUS JOIST® PLACEMENT PLANS(AND MATERIAL SCHEDULES) FOR REQUIRED MATERIAL.Coordinate load requirements with the design professional of record.Lack of proper bracing during construction can result in seriousaccidents. Observe the following guidelines:1. All blocking, hangers, rim boards and rim joists at the end supports of the TJI® joists must be completely installed and properly nailed.2. Laterial strength, like braced end wall or an existing deck, must be established at the ends of the bay. This can also beaccomplished by a temporary or permanent deck (sheathing) fastened to the first 4 feet of joists at the end of the bay.3. Safety bracing of 1x4 (minimum) must be nailed to a braced end wall or sheathed area (as in note 2) and to each joist.Without this bracing, buckling sideways or rollover is highly probable under light construction loads - such as a worker orone layer of unnailed sheathing.5. Ends of cantilevers require safety bracing on both the top and bottom flanges.6. The flanges must remain straight within 1/2" from true alignment.4. Sheathing must be completely attached to each TJI® joist before additional loads can be placed on the system.WARNING NOTES:WARNINGJoists are unstable until braced laterallyBracing Includes:BlockingHangersSheathingRim BoardStrut LinesRim JoistDO NOT stack buildingmaterials on unsheathedjoists. Stack only overbeams or walls.DO NOT walk on joiststhat are lying flat.DO NOT walk on joistsuntil braced.INJURY MAY RESULT.Weyerhaeuser, Microllam®, Parallam®, Silent Floor®, TimberStrand®, TJI®, and Trus Joist® are registered trademarksof Weyerhaeuser NR. © 2009 Weyerhaeuser NR Company. All rights reserved.TimberStrand® LSL, TrusJoist® rim board, or(Microllam® LVL with EORapproval) see placement plan.TimberStrand® LSL, TrusJoist® rim board, or (Microllam®LVL with EOR approval)TimberStrand® LSL, TrusJoist® rim board, or (Microllam®LVL with EOR approval)TimberStrand® LSL, TrusJoist® rim board, or (Microllam®LVL with EOR approval) seeplacement plan.B4End of joist at centerline of support. Blocking panels required.Load bearing or shear wall above (must stack over wall below when present)Plate nail - 16d (0.135" x 312")at 16" on-center*Floor panel nail - 8d (0.131" x 212")at 6" on-center*A3WWToe nail - 10d (0.131" x 3")at 6" on-center*When sheathing thickness exceeds 78",trim sheathing tongue at rim boardWeb Stiffeners requiredeach side at A3._WA3A3.2A3.1 A3.3A3.1WA3.2WA3.3TimberStrand® LSL, Trus Joist®rim board, or (Microllam® LVL withEOR approval) see placement plan.For rim board thicker than 1 34"- Attach TJI® Joist to rim board with one 10d (0.128"x3")nail. Top nail from TJI® joist into rim board.- Connect corner with four 10d (0.128"x3") nails. Toe nailfrom side of parallel closure into rim board.*Conventional construction code minimum for use withA3 only. See the Trus Joist TJI® Specifier's Guide, #TJ-4000,and the Trus Joist® Rim Board Specifier's Guide, #TJ-8000,for A3.1-A3.3 installation specifications and applications.Doubletop plateStudKingstudHeader platestops at insideface oftrimmersHeader - per plan(bears directly ontrimmers)Trimmers- per planHeadercrippleTypical Header DetailWindow/Door OpeningOnly header openings and roof loads which affect Trus Joistproduct sizes have been denoted on this layout. In addition toany CS detail callouts shown, solid blocking and/or squashblocks are required to provide vertical load transfer from allconcentrated load locations to foundation below. See pocketframer guide for appropriate detail(s).ASSUMED BEARING LENGTH FOR BEAMSAt parallel walls assume 1-1/2" end bearing, at perpendicular wallsassume full wall width end bearing UNO.ALLOWABLE JOIST SHIFTSIndividual joists can be shifted up to 3" maximum from their on-centerspacing to avoid hanger interference/plumbing drops/post.(DO NOT EXCEED 24" O.C. MAXIMUM SPACING)CANTILEVERS/TRUSSESDesign assumes all trusses at floor cantilevers are connected to thewall and NOT to the Trus Joist rimboard. If trusses need to connectto the Trus Joist rimboard, contact Weyerhaeuser for a connectiondetail prior to installation.JOIST & BEAM HANGER FACE NAILING REQUIREMENTS* FOR3 & 4 PLY SUPPORTING MEMBERSFor IUS or THF Hangers - Use 10d (0.148") x 3" nails.For MIU, HU, HHUS, HGUS or HD, THD, THDH Hangers - Use 16d(0.162") x 3-1/2" nails.*For hangers that have joist fasteners/connections, fill all holes withthe manufacturer's recommended fasteners.**FLOOR & ROOF DESIGN PARAMETERS**Face mounthangerTop flangehangerVerify column capacityand beam bearinglength. See currentiLevel® literature.L5L1BEARING ATCOLUMNColumnSee current Trus Joist® literaturefor framing connectorsL6Additional nailing or bolting may berequired with side-loaded multiple-memberbeams. Refer to current product literature.CONNECTION OF MULTIPLE PIECESOF TOP-LOADED BEAMS (1)Minimum of 3 rows 10d (3" x 0.128") nails at 12" o.c.Minimum of 4 rows 10d (3" x 0.128") nails at 12" o.c.for 14" and deeper beamsIf using 12d (314") or larger nails, the number ofnailing rows may be reduced by one.(1) Load must be applied evenly across entirebeam width. Otherwise, use connections forside-loaded beams.312" Width Pieces:Minimum of 2 rows 12" bolts at24" o.c. staggered134" Width Pieces:L2L3Protect untreatedwood from directcontact withconcreteL4BEARING AT WALLBEARING FOR DOOROR WINDOW HEADERStrap per code if top plateis not continuous overheaderBEAM TO BEAMCONNECTIONBEARING ATCONCRETE WALLTimberStrand® LSL, Trus Joist® rimboard, (Microllam® LVL with EORapproval), or TJI® blocking for lateral supportBEAM DETAILS2'TJI® JOIST2"2x6 (min.) solid sawn or 4 12" wideTimberstrand® LSL rim board, full lengthin bay and tight to each joist flange. Connectto plate with 8d (0.113" x 2 38") nails at 6"on-center.2416 span rated sheathing (716" Min.).Attach with 8d (0.113" x 2 38") nails at6" on-center along panel edges and infield. Use pressure treated plywoodfor ground level cantilevers.E1 ALTWARNINGJoists are unstable until braced laterally,Safety bracing required during installation.Lateral load transfer for this detail is180 PLF (pounds per lineal foot).Additional connections may be requiredto transfer lateral loads from wall above.16' maxdeck2'11 7/8" - 16" TJI®2"6"16' maxdeck2'9 1/2" TJI®6"2x_ Furring2416 span rated sheathing (716" Min.).Attach with 8d (0.113" x 2 38") nails at6" on-center along panel edges and infield. Use pressure treated plywoodfor ground level cantilevers.Inverted hanger (seehanger list on Trus Joiststructural layout)Treated ledger1 18" x 11 7/8" Trus Joist® rim boardInverted hanger (seehanger list on iLevelstructural layout)Treated ledgerE1 ALT LA2416 span rated sheathing (716" Min.).Attach with 8d (0.113" x 2 38") nails at6" on-center along panel edges and infield. Use pressure treated plywoodfor ground level cantilevers.E1 ALT LA 9.52x6 (min.) solid sawn or 4 12" wideTimberstrand® LSL rim board, full lengthin bay and tight to each joist flange. Connectto plate with 8d (0.113" x 2 38") nails at 6"on-center.Timberstrand ® LSL rim boardto match TJI® depth2x6 (min.) solid sawn or 4 12" wideTimberstrand® LSL rim board, full lengthin bay and tight to each joist flange. Connectto plate with 8d (0.113" x 2 38") nails at 6"on-center.WARNINGJoists are unstable until braced laterally,Safety bracing required during installation.Lateral load transfer for this detail is180 PLF (pounds per lineal foot).Additional connections may be requiredto transfer lateral loads from wall above.WARNINGJoists are unstable until braced laterally,Safety bracing required during installation.Lateral load transfer for this detail is180 PLF (pounds per lineal foot).Additional connections may be requiredto transfer lateral loads from wall above.Attach reinforcementto TJI® joist with 8d (212")common nails at 6" on-center. When reinforcingboth sides, stagger nails.E3E22'-0"maximumFace grainhorizontal4'-0" length of34" reinforcementon one side at E2,both sides at E3ALT ALTTimberstrand ® LSL rim boardto match TJI® depth2x6 (min.) solid sawn or 4 12" wideTimberstrand® LSL rim board, full lengthin bay and tight to each joist flange. Connectto plate with 8d (0.113" x 2 38") nails at 6"on-center.2416 span rated sheathing (716" Min.).Attach with 8d (0.113" x 2 38") nails at6" on-center along panel edges and infield. Use pressure treated plywoodfor ground level cantilevers.WARNINGJoists are unstable until braced laterally,Safety bracing required during installation.Lateral load transfer for this detail is180 PLF (pounds per lineal foot).Additional connections may be requiredto transfer lateral loads from wall above.Timberstrand ® LSL rim boardto match TJI® depthUNLESS NOTED OTHERWISEFLOOR LIVE LOAD DEFLECTION CRITERIA: L/480FLOOR LIVE LOAD: 40 PSFFLOOR DEAD LOAD: 10 PSFSNOW LIVE LOAD: 35 PSFROOF DEAD LOAD: 20 PSF (TRUSSED ROOFS)ROOF DEAD LOAD: 15 PSF* (TJI/RAFTER)*Dead Loads are adjusted for slope correctionTJI® blockingpanelA1PB113 joist span8' max.Apply subflooradhesive to allcontact surfacesOption #3:Option #1:Option #2:TJI® Joist blocking with endblocks installed at 13 joist-spanlocations usingtwo 8d (0.113" x 212")nails or2 12" screws,typical2x_ strapping installed at 13joist-span locations using two2 12" screws per joist, typicalDirectly applied ceilingWhen specified on the layout, one ofthe above bracing options is requiredAdditional Notes1.5E TimberStrand®LSL Prescriptive Chart13 depth2 x diameter of thelargest hole (minimum)8"See illustration for allowed hole zone1114"-11 78"14"-16"914"-912"358"458"3"Round holes onlyGeneral NotesNo holes within 8" of joist ends.Maximum RoundHole SizeJoist DepthAllowed hole zone1.5 E TimberStrand® LSL8"Round holes larger than 3-5/8" up to 7-1/4" max. in1.5" x 11-7/8" 1.5E TimberStrand LSL joist onlyEdge of large holes need to be at least 4 times the diameter of the largest hole(for a 7-1/4" hole, the closest distance allowed to the next hole is 29", even if the nexthole is a small 12" diameter hole).The hole must be centered within the joist vertically.No square or rectangular holesNo more than (2) holes between 3-5/8" and 7-1/4" diameter allowed per span.See chart below for minimum distance from inside face of bearing to edge of hole for holeslarger than 3-5/8" but not greater than 7.25"Minimum distance from edge of hole to inside face ofbearing (end or intermediate)4"5"6.5" 7.25"2'-0"2'-0" 3'-0"3'-6"the area of a 7-1/4" circumscribed hole A smaller hole can be drilled withincentered in the depth of the joistcircumscribed 7-1/4" holesmaller hole drilled withincircumscribed area of 7-1/4" holeassuming the circumscribed hole is a minimum of 3'-6" from face of bearing1-1/2" x 11-7/8" 1.5E TimberStrand LSL floor joist Start Framing HereLEVEL NOTESCurrent Date:6/1/2021File Name:5006 EI B - Copy.jvlLevel Name:1st FloorBuilding Code - Design Methodology:IBC 2018Members with Design Overridden:TJ-Pro Rating (Weighted Average):Unable to CalculateMinimum Level TJ - Pro Rating & Joist:Unable to CalculateMaximum Level TJ - Pro Rating & Joist:Unable to CalculateFLOORFloor Container:FC8Use/Occupancy:ResidentialLivingAreasFloor Area Loading is:40.0 lb/ft² Live Load & 10.0 lb/ft² Dead LoadOperator Added Additional LoadsFloor Maximum Allowed DeflectionL/480 Live Load & L/240 Total LoadTJ-Pro Rating Information:Weighted Average:Unable to CalculateDirectly Applied Ceiling:Gypsum 1/2"Decking Attachment:Glue and NailDecking Material:23/32"x48"x96" Weyerhaeuser Edge Gold Panel (0/24) T&G SFPerpendicular Partition:YesStrapping at max 8' o.c.:NoneBlocking at max 8' o.c.:NoPoured Flooring:NoADD - WALKOUT OPTIONPlotID Length ProductPlies Net QtyTSHd1-2 8' 0" 1 3/4" x 9 1/2" 1.55E TimberStrand LSL 2 2TSHd2-2 6' 0" 1 3/4" x 9 1/2" 1.55E TimberStrand LSL 2 4ADD - LOOKOUT OPTIONPlotID Length ProductPlies Net QtyTSHd2-2 6' 0" 1 3/4" x 9 1/2" 1.55E TimberStrand LSL 2 4Main FloorPlotID Qty Manuf Product Backer Blks Filler Web StiffH1 1 Simpson HU412 No No NoH2 1 Simpson IUS1.81/11.88 No No NoH3 9 Simpson LUS210 No No NoMain FloorPlotID Length ProductPlies Net QtyFBk1 5' 4 3/8" 11 7/8" TJI 210 joist1 1TS1 38' 0" 1 1/2" x 11 7/8" 1.5E TimberStrand LSL 1 7TS2 24' 0" 1 1/2" x 11 7/8" 1.5E TimberStrand LSL 1 6TS3 18' 0" 1 1/2" x 11 7/8" 1.5E TimberStrand LSL 1 15TS4 14' 0" 1 1/2" x 11 7/8" 1.5E TimberStrand LSL 1 1TS5 4' 0" 1 1/2" x 11 7/8" 1.5E TimberStrand LSL 1 1TS6-2 8' 0" 1 3/4" x 11 7/8" 1.55E TimberStrand LSL 2 2TS7-2 6' 0" 1 3/4" x 11 7/8" 1.55E TimberStrand LSL 2 2TS8 4' 0" 1 3/4" x 11 7/8" 1.55E TimberStrand LSL 1 1TS9-2 6' 0" 1 3/4" x 