HomeMy WebLinkAbout20745 Glade Avenue Survey*DROP GARAGE TOP OF BLOCK 0.67'*PHONE: 952.890.6044 www.jrhinc.com
PLANNERS / ENGINEERS / SURVEYORSDRAWN BYDATEREVISIONSCAD FILEPROJECT NO.SHEET 1 OF 12999 WEST C.R. 42, SUITE 100, BURNSVILLE, MN 55306
CERTIFICATE OF SURVEY
FOR
LT4/8/2022420416.dwg420416Lot 13, Block 4, CEDAR CROSSINGS
3RD ADDITION,
Dakota County, Minnesota 1. Bearings are based on the recorded plat.2. Building dimensions shown are for horizontal and vertical placement ofstructure only. See architectural plans for building and foundationdimensions.3. No specific soils investigation has been completed on this lot by JamesR. Hill, Inc. the suitability of soils to support the specific house proposedis not the responsibility of James R. Hill, Inc. or the surveyor.4. No specific title search for existence or non-existence of recorded orun-recorded easements has been conducted by the surveyor as a partof this survey. Only easements per the recorded plat are shown.5. Proposed grades shown were taken from the grading &/ordevelopment plan prepared by James R. Hill, Inc.6. Grading plan date/revision date: May 6, 20217. Plan No. 3035-C 'FINNEGAN'NOTESLot = 10,297 sq. ft.House/Garage = 2,461 sq. ft.Porch = 122 sq. ft.Driveway = 705 sq. ft.Sidewalk = 76 sq. ft.Patio = 18 sq. ft.Total Impervious = 3,382 sq. ft. or 32.84% of lotHARD COVER CALCULATIONSProposedGarage Floor @ Front = 976.43Garage Top of Foundation = 976.83House Top of Foundation = 977.5Lowest Floor = 974.3Lot 13, Block 4, CEDAR CROSSINGS 3RD ADDITION, Dakota County, MinnesotaPROPERTY DESCRIPTION20745 Glade Avenue, Lakeville, MinnesotaPROPERTY ADDRESSI hereby certify that this survey, plan or report was prepared by me or undermy direct supervision and that I am a duly Licensed Land Surveyor under thelaws of the State of Minnesota. That this survey does not purport to show allimprovements, easements or encroachments, to the property except asshown thereon.Signed this 8th day of April, 2022Marcus F. Hampton, MN L.S. No. 47481SURVEYOR'S CERTIFICATEFLOOR ELEVATIONSTop nut of hydrant located at Lot 10, Block 2 = 970.93BENCHMARKDenotes set spikeDenotes set iron monumentDenotes found iron monumentDenotes found scribed "x"Denotes set hubDenotes proposed drainageDenotes top of curbDenotes existing elevationDenotes proposed elevationZoning = RS-4FY - 20' House, 25' GarageSY - 7' Interior, 20' CornerRY - 30'SY Buffer - 30'RY Buffer - 50'The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.*Draintile connection required.EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION*Maintain 6" between bottom of siding and sod.*No structures in easements.ENGINEERING REVIEWEDDate:__________________05/06/2022lritchie