Loading...
HomeMy WebLinkAbout17948 Gresford Lane-SURVEYPlanning DepartmentApprovedDate:__________________04/29/2022 kjenson The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies will be released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection. EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION *Maintain 6" between bottom of siding and sod.*No structures in easements. ENGINEERING REVIEWED Date:__________________05/06/2022 lritchie