9 1/2" 1.55E TimberStrand LSL 2 2STCa1 16' 0" 1 1/8" x 11 7/8" TJ Rim Board1 1123/32"x48"x96" Weyerhaeuser Edge Gold Panel (0/24) T&G SF 1 39ADD - FULL FOUNDATIONPlotID Length ProductPlies Net QtyNot Shown 40' 0" 1-1/2" x 11-7/8" 1.5E Timberstrand LSL1 1All Elevations Soil Pressure BlockingPlotID Length Product Plies Net QtySoil pressure Blkg 98' 0" 11-7/8" TJI® 210 1 1A3A3A3A3B2B2CSCSCSCSCSCSCSCSA3B1TSHd2-2TSHd2-2TSHd2-2TSHd2-2BBOHd1-2TSHd1-2TS7-2TS6-2TS9-2BBO1-3TS3TS4STCa1STCa1STCa1STCa1STCa1STCa1STCa1STCa1STCa1STCa1SB8SB9TS8TS5H1L21L211 12"minimumspacing,typicalPoint Load Connector SpacingNail Connection2"2"10d (0.128" x 3")nails, typical.Stagger toprevent splitting.2" spacing, typical8"-10"There must be an equal number ofnails on each side of the connectionH2H31' 4"1' 9 5/8"1' 8"1' 10"1' 9 1/16"1' 5 3/8"1' 4 1/4"1' 1 9/16"1' 6 3/4"H3FBk114' 0" 1' 8 1/8"1' 8 11/16"TS119.2" O.C.TS319.2" O.C.TS319.2" O.C.TS219.2" O.C.H3H3WALKOUT OPTIONLOOKOUT OPTION3"3"3"3"3"3"3"Install (4) 2x6 squash blocks under allpoint loads at front of house.For labeled Point Loads exceeding10,000 lbs contact LENNAR forFraming Details.(12) 10d nailcluster.6 nails on eachside of beam.Pwdr BathFull Foundation: 1-1/2" LSL 1.5E flush with canted sillplate. LSL attached to Rim held to inside lining up withconcrete foundation. (1-1/2" LSL not shown on layout.)All joist blocking including soil pressure joistblocking can be either 210 or 360 series TJI or1-1/2" Timberstrand LSL 1.5E material.Int Brace Panel AboveGuest SuiteOptionNO MATERIAL CHANGE FOR FULL HEIGHTSTONE FIREPLACE OPTIONS FOR BOTHSIDE AND CORNER FIREPLACES.Weyerhaeuser prepared these plans for the specification of Trus Joistproducts based on project information provided to us. This service is solelyintended for product application assurance; and, is not intended to circumventthe need for a design professional as determined by the building codes.The designer of record and/or builder/framer is responsible to assure thesedrawings are compatible with the overall project.Copyright 2009 Weyerhaeuser NR Company. All rights reserved.Anyunauthorized copying of reproduction will constitute an infringement of copyright.Architectural Drawings Prepared By:LennarStructural Drawings Prepared By:N/A7/15/14N/ALennar MNEK05 Lewis E/I (prev. 5006)Elevation BMNRev.ByDateJLH6-1-21CommentsAdded notes for B3B, C3C, D3D elevations.Drawn By:Chuck EOriginal Date:7/15/14First Floor Framing PlanScale: 1/4" = 1'-0"Sheet2of 3Structural Framer'sPocket Guide.Access with your Smart Phone.http://woodbywy.com/document/tj-9001/Have a damaged joist or beam?File an electronic damage report forprompt service from your regionaltechnical office. Scan the QR Codewith your smartphone or go to:www.damagereport.wSpecification Teamservice.request@weyerhaeuser.com(888) 453-8358 . . . . . . . . www.woodbywy.comLack of proper bracing during construction can result in seriousaccidents. Observe the following guidelines:WARNING NOTES:WARNINGJoists are unstable until braced laterallyBracing Includes:BlockingHangersSheathingRim BoardStrut LinesRim JoistDO NOT stack buildingmaterials on unsheathedjoists. Stack only overbeams or walls.DO NOT walk on joiststhat are lying flat.DO NOT walk on joistsuntil braced.INJURY MAY RESULT.Weyerhaeuser, Microllam, Parallam, TimberStrand, TJI, TJ, and Trus Joist are registered trademarks ofWeyerhaeuser NR. © 2014 Weyerhaeuser NR Company. All rights reserved.1. All blocking, hangers, rim boards and rim joists at the end supports of the TJI® joists must be completely installed and properly nailed.2. Laterial strength, like braced end wall or an existing deck, must be established at the ends of the bay. This can also beaccomplished by a temporary or permanent deck (sheathing) fastened to the first 4 feet of joists at the end of the bay.3. Safety bracing of 1x4 (minimum) must be nailed to a braced end wall or sheathed area (as in note 2) and to each joist.Without this bracing, buckling sideways or rollover is highly probable under light construction loads - such as a worker orone layer of unnailed sheathing.5. Ends of cantilevers require safety bracing on both the top and bottom flanges.6. The flanges must remain straight within 1/2" from true alignment.4. Sheathing must be completely attached to each TJI® joist before additional loads can be placed on the system.THINK SAFETY - READ INSTALLATION INFORMATION BEFORE PROCEEDINGA COMPLETE JAVELIN® LAYOUT INCLUDES THE WEYERHAEUSER FRAMER'S POCKET GUIDE.Only header openings and roof loads which affectWeyerhaeuser product sizes have been denoted onthis layout. In addition to any'CS' detail calloutsshown, solid blocking and/or squash blocks arerequired to provide vertical load transfer from allconcentrated load locations to foundation below.See Pocket Framer's Guide for appropriate detail(s).3" adjustment allowed for joist spaced 19.2"o.c. or less to accommodate plumbing drops.DO NOT CUT JOIST FLANGES.This layout is intended for the use of TrusJoist® engineered wood products only. Thesubstitution of other engineered wood productswith this layout is NOT PERMITTED. Pleaseidentify the TJI® , TimberStrand® LSL , Microllam® LVL , and Parallam® PSL stampson the product to ensure that this layout isvalid for the products actually installed. 3rd Stall Garage w/ Garage Expansion Option Remove ListPlotID Length Product Plies Net QtyM2-3 20' 0" 1 3/4" x 18" 2.0E Microllam LVL 3 33rd Stall Garage w/ Garage Expansion Option Add ListPlotID Length ProductPlies Net QtyTS2-2 20' 0" 1 1/2" x 11 7/8" 1.5E TimberStrand LSL 2 2 Start Framing HereElevation B - Second Floor - 3rd Stall GaragePlotID Qty Manuf Product Backer Blks Filler Web StiffH1 1 Simpson HHUS410 No No NoH2 10 Simpson IUS2.06/11.88 No No NoH3 1 Simpson MIU4.28/11 No No NoH4 3 User HGUS5.25/10 Not Required No RequiredH5 8 User HU2.1/9 Not Required No RequiredH6 1 User HUC48 Not Required No Not RequiredH7 3 User MIU5.12/9 Not Required No RequiredElevation B - Second Floor - 3rd Stall GaragePlotID Length ProductPlies Net QtyF38' 38' 0" 11 7/8" TJI 210 joist1 7F36' 36' 0" 11 7/8" TJI 210 joist1 6F20'-2 20' 0" 11 7/8" TJI 210 joist2 2F20' 20' 0" 11 7/8" TJI 210 joist1 3F18' 18' 0" 11 7/8" TJI 210 joist1 12F14' 14' 0" 11 7/8" TJI 210 joist1 8F8' 8' 0" 11 7/8" TJI 210 joist1 1FBk1 6' 9 3/4" 11 7/8" TJI 210 joist1 1M2-3 20' 0" 1 3/4" x 18" 2.0E Microllam LVL3 3TS3-2 18' 0" 1 3/4" x 11 7/8" 1.55E TimberStrand LSL 2 2TS4-2 10' 0" 1 3/4" x 11 7/8" 1.55E TimberStrand LSL 2 2TS5-2 10' 0" 1 3/4" x 9 1/2" 1.55E TimberStrand LSL 2 2TSHd1-2 10' 0" 1 3/4" x 9 1/2" 1.55E TimberStrand LSL 2 2TSHd2-2 8' 0" 1 3/4" x 9 1/2" 1.55E TimberStrand LSL 2 4TSHd3-2 6' 0" 1 3/4" x 9 1/2" 1.55E TimberStrand LSL 2 2TS6 20' 0" 3 1/2" x 7 1/4" 1.3E TimberStrand LSL 1 1STCa1 16' 0" 1 1/8" x 11 7/8" TJ Rim Board1 102' 0" 2x6 + 3/8" sheathing Filler Blocks 1 19 1/8" 3/4" x 2 5/16" Web Stiffeners1 423/32"x48"x96" Weyerhaeuser Edge Gold Panel (0/24) T&G SF 1 50Elev B3B Add ListPlotID Length Product Plies Net QtyM1-3 20' 0" 1 3/4" x 24" 2.0E Microllam LVL 3 3Elev B3B Remove ListPlotID Length Product Plies Net QtyM2-3 20' 0" 1 3/4" x 18" 2.0E Microllam LVL 3 3Elev B3B w/ Garage Expansion Option Remove ListPlotID Length Product Plies Net QtyM2-3 20' 0" 1 3/4" x 18" 2.0E Microllam LVL 3 3Elev B3B w/ Garage Expansion Option Add ListPlotID Length Product Plies Net QtyM3-2 20' 0" 1 3/4" x 11 7/8" 2.0E Microllam LVL 2 2CSCSCSCSB1A3A3A3A3A3A3A3A3CSB1TSHd1-2 TSHd2-2 BBOHd2-2TSHd3-2TSHd2-2M2-3TS3-2TS4-2F18'F20'-2F8'STCa1STCa1STCa1STCa1STCa1STCa1STCa1STCa1FBk1BBO3TS6H2TS5-2BBO1BBO5STCa1STCa1TS2-2H61' 4"1' 4"1' 4"1' 3 15/16"1' 11 7/16"8 9/16"H5H5H4H4H7H71' 4 3/16"11 9/16"1' 0 1/16"1' 3 7/16"1' 8"1' 8 5/8"6 13/16"1' 9"10 9/16"1' 8 5/8"1' 11 1/2"1' 1 7/16"1' 2 3/16"L211 12"minimumspacing,typicalPoint Load Connector SpacingNail Connection2"2"10d (0.128" x 3")nails, typical.Stagger toprevent splitting.2" spacing, typical8"-10"There must be an equal number ofnails on each side of the connectionH3FBk114' 0" H1H2H7H4F38'19.2" O.C.F20'16" O.C.F18'19.2" O.C.F14'19.2" O.C.F36'19.2" O.C.H2H2H51' 10 1/8"1' 5 3/4"Attach Rim to Bottom Chordof Girder with (3) rows of 16dnails @ 6" o/c3rd Stall Garage Option3"3"3"3"3"3"Garage mono trusses tosupport bumpout area.3"4.5"4.5"4.5"Garage Expansion OptionGirder truss with garageexpansion option.Shorten girder truss backto here with garageexpansion option.See joist to girderconnection detailon this page.(2) 2x10 SYP/DF bottomchord - minimum(18) 10d nail cluster.9 nails on each side of beam.Int Brace Panel BelowSerenity Bath OptionFur out under railingas needed.Owners BathHall BathElevation B3B: Exterior stone added above garageheader, change garage header from (3)18" LVL to(3)24" LVL to meet L/600 TL deflection.Elevation B3B w/ Garage Extension Option:Exterior stone added above garage header,change garage header from (2)1-1/2" x 11-7/8"LSL to (2)11-7/8" LVL to meet L/600 TL deflection.Wall FramingPlotID Length Product Plies Net QtyTSHd1-2 8' 0" 1 3/4" x 9 1/2" 1.55E TimberStrand LSL 2 2TSHd1-2BBOHd3-2BBOHd3-2BBOHd1-2BBO3BBOHd1-2BBOHd3-2BBOHd3-2BBO53rd and 4th StallGarage OptionLEVEL NOTESCurrent Date:6/1/2021File Name:5006 EI B - Copy.jvlLevel Name:2nd FloorBuilding Code - Design Methodology:IBC 2018Members with Design Overridden:TJ-Pro Rating (Weighted Average):45Minimum Level TJ - Pro Rating & Joist:TJ-Pro rating = 34, joist = F38'(i36815)Maximum Level TJ - Pro Rating & Joist:TJ-Pro rating = 56, joist = F14'(i36830)FLOORFloor Container:FC4, FC9Use/Occupancy:ResidentialLivingAreasFloor Area Loading is:40.0 lb/ft² Live Load & 10.0 lb/ft² Dead LoadOperator Added Additional LoadsMaximum Allowed Deflection:L/480 Live Load & L/240 Total LoadTJ-Pro Rating Information:Weighted Average:FC4: 44; FC9: 45Directly Applied Ceiling:Gypsum 1/2"Decking Attachment:Glue and NailDecking Material:23/32"x48"x96" Weyerhaeuser Edge Gold Panel (0/24) T&G SFPerpendicular Partition:NoStrapping at max 8' o.c.:NoneBlocking at max 8' o.c.:NoPoured Flooring:NoGIRDER TRUSS BY OTHERSNOTES: TRUSS MANUFACTURER TODESIGN FOR ANY TORSION LOADS ATBOTTOM CHORDS OF GIRDER TRUSSIF NEEDED. THE TORSION FORCEDEPENDS ON THE NUMBER OF GIRDERTRUSS PLIES AND VERTICAL LOADAPPLIED.TJI SERIES WEB STIFFENER SQUASH BLOCK MAX. TJI REACTION1101178" MIN.58" x 512" Wide34" Net x 512" Wide1" Net x 512" Wide118" TJ Rim Board(BOTH SIDES OF JOIST)2x6 BLOCK(BOTH SIDES OF JOIST)(CUT 116" TALLER THAN JOIST)1,305 LBS1,530 LBS230 - 1,575 LBS360 - 1,620 LBS2ND FLOOR WALLSUPPORTING UNIFORMROOF LOAD(2) PLY 2X10 SYP/DFBOTTOM CHORD, MINIMUMSQUASH BLOCKS (SEE TABLE FOR SIZE & TYPE)ATTACH W/ (3) 10d (0.128" x 3") NAILS INTO WEB &WEB STIFFENER.TJI JOIST SERIES1178" MIN. DEPTHGAP:18" MINIMUM234" MAXIMUM(3) 8d (0.113" x 212") NAILS,CLINCHEDWEB STIFFENER EACH SIDESEE TABLE BELOWTIGHT FIT1"1"WEB STIFFENERSEE DETAILHANGER - SEE TABLERRRHANGER MAX. REACTION2,615 LBSMIU5.12/9 2,615 LBSMIU4.75/9 2,615 LBSLIGHT LOADS1 - MAXIMUM TJI REACTION FROM CURRENT LEVEL LOADS ONLY.2 - MAXIMUM LOAD / REACTION ON HANGER FROM CURRENT LEVEL & ALL LEVELS ABOVE. MAX HANGER REACTION FOR FLOOR & ROOF COMBINATION (115% SNOW LOAD DURATION)NAILING: SEE HANGER MANUFACTURE LITERATURE FOR TOP MOUNT MAX HANGER NAILING REQUIREMENTS.SIMPSON STRONG-TIEHANGER MAX. REACTION2,220 LBSHD310-2 2,920 LBS2,920LBSUSPGIRDER TRUSS BY OTHERSTOP VIEWRTJI JOISTSQUASH BLOCK - SEE TABLE2101178" MIN.230 / 3601178" MIN.RHD210-35 1/2"GIRDER TRUSS BY OTHERSHANGER - SEE TABLESQUASH BLOCK - SEE TABLEATTACH W/ (3) 10d (0.128" x 3")NAILS INTO WEB & WEB STIFFENER.RTJI JOIST118" TJ Rim Board(BOTH SIDES OF JOIST)MIU4.12/9SUH410RSIDE VIEWWEB STIFFENER - SEE TABLEHANGER - SEE TABLE2222221111RGIRDER TRUSS BY OTHERSNOTES: TRUSS MANUFACTURER TODESIGN FOR ANY TORSION LOADS ATBOTTOM CHORDS OF GIRDER TRUSSIF NEEDED. THE TORSION FORCEDEPENDS ON THE NUMBER OF GIRDERTRUSS PLIES AND VERTICAL LOADAPPLIED.2ND FLOOR WALLSUPPORTING UNIFORMROOF LOAD(2) PLY 2X10 SYP/DFBOTTOM CHORD, MINIMUMTJI JOIST SERIES1178" MIN. DEPTHHANGER - SEE TABLETJI SERIES SQUASH BLOCKS MAX. TJI REACTION134" 1.55E TIMBERSTRAND LSL(BOTH SIDES OF JOIST)(CUT 116" TALLER THAN JOIST)2x6 SQUASH BLOCK(BOTH SIDES OF JOIST)(CUT 116" TALLER THAN JOIST)1,560 LBS1,655 LBS230 - 1,655 LBS360 - 1,705 LBSHEAVY LOADSHANGER MAX. REACTIONHGUS5.50/10 9,100 LBSSIMPSON STRONG-TIEHANGER MAX. REACTIONTHDH610 9,855 LBSTHDH210-3 9,855 LBSTHDH610 9,855 LBSUSP1101178" MIN.2101178" MIN.230 / 3601178" MIN.9,100 LBS9,100 LBSHGUS5.25/10HGUS5.50/102x6 SQUASH BLOCK(BOTH SIDES OF JOIST)(CUT 116" TALLER THAN JOIST)SQUASH BLOCKS (SEE TABLE FOR SIZE & TYPE)ATTACH W/ (3) 10d (0.128" x 3") NAILS INTO WEB &WEB STIFFENER.WEB STIFFENERSEE DETAILGAP:18" MINIMUM234" MAXIMUM(3) 8d (0.113" x 212") NAILS,CLINCHEDWEB STIFFENER EACH SIDESEE TABLE BELOWTIGHT FIT1"1"GIRDER TRUSS BY OTHERSHANGER - SEE TABLESQUASH BLOCK - SEE TABLEATTACH W/ (3) 10d (0.128" x 3")NAILS INTO WEB & WEB STIFFENER.TJI JOISTSIDE VIEWGIRDER TRUSS BY OTHERSTOP VIEWTJI JOISTSQUASH BLOCK - SEE TABLE5 1/2"WEB STIFFENER - SEE TABLEHANGER - SEE TABLEWEB STIFFENER58" x 512" Wide34" Net x 512" Wide1" Net x 512" Wide22222211111 - MAXIMUM TJI REACTION FROM CURRENT LEVEL LOADS ONLY.2 - MAXIMUM LOAD / REACTION ON HANGER FROM CURRENT LEVEL & ALL LEVELS ABOVE. MAX HANGER REACTION FOR FLOOR & ROOF COMBINATION (115% SNOW LOAD DURATION)NAILING: SEE HANGER MANUFACTURE LITERATURE FOR TOP MOUNT MAX HANGER NAILING REQUIREMENTS.4th Stall Garage Option Add ListPlotID Length ProductPlies Net QtyTS2-2 20' 0" 1 1/2" x 11 7/8" 1.5E TimberStrand LSL 2 2TS5-2 10' 0" 1 3/4" x 9 1/2" 1.55E TimberStrand LSL 2 24th Stall Garage Option Remove ListPlotID Length Product Plies Net QtyM2-3 20' 0" 1 3/4" x 18" 2.0E Microllam LVL 3 3BBO3BBO5TS5-2TS2-2BBO3TS5-2BBO4Attach Rim to Bottom Chordof Girder with (3) rows of 16dnails @ 6" o/cGarage mono trusses tosupport bumpout area.4th Stall Garage OptionJoists and hangers same as 3rd stall.See 3rd stall option.Weyerhaeuser prepared these plans for the specification of Trus Joistproducts based on project information provided to us. This service is solelyintended for product application assurance; and, is not intended to circumventthe need for a design professional as determined by the building codes.The designer of record and/or builder/framer is responsible to assure thesedrawings are compatible with the overall project.Copyright 2009 Weyerhaeuser NR Company. All rights reserved.Anyunauthorized copying of reproduction will constitute an infringement of copyright.Architectural Drawings Prepared By:LennarStructural Drawings Prepared By:N/A7/15/14N/ALennar MNEK05 Lewis E/I (prev. 5006)Elevation B - 3rd Stall GarageMNRev.ByDateJLH6-1-21CommentsAdded notes for B3B, C3C, D3D elevations.Drawn By:Chuck EOriginal Date:7/15/14Second Floor Framing PlanScale: 1/4" = 1'-0"Sheet3of 3Structural Framer'sPocket Guide.Access with your Smart Phone.http://woodbywy.com/document/tj-9001/Have a damaged joist or beam?File an electronic damage report forprompt service from your regionaltechnical office. Scan the QR Codewith your smartphone or go to:www.damagereport.wSpecification Teamservice.request@weyerhaeuser.com(888) 453-8358 . . . . . . . . www.woodbywy.comRoof Header PlanScale: 3/16" = 1'-0"Lack of proper bracing during construction can result in seriousaccidents. Observe the following guidelines:WARNING NOTES:WARNINGJoists are unstable until braced laterallyBracing Includes:BlockingHangersSheathingRim BoardStrut LinesRim JoistDO NOT stack buildingmaterials on unsheathedjoists. Stack only overbeams or walls.DO NOT walk on joiststhat are lying flat.DO NOT walk on joistsuntil braced.INJURY MAY RESULT.Weyerhaeuser, Microllam, Parallam, TimberStrand, TJI, TJ, and Trus Joist are registered trademarks ofWeyerhaeuser NR. © 2014 Weyerhaeuser NR Company. All rights reserved.1. All blocking, hangers, rim boards and rim joists at the end supports of the TJI® joists must be completely installed and properly nailed.2. Laterial strength, like braced end wall or an existing deck, must be established at the ends of the bay. This can also beaccomplished by a temporary or permanent deck (sheathing) fastened to the first 4 feet of joists at the end of the bay.3. Safety bracing of 1x4 (minimum) must be nailed to a braced end wall or sheathed area (as in note 2) and to each joist.Without this bracing, buckling sideways or rollover is highly probable under light construction loads - such as a worker orone layer of unnailed sheathing.5. Ends of cantilevers require safety bracing on both the top and bottom flanges.6. The flanges must remain straight within 1/2" from true alignment.4. Sheathing must be completely attached to each TJI® joist before additional loads can be placed on the system.THINK SAFETY - READ INSTALLATION INFORMATION BEFORE PROCEEDINGA COMPLETE JAVELIN® LAYOUT INCLUDES THE WEYERHAEUSER FRAMER'S POCKET GUIDE.Only header openings and roof loads which affectWeyerhaeuser product sizes have been denoted onthis layout. In addition to any'CS' detail calloutsshown, solid blocking and/or squash blocks arerequired to provide vertical load transfer from allconcentrated load locations to foundation below.See Pocket Framer's Guide for appropriate detail(s).3" adjustment allowed for joist spaced 19.2"o.c. or less to accommodate plumbing drops.DO NOT CUT JOIST FLANGES.This layout is intended for the use of TrusJoist® engineered wood products only. Thesubstitution of other engineered wood productswith this layout is NOT PERMITTED. Pleaseidentify the TJI® , TimberStrand® LSL , Microllam® LVL , and Parallam® PSL stampson the product to ensure that this layout isvalid for the products actually installed. ©                                                                               ©             DateRevisionProject Number:Date:S31Sheets: of2Print Name:Signed: License Number:Ryan Mack46673Date:I hereby certify that this plan, specification or reportwas prepared by me or under my direct supervisionand that I am a duly Licensed Professional Engineerunder the laws of the State of Minnesota.3407 Kilmer Lane NSuite 4Plymouth, MN 55441Tel 612-708-3572www.hansongroupmn.comLennar Corporation16305 36th Ave N. Suite 600Plymouth, MN 55446 Lewis/EK05 Model"B" ElevationMinnesota ConstructionPLANS SHOWN LIGHT IN BACKGROUND ARE FORLOCATION REFERENCE ONLY. PLAN NOTES ANDELEMENTS SHOWN LIGHT MAY NOT NECESSARILYSUPPORT THE HANSON GROUP'S DESIGN.DescriptionApril 2, 20200.1364-2-20©COPYRIGHT HANSON GROUP, LLC 2020THIS SHEET/S REPRESENTS A COMPLETE DESIGN OF THE "MAIN WINDFORCE RESISTING SYSTEM" FOR THE ENTIRERESIDENTIAL STRUCTURE. THE LOCATION AND LENGTH OF EACH BRACED WALL PANEL AND ENGINEERED WINDRESISTING ELEMENT THAT IS REQUIRED FOR THE HANSON GROUP'S DESIGN IS SHOWN ON THE STRUCTURALDRAWINGS. WALLS NOT SPECIFICALLY LABELED ON THE PLANS MAY BE STANDARD FRAMING.SECTIONS SHOWN DEPICT CONNECTIONS OF BRACED WALL PANELS TOROOF TRUSSES ABOVE, TO JOISTS/TRUSSES/BLOCKING ABOVE, AND TOJOISTS/TRUSSES/BLOCKING BELOW. THESE PANELS ARE NOT NECESSARILYREQUIRED TO ALIGN, BUT MAY DEPENDING ON PLAN LAYOUT.ROOFTRUSSESBRACEDWALL PANELFLAT 2x6 @ 24" O.C.(MIN. (3) PER BRACEDWALL PANEL)SIMPSONA35FRAMINGANGLEEACH END(4) 0.131"Øx 3" NAILSPROVIDE 12" WIDTH WEBSTIFFENER FOR ATTACHMENTOF FRAMING ANGLEBRACEDWALL PANEL(4) 0.131"Øx 3" NAILSSIMPSONA35FRAMINGANGLEEACH ENDFLOORJOISTSPROVIDE 12" WIDTH WEBSTIFFENER FOR ATTACHMENTOF FRAMING ANGLEBRACEDWALL PANEL(4) 0.131"Øx 3" NAILSSIMPSONA35FRAMINGANGLEEACH ENDFLOORJOISTSBRACEDWALL PANEL(4) 0.131"Øx 3" NAILSSIMPSONLTP4FRAMINGPLATEEACH ENDFLOORTRUSSESFLAT 2x6 @ 24" O.C.(MIN. (3) PER BRACEDWALL PANEL)FLAT 2x6 @ 24" O.C.(MIN. (3) PER BRACEDWALL PANEL)FLAT 2x6 @ 24" O.C.(MIN. (3) PER BRACEDWALL PANEL)BRACEDWALL PANEL(4) 0.131"Øx 3" NAILSSIMPSONLTP4FRAMINGPLATEEACH ENDFLOORTRUSSESFLAT 2x6 @ 24" O.C.(MIN. (3) PER BRACEDWALL PANEL)BRACED WALL CONNECTIONBRACED WALL CONNECTIONBRACED WALL CONNECTION(ROOF TRUSSES)(FLOOR JOISTS)(FLOOR TRUSSES)DETAILS SHOWN ABOVE AREALTERNATIVE CONNECTIONS TO BEUSED WHEN BRACED WALL PANELDOES NOT ALIGN WITH FRAMING.EXTERIOR NON-BEARING WALLFRAME 2x4 BOXAROUND SPACEBETWEEN TRUSS w/SAME SHEATHINGAND FASTENING ASWALL BELOW(OR REPLACE w/ADEQUATE DEPTH2x MEMBER)#12 x 312" WOODSCREWS @ 16" O.C.INSTALLED INADDITION TO NAILS(MAIN/UPPERLEVEL ROOFTRUSS BEARINGWALLS ONLY)#12 x 312" WOODSCREWS @ 16" O.C.INSTALLED INADDITION TO NAILS(MAIN/UPPERLEVEL ROOFTRUSS BEARINGWALLS ONLY)EXTERIOR BEARING WALLREPRESENTSFIGURER602.10.8.2(3)INDICATES INTERIOR BRACED WALL PANEL w/ GYPSUMSHEATHING BOTH FACES WITH EITHER FASTENER OPTIONLISTED IN NOTE 3, SPACED AT 4" O.C. PROVIDE INCREASEDFASTENING REQUIREMENTS AS SHOWN BELOW.INDICATES ENGINEERED WIND RESISTING ELEMENTS TOBE CONSTRUCTED AS SHOWN IN THE DETAIL SHEETS.(MIN. LENGTH)INDICATES EXTERIOR BRACED WALL PANEL w/ SHEATHING ONEXTERIOR FACE IN ACCORDANCE w/ NOTE 2. PROVIDEINCREASED FASTENING REQUIREMENTS AS SHOWN BELOW.(MIN. LENGTH)w/ JOISTSw/ TRUSSESw/ JOISTSw/ TRUSSESw/ JOISTSw/ TRUSSESw/ JOISTSw/ TRUSSESSCOPEDESIGN AND DETAIL OF THE MAIN WINDFORCE RESISTING SYSTEM FOR A SINGLE-FAMILY RESIDENCE. CONSTRUCTION ISTO BE IN ACCORDANCE WITH THIS DOCUMENT, STANDARD INDUSTRY PRACTICE, AND THE CODE.NOTES1.THESE DOCUMENTS APPLY TO STRUCTURAL ONLY. REFER TO CONSTRUCTION DOCUMENTS FOR MORE INFORMATION.2.ALL EXTERIOR WALLS ARE TO BE CONSTRUCTED IN ACCORDANCE WITH THE FOLLOWING CRITERIA, U.N.O., WHICHMEETS OR EXCEEDS THE REQUIREMENTS OF CODE SECTION R602.10.4-WSP AND CS-WSP.A.2x6 STUDS SPACED @ 16" O.C.B.EXTERIOR SHEATHING: 716" MIN. STRUCTURAL PANEL SHEATHING w/ 8d COMMON NAILS @ 6" O.C AT PANEL EDGESAND 12" O.C. AT INTERMEDIATE SUPPORTS OR 134" 16 GAUGE STAPLES @ 3" / 6" SPACING.3.ALL INTERIOR WALLS ARE TO BE CONSTRUCTED IN ACCORDANCE WITH THE FOLLOWING CRITERIA, U.N.O.A.2x4 OR 2x6 STUDS SPACED @ 16" O.C.B.WALL SHEATHING: 12" MIN. GYPSUM SHEATHING FASTENED TO FRAMING w/ 5d COOLER NAILS @ 8" O.C. MAX. ORTYPE S/W WALLBOARD SCREWS @ 16" O.C. MAX. (58" MINIMUM STUD PENETRATION)4.ALL FLOORS ARE TO BE CONSTRUCTED IN ACCORDANCE WITH THE FOLLOWING CRITERIA.A.FLOOR FRAMING SPACED AT A MAXIMUM OF 24" O.C.B.FLOOR SHEATHING: 34" STRUCTURAL PANEL SHEATHING w/ 8d COMMON NAILS @ 6" O.C AT PANEL EDGES AND 12"O.C. AT INTERMEDIATE SUPPORTS.5.ALL ROOFS ARE TO BE CONSTRUCTED IN ACCORDANCE WITH THE FOLLOWING CRITERIA.A.ROOF FRAMING SPACED AT A MAXIMUM OF 24" O.C.B.FASTEN ALL ROOF FRAMING TO TOP PLATES WITH SIMPSON H2.5 CLIP OR EQUIVALENT AND (4) 0.131"Ø x 3"TOENAILS.C.ROOF SHEATHING: 12" STRUCTURAL PANEL SHEATHING w/ 8d COMMON NAILS @ 6" O.C AT PANEL EDGES AND 12"O.C. AT INTERMEDIATE SUPPORTS OR 134" 16 GAUGE STAPLES @ 3" / 6" SPACING.6.ALONG LENGTH OF WALLS, LAP WALL TOP PLATES A MINIMUM OF 24" AND FASTEN TOGETHER WITH (12) 0.131"Ø x 3" INLAP ZONE. AT CORNERS AND INTERSECTIONS, LAP PLATES AND PROVIDE (3) 0.131"Ø x 3" FACE NAILS.7.CONNECTIONS NOT SPECIFICALLY NOTED ARE TO BE IN ACCORDANCE WITH CODE TABLE R602.3(1).8.TALL WOOD WALL FRAMING IS TO BE DESIGNED BY SUPPLIER FOR GRAVITY AND OUT-OF-PLANE WIND LOADS.9.THE ENTRY PORCH IS CONSIDERED TO BE A PRIMARILY OPEN, NON-ESSENTIAL PORTION OF THE STRUCTURE AND ISEXCLUDED FROM THE OVERALL MAIN WINDFORCE SYSTEM OF THE HOME. PROVIDE CODE REQUIRED UPLIFTCONNECTIONS AT ALL POSTS.MATERIALSWALL STUDS (10' OR LESS):SPF STUD GRADE OR BETTERWALL STUDS (OVER 10'):SPF NO.2 GRADE OR BETTERDIMENSIONAL LUMBER:SPF NO.2 GRADE OR BETTERTREATED LUMBER:SYP NO.2 GRADE OR BETTERLSL:134" WIDTH - 1.55E OR BETTERLVL:134" WIDTH - 1.9E OR BETTERLOADSROOF SNOW LOAD: 35-42 PSFROOF DEAD LOAD: 15 PSFFLOOR LIVE LOAD: 40 PSFFLOOR DEAD LOAD: 15 PSFWIND LOAD:115 MPH ULTIMATE EXP. BCODE2020 MINNESOTA RESIDENTIAL CODEHARDWAREALTERNATETABLESIMPSONPRODUCTUSPPRODUCTA34MP34A35MPA1H2.5RT7HTT5HTT45LSTASTRAPSAMELTP4MP4FMSTCSTRAPSAMESTHD14/RJSTAD14/RJTITEN HDWEDGEBOLTHARDWARE IN SAMEROW MAY BE USEDINTERCHANGEABLYIN THIS DOCUMENTROOF TRUSSESFASTENED TO PLATESw/ (4) 0.131"Ø x 3"TOENAILS & SIMPSONH2.5 CLIPNAIL BOTTOM PLATETO RIM/JOIST/BLOCKING w/ (3) 16dNAILS EVERY 16"NAIL BOTTOM PLATETO RIBBON BRACE /TRUSS w/ (3) 16dNAILS EVERY 16"NAIL EACH JOIST TOTOP PLATES w/ (3)0.131"Ø x 3" NAILS2x4 BLOCKINGBETWEENTRUSSES NAILEDTO TOP PLATESw/ (3) 0.131"Ø x 3"NAILS EACHNAIL EACH TRUSS TOTOP PLATES w/ (3)0.131"Ø x 3" TOENAILSROOF TRUSSFASTENED TOPLATES w/0.131"Ø x 3"TOENAILS@ 6" O.C.NAIL BOTTOMPLATE TO RIM/JOIST/BLOCKINGw/ (3) 16d NAILSEVERY 16"NAIL RIM TOPPLATES w/0.131"Ø x 3"TOENAILS@ 6" O.C.NAIL BOTTOMPLATE TO LADDERTRUSS w/ (3) 16dNAILS EVERY 16"NAIL LADDERTRUSS TO TOPPLATES w/0.131"Ø x 3"NAILS @ 6" O.C.INTERIOR WALLPERPENDICULAR TO FRAMINGINTERIOR WALLPARALLEL w/ FRAMING2x4 BLOCKING BETWEENROOF TRUSSES NAILEDTO TOP PLATES w/ (3)0.131"Ø x 3" NAILS EACHNAIL BOTTOM PLATE TOBLOCKING w/ (3) 16dNAILS EVERY 16"PROVIDE FULL DEPTHBLOCKING BETWEEN JOISTSNAILED TO TOP PLATES w/(3) 0.131"Ø x 3" NAILS EACHNAIL EACH JOIST TO TOPPLATE w/ (3) 0.131"Ø x 3" NAILSNAIL BOTTOM PLATE TOBLOCKING w/ (3) 16dNAILS EVERY 16"PROVIDE FULL DEPTHBLOCKING BETWEEN TRUSSESNAILED TO TOP PLATES w/(3) 0.131"Ø x 3" NAILS EACHNAIL EACH TRUSS TO TOP PLATEw/ (3) 0.131"Ø x 3" TOENAILSPROVIDE ROOF TRUSSDIRECTLY IN LINE w/BRACED WALL PANELFASTENED TO PLATESw/ 0.131"Ø x 3"TOENAILS @ 6" O.C.NAIL BOTTOM PLATETO BLOCKING w/ (3)16d NAILS EVERY 16"PROVIDE JOIST DIRECTLYIN LINE w/ BRACED WALLPANEL FASTENED TOPLATES w/ 0.131"Ø x 3"TOENAILS @ 6" O.C.NAIL BOTTOM PLATETO BLOCKING w/ (3)16d NAILS EVERY 16"PROVIDE TRUSS DIRECTLYIN LINE w/ BRACED WALLPANEL FASTENED TOPLATES w/ 0.131"Ø x 3"TOENAILS @ 6" O.C.(4-FT)(4-FT) (4-FT)(4-FT)(4-FT)(4-FT)(4-FT)(3.5-FT)(4-FT)(4-FT)BRACED WALL LINE BRACED WALL LINEBRACEDWALL LINEBRACEDWALL LINEBRACEDWALL LINE(3.5-FT)(3.5-FT)(3.5-FT)(2-FT)(8-FT)(8-FT) (4-FT)(4-FT)(5-FT)(5-FT) (6-FT)(3.5-FT)(3.5-FT)(4-FT)(4-FT)(4-FT)(5-FT)(5-FT)(5-FT)BRACED WALL LINE BRACED WALL LINE BRACED WALL LINE BRACEDWALL LINEBRACEDWALL LINEBRACEDWALL LINE(6-FT)(4-FT)(5-FT)(5-FT)BRACED WALL LINE BRACED WALL LINE (5-FT)(5-FT)(5-FT)BRACED WALL LINE (6-FT)(6-FT)(4-FT)(5-FT)(5-FT)BRACED WALL LINE BRACED WALL LINE (5-FT)(5-FT)(5-FT)BRACED WALL LINE (8-FT)(8-FT) (8-FT)UPPER LEVEL HOUSE PLAN SHOWNFOR LOCATION REFERENCE ONLY(ACTUAL LAYOUT MAY BE MIRRORED)3S3REFERENCE PLANw/ 3-CAR & 4-CAR GARAGESMAIN LEVEL HOUSE PLAN SHOWNFOR LOCATION REFERENCE ONLY(ACTUAL LAYOUT MAY BE MIRRORED)2S3REFERENCE PLANw/ 3-CAR GARAGEw/ 4-CAR GARAGECONSTRUCT PORTAL FRAME AS SHOWN IN 1/S4(SHIFT OUTWARD 4'-0" w/ GARAGE BUMP-OUT OPTION,REMAINING WALL BRACING TO REMAIN UNCHANGED)CONSTRUCT PORTAL FRAME AS SHOWN IN 2/S4(SHIFT OUTWARD 4'-0" w/ GARAGE BUMP-OUT OPTION,REMAINING WALL BRACING TO REMAIN UNCHANGED)CONSTRUCT PORTAL FRAME AS SHOWN IN 2/S4(SHIFT OUTWARD 4'-0" w/ GARAGE BUMP-OUT OPTION,REMAINING WALL BRACING TO REMAIN UNCHANGED)(5-FT)(5-FT)(5-FT)BRACEDWALL LINE(5-FT)(5-FT)(5-FT)BRACEDWALL LINEPARTIAL LOWER LEVEL HOUSE PLANSHOWN FOR LOCATION REFERENCE ONLY(ACTUAL LAYOUT MAY BE MIRRORED)1S3REFERENCE PLANTHE REQUIREMENTS SHOWN DIRECTLY ABOVE ONLY APPLY TO WALKOUT FOUNDATIONSTHE REQUIREMENTS SHOWN DIRECTLY ABOVE ONLY APPLY TO LOOKOUT FOUNDATIONS ©DateRevisionApril 2, 2020Project Number:Date:0.136S42Sheets: of2Print Name:Signed: License Number:Ryan Mack46673Date:I hereby certify that this plan, specification or reportwas prepared by me or under my direct supervisionand that I am a duly Licensed Professional Engineerunder the laws of the State of Minnesota.3407 Kilmer Lane NSuite 4Plymouth, MN 55441Tel 612-708-3572www.hansongroupmn.comBRACED WALL PANELFASTEN BOTTOM PLATE TOJOIST/BLOCKING w/ (3) 16dNAILS EVERY 16" O.C.CANTILEVERED FLOORJOIST BY SUPPLIERFRAMEWALL / BRACEDWALL PANEL BELOWBLOCKING BETWEEN JOISTS AS FOLLOWS:·FLAT 2x4 TOP & BOTTOM OR JOISTMATERIAL OR SAWN BLOCKING·34" PLYWOOD SHEET NAILED TO 2x4's w/(8) 8d NAILS TOP & BOTTOM·CIRCULAR HOLE UP TO 6"Ø MAY BE CUTINTO CENTER OF PLYWOODNAIL FLOOR SHEATHING TOBLOCKING w/ 8d NAILS @ 6" O.C.FASTEN BOTTOM 2x4 w/ (3) 16dNAILS EVERY 16" O.C. SECTION 4S4AT BRACED WALL PANELS ABOVECANTILEVERED FLOOR FRAMINGLennar Corporation16305 36th Ave N. Suite 600Plymouth, MN 55446 Lewis/EK05 ModelAll ElevationsMinnesota Construction4-2-20DescriptionCOPYRIGHT HANSON GROUP, LLC 2020S4FRAMING DETAILGARAGE FRONT PORTAL FRAME2NOTEINFO APPLIES SYMMETRICALLY ACROSS DETAIL.16'-3"±NOT TO EXCEED 12'-0"FASTEN TOP PLATE TO HEADER w/ (2)ROWS 16d SINKER NAILS @ 3" O.C.(1) 2x6 BEARING STUD & (1) 2x6 FULLHEIGHT STUD EACH END OF HEADERLOCATE PANEL JOINT WITHIN 2'-0" FROMCENTER OF HEADER HEIGHT AS REQ'D (2x SOLIDBLOCKING REQUIRED AT SHEATHING JOINT)(2) 2x6 BEARING STUDS MIN.(VERIFY w/ SUPPLIER)PROVIDE 2x6 INFILL WALLABOVE HEADER AS REQ'DSIMPSON STHD14 EMBEDDED HOLDOWNANCHOR AT LOCATIONS SHOWN(REFER TO 3/S4 FOR ALTERNATIVE OPTION)FOUNDATION WALL BELOWLENGTH OF CONTINUOUS HEADER58" Ø ANCHOR BOLT (7" MIN. EMBED)w/ 2" x 2" x 316" PLATE WASHERNAIL SHEATHING TO HEADER w/ 8dNAILS @ 3" O.C. EA. WAY TYP.SMALL HATCH AREA INDICATES 716" ORTHICKER PLYWOOD OR OSB SHEATHINGAPPLIED TO EXTERIOR SIDE OF STUDS(NAIL SHEATHING AROUND PERIMETER w/ (2)ROWS 8d NAILS @ 3" O.C. STAGGERED & TOPLATES / BLOCKING @ 3" O.C.)SIMPSON MSTC40 STRAP ON INSIDE FACEOF WALL (PROVIDE SPACER TO FLUSHOUT HEADER TO WALL STUD THICKNESS)FASTEN KING STUD TO HEADER w/(2) ROWS 16d SINKER NAILS @ 3" O.C.LARGE HATCH AREA INDICATES 716" OR THICKERPLYWOOD OR OSB SHEATHING APPLIED TO EXTERIORSIDE OF STUDS w/ STANDARD 6"/12" NAILINGFASTEN FRAMING ABOVE AS SHOWNFOR BRACED WALL PANELS1'-1012"±CONTINUOUS LSL/LVL HEADER TOSUPPORT VERTICAL LOADS BY SUPPLIER(MIN.312" WIDTH & MIN.1114" DEPTH REQ'D)1'-1012"±NOTESECTION ONLY APPLIES WHEN BRACED WALLPANELS ARE LOCATED ABOVE FLOORCANTILEVER. SEE PLAN FOR APPLICABILITY.ALTERNATEHOLDOWN AALTERNATEHOLDOWN BPOST-INSTALLED HOLDOWN OPTIONS3S4FRAMING DETAILUSP HTT45 HOLDOWNANCHOR AT LOCATIONSSHOWN NAILED TO DOUBLESTUDS & 12"Ø x 12" LONGSIMPSON TITEN HD SCREW-INANCHOR INTO CONCRETEUSP MSTCM40 STRAP ATLOCATIONS SHOWN NAILEDTO DOUBLE STUDS & 14" x214" CONCRETE SCREWS(TAPCON, TITEN, OR EQUIV.)INTO FOUNDATIONCONCRETEFOUNDATIONBELOWALTERNATE B HOLDOWNS ARE TO HAVECORROSION PROTECTION BY OTHERSIF USED IN AN EXTERIOR APPLICATIONEXPOSED TO THE ELEMENTS.S4FRAMING DETAILGARAGE FRONT PORTAL FRAME1NOTEINFO APPLIES SYMMETRICALLY ACROSS DETAIL.16'-3"±NOT TO EXCEED 12'-0"FASTEN TOP PLATE TO HEADER w/ (2)ROWS 16d SINKER NAILS @ 3" O.C.(1) 2x6 BEARING STUD & (1) 2x6 FULLHEIGHT STUD EACH END OF HEADERLOCATE PANEL JOINT WITHIN 2'-0" FROMCENTER OF HEADER HEIGHT AS REQ'D (2x SOLIDBLOCKING REQUIRED AT SHEATHING JOINT)PROVIDE 2x6 INFILL WALLABOVE HEADER AS REQ'DSIMPSON STHD14 EMBEDDED HOLDOWNANCHOR AT LOCATIONS SHOWN(REFER TO 3/S4 FOR ALTERNATIVE OPTION)FOUNDATION WALL BELOWLENGTH OF CONTINUOUS HEADER(2) 58" Ø ANCHOR BOLTS (7" MIN. EMBED)w/ 2" x 2" x 316" PLATE WASHERSNAIL SHEATHING TO HEADER w/ 8dNAILS @ 3" O.C. EA. WAY TYP.SMALL HATCH AREA INDICATES 716" ORTHICKER PLYWOOD OR OSB SHEATHINGAPPLIED TO EXTERIOR SIDE OF STUDS(NAIL SHEATHING AROUND PERIMETER w/ (2)ROWS 8d NAILS @ 3" O.C. STAGGERED & TOPLATES / BLOCKING @ 3" O.C.)SIMPSON MSTC40 STRAP ON INSIDE FACEOF WALL (PROVIDE SPACER TO FLUSHOUT HEADER TO WALL STUD THICKNESS)FASTEN KING STUD TO HEADER w/(2) ROWS 16d SINKER NAILS @ 3" O.C.LARGE HATCH AREA INDICATES 716" OR THICKERPLYWOOD OR OSB SHEATHING APPLIED TO EXTERIORSIDE OF STUDS w/ STANDARD 6"/12" NAILINGFASTEN FRAMING ABOVE AS SHOWNFOR BRACED WALL PANELS2'-112"±CONTINUOUS LSL/LVL HEADER TOSUPPORT VERTICAL LOADS BY SUPPLIER(MIN.312" WIDTH & MIN.1114" DEPTH REQ'D)2'-112"±(2) 2x6 BEARING STUDS MIN.(3) 2x6 MIN. AT ELEVATION Bw/ 3 CAR GARAGE(VERIFY w/ SUPPLIER) 40,000 X X 40,000 2160 40,000 3000 3000 2160 3000 .72 .72 .28 40,000 40,000 13.33 13.33 .28 3.7 2.2 66,000 588 588 3918 240 375 375 -213 170 85 20490 Ginger Court Date Certificate Posted X Passive (No Fan) Active (With fan and monometer or other system monitoring device) Location (or future location) of Fan: Other Please Describe Here X R-15 X X X R-20 X R-20 X R-20 X R-49 X R-49 X R-30 X R-30 X Not applicable, all ducts located in conditioned space 8 X Not required per mech. code Passive Powered Interlocked with exhaust device. Describe: Input in BTUS:66,000 Capacity in Gallons:Other, describe: AFUE or HSPF% 93% Cfm's " round duct OR " metal duct Not required per mech. code X Passive X Low: Other, describe: Low: Location of fan(s), describe: Cfm's 6 " round duct OR " metal duct Balanced Ventilation capacity in cfms:Mech Room Capacity continuous ventilation rate in cfms: Total ventilation (intermittent + continuous) rate in cfms: 85 High: Energy Recover Ventilator (ERV) Capacity in cfms:High: Location of duct or system: Below Entire Slab Foundation Wall Perimeter of Slab on Grade Rim Joist (1st Floor) Rim Joist (2nd Floor+) Wall Ceiling, flat Interior R5 + R10 Exterior Interior Interior New Construction Energy Code Compliance Certificate Per R401.3 Certificate. A building certificate shall be posted on or in the electrical distribution panel.4/20/2022 Mailing Address of the Dwelling or Dwelling Unit City Lakeville20490 Ginger Court Name of Residential Contractor MECHANICAL VENTILATION SYSTEM Describe any additional or combined heating or cooling systems if installed: (e.g. two furnaces or air source heat pump with gas back-up furnace): Combustion Air Select a Type Select Type Heat Recover Ventilator (HRV) Capacity in cfms:170 MN License Number Lennar 1413 THERMAL ENVELOPE RADON CONTROL SYSTEM Type: Check All That Apply Insulation Location Total R-Value of all Types of InsulationNon or Not ApplicableFiberglass, BlownFiberglass, BattsFoam, Closed CellFoam Open CellMineral FiberboardRigid, Extruded PolystyreneRigid, IsocynurateResidential Load Calculation Heating Loss Heating Gain Cooling Load 52,931 21,860 27,665 13 Location of duct or system: Rating or Size 50 Output in Tons:2.5 Efficiency SEER /EER Nat Gas Nat Gas Elect GPVL-50 13ACXN030-230 Fuel Type Manufacturer Lennox AOSmith Lennox Model ML193UH070XE36B Average U-Factor (excludes skylights and one door ) U: 0.31 Solar Heat Gain Coefficient (SHGC):0.29 R-value MECHANICAL SYSTEMS Make-up Air Select a Type Appliances Heating System Domestic Water Heater Cooling System Duct system air tightness: Heating or Cooling Ducts Outside Conditioned Spaces Ceiling, vaulted Bay Windows or cantilevered areas Floors over unconditioned area Describe other insulated areas Building envelope air tightness: Windows & Doors 000000Builders Associaton of Minnesota version 101014 NEW RESIDENTIAL CONSTRUCTION SWPPP VERIFICATION This form must be completed and submitted with all new residential permit applications. New residential building permits WILL NOT be issued without this completed form. Project Site Address: _____________________________________________________________________ Company Name: _________________________________________________________________________ Primary Contact: _________________________________________________________________________ Phone # (24 hr Contact): ______________________ Email: ______________________________________ Description of Land Disturbing Activity: _____________________________________________________ NPDES Construction Stormwater Permit # C000 ___ ___ ___ ___ ___ or # SUB00 ___ ___ ___ ___ ___ If you are not covered under a NPDES Construction Stormwater Permit administered by the MPCA, an erosion and sediment control plan MUST be submitted with the residential building permit application. “The permittee(s) shall ensure that the individuals are trained by local, state, federal agencies, professional organizations or other entities in erosion prevention, sediment control, permanent Stormwater management and the Minnesota NPDES/SDS Construction Stormwater Permit.”(NPDES Construction Stormwater Permit, MPCA) “The permittee(s) must ensure that a trained person (as identified in Part III.A.3.a) will routinely inspect the entire construction site at least once every seven (7) days during active construction and within 24 hours after a rainfall event greater than 0.5 inches in 24 hours.” (NPDES Construction Stormwater Permit, MPCA) Contact information of person CERTIFIED to provide weekly onsite erosion and sediment control inspections and corrective actions: Name of Person: ________________________________Company: _______________________________ Phone # (24 hr Contact): ______________________ Email: ______________________________________ Entity that Provided Training: ________________________ Certification Expiration Date: ____________ NOTE: Prior to any land-disturbing activity, all erosion and sediment controls must be installed on the project site and on individual lots. No land disturbing activity may begin until a residential building permit has been issued. I understand, the above information to be true and I will have read, understood, and accepted all terms and conditions of the National Pollutant Discharge Elimination System (NPDES) Permit (MN R 100001). The City of Lakeville may issue a STOP WORK ORDER; withhold building inspections; or, draw on securities/escrows to bring the site into compliance with the NPDES Construction Stormwater Permit (MN R 100001) or erosion and sediment control plan. Signature: ________________________________________________ Date:_________________________ Contact the City of Lakeville with questions at erosion@lakevillemn.gov or 952-985-4500 20490 Ginger Court US Home LLC dba Lennar Jesse Schwarzrock 612-346-2648 Jesse.Schwarzrock@Lennar.com Residential Development 57174 Chad Johnson Stantec 651-325-6860 chad.johnson@stantec.com University of Minnesota 5/31/23 4/20/2022Kurt NiskaDigitally signed by Kurt Niska Date: 2022.04.20 13:23:28 -05'00' 4/29/22 Y AM